Europaudvalget 2009
SEK (2009) 1336
Offentligt
EN
EN
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0002.png
COMMISSION OF THE EUROPEAN COMMUNITIES
Brussels, 14.10.2009
SEC(2009) 1336
COMMISSION STAFF WORKING DOCUMENT
MONTENEGRO 2009 PROGRESS REPORT
accompanying the
COMMUNICATION FROM THE COMMISSION
TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
Enlargement Strategy and Main Challenges 2009-2010
{COM(2009) 533}
EN
EN
PDF to HTML - Convert PDF files to HTML files
TABLE OF CONTENTS
1.
1.1.
1.2.
1.3.
2.
2.1.
2.2.
2.3.
3.
3.1.
3.2.
4.
4.1.
4.1.1.
4.1.2.
4.1.3.
4.1.4.
4.1.5.
4.1.6.
4.1.7.
4.1.8.
4.1.9.
Introduction .................................................................................................................. 4
Preface.......................................................................................................................... 4
Context ......................................................................................................................... 4
Relations between the EU and Montenegro................................................................. 5
Political criteria ............................................................................................................ 6
Democracy and the rule of law .................................................................................... 6
Human rights and the protection of minorities .......................................................... 13
Regional issues and international obligations ............................................................ 18
Economic criteria ....................................................................................................... 20
The existence of a functioning market economy ....................................................... 20
The capacity to cope with competitive pressure and market forces within the Union
.................................................................................................................................... 25
European standards .................................................................................................... 27
Internal market ........................................................................................................... 27
Free movement of goods............................................................................................ 27
Movement of persons, services and right of establishment ....................................... 29
Free movement of capital........................................................................................... 30
Customs and taxation ................................................................................................. 31
Competition................................................................................................................ 32
Public procurement .................................................................................................... 32
Intellectual property law ............................................................................................ 33
Social policies, employment and public health policy............................................... 34
Education and research .............................................................................................. 35
4.1.10. WTO issues ................................................................................................................ 36
4.2.
4.2.1.
4.2.2.
4.2.3.
4.2.4.
Sectoral Policies ......................................................................................................... 36
Industry and SMEs..................................................................................................... 36
Agriculture and fisheries ............................................................................................ 37
Environment............................................................................................................... 38
Transport policy ......................................................................................................... 40
EN
2
EN
PDF to HTML - Convert PDF files to HTML files
4.2.5.
4.2.6.
4.2.7.
4.2.8.
4.3.
4.3.1.
4.3.2.
4.3.3.
4.3.4.
4.3.5.
4.3.6.
Energy ........................................................................................................................ 42
Information society and media................................................................................... 43
Financial control......................................................................................................... 44
Statistics ..................................................................................................................... 44
Justice, freedom and security ..................................................................................... 45
Visa, bordermanagement, asylum and migration....................................................... 45
Money laundering ...................................................................................................... 47
Drugs .......................................................................................................................... 49
Police.......................................................................................................................... 49
Fighting organised crime and terrorism ..................................................................... 50
Protection of personal data......................................................................................... 52
STATISTICAL ANNEX..........................................................................................................
53
EN
3
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0005.png
COMMISSION STAFF WORKING DOCUMENT
Montenegro 2009 Progress Report
1.
1.1.
I
NTRODUCTION
Preface
Since March 2002 the Commission has reported regularly to the Council and the Parliament
on progress made by the countries of the Western Balkans region.
The Commission issued progress reports focusing exclusively on Montenegro since 2006.
This report:
– briefly describes relations between Montenegro and the Union;
– analyses the political situation in Montenegro in terms of democracy, the rule of law,
human rights, protection of minorities and regional issues;
– analyses the economic situation in Montenegro;
– reviews Montenegro’s capacity to implement European standards, i.e. to gradually
approximate its legislation and policies to the
acquis,
in line with a Stabilisation and
Association Agreement and the European Partnership priorities.
This report covers the period from early October 2008 to mid-September 2009. Progress is
measured on the basis of decisions taken, legislation adopted and measures implemented. As a
rule, legislation or measures which are being prepared or awaiting parliamentary approval
have not been taken into account. This approach ensures equal treatment across all reports and
permits an objective assessment.
The report is based on information gathered and analysed by the Commission. Many
additional sources have been used, including contributions from the government of
Montenegro and from the EU Member States, European Parliament reports
1
and information
from various international and non-governmental organisations.
The Commission draws detailed conclusions regarding Montenegro in its separate
communication on enlargement
2
, based on the technical analysis contained in this report.
1.2.
Context
Montenegro is a potential candidate for EU membership. The Stabilisation and Association
Agreement between Montenegro and the EU was signed in October 2007. An Interim
Agreement was signed on the same date and entered into force in January 2008. The
1
2
The rapporteur for Montenegro until September was Mr. Marcello Vernola. Since September, the new
rapporteur is Mr. Charles Tannock.
Enlargement Strategy and Main Challenges 2009-2010 (COM(2009) 533 of 14.10.2009).
EN
4
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0006.png
Commission delegation in Montenegro has been operational since November 2007. In
December 2008 Montenegro applied for membership of the European Union. In April 2009
the Council decided to implement the procedure laid down in Article 49 of the Treaty on
European Union. Accordingly, the Commission was requested to submit to the Council its
Opinion on the application by Montenegro. The Commission started work on its Opinion by
sending Montenegro a comprehensive list of questions relating to the Copenhagen criteria and
the conditions set for the stabilisation and association process. This report in no way
prejudges the analysis to be made by the Commission in its Opinion on Montenegro’s
application for EU membership.
1.3.
Relations between the EU and Montenegro
Montenegro is participating in the
Stabilisation and Association Process.
Implementation of
the
Interim Agreement
(IA) has continued. Ratification of the
Stabilisation and
Association Agreement
(SAA) progressed. By 1 September 2009 22 EU Member States had
confirmed ratification of the SAA. Montenegro is continuing to implement its commitments
under the SAA and to prepare for full implementation of the SAA once it is ratified. This is a
key priority of the European Partnership. The bodies provided for by the Interim Agreement
operated smoothly.
The EU is providing guidance to the Montenegrin authorities on reform priorities as part of
the
European Partnership.
3
Implementation of the European Partnership by Montenegro is
progressing. Dialogue on European integration issues continued in the enhanced permanent
dialogue and in the bodies provided for by the Interim Agreement. In March 2009 a
political
dialogue
was held between the EU (troika) and Montenegro.
The visa facilitation and readmission agreements between Montenegro and the European
Community continued to be implemented. In the framework of the
visa liberalisation
dialogue, Montenegro has made important progress in the areas of justice, freedom and
security and has fulfilled the majority of the roadmap benchmarks. Therefore, the
Commission proposed in July 2009 lifting the visa obligation for Montenegrin citizens. This
proposal is subject to Montenegro meeting the outstanding criteria before the Council of the
EU takes its decision, after consultation of the European Parliament.
As a potential candidate for EU membership, Montenegro aligned itself with 121 CFSP
declarations from a total of 128 relevant declarations adopted by the EU during the reporting
period.
Since 2007 Montenegro has been receiving pre-accession
financial assistance
from the
Instrument for Pre-Accession Assistance (IPA), which is being implemented by the European
Commission delegation in Podgorica since September 2008. Montenegro has continued to
prepare for decentralised management of EC aid.
In 2009 a total of €33.3 million was allocated to Montenegro. The main focus areas are rule of
law, including justice and police reform, labour and safety at work, environmental protection
railways, State financial management and audit, and alignment to internal market legislation.
EU financial support has been provided to
civil society
development under the Civil Society
Facility. Under the national IPA programme for 2009, €2.2 million have been earmarked for
3
Council Decision 2007/49/EC.
EN
5
EN
PDF to HTML - Convert PDF files to HTML files
projects aiming to enhance civil society organisations contribution to the social, economic and
political development of Montenegro, in areas such as social welfare, special education,
preventive health, inter-cultural dialogue, transparency and accountability of the public
administration, judiciary and parliament.
In response to the economic crisis, an IPA
crisis package
has been created, comprising €200
million for the Western Balkan region which are expected to leverage investments of at least
€1 billion, co-financed by the partner financial institutions. The country will benefit from a
share of multi-beneficiary funds for competitiveness, SMEs, energy efficiency and banking
sector regulation. In addition, the country benefits from Montenegro-earmarked multi-
beneficiary funds to accelerate the infrastructure investments. €5 million were committed to
the Infrastructure Project Facility for a project on water infrastructure in mountain
municipalities.
Provisional application of Protocol 8 of the SAA started in November 2007. As a result,
Montenegro can join
Community programmes
which are open to Western Balkan countries.
Montenegro participates in the 7th Framework Programme for research and technological
development and in the specific programme on entrepreneurship and innovation, which is part
of the Competitiveness and Innovation Framework Programme (2007-2013). Montenegro is at
the final stage of its preparations to participate in the European Community’s Culture
Programme.
2.
P
OLITICAL CRITERIA
This section examines the progress made by Montenegro towards meeting the Copenhagen
political criteria, which require stability of institutions guaranteeing democracy, the rule of
law, human rights and respect for and protection of minorities. It also monitors regional
cooperation, good neighbourly relations with enlargement countries and Member States and
compliance with international obligations, such as cooperation with the International Criminal
Tribunal for the former Yugoslavia (ICTY).
2.1.
Democracy and the rule of law
Constitution
Establishment of the legal and institutional set-up required for an independent country, which
is a key European Partnership priority, is almost complete. One of the last pieces of legislation
required, the Law on State Property which regulates ownership and transfer of State and
municipal property, was adopted. The deadline for adoption of legislation provided for by the
Law on Implementation of the Constitution was further extended to April 2010.
Parliament
In January 2009 parliament adopted a decision to call early elections, which were held in
March 2009. According to the international election observation mission led by the
OSCE/ODIHR, the elections met almost all international and European commitments.
However, remaining shortcomings and challenges still need to be addressed. The electoral
framework has to be harmonised with the Constitution, including on minority representation.
Further work is also needed on ensuring full separation between State and party structures in
the electoral administration and ensuring transparent allocation of parliament seats. A new
EN
6
EN
PDF to HTML - Convert PDF files to HTML files
Law on State Property provides a framework ensuring clear separation of State and party
premises, including during elections, but has yet to be implemented.
Voter turn-out in the parliamentary elections was less than in the previous elections but
remained high at 66%. The coalition for European Montenegro led by outgoing Prime
Minister Milo Djukanovic increased its majority and won 48 out of 81 seats.
There has been some progress in the work and functioning of parliament. Work on
strengthening political consensus, particularly on European integration issues, has continued.
The National Council for EU Integration continued to contribute to EU integration. The
government reported on progress with EU integration at every session of the Committee for
International Relations and European Integration. This further raised the level of involvement
of this committee in the integration process. As regards control mechanisms, this committee
called ministers to hearings on several occasions.
Parliament adopted 124 laws, which is a 30% increase compared to 2007. This intense
activity is welcome as Montenegro continues to complete its legal framework following
independence and taking into account alignment with the
acquis communautaire.
However,
parliament's capacity to scrutinise legislation and monitor its implementation needs to be
enhanced.
In December 2008 a new set of rules on organisation of the parliamentary administration were
adopted. The rulebook provides for establishment of six more ‘bureaus’ within the
Parliament's Administration Service, including a Bureau for EU Integration. One of its tasks
is to give an independent assessment of alignment of draft legislation with the
acquis.
The
new rules provide for increasing the parliamentary administration’s human resources. A part
of these resources has already been made available. Further efforts have been made to provide
for staff training.
Steps have been taken to improve use of the working bodies and observance of the rules of
procedure. Efforts have been made to bring parliament closer to citizens, for example by
means of visits and brochures. Parliament continued its work on oversight of defence and
security bodies,
inter alia
by organising a hearing of the director of the police in December
2008. This practice needs to continue and expand. Civilian and democratic oversight of
defence and security bodies is a key priority of the European Partnership.
The Committee for International Relations and EU Integration has upgraded its contacts with
the European Parliament. It holds the chairmanship of the conference of the parliamentary
committees for EU integration of Western Balkan countries for 2008-2009. In this context,
Montenegro successfully hosted a well-attended regional parliamentary conference in Cetinje
in March 2009.
Parliament’s work and operation still need to be consolidated in several areas. Planning needs
to be improved. Inspection and control mechanisms are underused. The supervisory role of
parliament generally remains weak.
At present administrative and other resources required for parliament’s work, including expert
support, remain insufficient. Staff and expert support for committees are rudimentary.
The temporary solution for TV coverage of parliamentary debates, following the
disagreement between the government and opposition on this topic, expired in March 2009.
EN
7
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0009.png
No solution has been proposed for the new parliament’s mandate. Until then public TV
committed to cover parliamentary debates in line with an earlier arrangement with political
parties.
Neither the newly established Bureau for EU integration nor the Committee for International
Relations and EU Integration yet have sufficient capacity to scrutinise independently
alignment of draft legislation with the EU
acquis.
Further progress remains necessary on mature and consensual functioning of parliament.
From October 2008 to March 2009 two opposition parties boycotted parliamentary work due
to the government’s recognition of the independence of Kosovo
4
. This boycott hindered
contribution of a diversity of views for development of new legislation.
Overall,
there have been some improvements in the functioning of parliament. The
parliamentary parties’ overall commitment to working on the basis of consensus, in particular
on EU integration, remains a solid basis for further democratic development. The National
Council for EU Integration has yet to achieve its full potential Further efforts are needed to
enhance parliament’s efficiency as a legislative and oversight body. Aligning electoral
legislation with the Constitution remains a priority.
Government
Following the March 2009 parliamentary elections, a new government headed by the outgoing
Prime Minister was elected by parliament in June 2009. It has three Deputy Prime Ministers
(DPMs), amongst them a new DPM for the political system, four new ministries (Ministry for
EU integration, Ministry for Environment and Urban Planning, Ministry of Labour and Social
Welfare and Ministry of Health).
Building on the 2009 work programme of the previous government, the new government
programme gives priority to European and Euro-Atlantic integration, dealing with the
consequences of the economic crisis and ensuring sustainable growth in Montenegro,
including raising the standard of living, balanced regional development and key infrastructure
projects. The fight against organised crime and corruption along with judicial reform continue
to be government priorities.
The government maintained
including civil society and
developing new legislation.
thorough needs assessment
implementation.
a strong pace for adoption of new legislation. Stakeholders,
international organisations, were continuously involved in
However, new legislation has not always been based on a
and on identification of priorities and of means for full
The management structures of most government bodies, including ministries, have not
substantially changed and in many cases remain over-centralised. Further strengthening of the
middle-management level would make decision-making more effective. The human resources
of the Secretariat for EU Integration (SEI) and line ministries have not been substantially
improved, due to government cost-cutting measures in response to the economic crisis.
Progress remains necessary on monitoring implementation of policies and laws and receiving
feedback.
4
Under UNSCR 1244/1999.
EN
8
EN
PDF to HTML - Convert PDF files to HTML files
The Deputy Prime Minister and the SEI consistently raised the profile of the EU integration
process and related requirements as Montenegro moved forward with its EU membership
application. The SEI made some progress on issues related to translation of EU texts and
efforts have been made to harmonise vocabulary used by State bodies on EU issues. A plan
was adopted to improve government cross-checking of draft legislation with the EU
acquis
by
means of an article-by-article check by the SEI. In June 2009 the SEI was converted into a
fully fledged Ministry for European Integration and the post of the Deputy Prime Minister
was converted to Minister for European Integration to head the new ministry. The new set-up
is expected to streamline coordination on European integration issues.
Awareness of EU integration issues within line ministries was further raised by organising
round tables on EU affairs for civil servants. The EU offices in line ministries have become
more effective as they have grown more familiar with the demands of their role. In general,
the standard of contributions by the Montenegrin authorities to regular meetings with the
European Commission under the stabilisation and association process has been maintained.
As regards local government, the 2009 action plan on local government reform was adopted
in March 2009. A joint central/local government commission reviewed draft legislation on
local governance. However, implementation of reforms remains limited. Implementation of
the 2008 local government action plan, under the supervision of a joint central/local
government commission, has not advanced very far. No report on implementation of the 2008
action plan has been adopted.
Overall,
the government has continued to put together the structures needed as a result of
independence. The framework for coordination of European integration activities has been
made more effective. Human resources in ministries and relevant agencies to address
European integration issues need to be further strengthened. Local self-government reform
remains a key challenge.
Public administration
Some progress has been made on upgrading the country’s administrative capacity and on
reforming the public administration, a key European Partnership priority.
A Law on State Property adopted in January 2009 defined State and municipal property and
clarified the ownership of premises used by State bodies. A Law on Conflicts of Interest of
Public Servants adopted in December 2008, provided a detailed definition of public officials
and increased transparency requirements in the public administration. A commission to
oversee compliance with the new Law was appointed in July 2009. A Law providing for
internal audit units in government bodies was adopted in November 2008, but implementation
has not yet started. These legal provisions strengthen the overall framework for transparency
and accountability. Establishment of the central human resources register by the human
resources management authority (HRMA) is almost complete. The HRMA continued to
conduct training programmes for civil servants Recruitment procedures to the public
administration are generally based on public vacancy announcements, but the concept of
merit-based recruitment and promotion of civil servants is not provided for in the legislation
and is not implemented in practice. Several activities have been organised to raise awareness
of job opportunities in the public sector. Overall, the HRMA lacks the administrative capacity
to promote and monitor implementation of the Civil Service Law.
EN
9
EN
PDF to HTML - Convert PDF files to HTML files
The Ombudsman’s Office dealt with 541 complaints in 2008, around 80 % of which were
resolved. As in previous years, the majority concerned the work of courts, in particular the
long duration of court proceedings, followed by the public administration, the prosecution
service and municipalities. Most recommendations made by the Ombudsman’s Office were
followed up. A Deputy Ombudsman for children's rights has been appointed in July 2009.
However, the Law on the Ombudsman has still to be fully aligned with the Constitution.
Further enhancement of the office's capacities is required, as well as an improvement to its
premises' accessibility.
Implementation of the national training strategy for municipalities has begun. However,
implementation of the 2008 local government action plan has been limited, while progress on
building up local authorities’ administrative and management capacity remains slow. No
progress has been made on municipalities’ capacity for financial management, including
budgeting, public procurement and allocation of grants. Lack of computerisation in many
municipalities hinders efficiency and increases the risk of corruption.
Overall,
some progress has been made on strengthening the legislative framework for the
public administration. There was some progress on human resources management but, due to
the government’s cost-cutting measures, there has been no overall strengthening of human
resources. Significant efforts are required to establish a professional, accountable, transparent
and merit-based civil service, free of political interference. Further reform is required in the
fields of financial control, public procurement and licensing procedures. To this effect,
internal control mechanisms need to be established throughout the public administration.
Efforts need to continue to prepare fully for implementation of the SAA by upgrading
administrative capacity in the areas covered by the agreement.
Judicial system
Montenegro has made progress in the area of judicial reform, a key European Partnership
priority. The action plan to implement the 2007–2012 judicial reform strategy has been
further followed up. The second report on implementation of the action plan was adopted in
March 2009.
A Law on the Constitutional Court has been adopted with the objective of clarifying the
precise scope of the court's mandate. The new Criminal Procedure Code (CPC) intended to
increase the overall efficiency of the prosecution has been adopted. In particular, it extends
the powers of the public prosecution office, makes prosecution more efficient by placing the
pre-trial procedure in the hands of the public prosecutor, introduces a reversed burden of
proof for confiscation of criminal assets and extends use of special investigative measures to
corruption crimes. Preparatory work on the application of the CPC has started, including
specialised training for prosecutors, judges and the police.
Progress has been made on implementation of key legislation intended to increase the
professionalism and independence of judges and prosecutors. The Prosecutorial Council was
elected, adopted its rules of procedure and became operational. The remaining vacancy in the
Judicial Council, nominated by the parliamentary opposition, has been filled.
Both
the Judicial
and the Prosecutorial Councils have begun to establish a track record of decisions on selection
of judges, deputy prosecutors and prosecutors and on disciplinary proceedings. During the
reporting period, nine judges have been suspended and one has been dismissed by the Judicial
Council. Progress has also been made in reducing the backlog of cases.
EN
10
EN
PDF to HTML - Convert PDF files to HTML files
The overall professional capacity of judges and prosecutors has been strengthened by training,
including on anti-corruption. Some training on carrying out investigations has been provided
to prosecutors. Special departments in the high courts for combating organised crime,
corruption, war crimes and terrorism established in September 2008, started dealing with
cases. The capacity of the special prosecutor’s office for fighting organised crime has been
bolstered by additional deputy prosecutors, training and equipment.
Investigation and court proceedings in Montenegro's limited number of domestic
war crimes'
cases have made headway. An out-of-court settlement has been made regarding the survivors
and families of the victims of deportations of Bosnian civilians in 1992 and compensations
have been awarded.
However, there have been no further developments on supplementing the Constitution with
implementing provisions in line with European standards covering the judiciary and the
prosecution service, where there still is political interference. Serious concerns regarding the
independence of judges and prosecutors persist. Scope for political influence exerted on the
prosecution exists through the appointment of the Prosecutorial Council by parliament and the
parliament’s powers to appoint and dismiss the State prosecutors. The unclear division of
responsibility for supervision of the courts between the Ministry of Justice and the Judicial
Council, the participation of the Minister of Justice as a member of the Judicial Council and
the election and dismissal of the president of the Judicial Council by parliament, constitute
further causes for concern regarding the independence of the judiciary.
The efficiency of the judicial system needs to be further enhanced. Judicial enforcement
procedures remain inefficient while lengthy court procedures remain a cause for concern. The
misdemeanour reform strategy needs to be implemented in a way which will avoid creating
further backlogs. The new Law on the Right to Trial within Reasonable Time, granting
compensation to citizens whose trial exceeds a set time-frame, has entered into force, but a
track record has yet to be established. The reliability of court data needs to be improved. The
computerised case management system has yet to be introduced in all courts. Random
allocation of cases in courts has not yet been fully implemented and computerised.
Training programmes to prepare the prosecution service for its role in the pre-trial procedure
under the new Criminal Procedure Code must be further pursued. Modern techniques for
financial investigations are still insufficiently used. The special prosecutor’s office needs
further strengthening in the form of expertise, qualified support staff and equipment. The
capacity of the Ministry of Justice for judicial cooperation has been somewhat strengthened.
However, its internal organisation and procedures, skilled human resources and IT systems
need to be further improved. The ongoing reform of the juvenile justice system has yet to
yield results.
Overall,
Montenegro is moderately advanced in the area of judicial reform. There has been
some progress through the enhancement of the legal framework and the implementation of
legislation. Further efforts are required for the consolidation of the independence,
accountability, integrity and efficiency of the judicial system.
Anti-corruption policy
There has been progress in the fight against corruption, which is a key European Partnership
priority.
EN
11
EN
PDF to HTML - Convert PDF files to HTML files
The strategic framework for fighting corruption has been fine-tuned to place greater emphasis
on monitoring implementation of anti-corruption measures from the action plan against
organised crime and corruption. The national commission for monitoring implementation of
the action plan produced its fourth and fifth report.
The legal framework for the fight against corruption has been strengthened with the adoption
of the new Criminal Procedure Code in July 2009, the Law on Prevention of Conflicts of
Interest in Performing Public Functions in December 2008, the Law on Internal Financial
Control in November 2008 and the Law on Financing the Election Campaigns for the
President, Mayors and Presidents of Municipalities of Montenegro in January 2009.
Progress has been made on further enhancing preventive and investigative anti-corruption
bodies. The resources of the Directorate for Anti-Corruption Initiatives (DACI) have been
strengthened and its co-operation with the police has been enhanced. Furthermore, it
intensified its training activities for administrative bodies and the public, as well as the
realisation of reports and researches related to corruption. The human resources and
equipment of the special prosecutor’s office for fighting organised crime, corruption,
terrorism and war crimes have been built up. The specialised high court units for organised
crime and corruption have also been reinforced. Anti-corruption training is available to the
police, border police, customs officers, prosecutors and judges.
Internal control departments within the Police Directorate are starting to build a record of
action against corruption. During the reporting period, twelve corruption charges were
brought against thirteen police officers as a result of internal investigations. In the judiciary,
criminal charges for corruption and abuse of office were brought against three judges.
DACI, NGOs and the media conducted activities to raise awareness of corruption. Two NGOs
actively participated in the work of the national commission for fighting corruption and
organised crime and in screening related draft legislation
However, corruption continues to be a cause of concern in Montenegro. The national action
plan against organised crime and corruption needs to be compiled on the basis of risk
assessments and to include priorities for action. The country’s national legislation is not yet
fully aligned with the international anti-corruption instruments ratified by Montenegro. Some
Group of States against Corruption (GRECO) recommendations have yet to be fully
implemented. Anti-corruption action plans on the level of local administration have been
adopted by eleven out of t 21 municipalities but implementation has begun only in two.
Montenegro still lacks strong and independent supervisory authorities to evaluate asset
declarations and financing of political parties and to monitor and exercise control over
expenditure in the public sector, notably on public procurement, spatial planning and
privatisation. A supervising authority to monitor and ensure compliance with the Law on the
Financing of Political Parties and the Law on the Financing of Election Campaigns for the
President, Mayors and Presidents of Municipalities of Montenegro is yet to be established. As
a result, political parties' compliance with the law is only supervised in relation to allocations
provided by the state budget. Private donations remain uncontrolled, due to the absence of a
supervising authority. The new Law on the Prevention of Conflict of Interests in Performing
Public Functions, adopted in December 2008 includes some improvements but also has some
serious shortcomings and loopholes. Most importantly, it provides for a significant exemption
for parliamentarians, who are allowed to hold executive powers in public companies or
executive agencies. The appointment of the supervising authority by the parliament raises a
EN
12
EN
PDF to HTML - Convert PDF files to HTML files
cause for concern. Further, the sanctioning powers of the Commission are limited in scope, as
well as legally problematic especially with regard to politicians. The new Commission has
been appointed in July 2009. Its Rules of Procedure are yet to be adopted.
The administrative bodies for detecting and investigating corruption still lack sufficient staff
with appropriate skills. This applies to the Police Directorate’s internal control unit and unit
for combating organised crime and corruption and, to a lesser extent, to the prosecution
service.
A track record of corruption cases in courts is being built but the number of final convictions
remains low. The investigative capacity of law enforcement bodies remains weak due to
shortfalls in expertise, specialised equipment and working conditions. There is still a
significant lack of expertise in modern financial investigation. In 2008 and the first quarter of
2009, the Police Directorate for organised crime and corruption carried out financial
investigations in five cases which had elements of corruption. Inter-agency cooperation needs
to be further enhanced, as it is still based primarily on bilateral agreements and informal
arrangements. A national coordination unit, intended to bring together the expertise and
databases of the police, customs authorities, tax authorities and the administration for
prevention of money-laundering and financing of terrorism is yet to be created.
Overall,
good progress has been made on strengthening the strategic, legislative and
administrative framework. However, corruption remains prevalent in many areas and
continues to be a particularly serious problem. The commitment of the authorities has not yet
been backed by consistent implementation of anti-corruption legislation. While there is a
positive trend, investigation capacities and co-ordination of law-enforcement agencies remain
weak. There is insufficient supervision in the areas of financing of political parties and
conflict of interests. A solid track record of convictions in corruption cases remains to be
established, particularly in cases of high-level corruption.
2.2.
Human rights and the protection of minorities
Observance of international human rights law
As regards
ratification of human rights instruments,
some progress has been made. In
March 2009 Montenegro ratified the Optional Protocol to the UN Convention against Torture
(OPCAT) Montenegro applied to join the UN Human Rights Council in February 2009. In
June 2009, it signed the Council of Europe Conventions on Exercise of Children's rights, on
Protection of children against sexual exploitation and sexual abuse and on the Adoption of
children. It has not yet ratified the Council of Europe Convention on the avoidance of
statelessness in relation to State succession and the UN Convention on the rights of persons
with disabilities and its optional protocol.
In January 2009 Montenegro appointed a government agent before the
European Court of
Human Rights.
Regarding
promotion and enforcement of human rights,
direct implementation of
international human rights standards remains restricted to cases of conflicts with domestic
legislation. The Constitution contains no explicit provision that ratified international human
rights treaties should be applied in compliance with the practice of international bodies in
charge of interpreting them. The application of the European Convention on Human Rights
(ECHR) with regard to the period before independence has not yet been fully clarified.
EN
13
EN
PDF to HTML - Convert PDF files to HTML files
The right to appeal on the basis of the European Convention on Human Rights against
violations which occurred prior to Montenegro’s independence has not yet been clarified.
During the reporting period, the European Court of Human Rights (ECtHR) issued one
judgement finding that Montenegro had violated the ECHR. A total of 249 new applications
were made to the ECtHR since October 2008. As of September 2009, there were 404 cases
pending before the Court.
Overall,
Montenegro has made some progress on improving observance of international
human rights law. Further efforts to align legislation with international human rights standards
and to improve judicial enforcement are needed.
Civil and political rights
Some progress has been made on
prevention of torture and ill-treatment and the fight
against impunity.
The government adopted an action plan for the prevention of torture,
which aims to improve the conditions of detainees, prisoners or patients in neuro-psychiatric
institutions.
Allegations of torture and ill-treatment during arrest and detention continue to be reported. In
2008, the Ombudsman received a higher number of complaints about police ill-treatment than
in the previous year. In six cases, the Ombudsman recommended disciplinary proceedings or
criminal investigations against police officers. Civil society organisations reported an increase
in alleged police assaults in 2008. Overall, torture and ill-treatment remain a sporadic problem
in Montenegro.
The disciplinary procedure for abuse of office and exceeding official powers defined in the
Law on Civil Servants and Public Employees is not fully observed. A need remains to
strengthen internal control mechanisms and take steps to accelerate judicial intervention.
International standards and judicial practice for combating torture need to be fully applied.
As regards
access to justice,
the long duration of court procedures remains a cause for
concern. The right of citizens to a trial within reasonable time is protected by law, yet due to
deficiencies in the procedure, most claims have been rejected. Free legal aid remains limited.
The Law on Free Legal Aid has not yet been adopted. The overall backlog of court cases has
been reduced, but further efforts are necessary.
Some progress has been made regarding the
prison system.
New facilities for specific
categories of detainees have been opened. Video monitoring of detention areas has been
introduced in some police units. Some progress has been made on monitoring of detention
facilities by external bodies.
However, most detention facilities in Montenegro are not yet differentiated and specialised for
specific categories of detainees. Detention facilities lack sufficient capacity for all detainees.
Conditions in some police detention facilities are unsatisfactory. Staff in detention facilities
lacks training. Reform of the probation/parole system remains pending. Overall, conditions of
detention facilities are not yet in line with international standards and as recommended by the
Ombudsman.
Some progress can be reported on
freedom of expression.
A lengthy trial of a high-profile
murder case of a daily newspaper owner has been concluded and a conviction has been made.
Some progress was also achieved on investigation of violence against journalists. However,
EN
14
EN
PDF to HTML - Convert PDF files to HTML files
there is still cause for concern. New incidents of mistreatment have been reported.
Defamation cases against journalists continue to be used as a means of exerting pressure
against independent journalism and courts impose disproportionate fines in such cases.
Intimidating statements by state officials on the role of media and NGOs are a cause of
apprehension. The Law on Free Access to Public Information is still being implemented with
uneven results.
There were set-backs in the implementation of the Law on Electronic Communications due to
the delay in establishing the Agency for Electronic Communications and to a disagreement
between the Agency for Electronic Communications and the Broadcasting Agency on powers
regarding frequency allocation. Delays in frequency allocation procedures raise concerns
about political interference. The independence of the members of the governing council of the
Agency for Electronic Communications remains questionable, as they are appointed by the
government. Implementation of the Law on Electronic Communications remains
unsatisfactory. Media transparency remains insufficient.
Regarding
freedom of assembly and association,
there are no restrictions to report.
Some progress has been made on the role of
civil society organisations.
Several NGOs
continue to have a high public and political profile. A strategy for cooperation between the
government and NGOs was adopted in January 2009. Civil society organisations continue to
be consulted by the government and are represented in the National Council for European
Integration. However, the mechanism by which civil society members are elected to the
National Council for European Integration has to be clarified.
The number of registered NGOs has increased to 4,600, but only a small minority of them are
active. Civil society groups do not yet participate in the Radio/Television Council of
Montenegro.
As regards
freedom of religion,
relations between the major religious groups (Orthodox,
Islamic and Roman Catholic) remain satisfactory. However, the conflict between the Serbian
and Montenegrin Orthodox churches in Montenegro over official recognition and property
ownership continues.
Overall,
there has been some progress in the area of civil and political rights. However,
further efforts are necessary on prevention of ill-treatment, freedom of expression and access
to justice. The capacity and differentiation of detention facilities need to be enhanced.
Economic and social rights
Limited progress has been made on protection of
women’s rights,
including the issue of
domestic violence and protection of victims. A government campaign on violence against
women was launched in 2008. The speed of processing cases in courts and the attitude within
the police teams specialising in family violence have improved somewhat.
The number of cases of domestic violence reported to the police is still small. However,
domestic violence remains widespread. The Law on Protection from Violence in the Family
has still not been adopted. There is a lack of financial support for organisations providing
services to victims or for the victims themselves. The protection given to victims of violence
remains unsatisfactory and municipal social care centres still need to be improved. Sexual
harassment, as defined in the Labour Law, needs to be duly prosecuted.
EN
15
EN
PDF to HTML - Convert PDF files to HTML files
In the field of gender equality, some progress has been achieved. Implementation of the action
plan for gender equality (2008-2012) has started. The Office for Gender Equality has
established a forum for dialogue with civil society and a university pilot project on gender
studies. Government ministries and bodies have started reviewing documents from a gender
equality angle. Women remain well represented at working and middle management levels in
the public administration. A law which will prohibit discrimination based on gender is
pending.
Women remain underrepresented in decision-making processes and in leading positions both
in the public administration and in the private sector. Only 6% of top positions in the 2006-
2009 government mandate were occupied by women. In the new government mandate there is
one woman in a ministerial position. In parliamentary elections in March 2009 only 14% of
candidates were women, while in the new parliament only 11% of members of parliament are
women. More than 80% of the illiterate population are women. Overall, the Law on Gender
Equality has not yet resulted in mainstreaming gender equality policy in parliament, ministries
and across the public administration. Efforts in this field must be intensified.
In practice, limited progress has been made on women’s rights. Women remain
underrepresented in top public and private sector positions. It is necessary to continue
improving protection against and raising awareness of gender-based discrimination, in
particular on the labour market.
Limited progress has been achieved concerning
children’s rights.
A Deputy Ombudsman for
children’s rights has been appointed in July 2009. The council on child rights has begun to
meet on an ad hoc basis. A local day-care centre for children with disabilities was opened and
three local centres are being constructed. Efforts were made to improve school enrolment of
Roma children and avoid their marginalisation.
However, further reforms remain necessary. There is still a gap between the goals of the
national strategy on development of child and social protection and implementation in
practice. The Law on Child and Social Protection has not yet been brought into line with the
UN Convention on the Rights of the Child and with international practice. The council on
child rights has no systematic work programme. Capacity to monitor children’s rights remains
weak. Child protection from violence is inadequate, as most cases of violence against and
between children remain unreported. Capacity for data collection in the social and judicial
sectors needs to be further strengthened. Development of alternative, community-based care
services needs to be accelerated.
Concerning
socially vulnerable persons and/or persons with disabilities,
some progress
has been achieved. Laws on travel concessions for people with disabilities and on movement
of blind persons with the assistance of guide dogs were adopted. Construction of a centre for
professional rehabilitation and integration of people with disabilities and of several centres for
disabled children has begun. However, the Law on Professional Rehabilitation and
Employment of Disabled People, which places an obligation on employers to adapt their
premises to the needs of employees with disabilities, is not sufficiently enforced.
Regarding
labour rights and trade unions,
the Law on Strikes was brought into line with the
Constitution, expanding the right to strike to public administration employees.
EN
16
EN
PDF to HTML - Convert PDF files to HTML files
In the area of
anti-discrimination policies,
adoption of the Law on Prohibition of
Discrimination is still pending. Lesbian, gay, bisexual and transgender (LGBT) people are
marginalised and discriminated against in Montenegrin society.
Regarding
property rights,
a Law on Private Property Relations was adopted in March 2009.
It provides for equal treatment of foreign citizens with Montenegrin citizens on acquiring
movable and immovable property. A Law on State Property, which clearly defines the
property belonging to the State and municipalities, was adopted. However, property
restitution has been slow. The Ombudsman’s Office reported fewer complaints regarding
restitution of property in 2008, than in previous years.
Overall,
there has been limited progress in the area of economic and social rights. Major
legislation such as the Law against Discrimination and the Law on Protection from violence
in the Family is yet to be adopted. Domestic violence remains a cause for concern. The
protection of women against all forms of violence needs to be considerably strengthened.
Implementation of strategies and legislation addressing vulnerable groups needs to be
accelerated.
Minority rights, cultural rights and protection of minorities
Overall, minority rights are respected. There is a broad and adequate legal framework
safeguarding them, including
cultural rights,
on the basis of the constitution. Yet, the Law on
Minority Rights and Freedoms has not yet been harmonised with the Constitution regarding
minority representation. While preserving the existing tolerance and mutual respect between
Montenegro’s varied ethnic groups, there is a need to adopt legislation in order to address
outstanding issues in this area. Also the constitutional provision on ‘proportionate
representation’ of national minorities in public services needs to be clarified.
Montenegro needs to resolve the status of around 16,200
displaced persons
from Kosovo.
Their re-registration has been announced by the authorities. Displaced persons from Kosovo
face great difficulties in gaining access to employment, due to restrictions imposed by the
Law on Employment and Work of Foreigners. Construction of accommodation for displaced
Roma from Kosovo was initiated in June 2008. Overall, displaced persons from Kosovo live
in very difficult economic and social conditions partly due to their unresolved legal status.
Another particular cause for concern is the situation of the Konnik refugee camp close to
Podgorica.
A re-registration of displaced persons from Croatia and Bosnia and Herzegovina which has
been recently completed, has found 5,648 of them residing in Montenegro. A legal framework
to address their status has been put into place. Displaced persons can either be registered as
refugees if they fulfil the requirements of the Law on Asylum, and subsequently be able to
apply for Montenegrin citizenship, or as foreigners with permanent residence under the Law
on Foreigners. Montenegro must ensure the effective implementation of these laws. Between
March 2008 and September 2009, a total of 270 displaced persons acquired Montenegrin
citizenship by naturalisation. The European Partnership priorities regarding abolition of all
discriminatory provisions in key fields, affecting refugees and displaced persons and creating
the conditions for integration of those who choose to remain in Montenegro, have not yet
been fulfilled.
The situation of the
Roma, Ashkali and Egyptian
(RAE) communities remains a cause for
concern. A census conducted by the national statistical office in October 2008, has found a
EN
17
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0019.png
total of more than 10,000 RAE in Montenegro. However, this figure is disputed by Roma
representatives. The government is cooperating with international organisations and civil
society groups on projects to improve the situation of the RAE population in line with the
strategy under the Decade of Roma inclusion initiative. Regarding access to education, there
has been some progress on enrolment of RAE pupils in primary and secondary schools and on
addressing marginalisation in schools. The Ministry of Education and Science has dispersed
RAE pupils across schools to avoid segregation, introduced a policy of affirmative action to
secure acceptance of RAE students in secondary schools, conducted an awareness-raising
campaign to encourage acceptance of RAE pupils, and special training for teaching RAE
pupils.
However, further efforts are needed to improve the situation of the RAE population. As
regards education, scholarship funding for RAE students remains at a token level and almost
fully dependent on external donors. The unemployment rate among the Roma population
remains around 80%, while the illiteracy rate is around 70% and even higher among women.
There remains a lack of appropriate housing for the RAE community. Although the strategy
recognises the lack of documentation and civil registration amongst the RAE population, only
limited efforts have been made, in the form of encouraging local authorities to register the
RAE population. It is estimated that a big percentage of the RAE population currently lack
birth or citizenship certificates. The social and economic situation of the RAE population in
Montenegro remains a cause for serious concern. They face marginalisation and lack of
integration into society.
Overall,
there has been some progress on strengthening the framework for minority
protection. However, implementation is still lagging behind,
inter alia,
due to the lack of
reliable data and a relatively limited budget. Montenegro must effectively resolve the status of
displaced persons and work on improving their access to economic and social rights, which
remains limited. Roma continue to face very difficult living conditions and discrimination,
particularly regarding access to education, social protection, health care, employment and
adequate housing.
2.3.
Regional issues and international obligations
Satisfactory cooperation with the
International Criminal Tribunal for the former
Yugoslavia (ICTY),
a key European Partnership priority, is continuing.
Investigation and court proceedings in Montenegro’s limited number of domestic
war crimes
cases made headway or were concluded in cooperation with other countries in the region. The
"Kaluđerski Laz" and "Morinj"
5
trials are continuing. In April 2009 investigation of the
"Bukovica"
6
case was completed. The government agreed to pay an out-of-court
compensation settlement to the survivors and families of the victims of deportations of
Bosnian civilians in 1992. Several persons have been indicted for this crime. An investigation
was opened by the Chief Prosecutor in 2009 concerning possible war crimes by former
Yugoslav army pilots in Dubrovnik in the 1990s.
5
6
In the "Kaluđerski Laz" case, charges have been brought against eight people. The victims were
civilians of Albanian origin. In the "Morinj" detention camp case, charges have been brought against six
persons.
In the Bukovica case, charges have been brought against seven persons. The victims were civilian
muslims.
EN
18
EN
PDF to HTML - Convert PDF files to HTML files
Montenegro maintains the 2007 bilateral immunity agreement with the United States granting
exemptions from the jurisdiction of the
International Criminal Court.
This does not comply
with the EU Common Positions on the integrity of the Rome Statute or the related EU guiding
principles on bilateral immunity agreements. Montenegro needs to align with the EU position.
Montenegro adopted a Law on Cooperation with the ICC in July 2009.
There has been little progress in the
Sarajevo Declaration
process which aimed to finalise
the regional refugee return process by the end of 2006. While Montenegro continued to work
to a greater or lesser extent on its roadmap, there has been limited discussion on
implementation issues on either a bilateral or a regional basis.
Regional cooperation
and good neighbourly relations form an essential part of the process of
moving towards the European Union. Montenegro is actively participating in regional
initiatives, including the South East European Cooperation Process (SEECP) and will take
over its chairmanship in 2010-2011. Montenegro is also actively involved in the Regional
Cooperation Council (RCC). In 2009 Montenegro holds the chairmanship of the Central
European Free Trade Agreement (CEFTA) and also participates in the Energy Community
Treaty and the European Common Aviation Area Agreement (ECAAA).
The Regional School for Public Administration (ReSPA) in Danilovgrad near Podgorica has
become operational.
Montenegro has continued to foster good
bilateral relations with other enlargement
countries and neighbouring EU Member State
Italy. Cooperation with neighbouring
countries intensified particularly in the areas of cross-border cooperation and science and
technology.
Relations with
Albania
have developed further. Agreements on cooperation in science and
technology and in culture were signed and concrete steps against organised crime taken. The
construction of the joint border crossing point at Muriqan/Sokobine was completed.
Relations with
Bosnia and Herzegovina
have further intensified. Following the signature of
the Agreement on cross-border cooperation, joint border patrols have been set up. Agreements
on cooperation in the areas of culture, education and science as well as a readmission
agreement have been signed.
Cooperation with
Croatia
has been further strengthened. An agreement on protection of
minorities was signed. The joint working group on resolving property issues and the council
on economic relations both held meetings. An agreement on cooperation in science and
technology was signed. Progress has been achieved towards settling the bilateral border issue
between Croatia and Montenegro. The two countries have been co-operating on preparing
their submission to the International Court of Justice on delimiting the border at Prevlaka. The
temporary border agreement is functioning well.
Cooperation with
the former Yugoslav Republic of Macedoniа
has been strengthened. An
agreement on dual citizenship was signed, as were agreements on cooperation on EU affairs,
air traffic, tourism, agriculture and protection in the event of natural disasters. Defence
cooperation has been intensified. Negotiations on an agreement on social security are
ongoing.
EN
19
EN
PDF to HTML - Convert PDF files to HTML files
Relations with
Serbia
continue to be affected by the Montenegrin decision to recognise
Kosovo’s independence. The Montenegrin Ambassador was declared
persona non grata
in
October 2008. A new Ambassador was accredited to Belgrade in September 2009.
Cooperation in the defence sector was good and the Serbian Minister for Defence visited
Podgorica in February 2009. The Montenegrin President visited Belgrade in May 2009.
Economic cooperation remains good. On the basis of a bilateral agreement, Serbian
diplomatic and consular missions in some countries continue to provide services to
Montenegrin citizens. Negotiations on dual citizenship are ongoing but progress has been
limited. Agreements on judicial cooperation and joint border patrols were signed. Police
cooperation in the fight against organised cross-border crime was strengthened. Talks on
border demarcation are ongoing.
Relations with
Turkey
have remained good. Agreements were signed on free trade and on
bilateral defence cooperation.
Bilateral relations with
Italy,
Montenegro's neighbouring EU Member State, have further
developed. The EU is Montenegro’s main trading partner.
Overall,
Montenegro has further improved its active cooperation in the region, by intensifying
its participation in multilateral initiatives and organisations and by further fostering bilateral
relations.
3.
E
CONOMIC CRITERIA
In examining the economic developments in Montenegro, the Commission’s approach was
guided by the conclusions of the European Council in Copenhagen in June 1993, which stated
that membership of the Union requires the existence of a functioning market economy and the
capacity to cope with competitive pressure and market forces within the Union.
3.1.
The existence of a functioning market economy
Economic policy essentials
Montenegro submitted its third Economic and Fiscal Programme (EFP), covering the period
2009-2011, by the end of January 2009. However, its assumptions became very quickly
outdated due to the crisis. Yet, the fiscal strategy of the government continued to focus on
keeping the budget deficits within 3% of GDP in both 2009 and 2010 despite the negative
impact of the crisis and the cost of the measures adopted to mitigate its effects. Meanwhile,
the government coalition partners overcame some of the previous discrepancies of views on
economic policy.
Overall,
the domestic consensus on economic policy essentials has been
maintained.
Macroeconomic stability
The economy continued to grow strongly at around 8% in real terms in 2008 driven by strong
demand and, on the supply side, by construction and services. However, at the end of 2008
industrial output contracted on the poor results of manufacturing, and the metal industry in
particular. This sector suffered from decline in external demand in the context of the
international crisis and the subsequent collapse of commodity prices. In the first half of 2009
the economy contracted by 3.5%, as the negative effects of the crisis extended to several key
sectors (i.e. basic metals, financial services, and construction). Industrial production
EN
20
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0022.png
contracted on average by 20% year-on-year in the first six months of 2009, as manufacturing
output went down by 33%. Only three manufacturing industries (chemicals, foodstuffs and
printing) and the utility sector expanded in the first half of the year compared with the
previous one. On the other hand, after a bad spring the tourism industry recovered during the
summer. Yet, as a consequence of the robust economic growth witnessed during most of
2008, Montenegro’s per capita income, measured in purchasing power standards (PPS), rose
to 46% of the EU27 average, compared with 41% a year earlier.
Overall,
after the high
growth in 2008, the economy contracted in 2009 mainly due to the impact of the global crisis
on the real economy.
In 2008, the current account deficit remained very large at 29% of GDP, despite the strong
cutback in merchandise imports (45% year-on-year) in the last quarter of the year due to the
sharp deceleration of the banks’ lending activity. The surplus of the balance of services was
on a declining trend. The factor income balance deteriorated in 2008, as compensation paid to
the increasing number of foreign workers outpaced incomes from Montenegrins working
abroad. The cool-down of the real estate market in 2008 resulted in a decline of FDI inflows
by 17.4% year-on-year. Yet, the sizeable outflows associated to this market also decreased,
which contributed to sustain net FDI levels at 17% of GDP. Foreign loans increasingly
covered the financing gap of the current account deficit. The moderation of both domestic
demand and imports related to foreign investments continued during the first half of 2009,
resulting in a significant narrowing of the trade deficit by 36.6% year-on-year and a moderate
contraction of the current account deficit to 22% of GDP (annualised). The faster decrease of
FDI outflows by 53.2% over the year offset the decline in inflows (16.6%), so that on a net
basis FDI still expanded to 16% of GDP, covering 80% of the current account deficit.
Overall,
as a consequence of the crisis, the large current account deficit declined until June
2009, while net FDI remained resilient.
The labour force survey (LFS, according to the ILO definition) revealed that the
unemployment rate declined by 3 percentage points to 16.8% during 2008. More recent data
from the Employment Agency shows that the official unemployment rates for 2009 also
continued contracting until end-August. Meanwhile employment continued growing during
2009 by some 5% year-on-year. The unbalanced regional distribution of the workforce and its
limited mobility remain a rigidity factor, favouring continued inflows of foreign workers. Yet,
the government relies on the significant share of temporary non-resident workers to cushion
imbalances on the local labour market.
Overall,
labour market indicators improved on
favourable seasonal effects, despite diminishing economic activity.
In 2008 macroeconomic stability was also challenged by high prices. Yet, after peaking in
August 2008 close to 10%, the average annual inflation declined to 7.4% by the end of the
year. The consumer price index further slowed down to 2.1% year-on-year in July 2009 as
housing and transport prices exerted a downward pressure. With the euro as sole legal tender
7
the room for autonomous monetary policy remained limited. The Central Bank of Montenegro
(CBCG) continued to use prudential requirements, in particular reserve requirements, as
intervention tools. The CBCG has been very active trying to preserve the stability of the local
7
Montenegro unilaterally uses the euro as legal tender, without participating in the euro area. In October
2007 the Council adopted a declaration on the
de facto
use of the euro in Montenegro which is due to
exceptional circumstances.
EN
21
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0023.png
financial system. In autumn 2008 the growth of broad money supply
8
turned negative due to
serious withdrawals of bank deposits. The CBCG intervened by urgently adopting a set of
measures for protecting the banking system, consisting in a full guarantee for deposits and the
possibility of government credit support for eventual liquidity shortfalls of banks.
Overall,
inflation has been decelerating as the economy cooled down.
The lending activity of commercial banks expanded by 23% year-on-year in 2008, as
compared with 165% a year before. The moderation was initially the consequence of the
Central Bank measures to bring the lending boom down to sustainable levels. The credit
portfolio reached 83% of GDP in 2008 up from 80% a year earlier, while bank deposits
declined by 6.7% year-on-year. During the first half of 2009 the liquidity shortage triggered
by the withdrawal of deposits constrained the lending capacity of the banking sector. The
contraction of deposits reached 11.7%, while credit growth dropped by 5.9% since the start of
the year.
Overall,
the liquidity of the banking system was challenged by the problems in the
second largest lender and the effects of the global financial crisis.
In 2008 the budget execution yielded a surplus of 0.5% of GDP. Consolidated public
expenditures increased significantly, reaching 44% of GDP from 41% of GDP in 2007,
boosted by rising transfers to social security institutions and to households. This expansionary
increase in spending commitments put additional pressure on fiscal policy as of early 2009,
when the local repercussions of the crisis resulted in lower fiscal revenues than planned.
Nonetheless, the authorities reacted promptly by curtailing spending and still maintaining a
budget surplus of 0.4% of GDP in the first half of 2009. The government revised the 2009
budget in July, notably by reducing capital investments, expenditures in goods and services
and planning wage cuts in public administration, in order to maintain the deficit at 2.6% of
GDP. Loans from foreign private banks were subscribed and a minority stake in the power
utility (EPCG) was sold to a foreign partner. However, other fiscal risks, in particular the
contingent liabilities linked to the restructuring packages for the metal industries and the
liquidity problems in the banking sector.
Overall,
public finances have come under increased
pressure in 2009, but the authorities managed to limit the deficit by curtailing spending,
borrowing and selling assets.
In 2008 the public debt remained broadly unchanged in GDP terms at 26.8%. Public debt
further increased in the first half of 2009 to 28.4% of projected annual GDP. Public domestic
debt increased by 9% since the beginning of the year, while the public external debt grew
faster, by 15% since end-2008, mostly due to investments in infrastructure co-financed by
international financial institutions. During the third quarter of 2009, the government
subscribed two loans worth 3.4% of GDP from foreign private banks for financing the state
budget, bringing public debt above 30% of GDP at the end of the year.
Overall,
debt
obligations are rising due to infrastructure spending and loans to finance the emerging budget
deficit.
Macroeconomic policy has been driven to a large extent by the financial crisis. It focused on
implementing a more prudent fiscal policy and accelerating structural reforms in several
sectors. For instance, developing a more market-oriented approach to highway construction
by involving the private sector through Public-Private Partnerships (PPPs), reducing the fiscal
8
The broad measure of money (M21) aggregate consists of deposits of banks with the Central Bank and
demand and term deposits with banks and the Central Bank, in euros and other currencies, including
deposits of the central government.
EN
22
EN
PDF to HTML - Convert PDF files to HTML files
burden on labour to increase competitiveness, or developing the legislative framework for the
financial system with the adoption of legislation based on EC Directives. The Central Bank
has also contributed to macroeconomic stability by timely adapting monetary policy to fast-
evolving circumstances. In 2008 the CBCG introduced a restrictive policy to reduce the
exposure of the economy to the surge of a credit bubble. In 2009 it reversed its path, easing
reserve requirements to release more liquidity into the financial system.
Overall,
structural
reform policies combined with a timely adaptation of the fiscal and monetary policy to the
international crisis impact, are contributing to recovery.
Interplay of market forces
The share of the private sector in the economy is very large as the public sector is mostly
reduced to network industries (utilities and transport). Moreover, the influence of the public
sector in price dynamics is practically limited to the energy sector. The energy regulator
establishes electricity prices in relation to production cost thresholds. In June 2009, the
Administrative Court annulled the energy regulator’s decision to increase electricity prices.
As a result, some €20 million from the overhead prices are being returned to consumers
gradually by decreasing prices for electricity until the debt is settled. The privatisation process
also suffered from the global crisis as some successful bidders failed to conclude a sales
agreement. This was notably the case with the auctions of the tobacco retailer Duvankomerc,
and the publisher Pobjeda. A few publicly owned companies failed repeatedly to attract
interest from investors, such as the appliances factory Obod or the insurance company
Lovćen. In these cases, new privatisation methods are proposed and companies are being
slated for sale again. Further progress has been recorded in the privatisation of key energy and
transport systems. The government sold a minority stake in the power utility (EPCG),
providing the possibility for the new partner to acquire majority control of the company after
five years. The railway transportation company and the port of Bar have already established
their freight units as completely independent companies, preparing their privatisation through
concession deals. However, restructuring of the aluminium and steel plants remains a
considerable challenge.
Overall,
the privatisation process is quite advanced and state
intervention in the economy has remained limited except for temporary rescue operations in
strategic sectors such as basic metals and banks.
Market entry and exit
The Council for the elimination of business barriers, established in mid 2008, continued its
activity in 2009. Achievements in the relevant period included the simplification of
administrative procedure for obtaining construction permits and reviewing technical
documentation and enhancement of transparency through the relevant authorities' obligation
of publishing related documentation on their website. The operation of new trade outlets does
not require any longer municipal license but a simple announcement of intent for record
purposes. In addition, the authorities have also established a website for gathering online
requests from entrepreneurs to remove further barriers. However, electronic signature
legislation still needs to be implemented in order to benefit from the full potential of online
business and administrative transactions. Market exit procedures have been reduced to six
months on average. In the first half of 2009, in spite of the crisis, registration of new
enterprises continued at an average of 212 new limited liability companies per month
compared with 284 during 2008. During the first five months of 2009 the Commercial Court
registered 134 bankruptcy procedures, a similar number to that recorded during the same
period a year before (138). The backlog of ongoing cases decreased to 139, practically
converging with the number of newly opened files. Additionally, 284 companies applied for
EN
23
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0025.png
voluntary liquidation under the Law on Insolvency, and were subsequently removed from the
registry of the Commercial Court.
Overall,
market entry has improved and exit procedures
have been further streamlined.
Legal system
Three key pieces of legislation regulating property rights were adopted in 2009. The
Concession and the State Property Laws introduced more comprehensible concession rights
on public properties and resources, with the possibility of extension of such contracts up to 90
years. The Property Relations Law provides the same treatment to foreign citizens as to
nationals for acquiring movable and immovable property, although some limitations still
remain for foreigners purchasing agricultural land, for which the new law provides long-term
leasing as an alternative. Recourse to the judicial system increased as previous reluctance to
resolve commercial disputes through official circuits is fading away, also due to the negative
effects of the crisis. During the first half of 2009 the Commercial Court received 5,200 cases
(compared with 1,279 a year before). However, the large informal sector is fuelled by
weaknesses in tax and expenditure policies, as well as in law enforcement, including the fight
against corruption and organised crime. The informal sector remains an important challenge,
as it reduces the tax base and the efficiency of economic policies.
Overall,
the new property
laws improved legal certainty facilitating foreign investors’ engagement in large projects.
However, the fight against corruption and tackling the large informal economy remain major
challenges.
Financial sector development
The size of the banking sector in terms of assets stabilised at 99% of GDP by the end of 2008,
compared with 106% a year earlier. However, banks assets further contracted to 88.7% of
GDP by end-June 2009 as deposit withdrawals and negative lending growth persisted. The
sector remained highly concentrated, with three banks holding 63.9% of the banking sector’s
assets and 58.8% of total deposits. Excessive risk taking by Prva Banka -the second largest
bank- without due concern for prudent banking practices, resulted in stability risks for the
whole sector. Faced also with the effects of an international crisis threatening the domestic
market, the Central Bank together with the government adopted several measures for the
protection of the banking system. A full guarantee for all deposits, and the possibility of
government credit support for liquidity shortfalls or for recapitalisation were granted. In an
attempt to improve positions of both lenders and debtors and to create more space for bank
lending activities, the CBCG also introduced additional measures to create more favourable
conditions for loans restructuring and further reduced the rate of mandatory reserves on
existing deposits to 10%, with no reserve requirements for new deposits. The government also
intervened by providing a credit support of € 44 million (about 1.3% of 2008 GDP) to Prva
Banka in exchange for this bank's shares placed as collateral. The bank has meanwhile
managed to repay 75% of the loan. The withdrawal of deposits set off in October 2008,
occurring at a rate of 18% until February 2009, moderated to an average monthly contraction
of 0.2% in the second quarter of 2009. As a result, during the first half of 2009 the banking
system lost deposits for some 5.7% of GDP, most of it from the two biggest banks. End-June
2009, the average capital adequacy ratio came down to 11.9%, close to the stipulated 10%
minimum level, while the ratio of non-performing loans
9
climbed to 8.9%, compared with
9
Considering the Central Bank of Montenegro’s stricter classification of past-due loans as any loan that
is past due for more than 61 days, compared with the Basel II classification of after 90 days.
EN
24
EN
PDF to HTML - Convert PDF files to HTML files
3.9% a year before. In June 2009 the average weighted effective lending interest rate peaked
at 9.38%, while the weighted average deposit effective interest rates recorded 3.80%, down
from 9.40% and 4.10% respectively in December 2008.
Overall,
the stability of the financial
system was maintained under very difficult circumstances.
The domestic insurance market further expanded by a more modest 18% year-on-year in
2008, following a 28.7% expansion of billed premiums a year before. End 2008 there were 11
companies active in the sector, after several new firms entered the market. The sector remains
highly concentrated, with one company holding a 61% market share. The industry accounts
for some 3% of GDP and is primarily made up of compulsory insurance. Its life insurance
segment is developing fast from a very low base and accounted in 2008 for some 12% of total
premiums (compared with 4.5% a year before). The leasing market continued its rapid
expansion in 2008, increasing contract value by 42.2% year-on-year, representing 4.9% of
GDP (compared to 4.1% a year before). The majority of leasing contracts relate to real estate
and vehicle purchases. The two stock exchanges showed signs of recovery in May 2009 as the
markets were positively influenced by the sale of a minority stake in the power utility EPCG.
In May, after more than one year of continuous deterioration, the aggregate capitalisation rose
to 147% of GDP, from 116% in the previous month.
Overall,
while the non-banking financial
sector continued expanding, capital markets went through a severe correction.
3.2.
The capacity to cope with competitive pressure and market forces within the
Union
Existence of a functioning market economy
Quick responses to a fast-changing and difficult global economic environment prevented a
deep deterioration of macroeconomic stability, as employment was preserved, prices
moderated and the public deficit was contained. Macroeconomic stability was seriously
challenged by an expansionary fiscal stance in 2008, followed by liquidity problems in the
banking sector, and current contingent liabilities in the metal sector. Apart from direct support
to metal smelters and one bank, the authorities’ rescue plans focused on accelerating
structural reforms and preserving the stability of the financial system. To this end, the
government provided credit guarantees to international banks for extending loans to domestic
lenders which freely decided on the final allocation of credit.
Overall,
the functioning of
market mechanisms was challenged by the magnitude of adjustments taking place in the
external accounts and the financial sector.
Human and physical capital
In the context of still persistent labour demand, several educational reforms were
implemented to align the supply side with market requirements, not least the Law on National
Vocational Qualifications, and the strategies for introducing didactic software in education
and for establishing the qualification framework. For young managers having already
graduated, the Agency for Employment (ZZZ) together with the Directorate for Small and
Medium-Sized Enterprises (SMEDA) implemented practical training programmes. The
Agency continued its activities with academic institutions, providing professional guidance,
but also adopting programmes for the integration of minorities into the workforce as well as to
improve work participation rates, especially in the poorer northern region.
Overall,
the skills
mismatch remains an important issue. In some labour intensive sectors the country needs to
resort to foreign workers to sustain economic growth.
EN
25
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0027.png
Gross fixed capital formation (GFCF) as a share of GDP reached 24% in 2007. Estimates for
2008 suggest a ratio of 30% of GDP. Almost 40% of FDI invested in 2008 went into real
estate, 30% in domestic companies and banks and a similar amount in intercompany debt
(namely foreign banks towards local subsidiaries). Public capital spending increased in 2008,
reaching 9.3% of GDP, compared with 6.7% a year earlier. However, during the first half of
2009, further moderation in credit expansion and budget spending cuts reduced capital
formation.
Overall,
worsening economic conditions did not stop restructuring in energy and
transport as well as the launch of major concessions for private investments in tourism and
highways.
Sectoral and enterprise structure
The crisis exacerbated the weakness of the main industries of the country –basic metals
production– already hampered by excessively high production costs. To restructure and
address the structural problems of the aluminium smelter, and the more cyclical ones of the
steel mill, the government provided credit guarantees and a redundancy programme to
proceed with technological upgrades and labour cuts. In the energy sector, after the separation
of the transmission unit from the power company (EPCG), establishing tariffs for the use of
the network and the adoption of secondary legislation, all necessary preconditions were
formally met for the development of competition and establishment of the electricity market.
Meanwhile, the government sold in July a minority stake in the utility, retaining a 55% share.
The new partner may later acquire majority control in EPCG subject to successful
implementation of the investment programme. The railway transportation company and the
port of Bar separated their freight units, thus preparing the ground for their privatisation also
with a view to securing the necessary capital for their modernisation. The national air carrier,
Montenegro Airlines, implemented the first stage of its restructuring by transformation into a
shareholder company.
Overall,
a significant restructuring of strategic enterprises and sectors
is underway.
The structure of the economy continued shifting towards services. More than 70% of total
employment during 2008 was recorded in services. Public administration employees
10
in total
services decreased by 2%, while the private sector witnessed an increase of 4% year-on-year,
driven by large increases in the number of hotel and restaurant workers, but also transport and
financial activities. Yet the largest share of tertiary labour remains wholesale and retail trade
(20% of total labour). The industrial sector represented 22% of the total workforce, but is on a
declining trend. The participation of workers in agriculture, forestry and fishing represented
some 8% of total employment.
Overall,
most of the advertised employment vacancies (63%)
concerned jobs in tourism, construction and trade sectors, confirming that the economic shift
to these activities continues.
Small and medium-sized enterprises (SMEs) are proving their resilience as the number of
bankruptcies in 2009 remained at the same level as a year before although the number of
unpaid invoices reported by the Central Bank payment system has been rising. The SME
sector represents some 60% of GDP and employs 67% of the total workforce. Most
companies (77%) have less than 10 employees and deal largely in retail and repair services.
They still face a number of persistent difficulties, such as revolving existing loans, obtaining
municipal permits or the absence of spatial planning documents.
Overall,
SMEs went through
10
Including: public administration, social insurance, education, health and social workers.
EN
26
EN
PDF to HTML - Convert PDF files to HTML files
very difficult conditions, confronting increasing payment arrears, diminishing demand and
stricter conditions to obtain bank loans.
State influence on competitiveness
Government intervention in the economy expanded with the adoption of several initiatives in
support of those sectors most affected by the crisis, namely banking and metallurgy. Since the
start of the crisis until mid-2009 state guarantees amounted to 9% of GDP, of which 42%
were for loans to the aluminium complex KAP and the bauxite mine RBN (partially
renationalised), 47% to banks and 8% to the steel mill Niksic. The measures approved to
protect banks depositors benefited both local and foreign lenders operating in the country. The
authorities also adopted a programme reducing electricity prices for the most vulnerable
categories of the population, as well as for SMEs. In addition, the major industrial companies
(the steel mill and the aluminium factory) saw their temporary subsidies for the purchase of
electricity extended on condition of achieving major restructuring.
Overall,
increased state
intervention occurred as a reaction to the unfolding crisis.
Economic integration with the EU
As a consequence of the crisis the annualised level of openness of the economy decreased in
the first half of 2009 to 50.6% of GDP, from 83% a year earlier. The main foreign destination
for domestic products remains the EU, which accounts for 57.8% of the total (down from
64.6% in 2008), followed by CEFTA countries (40.2%, up from 33.4% in 2008). The
reversed trend was confirmed for imports, which mostly originate from neighbouring CEFTA
countries (53.3%, up from 50% a year before), followed by the EU (38.2%, down from 41.4%
in 2008).
Overall,
trade openness remained high, although the severe contraction of the metal
industry brought down the main export of the country, traditionally oriented to the EU market.
4.
E
UROPEAN STANDARDS
This section examines Montenegro's capacity gradually to approximate its legislation and
policies to the
acquis
related to the internal market, sectoral policies and justice, freedom and
security, in line with the Stabilisation and Association Agreement and the European
Partnership priorities. It also analyses Montenegro's administrative capacity. In each sector,
the Commission's assessment covers progress achieved during the reporting period and
summarises the country's overall level of preparations.
4.1.
4.1.1.
Internal market
Free movement of goods
Some progress can be reported on
standardisation.
The internal rules and procedures have
been drafted for the Institute for Standardisation (ISME) which is responsible for planning,
developing, approving, publishing and maintaining Montenegrin standards and related
documents. ISME has increased its staff to 16 and moved to new premises which provide the
necessary working conditions. Besides the database developed under the former State Union,
Montenegro is currently developing its own database of national standards. ISME has so far
adopted about 1,800 Montenegrin standards, of which 85% are European standards. ISME has
begun to develop a network of technical committees involving all the main stakeholders
(professional associations, scientists and government authorities) in the most relevant sectors.
EN
27
EN
PDF to HTML - Convert PDF files to HTML files
In July 2009 ISME became an affiliate member of the European Committee for
Electrotechnical Standardisation (CENELEC).
Limited progress can be reported with
conformity assessment.
The government has adopted
by-laws implementing the Law on Technical Requirements and Conformity Assessment.
These include decrees on methods and procedures for conformity assessment of products and
procedure of notification in the area of technical regulations, standards and conformity
assessment procedures. Enquiry points for technical regulations and standards have yet to be
established.
Limited progress can be reported in the field of
accreditation.
The new Law on Accreditation
was adopted in July 2009. The Accreditation Body of Montenegro (ABM) signed a
contractual agreement with the European co-operation for Accreditation (EA) in November
2008 and became an associate member of the International Laboratory Accreditation
Cooperation (ILAC) in April 2009. It received a number of applications but accredited no new
bodies. Improving coordination with other parts of the quality infrastructure and enhancing
the administrative capacity of the ABM itself are preconditions which must be met before the
quality infrastructure can function properly.
Some progress has been made as regards
metrology.
A new Law on Metrology was adopted
in December 2008. A by-law on legal units of measurement was also adopted in February
2009. The Bureau of Metrology has a staff of 28 out of the 34 planned. The bureau became an
associate member of WELMEC (European Cooperation in Legal Metrology) in April
2009.Conditions in five laboratories (for mass, length, electrical quantities, temperature and
pressure) are still not up to the required standard.
There has been limited progress in the area of
market surveillance.
The administrative
capacity of the Market Inspectorate and of the other authorities carrying out market
surveillance activities has been strengthened. However, by-laws necessary to implement the
Law on General Product Safety have not been adopted yet. Among these are also rules on
methods of exchange of information on dangerous products which would set the legal basis
for the Market Inspectorate to become the future national contact point for the RAPEX system
in the future. Further efforts are needed to raise administrative capacity in this field, to
develop and implement a market surveillance strategy with adequate coordination and
cooperation between relevant authorities, to create a market surveillance information
exchange system and to introduce modern risk assessment techniques for market control.
Good progress was made in the area of
consumer protection.
The focus was on
implementing the national consumer protection programme (NCPP) and the corresponding
action plan. The government adopted a report on the first year of implementation of the NCPP
(April 2008–March 2009). Cooperation with NGOs dealing with consumer protection was
strengthened as a result of implementation of the NCPP and for the first time the State
provided funds to NGOs for consumer protection-related activities. Twenty members of the
arbitration board on consumer protection, the body in charge of out-of-court settlement of
disputes, were appointed in December 2008 for a four-year mandate. The first case was
handled and other cases are now before the board waiting for decision. Awareness-raising
activities on the existence and purpose of the arbitration board are needed, along with further
development of the capacity of board members.
Overall,
preparations in the area of free movement of goods continued, even though they are
not very advanced in the area of market surveillance. Montenegro still needs to strengthen its
EN
28
EN
PDF to HTML - Convert PDF files to HTML files
institutional and administrative capacity further, improve cooperation between the relevant
State institutions and accelerate transposition of the product-specific
acquis
into its national
legislation.
4.1.2.
Movement of persons, services and right of establishment
Further progress has been made on
movement of persons
and access to the labour market.
The Law on Employment and Work of Foreigners, regulating the movement of labour force
by introducing a work permit system with annual quotas entered into force in January 2009.
By-laws necessary for the implementation were adopted, including one to fix the quota of
work permits for foreigners in 2009. The Law on Foreigners relating to terms and conditions
of entering, movement and stay of foreigners was adopted in December 2008.
As regards
coordination of social security,
the social insurance agreements ratified between
Montenegro and Luxembourg, Hungary and Switzerland brought significant improvements
for Montenegrins working abroad.
In the process of finalising negotiations for accession to the World Trade Organisation
(WTO), Montenegro ensured extensive liberalisation as regards freedom to
provide services.
Work permits and quotas as foreseen by the mentioned Law on Employment and Work of
Foreigners apply also as precondition for individual cross-border service-providers. No work
has been done on the distinction between the arrangements applicable to cross-border
provision of services by EU operators in Montenegro and to service-providers established in
Montenegro.
There has been some progress in the banking sector. Following adoption of the Law on
Banks, the Central Bank adopted a further set of related by-laws to be implemented by all
banks by March 2009. In particular, the minimum capital adequacy ratio was increased from
8% to 10% and the system for reporting by banks was improved by direct connection with the
Central Bank. The Central Bank concluded memoranda of understanding with a number of
home supervisors of foreign banks, covering seven of the nine countries which operate bank
subsidiaries in Montenegro. In response to the global economic crisis, in October 2008 the
government adopted a Law on Measures for Protection of the Banking System and related
implementing legislation, to be applied until the end of 2009. The law provides for a full
government guarantee for the deposits of physical and legal persons. In addition it provides
the possibility of government guarantee for inter-bank loans against shares as collateral,
government credit support, Central Bank short term loans and provision of additional capital
or obligatory capital provision for individual banks. These last are also allowed to temporarily
use of up to 50% of their mandatory reserves.
Further alignment with the
acquis
is still required, in particular regarding the Capital
Requirements Directive. Further strengthening of administrative capacity is still needed,
particularly of supervisory capacity with an increased focus on risk-based supervision,
consolidated supervision and cross-sector and international cooperation, including with home
supervisors.
The institutional framework for supervision of the non-banking financial sector continued to
improve. Thirteen by-laws related to the umbrella laws on insurance and several by-laws
related to securities were adopted. The agency for insurance supervision recruited additional
staff, bringing the total to 10 out of the 17 planned. Further recruitment of staff and upgrading
of implementation capacity are needed. In February 2009 the Securities Commission signed
EN
29
EN
PDF to HTML - Convert PDF files to HTML files
the Multilateral Memorandum on Cooperation with the International Organisation of
Securities Commissions (IOSCO).
As far as postal services are concerned, a strategy for the postal sector was adopted in
December 2008.
Limited progress can be reported on the
right of establishment.
The Property Relations Law
introduced the same treatment to foreign citizens as to nationals for acquiring movable and
immovable property, however with some limitations for agricultural land, providing for long-
term leasing as an alternative (See
points 3.1 The existence of a functioning market economy,
and 4.1.3. Free movement of capital).
No progress can be reported on recognition of
professional qualifications. An updated operational plan for elimination of business barriers
has not yet been developed.
No further progress can be reported regarding
company law.
A Law on Insolvency
Procedures is at the drafting stage and the draft Law on Takeovers of Joint Stock Companies
is before the government.
Some progress has been made in the areas of accounting and auditing. Amendments to the
Law on Accounting and Auditing introduced,
inter alia,
requirements on the transparency of
reporting, quarterly electronic reporting and supervision. The new law provides for
establishment of an accounting and auditing council, an advisory body to promote accounting
and auditing regulation and good practices. The government adopted a strategy and action
plan to promote financial reporting. However, gaps remain in establishment of an independent
public oversight system. The division for accounting and auditing in the Finance Ministry
currently carries out inspections but is understaffed. The planned supervisory authority has yet
to be established.
Overall,
in the areas of free movement of persons, services and right of establishment,
Montenegro partly meets the targets and priorities set.
4.1.3.
Free movement of capital
There has been further progress in the field of free
movement of capital.
A Law on State
Property and a Law on Property Relations were adopted in February 2009. Conditions for
acquisition of movable and immovable property have been clarified, however some
restrictions remain on foreign natural and legal persons owning property in Montenegro and
therefore the new legal framework does not yet allow treatment completely equivalent to that
given to Montenegrin nationals. Limits are imposed on acquisition of ownership rights over
inter alia
forests and forest land, agricultural land, cultural monuments of special importance,
real estate within one kilometre of the land border or islands.
With reference to
payment systems,
a new Law on National Payment Operations was
adopted in October 2008, regulating transfers of funds, inter-bank transfer settlements,
electronic means of payment and establishment and control of payment operations. Twelve
related by-laws were also adopted.
Overall,
Montenegro has met the priorities and objectives set in the area of free movement of
capital.
EN
30
EN
PDF to HTML - Convert PDF files to HTML files
4.1.4.
Customs and taxation
Further progress was achieved in the area of
customs.
The customs tariff nomenclature was
harmonised with the 2009 EU Combined Nomenclature and duties were reduced in line with
the Interim Agreement. The Convention on Temporary Admission (Istanbul Convention) was
ratified. Fees for customs services have been harmonised with Article VIII of GATT, but not
yet with the SAA and the
acquis.
In relation to the previous year the total amount of duties and taxes collected by the customs
administration increased by 6.5%. New division and database for dealing with infringements
of intellectual property rights has been set up within the customs administration (See
point
4.1.7 Intellectual property law).
A joint border crossing point with Albania became
operational in June 2009. Further training on rules of origin, valuation of imported goods and
protection of intellectual property rights was organised for both customs officers and
economic operators. An agreement on integrated border management has been signed with the
police and the health administration. Montenegro signed with Serbia an agreement on
facilitating border controls on goods transported by rail. An agreement on mutual assistance
on customs matters with Moldova was signed and ratified by parliament. Montenegro also
participates in a regional project in order to exchange pre-arrival customs information with
neighbouring countries, in order to facilitate trade and enforce customs legislation. To
enhance cooperation with EU customs administrations and the Commission, Montenegro
asked to join the Community’s Customs 2013 Programme. The customs administration
currently employs 579 staff out of the 669 planned. Recruiting and retaining staff is a
recurring problem, which weakens the administrative capacity of the institution. No business
or IT strategy has been adopted.
Overall, legislative alignment with the
acquis
is well on track and the customs administration
has been able to manage implementation of the SAA. However, further alignment is still
required in areas such as origin, transit and simplified procedures, customs valuation and
customs fees. A business and IT strategy needs to be developed and attention needs to be paid
to strengthening the administrative capacity in terms of project management skills and quality
assurance. The fight against corruption remains a key priority.
Further progress can also be reported on
taxation.
With reference to direct taxation, personal
income tax was reduced from 15% to 12%. In the case of corporate taxation, legislative
amendments cut the tax rates on dividends from 15% to 9% and eliminated double taxation of
profits paid by subsidiaries to parent companies. As for indirect taxation, amendments to the
Law on Excise and related by-laws improved alignment with the
acquis,
in particular on
increasing excise on cigarettes, other tobacco products and mineral oils with effect from
October 2009. The legislation is, however, not yet completely aligned with the European
standards. This applies, in particular, to the excise arrangements for energy products and
small producers of alcoholic beverages, to zero or reduced VAT rates or special VAT
schemes and to the principles of the code of conduct for business taxation which have not yet
been implemented. Amendments to the Law on Administrative Taxes improved alignment
with Article VIII of GATT.
In 2008 the gross tax and contributions collected by the tax
administration
were 26.5%
higher than in 2007. In the first quarter of 2009 they were 10.5% higher than the planned
budget revenue. A project is under way to introduce both a single tax registration form and a
single tax return form. To improve operation of its tax system, Montenegro asked to join the
Community’s Fiscalis 2013 Programme. The tax administration currently employs 613 staff
EN
31
EN
PDF to HTML - Convert PDF files to HTML files
out of the 744 planned. Its main needs remain additional long-term recruitment and
professional training. IT strategy is in place. Project management skills and quality assurance
methods have not yet been introduced.
Overall,
alignment with the
acquis
is on track, although further alignment is still required.
Further progress towards modernising the tax administration is also needed, with particular
emphasis on tax collection and controls, including effective use of risk analysis. The effort to
reduce informal economy needs to continue. A business and IT strategy needs to be developed
and project management skills and quality assurance have to be introduced.
4.1.5.
Competition
Limited progress can be reported in the field of
anti-trust.
Efforts are still required to adopt
the new Law on Competition Protection, to further improve the existing legislation, transform
the existing Administration for Competition protection (ACP) into a fully independent
Competition Protection Authority (CPA) and establish a system of deterrent fines.
Implementing rules are also still to be adopted.
Between October 2008 and August 2009 the ACP decided twelve merger cases and examined
two case of abuse of a dominant position. The ACP is gradually improving its capacity with
the aid of training courses. Out of a planned staff of thirteen, the ACP currently employs ten.
Its administrative capacity needs to be further enhanced to allow it to exercise its future
investigation, decision-making and sanction powers and eventually secure full professional
and financial independence. Additional efforts are also required to raise public awareness of
competition policy.
Further progress can be reported in the area of
State aid.
The government adopted a new draft
Law on State Aid Control in April 2009 and prepared a series of by-laws with the aim of
further alignment with the
acquis.
The State Aid Control Commission (SACC) continued strengthening its administrative
capacity with the aid of training. From October 2008 to August 2009 the SACC took eleven
decisions and three conclusions. A department for control of state aid was set up within the
Finance Ministry in November 2008. It currently employs three persons. However, the
capacity of both the SACC and the state aid department still needs to be strengthened to
enable them to assess complex state aid cases autonomously and to play an active and visible
role in the design of government support to national operators. A preliminary inventory of
state aid schemes was compiled, but additional efforts are required in order to complete it.
Overall,
Montenegro partially meets its targets in the area of competition. Further
improvement of the framework for protecting competition and upgrading of the relevant
administrative capacity are required. In particular, the State aid control system needs to be
strengthened and the capacity of the SACC and the State aid department needs to be
enhanced.
4.1.6.
Public procurement
Some progress has been made in the public procurement system, notably in the form of
adoption of implementing legislation, training to support contracting entities and awareness-
raising in the private sector.
EN
32
EN
PDF to HTML - Convert PDF files to HTML files
A new Law on Concessions was adopted in January 2009. However, it falls short of the
requirements of the
acquis.
Improvements have been made with regard to transparency. The State Commission for the
Control of Public Procurement Procedures (PPC) publishes its decisions and all complaints on
its website. All tenders are currently published on the Public Procurement Directorate’s (PPD)
website. There has been no progress towards introducing electronic procurement.
The 2006 Public Procurement Law established a complex framework for qualification of
bidders and documentation requirements. The two key institutions – the PPD and the PPC –
currently employ 15 and 8 staff respectively. They both require additional staff.
Administrative capacity in general needs further upgrading, in particular as regards anti-
corruption activities and integrity. Procurement officers and procurement departments within
the contracting entities have not yet been sufficiently developed. The new Law on
Concessions does not distinguish clearly between concession contracts and public contracts.
Further work is needed on the definitions for works concessions and the relevant
implementing legislation has yet to be adopted. The Concession Committee should be set up
to handle complaints about the award of concessions, keep a concession register and approve
the use of certain procedures. Additional efforts are needed to introduce a separate
procurement system for utilities and fully transpose the Utilities Directive. The introduction of
e-procurement needs to be started and centralised procurement seriously considered by the
authorities.
Overall,
Montenegro partially meets its targets in the area of public procurement.
Further efforts are needed to align the legislation with European standards and to build up the
administrative capacity.
4.1.7.
Intellectual property law
Some progress has been made in the field of
intellectual property rights
and
industrial
property rights.
The legislative framework has been improved with the adoption of a Law on
Patents which is generally in line with international and EU standards. Implementing
legislation remains to be adopted. Amendments to the Regulation concerning the validity of
existing intellectual property rights were made to eliminate legal gaps related to the validity of
national IP rights and to bring the procedures into line with international agreements.
Following the amendments to the Decree on the fees for customs services, since January 2009
holders of IPR are not required to pay a fee for processing requests for IPR protection. A
uniform request form is being introduced to ensure equal treatment by the customs authorities,
in compliance with the model laid down by Commission Regulation 1891/2004. An
agreement on the extension of European patents to Montenegro was signed with the European
Patent Office (EPO) in February 2009 allowing the validity of European patents on the
territory of Montenegro but has not been ratified yet.
The Montenegrin Intellectual Property Office (MIPO) is gradually improving its capacity.
Also, a division for intellectual property was established in the customs administration. It
prepared an information brochure for the public on customs measures to protect IPR and
combat counterfeiting and piracy. In September 2008 an intellectual property database, based
on the UK model, was installed (See
point 4.1.4 Customs and taxation).
Customs staff dealing
with IPR attended a number of training courses and international conferences. As for judicial
protection, the Podgorica commercial court established a specialised intellectual property
division.
EN
33
EN
PDF to HTML - Convert PDF files to HTML files
However, an IPR strategy is not yet in place and further strengthening of the legislative
framework remains necessary. The administrative capacity of the MIPO is insufficient,
especially in terms of human resources, as it currently employs 17 out of the 22 staff planned,
premises and IT capacity (network, databases and registers). The market inspectorate also
needs further strengthening, including establishment of a specialised unit to deal with IPR
infringements and the hiring of specialised market inspectors. Further measures are also
required to develop an information system connecting the various bodies involved and
supporting the data exchange and to introduce modern risk assessment for performing market
control. The number of police staff dealing with IPR infringements is still insufficient.
Specialised training needs to be provided for judges working in this sector. Further efforts are
needed to improve overall cooperation and coordination between enforcement bodies,
including the Market Inspectorate, and also cooperation with rights-holders.
Overall,
preparations in the area of IPR protection are at an early stage, in particular with
regard to the institutional and enforcement capacity for dealing with complex IPR cases and
public awareness of protection of intellectual property rights.
4.1.8.
Social policies, employment and public health policy
In the area of
social policies,
as regards
labour law
the legal framework remains the 2008
Labour Law.
The legislation on
health and safety at work
has yet to be brought in line with European
standards. A Law on Labour Inspection was adopted in December 2008, but the capacity of
the Ministry of Labour and Social Welfare, including its labour inspection department,
remains weak. There are currently 11 safety at work inspectors in charge of labour inspection.
With regard to tripartite
social dialogue,
the government decided to establish an agency for
peaceful settlement of labour disputes, as required by the Labour Law, but it is not yet
operational. In April 2009, the Social Council signed a memorandum on social partnership in
view of addressing the impact of the global economic crisis. A working group for monitoring
the economic crisis was established in June 2009 that can propose measures to the Social
Council in case of severe disturbances on the labour market. Nevertheless, the role of social
partners in the decision making process remains limited. Amendments to the Law on Strikes
gave public servants the right to strike. Collective labour disputes are generally not solved by
mutual agreement. Bipartite social dialogue needs to be further developed, in particular at
national and sectoral levels.
As regards
social inclusion and anti-discrimination,
reliable data and comprehensive analyses
are needed to provide a sound basis for social inclusion policies. Particular attention needs to
be paid to territorial aspects of poverty. Fighting poverty and promoting social inclusion
needs to be further prioritised. Several laws governing the rights and status of disabled
persons have been adopted, but have yet to be implemented. As regards anti-discrimination,
little progress can be noted on the adoption of a comprehensive anti-discrimination law. (See
also point 2.2 Human rights and the protection of minorities, section on social inclusion, anti-
discrimination and equal opportunities.)
As regards
social protection,
the Law on Basic Social Benefits was amended and the Law on
Pension and Invalid Insurance was adopted. Implementation of the strategies for social and
child protection, for social protection for the elderly and for the inclusion of disabled persons
in Montenegro together with the related action plan for 2008 and 2009 remains slow.
EN
34
EN
PDF to HTML - Convert PDF files to HTML files
In the field of
employment policy,
a small decrease in unemployment was reported by the
Employment Agency despite the contracting demand resulting from the crisis. The two large
activation programmes implemented early 2009 have contributed to counteract the impact of
the crisis on unemployment. Their longer term impact needs to be carefully monitored.
Structural unemployment, uneven regional employment, undeclared work and skills
mismatches are still problems that are insufficiently addressed. The Employment Agency
produces unemployment statistics and the National Statistical Office (MONSTAT) conducts
the labour force survey in line with the relevant legislation. The Ministry of Health, Labour
and Social Welfare has been divided into the Ministry of Health and the Ministry of Labour
and Social Welfare.
In the area of
public health policy,
laws were adopted on emergencies, health inspection,
drug abuse, health-related databases and health inspections. Strategies on fighting chronic
non-contagious diseases and managing medical waste were put in place.
However, currently the healthcare system does not meet the needs of the population. Further
efforts are needed to reform primary health centres, improve health service quality and patient
safety and provide equal access to healthcare. Legislation concerning human blood and tissues
and cells quality and safety, tobacco control and reporting of communicable diseases is not
yet fully aligned with European standards and has not yet been implemented. Guidelines for
implementation and action plans still need to be developed. There are still significant gaps
with regard to communicable diseases (an early warning and response system is not yet in
place). Cancer screening is currently not organised, traceability of human blood and tissues
and cells quality and safety is lacking and the blood transfusion system needs to be reformed.
The budget for health policy remains very limited.
In the field of mental health, further efforts are needed to create community-based services as
an alternative to institutionalised healthcare, together with specific healthcare for children and
young people with mental health problems. Adequate financial resources and trained
healthcare personnel are needed to improve the quality of health services in this area.
Overall,
Montenegro has continued to address its priorities in the area of employment and
social policies. However, compliance with European standards needs to be further improved
and the country’s capacity to implement the new legislation effectively needs to be enhanced.
With the exception of labour market analysis, more reliable statistics for social policies are
needed as a basis for further intervention. Further efforts are also required to strengthen
administrative and institutional capacity in the area of public health.
4.1.9.
Education and research
As regards access to
education,
primary and secondary school enrolment rates remain high.
Four new private universities have been established specialising in management of traffic and
communications, humanities, information technology and international tourism and hotel
management.
The Ministry for Education and Science has been reorganised and now employs 72 staff out
of the 99 planned. The government adopted a strategy for the establishment of a Montenegrin
qualification framework (MQN) for 2008-2010 and a strategy on introducing educational
software in schools. In December 2008, a Law on National Professional Qualifications was
adopted.
EN
35
EN
PDF to HTML - Convert PDF files to HTML files
Further steps were taken to upgrade the quality assurance system for universities. A quality
assurance system is now in operation at the University of Montenegro. The faculties of
Business Management, of State and European Studies, and of Foreign Languages at the
Mediterranean University have been re-accredited, while two other private universities are in
the process of re-accreditation.
Future challenges in the field of education include finalising the establishment of the National
Qualifications Framework, improving recognition of informal learning, strengthening the
links between higher education and vocational training and the labour market.
In the field of culture, Montenegro has finalised talks for inclusion in the Community’s
Culture Programme as of 2010 and has established a cultural contact point to promote the
programme and assist potential applicants.
As regards
research,
a special department dealing with science, research and technological
development was established within the Ministry of Education and Science. Montenegro
participated actively in the Seventh EC Framework Programme for research and technological
development (FP7). It nominated observers for various programme committees and the
European Strategy Forum on Research Infrastructure and managed its financial contribution.
Information days on FP7 were organised in order to encourage participation and several
cooperation projects are under way. Montenegro has also been very active in international
cooperation in the Steering Platform for the Western Balkan countries. However, more efforts
could be made to involve small and medium-sized enterprises and on Marie Curie projects.
Based on the strategy on scientific research activities for the period 2008-2016, Montenegro
has taken a number of steps towards integration into the European Research Area, such as
introduction of a young researcher programme.
Overall,
further progress has been made in the fields of education and culture. There has been
good progress on research, particularly on strengthening the institutional framework and on
participation in FP7.
4.1.10. WTO issues
Montenegro's legislation has been brought in line with WTO requirements. The country
concluded all its bilateral negotiations with working party members in 2008 and the country’s
accession conditions were agreed. However, Montenegro’s accession to the WTO continues
to be blocked by a Ukraine request for radical tariff reductions and wide-ranging
commitments in access to services markets, including many sensitive sectors, which was only
made in December 2008.
Efforts are required to strengthen the management and administrative capacity necessary for
proper implementation of the commitments made to WTO members.
4.2.
4.2.1.
Sectoral Policies
Industry and SMEs
Some slight progress can be reported on
SME
policy. Montenegro remains committed to
applying the European Charter for Small Enterprises. It is also a full member of the
Entrepreneurship and Innovation Programme (EIP) under the Competitiveness and Innovation
Framework Programme (CIP). A local consortium led by the European Information and
EN
36
EN
PDF to HTML - Convert PDF files to HTML files
Innovation Centre joined the Enterprise Europe Network in November 2008. An interactive
SME website came into operation at the beginning of 2009. It allows the introduction of
online requests for removal of barriers.
Further legislative progress was made towards simplifying administrative procedures and
shortening the time taken for reviewing technical documentation and issuing construction
permits and certificates of occupancy. The law on craftsmanship was adopted in July 2009.
The network of nine business centres was expanded by adding two more, one in Plav the other
in Kolasin. An IT business incubator has come into operation in Podgorica, with four
businesses assisted up to now. A business start-up centre was established in Bar to support
newly established SMEs in cooperation with local business and educational establishments.
However, the regulatory impact assessment for the new legislation has not yet been
established. No progress was made in extending the silent-is-consent principle to other
spheres of public administration apart from business registration.
The process of developing Montenegro's industrial strategy has not advanced and the
administrative capacity for industrial policy remains weak. An operational plan for removal of
business barriers for 2009 has not been adopted. No progress can be reported on establishment
of a credit guarantee fund (CGF) for SMEs. No progress has been made on cluster policy.
Implementation of the strategy for lifelong entrepreneurship learning for 2008-2013, which
envisages introducing entrepreneurial learning as a key skill in primary and secondary
schools, is at an early stage.
Overall,
Montenegro has started to address its priorities in the area of industrial policy and
has partly met them as regards SME policy. However, further efforts are required to remove
barriers to business, especially at local level, including speeding up licences and permits and
fully implementing measures such as a CGF, incubators and clusters.
4.2.2.
Agriculture and fisheries
Some progress was achieved on
agriculture and rural development policy.
Laws on
agriculture and rural development and on an agricultural census were adopted by the
parliament in July 2009. Amendments to the Tobacco Law and to the Law on Fertilisers were
also adopted. Montenegro ratified the International Plant Protection Convention in December
2008.
The government adopted a national programme for food production and rural development for
the period 2009-2013. This builds on the strategy for food production and rural development
and further aligns Montenegro’s agricultural policy with the EU agricultural policy. The
budget for agriculture and rural development was increased by 20% compared with 2008. A
pilot census conducted in October 2008 successfully tested the instruments for the main
agricultural census which was postponed to April 2010.
Direct support continued to be provided to the livestock sector in the form of headage
payments. Different models for support for the plant production sector (modernisation of
production of vegetables in greenhouses, direct support per hectare to seed-potato growers
and certain cereal growers and production support for tobacco growers) also remained in
place for several thousand beneficiaries, as did investment support for primary production.
EN
37
EN
PDF to HTML - Convert PDF files to HTML files
A phytosanitary administration was established in the Ministry of Agriculture, Forestry and
Water Management and experts to work on rural development issues were recruited.
However, administrative capacity as regards rural development within the Ministry of
Agriculture remains very limited and further upgrading is needed in order to start preparation
for the IPARD framework. Staffing needs to be augmented.
In the area of
food safety, veterinary and phytosanitary policy,
adoption of implementing
regulations improved legislative alignment with the
acquis
and the institutional framework.
The phytosanitary administration came into operation and currently employs 18 staff out of
the 28 planned. In accordance with the Law on Plant Variety Protection, a department for
plant variety protection was established within the phytosanitary administration.
Regarding food safety, the government adopted implementing regulations on control of food
of plant or animal origin and a residue monitoring programme. The Law on Ratification of the
International Plant Protection Convention was adopted. The phytosanitary administration
established a department for food safety.
The veterinary administration was restructured in November 2008 and a department for public
health was established. In accordance with the Veterinary Law, the 2008 annual health
protection programme was implemented and a programme for 2009 was adopted. The
recently established veterinary administration continued to upgrade its administrative capacity
and the veterinary diagnostic laboratory improved its equipment and staffing. Assessment of
agri-food establishments for compliance with EU requirements has started.
The government adopted a national strategic plan for the
fisheries
sector for 2009-2013 which
sets objectives for the development of aquaculture and marine fisheries, including scientific
assessment of fish stocks. The number of staff responsible for fisheries in the Ministry of
Agriculture has been increased. A draft Law on Marine Fisheries is before parliament.
Overall,
some progress can be reported on the strengthening of the legal framework, however,
implementation of legislation still needs to be enhanced. Further strengthening of the
administrative capacity of bodies in charge of phytosanitary policy and food safety is
required. An integrated food safety system still needs to be established. The administrative
capacity of the Ministry of Agriculture, Forestry and Water Management, in particular as
regards rural development, needs to be strengthened.
4.2.3.
Environment
Progress has been made as regards
horizontal legislation.
The government adopted a national
environmental policy setting out national priorities and addressing cross-cutting issues, such
as the need to bring gradually all environmental protection issues together under a single
ministry. The decree on the amount of fees, the manner of calculation and payment of fees
related to the pollution of the environment has been brought in line with the provisions of the
Interim Agreement to the SAA (See
point 4.2.4 Transport Policy).
Alignment of the relevant
environmental legislation with the
acquis
is moderately advanced. A national committee for
approval of clean development mechanism projects was established. The Espoo Convention
on Environmental Impact Assessment in a Transboundary Context and the Aarhus
Convention on Access to Information, Public Participation in Decision-Making and Access to
Justice in Environmental Matters were ratified. Further efforts are required on implementation
and enforcement of legislation.
EN
38
EN
PDF to HTML - Convert PDF files to HTML files
In the area of
air quality,
considerable work is under way, but little tangible progress has
been achieved. Amendments to the Air Quality Law aiming to improve harmonisation with
EU standards and a rulebook on air quality assessment are being developed, but alignment
towards four directives on air quality, laying down the remaining definitions and air quality
standards, needs to be finalised. Regarding air quality assessment, emission inventories need
to be prepared. The national and local emission inventory for 2006 was updated in October
2008. Implementing legislation on air quality is also required. Gaps to be filled include
identifying conglomerations and zones, establishing a monitoring programme and database
and making data available to the public.
Limited progress has been made in the field of
waste management.
Financial and
administrative limitations delayed implementation of the Waste Management Law from
1 November 2008 to 1 January 2010. Further work is required to develop the necessary by-
laws. Implementation of the strategic plan for waste management continued. A regulation was
published on the criteria, amount and method of payment of fees for waste management.
Feasibility studies and environmental impact assessments on six regional sanitary landfill
locations were finalised and projects are being designed. However, alignment with European
standards needs considerable strengthening and acceleration, in particular concerning the
landfill Directive and the waste shipments regulation.
Limited progress can be reported on
water quality.
A Law on Water Management and
Financing was adopted. In spite of some progress, the degree of alignment to the Drinking
Water Directive remains very low. Alignment with European standards needs to be improved
substantially. Further efforts are required to improve implementation and enforcement.
Some progress can be reported in the field of
nature protection.
A Nature Protection Law
established the legal framework for Natura 2000. Related by-laws have not yet been adopted.
A number of international conventions and agreements were ratified, e.g. the Convention on
the Conservation of European Wildlife and Natural Habitats (Bern Convention), the
Convention on the Conservation of Migratory Species of Wild Animals (Bonn Convention),
the Agreement on the Conservation of Cetaceans of the Black Sea, Mediterranean Sea and
Contiguous Atlantic Area (ACCOBAMS), the European Landscape Convention and the
Convention on the Protection of Underwater Cultural Heritage. A Law on Mountain Trails
and amendments to the Law on National Parks were adopted. A decision on establishment of
the Nature Protection Institute was adopted. Further awareness-raising efforts are needed in
this field. Inspection measures and sanctions have not yet been adopted. The level of
alignment has improved, but implementation and enforcement remain challenges.
Preparations in this area are at an early stage.
Some progress can be reported on
industrial pollution control and risk management,
although there are no signs of transposition of the Mining Waste Directive. The Convention
on Transboundary Effects of Industrial Accidents was ratified. Montenegro has aligned with
almost all the relevant legislation, but implementation and enforcement remain challenges.
There was no progress in the areas of
chemicals
and
genetically modified organisms
(GMOs).
Implementation and enforcement in both fields remain weak. Preparations in these
areas are at an early stage.
There was no progress on
noise
abatement.
EN
39
EN
PDF to HTML - Convert PDF files to HTML files
Further efforts are needed to strengthen the
administrative capacity
of all institutions
involved in environmental policy-making and enforcement.
Following establishment of the new government, responsibility for the environment and
spatial planning was assigned to the new Ministry of the Environment and Spatial Planning.
Previously it had been divided between the Ministry of Tourism and the Environment and the
Ministry of Economic Development (spatial planning). This redistribution of powers did not
affect the administrative capacity in these areas, which remains limited.
An Environmental Protection Agency (EPA), with a wide range of responsibilities in
implementing and enforcing environmental legislation, was formally established by
government decree. A director was appointed and an operating budget allocated for 2009. So
far the EPA has employed 14 permanent staff out of the 60 or so planned. In particular,
environmental impact assessment (EIA) need to be properly carried out by the EPA whenever
legally required and in proper coordination between all relevant authorities, including in cases
(such as small-scale energy projects or in connection with the implementation of the spatial
plan) where a local authority issues the permit and decides on the scope and final approval of
EIA. Proper inspections need to be made possible at all levels, central and local. The limited
resources of the EPA raise serious concerns about the ability of the new agency to perform its
functions.
The sharing of responsibility for the water sector between the Ministry of the Environment
and Spatial Planning and other ministries must be clarified. Coordination between the bodies
involved in environmental protection issues, particularly in inspection activities, needs to be
improved. There has been a considerable increase in the number of inspections conducted by
the ecological inspectorate. However, the lack of implementation capacity at local level and
poor coordination between central and local government are continuing to limit enforcement
capacity. Further upgrading of the administrative capacity of the ecological inspectorate is
necessary.
The government established ‘Project Consulting’ (PROCON), a company in charge of
managing projects in the field of communal services and environmental protection, primarily
providing related logistical support to municipalities.
Overall,
Montenegro has made some progress on legislative alignment with European
standards. However, implementation and enforcement need to be further strengthened.
Particular attention needs to be paid to strengthen administrative capacity and to establish
effective inspection services. Work on awareness-raising on environmental protection issues
needs to be continued. Environmental protection, in particular in coastal areas and national
parks, remains a cause for concern.
4.2.4.
Transport policy
In the field of
trans-European transport networks,
Montenegro has continued to actively
participate in the implementation of the 2004 Memorandum of Understanding on the
development of the South East Europe Core Regional Transport Network, and in the South
East Europe Transport Observatory (SEETO) particularly by updating and implementing the
Multi-annual Plan 2009-2013. Continued cooperation in the framework of SEETO and further
improvement in the quality of the existing road and rail infrastructure are needed.
EN
40
EN
PDF to HTML - Convert PDF files to HTML files
On
road transport,
Montenegro continued to allow unrestricted Community transit traffic
through its territory. The decree amending the amount of fees, the manner of calculation and
payment of fees related to the pollution of the environment, so called "Eco-tax", has been
brought in line with the Interim Agreement to the SAA. The amendment ensures eco-tax
proportionality for foreign heavy goods vehicles entering Montenegro territory. However,
proportionality of the same tax applying to other EU vehicles coming to Montenegro and not
covered by the Interim Agreement remains a concern. Amendments to the Law on Road
Traffic Safety were adopted. In January 2009 Montenegro became a member of INTERBUS.
Progress in the road haulier sector was limited both on adoption and on implementation of
harmonised legislation. The Law on Contracts for Carriage by Road was adopted by
parliament.the Law on Digital Tachographs remains to be drafted. The draft strategy to
improve road traffic safety has yet to be adopted. The traffic safety situation remains
unsatisfactory and additional prevention measures are necessary.
In the field of
rail transport,
unbundling of the railway company into an infrastructure
company (Montenegrin Railway Infrastructure) and an operator (Railway Transport of
Montenegro) was followed by establishment of the commissions for privatisation of the newly
established companies. A border-crossing agreement was concluded with Serbia in March
2009, but it appears not to be in line with EU open access provisions (See
point 4.1.4 Customs
and taxation).
However, no progress was reported on implementation of rail safety rules. The
Railway Directorate which under the new government regulations, will take over
responsibility for the rail transport department from the Transport Directorate has not yet been
set up.
In the field of
maritime transport,
there is limited progress to report. Restructuring of the
national port at Bar through privatisation was launched. The port was divided into five limited
liability companies. Privatisation will be implemented in two phases. The first phase, putting
out to tender the Marina Bar port authority, started. The new regulator, the Port
Administration provided for by the Law on Ports, has not yet been set up. On safety issues,
the rate of detention of Montenegrin vessels in the area covered by the Paris memorandum of
understanding reached an appalling 33% in 2008, indicating clear flag State insufficiencies
that need to be addressed. Security issues also require particular attention.
There are no developments to report in the fields of
inland waterways
and
combined
transport.
Concerning
air transport,
alignment of national legislation on aviation with the
acquis
progressed. The 2008 Law on Civil Aviation came into force with effect from February 2009.
Bilateral air services agreements have been signed with the former Yugoslav Republic of
Macedonia and initialled with Croatia and Switzerland. However, the Law on Civil Aviation
needs to be amended in line with the recommendations made in the 2008 ECAA assessment
report to ensure compliance with the European Common Aviation Area (ECAA) Agreement.
A civil aviation safety committee has still not been established and this is preventing
implementation of a civil aviation safety programme. The Montreal Convention has yet to be
ratified and Montenegro has not yet become a full member of the European Joint Aviation
Authorities (JAA). Relations with the European Aviation Safety Agency (EASA) have been
put on a formal footing by a working arrangement signed on 7 July 2009. The administrative
capacity of the relevant authorities is not yet up to the standards for proper enforcement of the
aviation
acquis.
Despite Montenegro serious engagement in the recent set up of air traffic
national bodies, staff available is limited. Additional efforts are necessary to ensure the
appropriate level of alignment with European standards. Montenegro's participation in the
EN
41
EN
PDF to HTML - Convert PDF files to HTML files
Single European Sky Committee and in the Implementation of the Single European Sky in
South Eastern Europe (ISIS) Programme will be beneficial in this regard.
Overall,
Montenegro’s preparations are moderately advanced in the cases of road and rail
transport, but still at an early stage for air and maritime transport. Progress on safety aspects
and a systemic approach to development of transport is still limited. Considerable efforts are
required to establish adequate administrative capacity and implement the
acquis.
4.2.5.
Energy
Regarding
security of supply,
the new Energy Law remains to be adopted. It will address oil
stocks, security of electricity and gas supply and cogeneration.
Regarding the
internal energy market,
in line with the national energy development
strategy, an action plan for the period 2008-2012 was adopted in October 2008. It reflects the
general objectives of the EU’s energy policy. The electricity market was opened for all non-
household consumers with effect from 1 January 2009. The regulator has adopted rules on
qualified buyers of electricity, on designation of the public electricity supplier and on
approval of market rules.
Progress on restructuring the State electricity company (EPCG) has continued. Following the
decision to unbundle EPCG, five daughter companies were established. The Company Law
was amended to allow unbundling of transmission and the setting-up of a transmission
company and a holding company – EPCG AD. Four of the five daughter companies, dealing
with generation, supply, distribution and construction, remain part of the holding company.
The transmission joint stock company was fully unbundled in April 2009. EPCG AD is being
partly privatised by means of a capital increase and sale of 18.3% of its shares to Italian
power company A2A. In the next stage, the plan is to turn the four remaining companies into
independent joint stock companies. Restructuring is due to be completed by the end of 2009.
Decisions to award eight concessions to build and operate small hydroelectricity plants were
adopted. A decision determining feed-in tariffs from small hydroelectricity plants was
adopted.
Preparation are being made for putting out to tender construction of large hydroelectricity
plants, based on a concession.
There has been little tangible progress in relation to
renewable energy.
Several programmes and awareness-raising campaigns to promote
energy efficiency
were
conducted as part of the Montenegrin Year of Energy Efficiency. The adoption of the Law on
Energy Efficiency remains hereby of key importance.
A Law on
Nuclear Safety and Radiation Protection
has been adopted in August 2009.
Within the Environmental Protection Agency a regulatory body responsible for protection
against ionising radiation was established. However, alignment with the
acquis
would require
improvement of the regulatory infrastructure and enhancement of its technical capacity. The
existence of hundreds of radioactive lightning rods spread all over the country still constitutes
a radiological thread that needs to be addressed.
Overall,
some progress can be reported in some energy sectors. Steps have been taken
towards meeting the requirements of the Energy Community Treaty, such as the opening of
EN
42
EN
PDF to HTML - Convert PDF files to HTML files
the electricity market for non-household consumers, but further efforts are required.
Promoting energy efficiency and renewable energy sources is crucial.
4.2.6.
Information society and media
Some progress has been made on
electronic communications and information
technologies.
The liberalisation of the sector has continued. Even though narrowband is still
predominant for connecting to the internet, as of January 2009 the broadband penetration rate
was 5.5% and alternative operators held around 20% of this important growth market. The
mobile penetration rate was 184%.
The Agency for Electronic Communications and Postal Services (EKIP), established by the
Law on Electronic Communications, has come into operation. Its statutes, work programme
and operational and financial plans were adopted. The agency increased its human resources.
Rulebooks on the annual fees for numbers and addresses and on use of radio frequencies have
been adopted. Rules on (higher) annual fees for numbers and addresses as well as for the use
of frequencies were adopted. So far no comprehensive market analysis has been performed by
EKIP. However, the Law on Electronic Communications defines significant market power
(SMP) operators in its transition articles and accordingly new licences were issued to these
operators. In 2009 EKIP launched the market analysis and designation of operators holding
SMP process.
However, implementation of the Law on Electronic Communications was delayed by the late
nomination of the new board and the executive director of the Electronic Communications
Agency. The procedure for appointing the members of the board remains a cause for concern
regarding their independence. The late establishment of the agency delayed adoption of
implementing legislation, including rulebooks on number portability and local loop
unbundling. The administrative capacity of the department for telecommunications policy in
the Ministry of Transport, Maritime Affairs and Telecommunications remains weak.
There has been no progress towards enhancing consumer protection.
There have been further developments regarding
information society services.
A new
Ministry for the Information Society was established on 3 January and turned into the
Ministry for Economic Policy and the Information Society with the formation of the new
government in June 2009. It is responsible for information and communication technology
initiatives in all government bodies. An information society strategy for 2009-2013 was
adopted in February 2009. Laws on personal data protection and on personal names were
adopted. However, the Conditional Access Directive has not yet been transposed. Human
resources at the Ministry for Economic Policy and the Information Society are still weak.
Electronic signature legislation is in the process of implementation.
In the area of
audiovisual policy and the media,
a Law on Public Service Broadcasting was
adopted in December 2008. It abolished the steering committee of Radio Television
Montenegro (RTCG) and transferred its powers to the RTCG Council, which has nine
members appointed by parliament. However, the political independence of the public service
broadcaster has to be ensured. Licence fees for radio and television were abolished. RTCG is
now financed from the State budget. It receives 1.2% of the annual budget. This provides the
public broadcaster with stable financial resources.
EN
43
EN
PDF to HTML - Convert PDF files to HTML files
The responsibilities of the Agency for Electronic Communications and of the Broadcasting
Agency under the Law on Electronic Communications regarding frequency licensing remain
unclear. A disagreement between the two agencies regarding their competences contributed to
delays in allocating a frequency to a private TV station.
Overall,
some progress has been made regarding the information society and the media.
However, progress in this sector has been hindered by the late implementation of the Law on
Electronic Communications. Concerns remain about the independence of the Electronic
Communications Agency. Disagreements on responsibility for frequency licensing are giving
rise to concern and related competences and procedures require urgent clarification. Further
strengthening of the legislation and related implementing regulations is needed. Greater focus
needs to be put on implementing the national information society strategy. The effectiveness
and independence of the public service broadcaster need to be ensured.
4.2.7.
Financial control
Some progress can be reported in the area of
public internal financial control
(PIFC), in line
with Montenegro’s PIFC policy paper. The Law on PIFC was adopted in November 2008,
followed by implementing legislation focusing on financial management and control (FMC)
systems and internal audits (IA) in the public sector. A Central Harmonisation Unit for both
FMC and IA is in place and internal audit units are being set up in line ministries. Further
efforts are required, however, to draft new and align existing implementing legislation.
Considerable awareness-raising at all levels of the administration and training remain
necessary.
In the area of
external audits,
progress can be reported. The numbers of qualified State
auditors and of audits undertaken are increasing. The State Audit Institution is steadily
developing its administrative capacity to ensure efficient external audit. Parliament adopted
the institution’s annual report for the period from October 2007 to October 2008, accepting all
the proposed conclusions.
Overall,
Montenegro’s preparations in the fields of PIFC and external audit are at an early
stage.
4.2.8.
Statistics
There has been some progress on
statistical infrastructure.
The government adopted a
development strategy for statistics for 2009-2012. The new strategy gives the Statistical
Office of Montenegro (MONSTAT) the coordinating role for developing a statistical system
in compliance with the European Statistics Code of Practice. However, an action plan and
financial resources for implementing the strategy are still not available. The Statistical Law
needs to be revised to match the objectives of the strategy.
Currently MONSTAT employs 135 people, out of 203 posts allocated by the organisation
chart adopted in April 2008. The process of filling the new posts has been constrained by the
lack of office space. Management capacity remains relatively weak, with three positions for
assistant directors vacant for a whole year. Retaining skilled staff remains a problem.
Some progress was made on data dissemination policy. A release calendar for 2009 was
published on MONSTAT’s website in December 2008. A multiannual statistical work
programme for 2009-2013 was adopted, providing the basis for the annual plans. Efforts are
EN
44
EN
PDF to HTML - Convert PDF files to HTML files
required to implement the annual plans effectively. A memorandum of understanding remains
to be signed with the Central Bank to ensure provision of timely and high-quality statistics,
particularly in relation to GDP in accordance with ESA 95, the European System of Accounts.
Progress in the field of
classifications and registers
has been limited.
As regards
sector statistics,
progress can be reported. MONSTAT conducted the pilot
population and housing census in June 2009. The pilot agricultural census was conducted in
2008 and the agricultural census law was adopted in July 2009. The preparations for the
agricultural census in April 2010 are well advanced. Some progress has been made on
business statistics, but generally the availability of business statistics, especially short-term
statistics, needs to be improved. Efforts are still needed to ensure that the 2011 population and
housing census is carried out in a timely manner in line with EU standards. As regards
macroeconomic statistics, cooperation with the customs administration has improved, leading
to better timeliness and quality in the monthly external trade statistics. The consumer price
index is now published monthly. Compliance with ESA 95 has progressed, but much remains
to be done. MONSTAT still does not produce quarterly national accounts. The quality and
timeliness of data need to be improved; annual national accounts should be published by
September, in line with EU standards. Transmission of trade data to Eurostat needs to be
improved.
Overall,
some progress can be reported in the area of statistics and Montenegro has started to
address its targets. However, its administrative capacity remains weak and the legislative
framework needs to be further improved and completed. Substantial efforts remain necessary
in all areas in order to improve compliance with EU standards.
4.3.
4.3.1.
Justice, freedom and security
Visa, bordermanagement, asylum and migration
Good progress has been made in the area of
visa policy
and in the wider framework of the
visa liberalisation dialogue. In particular, Montenegro has taken important steps towards the
benchmarks set in the road map for visa liberalisation and met the majority of them, allowing
the Commission to include Montenegro in its proposal of July 2009 for visa free travel.
Montenegro has established sound procedures for applying for and issuing travel documents,
supported by suitable technology and equipment. By September 2009, it has issued 122,190
new biometric passports in line with EU and international standards. Replacement of old-style
travel documents by new biometric passports is expected to be completed by the end of 2009.
The Law on Foreigners entered into force in January 2009. A new Visa Regulation, based on
the Schengen rules, entered into force in March 2009. The visa policy is not yet fully in line
with European standards. Montenegro still has limited capacity for issuing visas in the
Ministry of Foreign Affairs and at its few diplomatic and consular missions. There is no
electronic database or other IT system linking consular offices issuing visas with the Foreign
Ministry. Processing applications on paper hinders effective control of applicants, in
particular when visas are issued at border crossing points. The sector for migration, visas and
readmission in the Ministry of the Interior and Public Administration needs to be reinforced in
terms of both expertise and human resources. Montenegro has started to address its priorities
in the area of visa policy, but further work is required. As regards
border management,
Montenegro made progress. It has continued to implement its integrated border management
(IBM) strategy and the associated action plan. Cross-border cooperation is working well
under both formal and informal arrangements. The border police carry out regular joint
EN
45
EN
PDF to HTML - Convert PDF files to HTML files
patrols with the Albanian border police and the Croatian police. Reconstruction of the Bozaj
border crossing point (BCP) was completed and work has started on reconstruction of the
Dobrakovo BCP. The Sukobin-Muriqan joint BCP with Albania was opened in June 2009.
There has been some improvement in the equipment at BCPs, although the availability of
integrated passport readers remains limited and there are no devices for taking fingerprints.
At the end of 2008 a memorandum of understanding on cooperation on IBM, was signed
between the Ministry of the Interior and Public Administration, the Police Directorate, the
Customs Directorate, the Veterinary Directorate and the phytosanitary administration. A
working arrangement with FRONTEX was signed in June 2009. Five additional border
crossing points were connected to the Police Directorate’s central database and have access to
the Interpol database.
However, new legislation on State border control, including border surveillance, and related
implementing legislation which will ensure further alignment with the Schengen
acquis
have
yet to be adopted. The border demarcation with Serbia and Kosovo is still pending.
Surveillance systems are lacking at both the blue and green borders and the equipment used
for border checks is not yet adequate. A basic training curriculum for border police needs to
be established. Further development of specialised and advanced training for experienced
border police staff (with special reference to intelligence personnel) is needed in order to
boost the capacity to prevent and detect cross-border crimes. Inter-agency cooperation on
border management requires further improvement by establishing a national coordination unit
or multi-agency information centre, in particular to allow on-line sharing of information
between institutions for their day-to-day work. Progress can be reported in relation to
establishment of a risk analysis system. However, more trained intelligence officers are
required at all levels. Linking all border crossing points into a network with online access to
the national database and to the Interpol database must be addressed as a priority.
Overall,
Montenegro has made good progress on addressing priorities in the area of border
management but needs to maintain the pace of reforms.
Limited progress has been made in the area of
asylum,
although the legislative and
institutional frameworks are almost complete. The Law on Asylum provides a broad spectrum
of rights. There are very limited numbers of asylum-seekers in Montenegro: in 2008 there
were seven and to date in 2009 there have been 13.
In practice, asylum-seekers and recognised refugees face certain obstacles, including difficult
access to the labour market. The mixed judicial/administrative nature of the State Asylum
Appeal Commission needs to be clarified. The law provides for no judicial recourse against its
decisions. Its staff requires training on asylum issues. Construction of the planned reception
centre for asylum-seekers has not yet begun. Currently accommodation for asylum-seekers is
provided by the bureau for the care of refugees. Proper implementation of the asylum
legislation needs to be ensured, including due examination of asylum applications and
provision of judicial review in the event of refusal.
Overall,
Montenegro has started to address priorities in the area of asylum. However, further
efforts are needed on implementation of legislation.
Some progress has been made on
migration.
The Law on Foreigners and the Law on
Employment and Work of Foreigners have been in force since January 2009. The Law on
Foreigners broadly reflects the principles laid down in the Directive on common standards
EN
46
EN
PDF to HTML - Convert PDF files to HTML files
and procedures for returning illegally staying third-country nationals. A number of
implementing laws related to the Law on Foreigners need to be adopted. The border police
department for foreigners and fighting illegal migration and the Ministry of the Interior’s
department for migration, visas and readmission deal with migration issues. The strategy for
integrated migration management for 2008-2013 and the action plan for 2008-2009 were
adopted in November 2008. A council for monitoring implementation of the strategy has been
established. No problems have been observed with implementation of the readmission
agreement between Montenegro and the European Community. At the end of 2008 Albania,
Bosnia and Herzegovina, Croatia, Montenegro, the former Yugoslav Republic of Macedonia
and Serbia signed a memorandum of understanding on setting up a system for sharing
statistical data on illegal migration and participating in the regional system of advance
notification.
However, the human resources and specialist knowledge on migration issues within the
Ministry of the Interior need to be strengthened. Cooperation with other public institutions, in
particular with the Employment Office, on unlawful employment of migrants remains weak.
Integration of migrants and reintegration of Montenegrin nationals readmitted under
readmission agreements have not yet been sufficiently addressed. Further progress is needed
on collection of data on migration. Detention facilities for those foreign nationals who
illegally overstay are not yet adequate.
Montenegro needs to ensure effective implementation of the legal framework aimed at
resolving the status of displaced persons from Bosnia Herzegovina and Croatia and resolve
the status of displaced persons from Kosovo.
Overall,
there has been good progress in the area of migration. Further efforts are needed on
implementation of legislation and enhancement of administrative capacity and institutional
cooperation. The issue of internally displaced persons needs to be resolved.
4.3.2.
Money laundering
Some progress has been achieved in the fight against money-laundering. Legislation
implementing the Law on the Prevention of Money-Laundering and Terrorist Financing was
adopted in December 2008. These two regulations put in place rules and procedures for
reporting cash transactions over €15,000 and suspicious transactions and for organising data-
keeping, data protection, compliance officers’ professional training and internal control within
the entities reporting to the anti-money-laundering administration. In March 2009, one further
piece of implementing legislation was adopted on drafting guidelines for risk analysis for the
purpose of preventing money laundering and terrorism financing. Police and prosecutors have
received training on identification and detection of money-laundering and confiscation of
criminal assets.
The directorate for prevention of money-laundering and terrorism financing is maintaining
databases on suspicious transactions, cash transactions over a given threshold and court-
registered real estate sales contracts. Analysts from the directorate also have access to
statistical reports on deposits and withdrawals and on investors in capital markets. However,
the Directorate lacks an important software database (IBASE), which would facilitate national
and international cooperation and exchange of data with law enforcement agencies. It
currently employs 25 staff of the foreseen 34 posts. A reporting entities register makes it
possible to monitor reporting trends. The scope of reporting entities has been extended but the
number of suspicious transactions reported decreased over 2008.
EN
47
EN
PDF to HTML - Convert PDF files to HTML files
The requirements for identification of beneficial owners by the reporting entities, especially
by casinos and estate agencies, have been tightened up and one report of a suspicious
transaction has already been received from an estate agency.
However, Montenegro’s effectiveness in fighting money-laundering needs to be enhanced. Its
legislation is not yet fully in line with the UN Convention against Transnational Organised
Crime and the UN Convention against Illicit Traffic in Narcotic Drugs and Psychotropic
Substances. A quarter of the anti-money-laundering administration’s posts have not been
filled; staff turnover is high and remuneration low. The statistics produced are not yet reliable.
A clear set of management statistics needs to be agreed so that the appropriate data are
collected on a routine basis.
During 2008 only one report of a suspicious transaction was made by a money service bureau
and none by lawyers or notaries. Tighter control needs to be exercised over funds invested in
real estate. Only five of the eleven commercial banks in total submitted STRs in 2008 and
2009 and about half of all STRs originate from two banks. Reporting entities’ understanding
of their obligations to report to the anti-money-laundering administration needs to be
improved, as does supervision of compliance by reporting entities. This calls for greater
capacity in the anti-money-laundering administration.
The March 2007 list of indicators for identifying suspicious customers and transactions needs
to be updated. The capacity for a risk-based approach to dealing with suspicious transactions
reported to the anti-money-laundering administration and the resulting implementation record
remain weak. The necessary guidelines are not yet in place. Analysts with the necessary
training are needed for the directorate.
The capacity of the police and the prosecution service to investigate cases of money-
laundering remains insufficient. Only a small, though increasing number of money-laundering
cases were forwarded to the prosecution service by the police. The prosecution service still
lacks expertise in this field. In 2008 three financial investigations were conducted by the
police in cooperation with the special prosecutor for fighting organised crime. There is a need
to strengthen the human resources further, along with the expertise and technical capacity of
the police and prosecutors, particularly for financial investigations. Between September 2008
and August 2009 there was no conviction on money-laundering.
The capacity for conducting financial investigations and awareness of their importance in the
anti-money-laundering administration, the police and the prosecution service needs to be
improved. More effective inter-agency cooperation is necessary to reduce bureaucracy and
ensure regular feedback on investigations. This will require, amongst other things, revision of
the current memoranda on cooperation between the anti-money-laundering administration, the
police and the prosecutor’s office.
Overall,
Montenegro has continued to address its priorities, but money-laundering remains a
serious problem linked to organised crime and corruption. Clear determination to prevent and
combat money-laundering is needed. The fall in the number of investigations and of reports of
suspicious transactions and the fact that there were no convictions for money-laundering are
causes for concern.
EN
48
EN
PDF to HTML - Convert PDF files to HTML files
4.3.3.
Drugs
Montenegro has made some progress in the fight against drugs. The national strategic
response to narcotics and the associated action plan are being implemented under the
coordination of a new National Drugs Office. For the first time a survey on the use of alcohol,
tobacco and drugs was conducted in line with the EU method. Preventive activities have
continued. Police and customs officers have received training on control of precursors and
smuggling of drugs. A drug manual has been distributed to border police officers. There was
an upward trend in seizures of most types of drugs during the reporting period. International
cooperation on law enforcement in drug cases has improved.
However, a Law on Precursors has not still been adopted. Montenegro remains a key link on
the transit routes for drugs. Domestic drug consumption is increasing. The capacity of the
police to fight drug-related crime continues to be insufficient. The police department
responsible for combating drug-related crime is still not properly staffed and equipped.
Instruments such as witness protection and under-cover agents are infrequently used, partly
due to the inherent difficulty of using such tools in a very small, socially tightly-knit country.
The National Drug Office has become operational but is understaffed. The planned national
information unit on drugs, which will be responsible for collecting and documenting
information on drug addicts, has yet to be established. Problems persist with prevention of
drug addiction and with treatment and rehabilitation of addicts. Inter-agency and international
cooperation on law enforcement needs to be strengthened.
Overall,
Montenegro has started to address its main priorities, but further action is needed.
The institutional framework for fighting drug-related crime has been reinforced and seizure
levels have increased. However, drug trafficking, in particular by groups engaged in organised
crime, remains a serious cause for concern. Drug abuse is continuing to rise and there is still a
lack of reliable statistics.
4.3.4.
Police
Some progress was made in the area of policing and police reform over the reporting period.
The internal reorganisation continued. Staff has been receiving extensive training. The Police
Academy continued to build its capacity for general and specialised training for various levels
of staff, including specialised training for criminal and border police. A track record is being
established in the area of internal control. Disciplinary measures have been imposed on 124
police officers while from February to July 2009, criminal charges were brought against 27
police officers. Pilot implementation of intelligence-led policing has started in two regional
police units – Bar and Budva, including the outpost of Ulcinj. A pilot project on community
policing has also been successfully implemented in all regional police units. A modern
forensic centre has started work. New equipment was provided to the police and new police
uniforms were introduced.
The police have been actively participating in international police cooperation and a number
of joint operations conducted. Under the Convention on Police Cooperation for South-East
Europe (Vienna Convention), the Montenegrin police were involved in cross-border
cooperation and exchanged intelligence with the police services of neighbouring countries.
However, the professional capacity of the police still needs to be improved, in particular as
regards use of modern investigation and analysis techniques, the availability of basic
infrastructure and equipment and a comprehensive IT network. Equipment and facilities need
EN
49
EN
PDF to HTML - Convert PDF files to HTML files
to be upgraded, in particular for the organised crime department. Police staff specialising in
the fight against organised crime need to remain focused on this field rather than diverted to
other tasks. Operational effectiveness and security require that dissemination of intelligence
and operational data need to be based on the ‘need to know’ principle rather than on
hierarchical channels of communication.
Data maintenance rules and compilation of statistics in the Police Directorate need to be
improved. The overall number of policemen remains high compared with crime rates. The
police internal control unit needs to be further strengthened. The overall reform of the police
needs to continue with the adoption of a new Law on the Police, taking into account the new
Criminal Procedure Code and strengthening police integrity and understanding of the role of
the police as a provider of services to the public. Control of access to weapons and explosives
needs to be tightened up. The strategic cooperation agreement with Europol has been ratified
in August 2009.
Overall,
police reform in Montenegro is moderately advanced.
4.3.5.
Fighting organised crime and terrorism
Some progress can be reported in the fight against
organised crime.
In February 2009 the
second Additional Protocol to the European Convention on Mutual Legal Assistance in
Criminal Matters entered into force. The government adopted the fourth and fifth report on
the action plan for implementation of the programme for fighting corruption and organised
crime. Progress has been made on implementation across a large number of areas, although a
considerable number of measures have been only partially implemented or not yet applied.
The national commission on fighting organised crime and corruption and its tri-partite
commission continued their activities on case monitoring and on harmonising statistics and
methods of analysis.
The newly adopted Criminal Procedure Code considerably strengthens the legislative
framework for fighting organised crime and corruption. The number of deputies and
administrative staff in the special prosecutor’s office for fighting organised crime, corruption,
war crimes and terrorism was increased. The relevant departments in the two high courts have
also been strengthened with the aid of specialised training. The number of investigations and
indictments of organised crime cases increased and a higher number of final convictions were
secured, including in a high-profile case concerning the murder of a journalist. The authorities
have been actively participating in international judicial and police cooperation.
The Police Directorate’s unit for fighting organised crime and corruption conducted six
financial investigations in 2008 and brought six criminal charges. Three financial
investigations were initiated between January and April 2009, of which one concerned an
organised crime case. The investigative and operational capacity of the special verification
unit responsible for collecting and analysing intelligence was further developed and the unit
was equipped with new computers.
However, efforts are still needed to ensure effective implementation of delayed measures
under the action plan for fighting organised crime and corruption. Future strategic priorities
and activities need to be based on a thorough and comprehensive assessment of the real needs
and threats related to organised crime and corruption, taking into account the resources
available for implementation. The quality of statistics needs to be substantially improved in
order to be able to track trends in organised crime and corruption. Coordination, at national
EN
50
EN
PDF to HTML - Convert PDF files to HTML files
level, of international judicial cooperation needs to be formalised and improved. The working
procedures, staff and technical equipment of the bodies in charge of international cooperation
on law enforcement, in particular the international police cooperation unit, need to be further
enhanced. If the legislative provisions allowing confiscation of criminal assets are to be
effective, police and prosecutors need further training in financial investigations, so that they
can trace criminal assets and present related evidence before the courts. The State Agency,
which will have the task of dealing with confiscated criminal assets, was established in July
2009. Enhanced efforts are needed to ensure the necessary institutional and administrative
capacity to make it operational.
The Police Directorate’s organised crime unit is understaffed and has no staff at local level.
The working conditions of this unit are inadequate and its professional skills need further
upgrading, especially with regard to modern investigation techniques, including financial
investigation, which is not yet perceived as one of the main tools for tackling organised crime,
corruption and money-laundering.
The surveillance capability of the Police Directorate’s special verification unit is insufficient
to conduct investigations effectively, because of the shortage of skilled staff and some special
equipment. Plans to develop a number of practical tools for law enforcement practitioners -
such as a manual on application of special investigative techniques and a manual on
intelligence-led policing - have still to be implemented. Training and expertise, particularly on
financial investigative methods, need to be improved significantly, as do equipment and
premises.
A cooperation agreement between the Police Directorate and the prosecutor’s office was
signed in June 2009. However, implementation of other planned measures, aimed at
formalising the existing informal inter-agency cooperation and exchange of information,
needs to continue. Operational cooperation between law enforcement agencies could be
improved by the establishment of a national coordination unit allowing direct exchanges of
information and intelligence between the police and the tax, customs and money-laundering
administrations. To ensure greater efficiency, gradual development of the necessary expert
skills and processing procedures is needed, together with production and systematic
dissemination of intelligence and information which will support the full-time work of the
unit.
During the reporting period,, convictions in organised crime have increased. In order to attain
better results, consistent use will have to be made of new legal tools, along with recruiting
additional specialised police and prosecution staff, streamlining procedures, strengthening
inter-agency cooperation and providing specialised training.
Overall,
the institutional, legal and administrative capacity for fighting organised crime has
been strengthened. The improvements to the legislation on criminal procedure are a major
step in the right direction. However, the capacity of the police and judiciary to deal with such
cases remains limited. The inefficiencies in prosecution, trial and sentencing of organised
crime in Montenegro remain a serious cause for concern.
There has been good progress in the fight against the
trafficking of human beings.
Montenegro is continuing to be used primarily as a transit country. The 2009 action plan to
implement the strategy to fight trafficking in human beings was adopted in December 2008. It
includes measures against the trafficking of children. The Council of Europe Convention on
Trafficking of Human Beings entered into force in November 2008. Facilities are in place to
EN
51
EN
PDF to HTML - Convert PDF files to HTML files
support and protect victims of trafficking. Shelters and victim assistance schemes are
continuing to be run by NGOs and financed by the government. Their existing capacity is
presently sufficient given the low number of victims of trafficking (four persons in 2007 and
three in 2008). The office of the national coordinator on trafficking in human beings has
carried out extensive work on prevention and public awareness-raising to combat trafficking.
Specialised training has been provided to relevant institutions at national and local levels.
Cases concerning trafficking in human beings have been investigated and concluded with
convictions.
Further measures are necessary to enhance the capacity of the authorities to identify potential
victims. The need for changes to the existing legislation on illegal migration will have to be
examined from this angle.
Overall,
Montenegro has advanced in the area of the fight against trafficking in human
beings, though efforts need to continue.
Limited progress has been made on strengthening coordination between and the capacity of
the law enforcement agencies for
fighting terrorism.
The special counter-terrorism unit
within the Police Directorate received further training and contributed to police operations, for
example by protecting persons and consignments of money. A national strategy against
terrorism still needs to be adopted.
Overall,
Montenegro's framework for fight against terrorism is at an early stage of
preparation.
4.3.6.
Protection of personal data
Some progress was achieved, in the form of adoption of the Law on Protection of Personal
Data at the end of 2008. The Law entered into force but changes to the legislation as aiming at
ensuring the independence of the supervisory authority have not yet been adopted. The
President and members of the Council of the authority were not appointed within the time
frame set out by the law.
Personal data protection has not yet substantially improved. Montenegro still needs to
harmonise its data protection legislation fully with the EU
acquis.
The newly adopted law
does not give sufficient independence to the supervisory authority. The supervisory authority
and the necessary information systems are not yet in place. Other legislation also needs to be
aligned with the Law on Personal Data Protection. The public administration needs to be
trained on its new obligations regarding personal data protection.
Overall,
Montenegro has started to address some of its priorities in this area.
EN
52
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0054.png
STATISTICAL ANNEX
STATISTICAL DATA (as of 14 September 2009)
Montenegro
Basic data
Population (thousand)
Total area of the country (km²)
National accounts
Gross domestic product (GDP) (million national currency)
GDP (million euro)
GDP (euro per capita)
GDP (in Purchasing Power Standards (PPS) per capita)
SI: GDP (in PPS per capita, EU-27=100)
SI: Growth rate of GDP (national currency, at constant prices, % change on previous year)
SI: Employment growth (national accounts, % change on previous year)
Labour productivity growth: GDP growth per person employed (% change on previous year)
SI: Unit labour cost growth (national accounts, % change on previous year)
SI: Labour productivity (GDP in PPS per person employed, EU-27=100)
Gross value added by main sectors (%)
Agriculture
Industry
Construction
Services
Final consumption expenditure, as a share of GDP (%)
Gross fixed capital formation, as a share of GDP (%)
Changes in inventories, as a share of GDP (%)
Exports of goods and services, relative to GDP (%)
Imports of goods and services, relative to GDP (%)
Industry
Industrial production volume index (2000=100)
Inflation rate
SI: Consumer price index (CPI), (total, % change on previous year)
Balance of payments
Balance of payments: current account total (million euro)
Balance of payments current account: trade balance (million euro)
Note
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
610
612
615
617
619
621
623
624
625
627
13 812 13 812 13 812 13 812 13 812 13 812 13 812 13 812 13 812 13 812
1999
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Note
1999
96.0
1999
:
1999
:
:
2000
:
1 066
1 750
:
:
:
:
:
:
:
12.4
19.2
4.3
64.1
91.9
16.9
5.5
36.8
51.1
2000
100.0b
2000
:
2000
:
:
2001
:
1 295
2 113
:
:
1.1
:
:
:
:
11.9
20.7
3.9
63.4
100.2
17.5
5.9
38.4
62.0
2001
99.0
2001
:
2001
:
:
2002
:
1 360
2 208
:
:
1.9
-19.9e
21.8
:
:
12.2
20.0
4.0
63.8
105.8
14.6
4.1
35.4
59.9
2002
100.0
2002
:
2002
-175
-433
2003
:
1 510
2 435
:
:
2.5
-8.9e
11.4
:
:
11.6
19.2
3.4
65.8
101.0
13.3
2.1
30.6
47.0
2003
102.0
2003
:
2003
-102
-359
2004
:
1 670
2 684
:
:
4.4
2.7e
1.7
:
:
10.9
18.7
3.5
66.9
99.4
17.0
-0.4
42.0
58.1
2004
116.0
2004
:
2004
-120
-416
2005
2006
2007
:
:
:
1 815 2 149p 2 808p
2 912 3 443p 4 484p
:
:
:
31.0
35.0
41.0
4.2
8.6p
10.7p
-11.4e -5.0e 11.7e
15.6
13.6
-1.0
:
:
:
:
:
:
10.4
17.1
3.6
68.9
99.8
18.0
-0.3
43.6
61.1
2005
114.0
2005
:
2005
-154
-514
10.1p
8.5p
16.0p 13.6p
4.3p
4.2p
69.5p 73.7p
104.2p 104.5p
21.9p 24.3p
3.6p
3.7p
49.4p 46.5p
79.1p 79.0p
2006
115.0
2006
:
2006
-531
-849
2007
115.0
2007
:
2007
-643
-1 159
2008
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
2008
113.0
2008
7.4
2008
-1 006
-1 490
Note
1)
Note
Note
EN
53
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0055.png
Balance of payments current account: net services (million euro)
Balance of payments current account: net income (million euro)
Balance of payments current account: net current transfers (million euro)
of which government transfers (million euro)
Net foreign direct investment (FDI) (million euro)
Foreign direct investment (FDI) abroad (million euro)
of which FDI of the reporting economy in EU-27 countries (million euro)
Foreign direct investment (FDI) in the reporting economy (million euro)
of which FDI of EU-27 countries in the reporting economy (million euro)
Public finance
General government deficit/surplus, relative to GDP (%)
SI: General government debt, relative to GDP (%)
Financial indicators
Gross foreign debt of the whole economy, relative to GDP (%)
Gross foreign debt of the whole economy, relative to total exports (%)
Money supply: M1 (banknotes, coins, overnight deposits, million euro)
Money supply: M2 (M1 plus deposits with maturity up to two years, million euro)
Money supply: M3 (M2 plus marketable instruments, million euro)
Total credit by monetary financial institutions to residents (consolidated) (million euro)
Interest rates: day-to-day money rate, per annum (%)
Lending interest rate (one year), per annum (%)
Deposit interest rate (one year), per annum (%)
euro exchange rates: average of period - 1 euro = … national currency
Effective exchange rate index (2000=100)
Value of reserve assets (including gold) (million euro)
External trade
Value of imports: all goods, all partners (million euro)
Value of exports: all goods, all partners (million euro)
Trade balance: all goods, all partners (million euro)
Terms of trade (export price index / import price index, 1998=100)
Share of exports to EU-27 countries in value of total exports (%)
Share of imports from EU-27 countries in value of total imports (%)
Demography
Natural growth rate: natural change (births minus deaths) (per 1000 inhabitants)
Infant mortality rate: deaths of children under one year of age per 1000 live births
Note
:
:
:
:
:
:
:
:
:
1999
:
:
1999
:
:
:
:
:
:
:
:
:
:
:
:
1999
:
:
:
:
:
:
1999
5.6
13.4
:
:
:
:
:
:
:
:
:
2000
:
:
2000
:
:
:
:
:
:
:
:
:
:
:
:
2000
:
:
:
:
:
:
2000
6.1
11.1
:
:
:
:
:
:
:
:
:
2001
:
:
2001
:
:
:
:
:
:
:
:
:
:
:
:
2001
:
:
:
:
:
:
2001
5.5
14.6
100
76
83
:
76
0
0
76
69
2002
:
:
2002
:
:
:
:
:
125
:
:
:
:
:
55
2002
:
:
:
:
:
:
2002
4.8
10.8
112
88
58
:
39
-5
0
44
16
2003
:
:
2003
:
:
285
403
494
199
:
:
:
1.000
:
50
2003
:
:
:
:
:
:
2003
4.3
11.0
148
86
62
:
51
-2
-1
53
36
2004
:
:
2004
:
:
291
437
547
279
:
:
:
1.000
:
60
2004
:
:
:
:
:
:
2004
3.4
7.8
196
18
147
6
381
-4
-3
384
318
2005
:
:
2005
:
:
351
615
867
374
:
:
:
1.000
:
173
2005
974
461
-514
:
53.5
45.3
2005
2.4
9.5
197
31
90
7
467
-26
-78
493
376
2006
:
:
2006
:
:
484
1 099
1 587
843
:
:
:
1.000
:
329
2006
1 483
627
-855
:
62.2
45.4
2006
2.5
11.0
440
17
59
2
525
-115
-71
640
515
2007
:
:
2007
:
:
592
1 557
2 728
2 213
:
:
:
1.000
:
512
2007
2 073
487
-1 585
:
65.6
41.3
2007
3.0
7.4
403
8
73
9
568
-74
-58
641
447
2008
:
:
2008
:
:
512
1 209
2 339
2 726
:
:
:
1.000
:
360
2008
2 527
433
-2 094
:
61.3
41.1
2008
:
7.5
Note
2)
3)
4)
5)
Note
Note
EN
54
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0056.png
Life expectancy at birth: male (years)
Life expectancy at birth: female (years)
Labour market
Economic activity rate (15-64): share of population aged 15-64 that is economically active (%)
SI: Employment rate (15-64): share of population aged 15-64 that is in employment (%)
Share of male population aged 15-64 that is in employment (%)
Share of female population aged 15-64 that is in employment (%)
SI: Employment rate of older workers (55-64): share of population aged 55-64 that is in employment (%)
Employment by main sectors (%)
Agriculture
Industry
Construction
Services
SI: Unemployment rate: share of labour force that is unemployed (%)
Share of male labour force that is unemployed (%)
Share of female labour force that is unemployed (%)
Unemployment rate of persons < 25 years: share of labour force aged <25 that is unemployed (%)
SI: Long-term unemployment rate: share of labour force that is long-term unemployed (%)
Social cohesion
Average nominal monthly wages and salaries (national currency)
Index of real wages and salaries (index of nominal wages and salaries divided by the CPI) (2000=100)
SI: Early school-leavers: share of population aged 18-24 having not completed upper secondary education
and not currently in education or training (%)
Standard of living
Number of passenger cars per 1000 population
Number of subscriptions to cellular mobile telephone services per 1000 population
Infrastructure
Density of railway network (lines in operation, per 1000 km²)
Length of motorways (thousand km)
Innovation and research
SI: Spending on human resources (public expenditure on education) relative to GDP (%)
SI: Gross domestic expenditure on research & development, relative to GDP (%)
SI: Percentage of households who have Internet access at home (%)
Environment
SI: Total greenhouse gases emissions, CO2 equivalent (tons, 1990=100)
SI: Energy intensity of the economy (kg of oil equivalent per 1000 euro GDP 2004)
Note
6)
6)
6)
6)
70.7
76.1
1999
58.5
39.2
47.3
31.4
:
2.6
22.5
3.0
71.8
19.3
:
:
:
:
1999
164.4
99.9
:
Note
1999
184.6
:
1999
18.1
:
1999
:
:
:
1999
:
:
71.1
76.3
2000
60.4
38.5
46.2
30.6
:
3.4
22.4
3.5
70.8
19.3
:
:
:
:
2000
181.0
100.0
:
2000
185.3
:
2000
18.1
:
2000
:
:
:
2000
:
:
71.4
76.5
2001
57.1
37.1
45.6
29.0
:
3.1
25.8
2.1
69.1
21.2
:
:
:
:
2001
211.0
91.6
:
2001
161.0
639.6
2001
18.1
:
2001
:
:
:
2001
:
:
70.9
75.7
2002
59.1
37.7
46.6
29.0
:
3.0
26.0
2.1
68.8
20.7
:
:
:
:
2002
149.1
109.7
:
2002
166.8
775.5
2002
18.1
:
2002
:
:
:
2002
:
:
70.4
74.9
2003
58.9
36.2
44.5
28.1
:
1.8
25.7
2.0
70.6
22.7
:
:
:
:
2003
173.9
119.3
:
2003
171.8
674.4
2003
18.1
:
2003
:
:
:
2003
:
:
71.0
75.3
2004
51.7b
37.4b
46.5b
28.8b
:
10.9b
16.5b
3.4b
69.2b
27.7b
:
:
:
:
2004
195.3
130.9
:
2004
176.1
778.7
2004
18.1
:
2004
:
:
:
2004
:
:
70.4
74.9
2005
49.9
41.0
42.4
27.6
:
8.6
16.3
2.9
72.1
30.3
:
:
:
:
2005
213.1
139.7
:
2005
190.9
872.0
2005
18.1
:
2005
:
:
:
2005
:
:
70.7
74.8
2006
49.0
41.0
41.0
29.0
:
6.8
14.8
4.7
73.7
29.6
:
:
:
:
2006
246.0
156.4
:
2006
:
1 127.5
2006
18.1
:
2006
:
:
:
2006
:
493.8
71.2
76.1
2007
53.0
43.0
48.0
37.0
:
8.1
13.8
3.8
74.3
19.3
18.1
20.9
:
:
2007
338.0
179.9
:
2007
:
:
2007
:
:
2007
:
:
:
2007
:
384.4
71.2
76.1
2008
51.9
43.2
50.8
36.1
:
7.6
15.3
6.1
71.0
16.8
15.9
17.9
:
:
2008
416.0
195.2
:
2008
:
:
2008
:
:
2008
:
:
:
2008
:
:
7)
7)
7)
7)
Note
Note
Note
Note
EN
55
EN
PDF to HTML - Convert PDF files to HTML files
1453267_0057.png
SI: Share of renewable energy in electricity consumption (%)
SI: Road freight transport as a share of total inland freight transport (modal split of freight transport) (%)
Energy
Primary production of all energy products (thousand TOE)
Primary production of crude oil (thousand TOE)
Primary production of hard coal and lignite (thousand TOE)
Primary production of natural gas (thousand TOE)
Net imports of all energy products (thousand TOE)
Gross inland energy consumption (thousand TOE)
Electricity generation (thousand GWh)
Agriculture
Agricultural production volume index of goods and services (producer prices, previous year=100)
Total utilised agricultural area (thousand hectare)
Livestock: cattle (thousand heads, end of period)
Livestock: pigs (thousand heads, end of period)
Livestock: sheep and goats (thousand heads, end of period)
Production and utilisation of milk on the farm (total whole milk, thousand tonnes)
Crop production: cereals (including rice) (thousand tonnes, harvested production)
Crop production: sugar beet (thousand tonnes, harvested production)
Crop production: vegetables (thousand tonnes, harvested production)
Note
:
:
1999
:
:
:
:
:
:
2.7
1999
106.0
518p
180e
22e
306e
195e
4p
:
:
:
:
2000
:
:
:
:
:
:
2.7
2000
95.0
518p
179e
19e
293e
197e
3p
:
:
:
:
2001
:
:
:
:
:
:
2.5
2001
107.0
518p
178e
21e
244e
194e
4p
:
:
:
:
2002
:
:
:
:
:
:
2.3
2002
106.0
518p
183e
22e
241e
198e
5p
:
:
:
:
2003
:
:
:
:
:
:
2.7
2003
101.0
518p
175e
24e
252e
203e
4p
:
:
:
:
2004
:
:
:
:
:
:
3.3
2004
104.0
518p
169e
27e
254e
209e
3p
:
:
:
:
2005
:
:
:
:
:
:
2.9
2005
99.0
517p
118
11
255
186
3p
:
:
:
:
2006
982
:
982
:
-49
933
3.0
2006
102.0
517
115
13
249
178
3
:
:
:
:
2007
795
:
795
:
87
804
2.1
2007
89.0
516
109
10
222
173
2
:
:
:
:
2008
1 136
:
1 136
:
-25
1 111
2.8
2008
:
516
106
10
209
160
3
:
:
Note
8)
9)
9)
9)
10)
11)
SI = Structural indicators
: = not available
p = provisional value
e = estimated value
b = break in series
1) The data are without Financial Intermediation Services Indirectly Measured (FISIM).
2) As of 31 December. Instead of standard M1, data under national definition of M0 are provided.
3) As of 31 December. Instead of standard M2, data under the national definition of M11 are provided. The monetary aggregate M11 comprises M1 increased by the Central Government’s demand deposits
in euros and other currencies. The monetary aggregate M2 includes M1 and the non-banking sector’s time deposits with banks, in euros and other currencies, excluding deposits of the Central Government.
4) As of 31 December. Instead of standard M3, data under the national definition of M21 are provided. Monetary aggregate M21 comprises M2 increased by the Central Government’s time deposits in euros
and other currencies.
5) No official national currency exists. Euro is the currency in use.
6) Age group refers to persons aged 15 or more years.
7) From 2004 onwards, a new methodology, harmonized with the EU requirements, is used.
8) Agricultural area includes: arable land, area under pastries, fishponds and ponds.
9) Number of livestock in 1 000 including enterprises and cooperatives and households.
10) Calculated net quantity in 1 000 tonnes; includes enterprises and cooperatives, and households.
11) Includes households, enterprises and cooperatives
.