Europaudvalget 2016
KOM (2016) 0863
Offentligt
1730752_0001.png
EUROPEAN
COMMISSION
Brussels, 30.11.2016
SWD(2016) 410 final
PART 1/5
COMMISSION STAFF WORKING DOCUMENT
IMPACT ASSESSMENT
Accompanying the document
Proposal for a Directive of the European Parliament and of the Council on common
rules for the internal market in electricity (recast)
Proposal for a Regulation of the European Parliament and of the Council on the
electricity market (recast)
Proposal for a Regulation of the European Parliament and of the Council establishing
a European Union Agency for the Cooperation of Energy Regulators (recast)
Proposal for a Regulation of the European Parliament and of the Council on risk
preparedness in the electricity sector
{COM(2016) 861 final}
{SWD(2016) 411 final}
{SWD(2016) 412 final}
{SWD(2016) 413 final}
EN
EN
kom (2016) 0863 - Ingen titel
1730752_0002.png
Abstract of the Impact Assessment of the Market Design Initiative
I.
POLICY CONTEXT AND KEY CHALLENGES
The Energy Union framework strategy puts forward a vision of an energy market 'with
citizens at its core, where citizens take ownership of the energy transition, benefit from
new technologies to reduce their bills, participate actively in the market, and where
vulnerable consumers are protected'.
Well-functioning energy markets that ensure secure and sustainable energy supplies at
competitive prices are essential for achieving growth and consumer welfare in the
European Union and hence are at the heart of EU energy policy.
To live up to this vision, a series of legislative proposals have been prepared, following the
objectives of secure and competitive energy supplies and building on the EU's 2030 climate
commitments reconfirmed in Paris last year.
The electricity sector will be one of the main contributors to decarbonise the economy.
Currently, 27.5% of Europe's electricity is produced using renewable energy and the
modelling shows that close to half of our electricity will come from renewables by 2030.
With increasing use of electricity in sectors like transport or heating and cooling,
traditionally dominated by fossil fuels, it is ever more important to further increase the
share of renewable energies in electricity and to unlock flexible demand, generation and
storage solutions.
A new regulatory framework is needed to address these challenges and opportunities. The
new proposals for a revised Renewable Energy Directive and for a new Market Design
will precisely do this, by deepening integration of the internal energy market, empowering
consumers, stepping up regional and EU-wide cooperation and providing the right signals
for investment, thus ensuring secure, sustainable and competitive electricity systems.
A successful transition of the energy system delivering on the ambition to become world
leader in renewables will require substantial investment in the sector, and in particular
investments in low-carbon generation assets as well as network infrastructure. This
requires a revised Emissions Trading System in order to address the current surplus of
allowances and to deliver a strong investment signal to reach 40% greenhouse gas
emissions reductions by 2030, but also specific rules to complement market revenues if
those are not sufficient to attract investments in renewable electricity. In addition, measures
to promote renewable energies in sectors like transport or heating and cooling are also
crucial. Reaching the 2030 framework targets and achieving an Energy Union will be
underpinned by a strong Energy Union governance, which will ensure the necessary
ambition level in an iterative dialogue between the Commission and all Member States.
Finally, a successful transition of the energy system will also require continued
commitment and support for infrastructure development both locally as well as across
borders.
2
kom (2016) 0863 - Ingen titel
1730752_0003.png
At the same time the transition will only be successful if consumers are given the
information, opportunities and rewards to actively participate in it. The availability of new
technologies that allow consumers to both consume electricity in a smarter way as well as
produce it themselves at costs which are more and more competitive opens up manifold
possibilities. What is still needed to fully reap these opportunities is the appropriate
regulatory framework accompanying the digital transformation and technological
development that will empower consumers to take part in the energy transition by
becoming active market participants. Empowering consumers in this way will also
contribute to a more efficient use of energy and is therefore an integral part of
implementing the efficiency first principle.
Finally, the EU will only be able to manage the energy transition successfully and cost-
effectively in a more deeply integrated internal electricity market. Only a more competitive
and better interconnected market will allow Europe to drive cost-efficient investment and
in particular to integrate the rising share of renewable energy production in a cost-efficient
and secure manner into the system, profiting fully from complementarities between
Member States and broader regions.
Such a deeply integrated and competitive market is also a key building block for
guaranteeing security of supply and policies and mechanisms intended to reach this
objective should follow a cooperative logic. National security of supply policies need to
be better coordinated and aligned. This will ensure that Member States are duly prepared
to tackle possible crisis situations, in particular those that affect several countries at the
same time.
The present package of legislative measures directly contributes to the Energy Union
dimensions of energy security, solidarity and trust, a fully integrated internal energy market
as well as decarbonisation of the economy, while also indirectly contributing to the other
two.
II.
LESSON LEARNED AND PROBLEM DEFINITION
Three consecutive legislative packages have transformed what used to be fragmented
energy markets in Europe into a more integrated Internal Electricity Market, thus
increasing competition. However, Europe's energy markets are undergoing further
profound changes.
The transition towards a low-carbon electricity production
poses a number of
challenges for the secure and cost-effective
organisation and operation of Europe’s power
grids and electricity markets. The increasing penetration of variable and decentralised
renewable energy
driven
inter alia
by the EU’s goals for
climate change and energy in
line with the 2020 and 2030 targets
requires the electricity sector to be operated more
flexibly and efficiently.
Today, most new installed capacity is based on wind and solar power which are inherently
more variable and less predictable when compared to conventional sources of energy
3
kom (2016) 0863 - Ingen titel
1730752_0004.png
(predictable central, large-scale fossil fuel-based power plants) or flexible renewable
energy technologies (e.g. biomass, geothermal or hydropower). By 2030, this trend is
expected to be ever more pronounced. As a result, there will be times when variable
renewables could cover a very large share - even 100% - of electricity demand and times
when they only cover a minor share of total consumption. The overall electricity supply
and demand needs to be in balance in physical terms at any given point in time (including
production or storage of electricity). This balance is a precondition for the secure operation
and stability of the electricity grid, thus avoiding the risk of black-outs.
Current market arrangements do not adequately incentivize all market participants
including renewable energy generation - to adjust their portfolios by revising production
and consumption plans on short notice. The manner in which the trading of electricity is
arranged and in which the methods for allocating the network capacity to transport
electricity are organized, allow only for efficient trading of electricity in timeframes of one
or more days ahead of physical delivery. Yet, the increasing penetration of variable
renewable sources of electricity ('RES E') requires efficient and liquid short-term markets
that can operate as close to real time as possible
until very shortly before the time of
physical delivery (i.e. the moment when electricity is consumed). Indeed, most renewable
generation can only be accurately predicted shortly before the actual production (due to
weather uncertainties). Flexibility is essential to deal effectively with an increased share
of variable renewable generation. Besides, these markets do not fully take into account
possible contribution of cross-border resources.
Retail markets for energy in most parts of the EU suffer from persistently low levels
of competition, consumer choice and engagement.
In spite of falling prices on wholesale
markets, retail prices have risen steadily for households as a result of significantly
increased network charges, taxes and levies in recent years. Market concentration remains
generally high due to persisting barriers to new entrants. Switching related fees such as
contract termination charges continue to constitute a significant financial barrier to
consumer engagement. In addition, the high number of complaints related to billing
suggests that there is still scope to improve the comparability, clarity and accuracy of
billing information.
Despite technical innovations that allow consumers to better and more easily manage their
energy use
smart grids, smart homes, rooftop solar panels and storage, for example
consumers are not sufficiently able to actively participate in electricity markets and match
demand with supply during peak times, particularly through demand-response. This is
because households and businesses often have scarce knowledge and little or no incentive
to change the amount of electricity they use or produce in response to changing prices in
the markets. Indeed, a host of issues such as a slow roll out of fully functional smart
metering systems, regulated prices, lacklustre competition between retailers and an
increasing portion of fixed charges in energy bills mean that real-time price signals are
usually not passed on to final consumers.
In some Member States, up to 90% of renewable electricity generation is connected at
distribution level, putting more pressure on distribution system operators ('DSOs') to
4
kom (2016) 0863 - Ingen titel
1730752_0005.png
actively manage their grids and to efficiently adjust to the increasing share of variable and
decentralized renewable electricity injected into their networks. However
in contrast to
transmission system operators ('TSOs')
the current regulatory framework does not always
provide appropriate tools to DSOs to do this, resulting in network charges that are often
higher than they could be for end consumers. Ensuring that all DSOs become more flexible
would create a level playing field for the deployment of renewable generation that would
make attaining the EU's climate and energy objectives easier.
The deployment of information technology offers the possibility to address these issues,
facilitating the development of new services, improving consumer's comfort and making
the market more contestable and efficient. However, to fully benefit from the digitalisation
of the electricity market we need a non-discriminatory data management framework that
makes the right information immediately available to the right market actors, while at the
same time ensuring a high level of data protection.
With regard to consumer protection, there is a need to ensure that the move towards more
efficient retail markets does not lead to any group of consumers being left behind. In
particular, rising energy poverty as well as a lack of clarity on the most appropriate means
of tackling consumer vulnerability and energy poverty can hamper the further deepening
of the internal energy market.
In the current context, wholesale electricity prices have been decreasing
due to number
of coinciding drivers: a decline in primary energy prices, a surplus of carbon allowances
and an overcapacity of power generation facilities in some regions of the EU caused by a
drop in electricity demand, rising investments in renewables driven by EU policies and
increased sharing of resources among Member States through market coupling.
For most regions in Europe,
current electricity wholesale prices do not indicate the
need for new investments into electricity generation.
However, in the current market
arrangement, prices often do not reflect the real value of electricity due to regulatory
failures such as the lack of scarcity pricing and inadequately delimited price (or bidding)
zones. These regulatory failures, taken together with the increasing penetration of
electricity generated from renewable sources with low operating costs, affect the
remuneration of conventional electricity generation units that operate less often but
contribute to providing security and flexibility to the system
alongside non-conventional
flexible generation, interconnections, storage and demand response.
In light of the 2030 objective for renewable energy, considerable new investment in
electricity generation capacity will be required. The largest part will be provided by
variable renewable generation, complemented to a certain extent by more predictable,
flexible, less carbon-intensive forms of power generation. Independently of current
overcapacities, there are growing concerns in some areas of Europe that current average
wholesale prices may not provide appropriate signals for the necessary investments into
future generation or for keeping sufficient capacity in the market. A number of Member
States anticipate inadequate generation capacity in future years and introduce capacity
mechanisms at national level to support investment in capacity and ensure system
5
kom (2016) 0863 - Ingen titel
1730752_0006.png
adequacy (i.e. the ability of the electricity system to serve demand at all times).
When
uncoordinated
and designed without a proper assessment of the appropriate level of
supply security,
capacity mechanisms may risk affecting cross-border trade, distorting
investment signals,
affecting thus the ability of the market to deliver any new investments
in conventional and low-carbon generation,
and strengthening market power
of
incumbents by not allowing alternative providers to enter the market.
Despite best efforts to build an integrated and resilient power market, crisis situations can
never be excluded. The potential for crisis situation increases with climate change (e.g.
extreme weather conditions) and the emergence of new areas that are subject to criticalities
such as malicious attacks and cyber-threats. Such crises tend to often have an immediate
cross-border effect in electricity. Where systems are interconnected, incidents that start
locally can rapidly spread beyond borders and crisis situations might also affect several
Member States at the same time (e.g. prolonged heat waves or cold spells).
Today,
risk assessments as well as plans and actions for dealing with electricity crisis
situations focus on the national context only
and there is insufficient information-sharing
and transparency across Member States. In addition, there are different views on what is
to be considered as a risk to security of supply. In an increasingly inter-connected
electricity market, the lack of common approach and coordination can seriously imperil
security of supply across borders and dangerously undermine the functioning of the
internal electricity market.
In addition, missing opportunities to exchange energy with neighbours remains a key
obstacle to the internal energy market. Even where interconnectors are in place, they often
remain unused due to a lack of coordination between Member States. Rules are therefore
needed that ensure that the use of interconnection is not unduly limited by national
interventions.
Based on the above-mentioned shortcomings and underlying drivers, the present impact
assessment has identified four key problem areas that are addressed in the proposed
initiative:
i) the current market design is not fit for integrating an increasing share of
variable, decentralised generation and for reaping the potential of technological
developments; ii) uncertainty about sufficient future generation investments and
uncoordinated capacity mechanisms; iii) Member States do not take sufficient
account of what happens across their borders when preparing for and managing
electricity crisis situations; and iv) as regards retail markets, there is a slow
deployment and low levels of services and poor market performance are wide-spread
in the EU.
III.
SUBSIDIARITY
Article 194 of the Treaty of the Functioning of the EU consolidated and clarified the
competences of the EU in the field of energy and is the legal basis of the current proposal.
Electricity markets have become more integrated and interdependent physically,
economically and from a regulatory point of view, due to increasing cross-border
6
kom (2016) 0863 - Ingen titel
1730752_0007.png
electricity trade, growing share of renewable energy sources and more interconnections in
the European electricity grid. The challenges can no longer be addressed as effectively by
individual Member States. New frameworks to further integrate the internal energy market
and improve the conditions for competition while at the same time adjusting to the
decarbonisation targets and ensuring a more coordinated policy response to security of
supply, can most effectively be achieved at European level.
IV.
SCOPE AND OBJECTIVES
Against this background and in line with the Union's policy on climate change and energy,
the general policy objective of the present initiative is to make electricity markets more
secure, efficient and competitive, while ensuring that electricity is generated in a
sustainable way and remains affordable to all consumers. The present impact assessment
reflects and analyses the need and policy options for a possible revision of the main
framework governing electricity markets and security of supply policies in Europe.
There are four specific objectives: i) adapt the market design for the cost effective
operation of variable and often decentralised generation, taking into account technological
developments; ii) facilitate investments in generation capacity in the right amount and type
of resources for the EU: iii) improve Member States' resilience on each other in times of
system stress and reinforce their coordination and cooperation regarding crisis situations;
and iv) address the root causes of weak competition on energy retail markets and improve
consumer protection and engagement.
Interlinkages with parallel initiatives
The proposed initiative is strongly linked to other energy and climate related legislative
proposals brought forward in parallel, including the renewable energy package which
covers a number of measures deemed necessary to attain the EU binding objective of
reaching a level of at least 27% renewables in final EU energy consumption by 2030. The
renewable energy directive has synergies with the present initiative, which seeks to adapt
the current market design to the increasing share of variable decentralised generation and
technological development and to create an environment conducive for investments in
renewables.
In particular, the reflections on a revised Renewables Energy Directive will include
framework principles on support schemes for market-oriented, cost-effective and more
regionalised support to RES E up to 2030, in case Member States were opting to have them
as a tool to facilitate target achievement. Conversely, measures aimed at the integration of
RES E in the market, such as provisions on priority dispatch and access previously
contained in the Renewables Directive are part of the present market design initiative. The
Renewable Package also deals with legal and administrative barriers for self-consumption,
whereas the present package addresses market related barriers to self-consumption.
Both the market design and renewable energy impact assessments come to the conclusion
that the improved electricity market, supported through a revised Emission Trading System
('ETS'), could, under certain conditions, by 2030 deliver investments in the most mature
low-carbon technologies (such as PV and onshore wind). However, until such conditions
7
kom (2016) 0863 - Ingen titel
1730752_0008.png
materialise, market-based support schemes will still be needed in order to provide
investment certainty. Less mature RES E technologies, such as offshore wind, will likely
need some form of support throughout the transitional period.
The Energy Union governance initiative also has synergies with the present initiative and
will contribute to ensure policy coherence and reduce administrative impact. It will also
streamline the reporting obligations by Member States and the Commission that are
presently enshrined in the Third Package.
In general terms, energy efficiency measures also interact with the present initiative as they
affect the level and structure of electricity demand. In addition, energy efficiency measures
can alleviate energy poverty and consumer vulnerability. Besides consumer income and
energy prices, energy efficiency is one of the major drivers of energy poverty. The
provisions previously contained in the energy efficiency legislation on demand response,
billing and metering will be set out in the present initiative.
The present initiative is furthermore consistent with the findings of the sector inquiry on
capacity mechanisms. Pointing out that there is a lack of adequate assessment of the actual
need for capacity mechanisms, the sector inquiry emphasizes that where needed capacity
mechanisms need to be designed with transparent and open rules of participation that does
not undermine the functioning of the electricity market, taking into account cross border
participation.
The Commission Regulation establishing a Guideline on Electricity Balancing ('Balancing
Guideline') is also closely related to the present initiative as it aims to harmonise certain
aspects of the EU's balancing markets and to optimise cross-border usage. Indeed, efficient,
integrated balancing markets are an important building block for the consistent functioning
and flexibility of the market which in turn is needed for a cost effective integration of RES
E into the electricity market.
V.
DESCRIPTION OF POLICY OPTIONS AND METHODOLOGY
In assessing all possible options (ranging from non-regulatory to legislative policy options)
the following approach was taken:
-
-
Identification of a set of high level options for each problem area. Each of these high
level options contains sub-options for specific measures;
Assessment of each specific measure, comparing a number of options in order to select
the preferred approach.
The following policy options have been considered:
Regarding Problem Area I: the need to adapt the market design to the increasing
share of variable decentralised generation and technological developments,
Option 0+ (Non-regulatory approach) provides little scope for improving the market and
the level-playing field among resources. Indeed, the current EU regulatory framework is
limited in certain areas (e.g., balancing and intraday markets) and even non-existent for
8
kom (2016) 0863 - Ingen titel
1730752_0009.png
other areas (e.g., role of DSOs in data management). Besides, voluntary cooperation may
not provide for the appropriate levels of harmonisation or certainty to the market and
legislation. This option was therefore discarded.
Two possible paths going beyond the baseline scenario were however identified and
assessed: (i) enhancing current market rules through EU regulatory action in order to
increase the flexibility of the system, retaining to a certain extent the national operation of
the systems (Option 1) and, (2) moving to a fully integrated approach via relatively far-
reaching changing to the current regulatory framework (Option 2).
Option 1 of enhancing the current market rules comprises three different sub-options:
Option 1(a)
Creating a level-playing field among all generation technologies and
resources and remove existing market distortions. It addresses rules that
discriminate between resources and which limit or favour the access of
certain technologies to the electricity grid (such as so-called 'must-run'
provisions and rules on priority dispatch and access). In addition, all market
participants would bear financial responsibility for the imbalances caused
on the grid and all resources would be remunerated in the market on equal
terms. Barriers to demand-response would be removed. Exemptions from
certain regulatory provisions may, in some cases, be required, notably for
certain small-scale installations and emerging technologies.
(In addition to sub-option (a)) Strengthening the short-term markets by
bringing them closer to real-time in order to provide maximum opportunity
to meet the flexibility needs and balance the market. The sizing of balancing
reserves and their use would be harmonised in larger balancing zones in
order to optimally exploit interconnections and cross-border exchange in
shorter term markets.
(In addition to sub-option (a) and (b)) Pulling all flexible distributed
resources concerning generation, demand and storage, into the market via
proper incentives and a market framework better adapted to them. This
would be based on smart-metering allowing consumers to directly react to
price signals and measures to incentivise DSOs to manage their networks in
a flexible and cost-efficient way.
Option 1(b)
Option 1(c)
Option 2 (fully integrated market) considers measures that would aim to deliver a truly
integrated pan-European electricity market through the adoption of far-reaching measures
changing the current regulatory framework.
Regarding Problem Area II: uncertainty about sufficient future generation
investments and uncoordinated capacity mechanisms,
four options were considered.
As regards Option 0+ (Non-regulatory approach), existing provisions under EU legislation
are not sufficiently clear and robust to cope with the challenges facing the European
electricity system. In addition, voluntary cooperation may not provide for appropriate
levels of harmonisation across all Member States or certainty to the market. Legislation is
9
kom (2016) 0863 - Ingen titel
1730752_0010.png
needed in this area to address the issues in a consistent way. This Option was therefore
discarded.
Various policy options going beyond the baseline scenario were assessed. They differ
according to which extent market participants can rely on energy market payments. Each
policy option also considers varying degrees of alignment and coordination among
Member States at EU-level.
Option 1 (energy-only market without capacity mechanisms) builds upon Option 1(a) to
1(c) under problem area I and would be based on additional measures to further strengthen
the internal electricity market. Under this option, it is assumed that European markets, if
sufficiently interconnected and undistorted, can provide for the necessary price signals to
incentivise investments in new generation thus also reducing the need for government
interventions in support thereof. This option consists of improving price signals by
removing price caps in order to allow scarcity pricing during peak time. At the same time,
price signals could drive the geographical location of new investments and production
decisions, via price zones aligned with structural congestion in the transmission grid.
Option 2 and 3 include the measures presented in Option 1, but allow capacity mechanisms
under certain conditions and propose possible measures to better align them among
Member States in order to avoid negative consequences for the functioning of the internal
market. These options build on the European Commission's 'EEAG' state aid Guidelines
and the Sector Inquiry on capacity mechanisms. In Option 2, capacity mechanisms are
based on a transparent and EU-wide resource adequacy assessment carried-out by the
European Network of Transmission System Operators for electricity ('ENTSO-E'). Such
EU-wide assessment would also allow for effective cross-border participation.
Additionally, Option 3 would provide for common design features for better compatibility
between national capacity mechanisms and harmonised cross-border cooperation.
Under Option 4 based on regional or EU-wide generation adequacy assessments, entire
regions or ultimately all EU Member States would be required to roll out capacity
mechanisms on a mandatory basis. This option was found to be disproportionate and was
discarded.
Regarding Problem Area III: the lack of coordination among Member States when
preparing for and managing electricity crisis situations,
five policy options ranging
from the baseline scenario (Option 0) to the full harmonization and decision making at
regional level have been identified.
Option 0+ (Non-regulatory approach). As current legislative provisions do not prescribe
how Member States should prevent and manage crisis situations nor mandate any form of
cross-border co-operation, better implementation and enforcement actions will be of no
avail. In addition, whilst there is some voluntary cross-border cooperation in this area, it is
limited to a few regional parts of the EU. This option was discarded.
Under Option 1 (Common minimum EU rules), Member States would have to respect a
set of common rules and principles regarding crisis prevention and management, agreed at
10
kom (2016) 0863 - Ingen titel
1730752_0011.png
the European level ('minimum harmonisation'). Accordingly, non-market measures should
only be introduced as a means of last resort, when duly justified. Member States would be
obliged to address electricity crisis situations, in particular situations of a simultaneous
crisis, in a spirit of co-operation and solidarity. Member States should inform each other
and the Commission without undue delay when they see a crisis situation coming or when
being in a crisis situation. Member States would be obliged to develop national Risk
Preparedness Plans ('Plan') with the aim to avoid or better tackle crisis situations. Plans
could be prepared by TSOs, but need to be endorsed at the political level. On cyber-
security, Member States would need to set out in the Plan how they will prevent and
manage cyberattack situations.
Option 2 (EU rules + regional cooperation) would include all common rules included in
Option 1. In addition, it would put in place rules and tools to ensure that effective cross-
border co-operation takes place in a regional and EU context. Thus, there would be a
systematic assessment of rare/extreme risks at the regional level. The identification of
crisis scenarios would be carried out by ENTSO-E in a regional context and tasks would
be delegated to Regional Operation Centres (ROCs). For cybersecurity, the Commission
would propose the development of a network code/guideline which would ensure a
minimum level of harmonization in the energy sector throughout the EU. The Risk
Preparedness Plans would contain two parts
a part reflecting national measures and a
part reflecting measures to be pre-agreed in a regional context (including regional 'stress
tests', procedures for cooperation in different crisis scenarios and agreement on how to deal
with simultaneous electricity crisis situations).
Option 3 (Full harmonisation) entails full harmonisation and decision-making at regional
level. The risk preparedness plans would be developed on regional level in order to allow
a harmonised response to potential crisis situation in each region. On cybersecurity, Option
3 would go one step further and nominate a dedicated body (agency) to deal with
cybersecurity in the energy sector. Crisis would have to be managed according to the
regional plans agreed among Member States. A detailed 'emergency rulebook' for crisis
handling would be put in place, containing an exhaustive list of measures that can be taken
by Member States in crisis situations.
Regarding Problem Area IV: retail markets and the slow deployment and low levels
of services and poor market performance,
four policy options have been considered
ranging from baseline scenario (Option 0) to full harmonization and extensive safeguards
for consumers.
Option 0+ (Improved implementation/enforcement and non-regulatory approach) consists
in sharing of good practices and increasing the efforts to correctly implement the
legislation. This non-regulatory approach addresses competition and consumer
engagement issues by strengthening the enforcement of the existing legislation as well as
through bilateral consultation with Member States to progressively phase-out price
regulation, starting with prices below costs. It also considers developing a
Recommendation on energy bills. However, this option does not tackle the third problem
driver of the market failures that prevent effective data flow between market actors.
11
kom (2016) 0863 - Ingen titel
1730752_0012.png
Under Option 1 (Flexible legislation), all problem drivers are addressed through new
legislation. To improve competition, Member States progressively phase-out blanket price
regulation by a deadline specified in new EU legislation, starting with prices below costs,
while allowing transitional price regulation for vulnerable consumers. To increase
consumer engagement, the use of contract termination fees is restricted. Consumer
confidence in comparison websites is fostered through national authorities implementing
a certification tool. In addition, high-level principles ensure that energy bills are clear and
easy to understand, through minimum content requirements. A generic adaptable,
definition of energy poverty based on household income and energy expenditure is
proposed in the legislation for the first time. Finally, to allow the development of new
services by new entrants and energy service companies, non-discriminatory access to
consumer data is ensured.
Building on Option 1, Option 2 (Full harmonisation and extensive consumer safeguards)
aims to provide maximum safeguards for consumers and extensive harmonisation of
Member States action throughout the EU. Exemptions to price regulation are defined at
EU level on the basis of either a consumption threshold or a price threshold. A standard
data handling model is enforced and assigns the responsibility to a neutral market actor
such as a TSO. All switching fees including contract termination fees are banned and the
content of energy bills is partially harmonized. Finally, an EU framework to monitor
energy poverty based on an energy efficiency survey done by Member States of the
housing stock as well as preventive measures to avoid disconnections are put in place.
VI
POLICY TRADE-OFFS
The measures considered in this impact assessment are highly complementary. Most of the
different options considered in each problem area would reinforce the effect of options in
other problem areas, with little trade-offs between the different areas. The overall
beneficial effects will be achieved only if all measures are implemented as a package
The measures under Problem Area I and II are strongly linked in that they collectively aim
at improving market functioning, including the delivery of investment by the market.
Measures under Problem Area I and Option 1 of Problem area II thus reduce the need for
market government intervention by means of capacity mechanisms. The other measures
under Problem Area II reduce their distortive effects if such mechanisms are nonetheless
justified.
Scarcity pricing and capacity mechanisms can to a certain degree be seen as alternative
measures to foster investments. With assets remunerated by capacity mechanisms, the
effectiveness of scarcity prices may be reduced. It needs also to be noted that scarcity prices
and market-wide capacity mechanisms incentivise different investment decisions: whereas
such capacity mechanisms may reward any firm capacity, scarcity pricing will improve
remuneration of flexible capacity in particular.
The measures aiming at providing adequate price signals (measures under Problem Area I
and Problem Area Option 1) are no-regret options. Until these conditions are achieved and
under specific circumstances (like energy isolation), State intervention in the form of some
12
kom (2016) 0863 - Ingen titel
1730752_0013.png
type of capacity mechanism may be necessary. That is why it is essential that such
mechanisms are properly designed, taking into account the wider regional and European
resources and allowing cross-border participation in a technology-neutral manner.
The measures assessed under various options in the impact assessment seek to improve the
overall flexibility of the electricity system. However, they do this by employing different
means. Investment in new interconnection capacity may reduce the need for new
generation and vice-versa, new generation can reduce the incentives for new interconnector
capacity. Similarly, pulling demand response into the market will reduce the profits of
generation capacity. Ultimately, the efficient markets should opt for the most cost-efficient
solutions.
Energy poverty safeguards whose costs directly accrue to suppliers
particularly, the
disconnection safeguards considered in Option 2 (Harmonization and extensive consumer
safeguards) of Problem Area IV (Retail markets)
may act as a barrier to retail-level
competition, and diminish the associated benefits to consumers, including lower prices,
new and innovative products, and higher levels of service. Although the implementation
costs of these safeguards will be passed on to consumers, and therefore socialized, different
energy suppliers may have different abilities to do this, and to deal with the additional
consumer engagement costs. Some may therefore choose not to enter markets with such
safeguards in place.
VII.
ANALYSIS OF IMPACTS AND CONCLUSIONS
All options have been compared against each other using, the baseline scenario as a
reference and applying the following criteria:
-
-
Effectiveness: the options proposed should first and foremost be effective and thus be
suitable to addressing the specified problem;
Efficiency: this criterion assesses the extent to which objectives can be achieved at the
least cost (benefits versus the costs).
Policy options regarding the need to adapt the market design to the increasing share
of variable decentralised generation and technological developments (Problem Area
I)
Options 1(a) (level playing field), 1(b) (strengthening short-term markets) and 1(c)
(demand response/distributed resources) represent an interlinked set of measures regarding
the integration of the national electricity markets and present a compromise between
bottom-up initiatives and top-down steering of the market development, without
substituting the role of national governments, regulators and TSOs by a centralised and
fully harmonised system.
However, Option 1(a) (level playing field) and Option 1(b) (strengthening short-term
markets) do not cover measures to pull all distributed flexible resources (demand-response,
renewable electricity and storage) into the market. These options do not take advantage of
the potential offered by these resources to efficiently operate and decarbonise the
electricity market.
13
kom (2016) 0863 - Ingen titel
1730752_0014.png
In this context, Option 1(c) (demand response/distributed resources) provides a more
holistic, effective and efficient package of solutions. While this option may lead to minor
additional administrative impacts for Member States and competent authorities regarding
the implementation and monitoring of the measures, these impacts will be offset by lower
barriers to entry to start-ups and SMEs, by the benefits to market parties from more stable
regulatory frameworks and new business opportunities as well as by the benefits to
consumers from more competition and access to wider choice.
As regards Option 2 (fully integrated market), while having advantages in terms of less
coordination requirements (i.e., a fully integrated EU-market can be operated more
efficiently), the results of the assessment indicate that the move towards a more integrated
European approach has less significant economic added value since most of the benefits
will have already been reaped under the regional, more decentralised approach under
option. In addition, it has significant impacts on stakeholders, Member States and
competent authorities since it requires significant changes to established practices.
Preferred option for Problem Area I: Option 1(c) (demand
response/distributed
resources, also encompassing options 1(a) (level playing field) and 1(b) (strengthening
short-term markets))
Policy options regarding uncertainty about sufficient future generation investments
and uncoordinated capacity mechanisms (Problem Area II)
Option 1 (reinforced energy only market without capacity mechanisms) can in principle
provide the right signals for market operation and ensure system adequacy and ensure
better utilisation of resources across borders, demand participation and renewable
integration without subsidies. Improving the functioning of electricity markets will
improve the conditions for investment in the electricity market to ensure reliable and
effective supply of electricity, even in times of scarcity. This will in turn decrease the need
for capacity mechanisms.
However, markets are today still characterised by manifold regulatory distortions today
and removing the distortive effects will not be possible with immediate effects in many
Member States. Besides under such option, uncertainty about future policy directions or
governmental interventions still exists. Such uncertainty may hamper investment and in
turn create the need for mechanisms that address the lack of investments ('missing money').
It should be noted that undistorted energy price signals are fundamental irrespective of
whether generators are solely relying on energy market incomes or also receive capacity
payments. Therefore the measures aimed at removing distortions from energy-only
markets discussed under Option 1(a) to 1(c) (e.g. scarcity pricing or reinforced locational
signals) are 'no-regrets' and assumed as being integral parts of Options 2, 3 and 4.
Option 2
(Improved
energy markets
Capacity Mechanisms ('CM's) only when needed,
based on a common EU-wide adequacy assessment can improve the overall cost-efficiency
of the electricity sector through establishing an EU-wide approach to system adequacy
assessments as opposed to national-based adequacy assessments. At the same time Option
14
kom (2016) 0863 - Ingen titel
1730752_0015.png
2 does not allow reaping the full benefits of cross-border participation in capacity
mechanisms.
A more coordinate approach to state interventions across Member States is needed and is
a clear priority for reform. Placing capacity mechanisms into a more regional/EU context
is a pre-requisite to reduce market distortions. It is indeed necessary that the schemes
Member States introduce are compatible with internal market rules.
Option 3 (Improved energy market
CMs only when needed, plus cross-border
participation) proposes additional measures to avoid fragmentation of capacity
mechanisms and ensures that foreign resource providers can effectively participate in
national capacity mechanisms and avoids competition and market distortions resulting
from capacity payments which are reserved to domestic participants. As a result, it reduces
investment distortions that might be present in Option 2 because of uncoordinated
approaches to cross-border participation.
Preferred option for Problem Area II: Option 3 (Improved energy market
CMs
only when needed, plus cross-border participation)
(encompassing also Options 1 and
2)
Policy options regarding the lack of coordination among Member States when
preparing for and managing electricity crisis situations (Problem Area III)
Based on a set of clear common rules, Option 1 (Common minimum EU rules) would
improve the level of transparency and crisis management across Europe and is likely to
reduce the chances of premature market intervention. The policy tools proposed under this
option would bring economic benefits to businesses and consumers by helping to prevent
costly blackout situations. However, this option does not solve the issue of uncoordinated
planning and preparation ahead of a crisis since Member State are not required to take into
account cross-border risks and crisis.
Under Option 2 (EU rules + regional cooperation), the regionally coordinated plans ensure
the regional identification of risks and the consistency of the measures for prevention and
managing crisis situations while respecting national differences and competences. This
significantly improves the level of preparedness (compared to Option 1) at national,
regional and EU level, as the cross border considerations are duly taken into account since
the beginning. A regional approach to security of supply results in a better utilisation of
power plants and guarantees risk preparedness at a lesser cost.
Under Option 3 (Full harmonisation), the estimated impact on cost is likely to be high
(notably with the creation of an EU agency on cyber-security) and the measures put
forward appear disproportionate compared to the expected effectiveness. Indeed, this
option represents a highly intrusive approach
with significant administrative impact - by
resorting to a full harmonisation of principles and the prescription of concrete solutions.
Preferred option for Problem Area III: Option 2
(EU
rules + regional cooperation)
Policy options regarding retail markets and the slow deployment and low levels of
services and poor market performance (Problem Area IV)
15
kom (2016) 0863 - Ingen titel
1730752_0016.png
Given its low implementation costs, Option 0+ (Non-regulatory approach) is a highly
efficient option. However, the effectiveness of Option 0+ is significantly limited by the
fact that non-regulatory measures are not suitable for tackling the poor data flow between
retail market actors that constitutes both a barrier to entry and a barrier to higher levels of
service to consumers. In addition, shortcomings in the existing legislation make it
impossible to significantly improve consumer engagement and energy poverty safeguards.
They also introduce great uncertainty around the drive to phase out price regulation which
does not provide sufficient incentives to consumers to play an active role in the market and
which also limits competition and new entrants into the market.
Option 1 (Flexible legislation) would lead to substantial economic benefits. Retail
competition would be improved as a result of the progressive phase-out of blanket price
regulation, non-discriminatory access to consumer data, and increased consumer
engagement. In addition, consumers would see direct benefits through improved switching.
In Option 2 (Harmonization and extensive consumer safeguards) there is uncertainty over
the size of the economic benefits. This uncertainty stems from the tension some of the
measures in Option 2 may have with competition (stronger disconnection safeguards, an
outright ban on all switching-related charges), and from the difficulty of prescribing EU-
level solutions in certain areas (defining exceptions to price deregulation, implementing a
standard EU bill design). Besides, a single EU data management model would have high
implementation costs, thus reducing the efficiency of the option.
Preferred option for Problem Area IV: Option 1 (Flexible legislation)
***
TABLE OF CONTENTS
1.
1.1.
INTRODUCTION ............................................................................................................. 22
Background and scope of the market design initiative ............................................................. 22
Context of the initiative ............................................................................................................. 22
1.1.1.1.
The gradual process of creating an internal electricity market ....................................... 22
1.1.1.2.
The Union's policy concerning climate change ................................................................ 22
1.1.1.3.
Paradigm shift in the electricity sector ............................................................................ 23
1.1.1.4.
The vision for the EU electricity market in 2030 and beyond .......................................... 24
Scope of the initiative ................................................................................................................ 30
1.1.2.1.
Current relevant legislative framework ........................................................................... 30
1.1.2.2.
Policy development subsequent to the Third Package .................................................... 31
1.1.2.3.
Scope and summary of the initiative ............................................................................... 32
Organisation and timing ............................................................................................................ 33
1.1.3.1.
Follow up on the Third Package ....................................................................................... 33
1.1.3.2.
Consultation and expertise .............................................................................................. 34
1.2.
Interlinkages with parallel initiatives........................................................................................ 34
The Renewable Energy Package comprising the new Renewable Energy Directive and
bioenergy sustainability policy for 2030 ('RED
II')
................................................................................... 34
Commission guidance on regional cooperation ........................................................................ 36
The Energy Union governance initiative .................................................................................... 36
16
kom (2016) 0863 - Ingen titel
1730752_0017.png
The Energy Efficiency legislation ('EE') and the related Energy Performance of Buildings
Directive ('EPBD') including the proposals for their amendment. ........................................................... 36
The Commission Regulation establishing a Guideline on Electricity Balancing ('Balancing
Guideline') ................................................................................................................................................ 37
Other relevant instruments ....................................................................................................... 38
2.
PROBLEM DESCRIPTION............................................................................................. 38
2.1.
Problem Area I: Market design not fit for an increasing share of variable decentralized
generation and technological developments ......................................................................................... 38
Driver 1: Short-term markets, as well as balancing markets, are not efficiently organised ...... 40
Driver 2: Exemptions from fundamental market principles ...................................................... 42
Driver 3: Consumers do not actively engage in the market and demand response potential
remains largely untapped ........................................................................................................................ 44
Driver 4: Distribution networks are not actively managed and grid users are poorly
incentivised .............................................................................................................................................. 50
2.2.
Problem Area II: Uncertainty about sufficient future generation investments and
uncoordinated capacity markets ............................................................................................................ 51
Driver 1: Lack of adequate investment signals due to regulatory failures and imperfections in
the electricity market ............................................................................................................................... 55
Driver 2: Uncoordinated state interventions to deal with real or perceived capacity problems
58
2.3.
Problem Area III: Member States do not take sufficient account of what happens across their
borders when preparing for and managing electricity crisis situations................................................... 63
Driver 1: Plans and actions for dealing with electricity crisis situations focus on the national
context only ............................................................................................................................................. 65
Driver 2: Lack of information-sharing and transparency ........................................................... 67
Driver 3: No common approach to identifying and assessing risks ........................................... 68
2.4.
Problem Area IV: The slow deployment of new services, low levels of service and questionable
market performance on retail markets .................................................................................................. 69
Driver 1: Low levels of competition on retail markets .............................................................. 70
Driver 2: Possible conflicts of interest between market actors that manage and handle data 74
Driver 3: Low levels of consumer engagement ......................................................................... 75
2.5.
2.6.
What is the EU dimension of the problem? .............................................................................. 76
How would the problem evolve, all things being equal? .......................................................... 77
The projected development of the current regulatory framework ........................................... 77
Expected evolution of the problems under the current regulatory framework........................ 78
Issues identified in the evaluation of the Third Package ........................................................... 79
2.7.
3.
3.1.
SUBSIDIARITY ................................................................................................................ 80
The EU's right to act ................................................................................................................. 80
3.2.
Why could Member States not achieve the objectives of the proposed action sufficiently by
themselves? ........................................................................................................................................... 80
3.3.
Added-value of action at EU-level ............................................................................................ 82
4.
4.1.
17
OBJECTIVES ..................................................................................................................... 83
Objectives and sub-objectives of the present initiative ............................................................ 83
kom (2016) 0863 - Ingen titel
1730752_0018.png
4.2.
Consistency of objectives with other EU policies ...................................................................... 84
5.
POLICY OPTIONS ........................................................................................................... 87
5.1.
Options to address Problem Area I (Market design not fit for an increasing share of variable
decentralized generation and technological developments) .................................................................. 88
Overview of the policy options .................................................................................................. 88
Option 0: Baseline Scenario
Current Market Arrangements .................................................. 89
Option 0+: Non-regulatory approach ........................................................................................ 90
Option 1: EU Regulatory action to enhance market flexibility .................................................. 91
5.1.4.1.
Sub-option 1(a): Level playing field amongst participants and resources ....................... 93
5.1.4.2.
Sub-option 1(b): Strengthening short-term markets ....................................................... 95
5.1.4.3.
Sub-option 1(c): Pulling demand response and distributed resources into the market .. 98
Option 2: Fully Integrated EU market ...................................................................................... 102
For Option 1 and 2: Institutional framework as an enabler .................................................... 104
Summary of specific measures comprising each Option ......................................................... 106
5.2.
Options to address Problem Area II (Uncertainty about sufficient future generation
investments and uncoordinated capacity markets) .............................................................................. 110
Overview of the policy options ................................................................................................ 110
Option 0: Baseline Scenario
Current Market Arrangements ................................................ 111
Option 0+: Non-regulatory approach ...................................................................................... 112
Option 1: Improved energy market - no CMs .......................................................................... 112
Option 2: Improved energy market
CMs only when needed, based on a common EU-wide
adequacy assessment) ........................................................................................................................... 114
Option 3: Improved energy market - CMs only when needed, based on a common EU-wide
adequacy assessment, plus cross-border participation ......................................................................... 116
Option 4: Mandatory EU-wide or regional CMs ...................................................................... 117
Discarded Options ................................................................................................................... 117
Summary of specific measures comprising each Option ......................................................... 117
5.3.
Options to address Problem Area III (When preparing or managing crisis situations, Member
States tend to disregard the situation across their borders) ................................................................ 120
Overview of the policy options ................................................................................................ 120
Option 0: Baseline scenario
Purely national approach to electricity crises .......................... 120
Option 0+: Non-regulatory approach ...................................................................................... 121
Option 1: Common minimum rules to be implemented by Member States ........................... 122
Option 2: Common minimum rules to be implemented by Member States, plus regional co-
operation ............................................................................................................................................... 124
Option 3: Full harmonisation and decision-making at regional level ...................................... 127
Discarded Options ................................................................................................................... 128
Summary of specific measures comprising each Option ......................................................... 128
5.4.
Options to address Problem Area IV (Slow deployment and low levels of services and poor
market performance) ........................................................................................................................... 132
Overview of the policy options ................................................................................................ 132
Option 0: Baseline Scenario - Non-competitive retail markets with poor consumer
engagement and poor data flows .......................................................................................................... 132
Option 0+: Non-regulatory approach to address competition and consumer engagement ... 133
Option 1: Flexible legislation addressing all problem drivers .................................................. 134
Option 2: EU Harmonization and extensive safeguards for consumers addressing all problem
drivers 136
Summary of specific measures comprising each Option ......................................................... 137
6.
ASSESSMENT OF THE IMPACTS OF THE VARIOUS POLICY OPTIONS ....... 139
6.1.
Assessment of economic impacts for Problem Area I (Market design not fit for an increasing
share of variable decentralized generation and technological developments ...................................... 139
18
kom (2016) 0863 - Ingen titel
1730752_0019.png
Methodological Approach ....................................................................................................... 139
6.1.1.1.
Impacts Assessed ........................................................................................................... 139
6.1.1.2.
Modelling and use of studies ......................................................................................... 140
6.1.1.3.
Summary of Main Impacts ............................................................................................. 140
6.1.1.4.
Overview of Baseline (Current Market Arrangements) ................................................. 141
Policy Sub-option 1(a) (Level playing field amongst participants and resources) ................... 144
6.1.2.1.
Economic impacts .......................................................................................................... 144
6.1.2.2.
Who would be affected and how ................................................................................... 147
6.1.2.3.
Administrative impact on businesses and public authorities......................................... 147
Impacts of Policy Sub-option 1(b) (Strengthening short-term markets) ................................. 147
6.1.3.1.
Economic Impacts .......................................................................................................... 147
6.1.3.2.
Who would be affected and how ................................................................................... 150
6.1.3.3.
Administrative impact on businesses and public authorities......................................... 150
Impacts of Policy Sub-option 1(c) (Pulling demand response and distributed resources into the
market) 151
6.1.4.1.
Economic Impacts .......................................................................................................... 151
6.1.4.2.
Who would be affected and how ................................................................................... 152
6.1.4.3.
Impact on businesses and public authorities ................................................................. 153
Impacts of Policy Option 2 (Fully integrated EU market) ........................................................ 154
6.1.5.1.
Economic Impacts .......................................................................................................... 154
6.1.5.2.
Who would be affected and how ................................................................................... 155
6.1.5.3.
Impact on businesses and public authorities ................................................................. 155
Environmental impacts of options related to Problem Area I ................................................. 155
Summary of modelling results for Problem Area I .................................................................. 156
6.2.
Impact Assessment for Problem Area II (Uncertainty about future generation investments and
fragmented capacity mechanisms) ....................................................................................................... 164
Methodological Approach ....................................................................................................... 164
6.2.1.1.
Impacts Assessed ........................................................................................................... 164
6.2.1.2.
Modelling ....................................................................................................................... 164
6.2.1.3.
Overview of Baseline (Current Market Arrangements) ................................................. 165
Impacts of Policy Option 1 (Improved energy markets - no CMs ) .......................................... 166
6.2.2.1.
Economic Impacts .......................................................................................................... 166
6.2.2.2.
Who would be affected and how ................................................................................... 167
6.2.2.3.
Administrative impact on businesses and public authorities......................................... 167
Impacts of Policy Option 2 (Improved energy markets
CMs only when needed, based on a
common EU-wide adequacy assessment) ............................................................................................. 168
6.2.3.1.
Economic Impacts .......................................................................................................... 168
6.2.3.2.
Who would be affected and how ................................................................................... 169
6.2.3.3.
Impact on businesses and public authorities ................................................................. 169
Impacts of Policy Option 3 (Improved energy market
CMs only when needed, plus cross-
border participation).............................................................................................................................. 170
6.2.4.1.
Economic Impacts .......................................................................................................... 170
6.2.4.2.
Who would be affected and how ................................................................................... 170
6.2.4.3.
Impact on businesses and public authorities ................................................................. 171
Environmental impacts of options related to Problem Area II ................................................ 171
Overview of modelling results for Problem Area II ................................................................. 171
6.2.6.1.
Improved Energy Market as a no-regret option ............................................................ 171
6.2.6.2.
Comparison of Options 1 to 3 ........................................................................................ 173
6.2.6.3.
Delivering the necessary investments............................................................................ 178
6.2.6.4.
Level and volatility of wholesale prices .......................................................................... 185
6.3.
Impact Assessment for problem Area III (reinforce coordination between Member States for
preventing and managing crisis situations) .......................................................................................... 187
Methodological Approach ....................................................................................................... 187
Impacts of Policy Option 1 (Common minimum rules to be implemented by Member States)
188
6.3.2.1.
Economic impacts .......................................................................................................... 188
6.3.2.2.
Who would be affected and how ................................................................................... 189
19
kom (2016) 0863 - Ingen titel
1730752_0020.png
6.3.2.3.
Impact on businesses and public authorities ................................................................. 189
Impacts of Policy Option 2 (Common minimum rules to be implemented by Member States
plus regional co-operation) .................................................................................................................... 190
6.3.3.1.
Economic impacts .......................................................................................................... 190
6.3.3.2.
Who would be affected and how ................................................................................... 192
6.3.3.3.
Impact on businesses and public authorities ................................................................. 192
Impacts of Policy Option 3 (Full harmonisation and full decision-making at regional level) ... 193
6.3.4.1.
Economic impacts .......................................................................................................... 193
6.3.4.2.
Who would be affected and how ................................................................................... 193
6.3.4.3.
Impact on businesses and public authorities ................................................................. 194
6.4.
Impact Assessment for Problem Area IV (Increase competition in the retail market) ............. 194
Methodological Approach ....................................................................................................... 194
Impacts of Policy Option 0+ (Non-regulatory approach to improving competition and
consumer engagement) ......................................................................................................................... 194
6.4.2.1.
Economic Impacts .......................................................................................................... 194
6.4.2.2.
Who would be affected and how ................................................................................... 195
6.4.2.3.
Impact on businesses and public authorities ................................................................. 196
Impacts of Policy Option 1 (Flexible legislation addressing all problem drivers) .................... 196
6.4.3.1.
Economic Impacts .......................................................................................................... 196
6.4.3.2.
Who would be affected and how ................................................................................... 197
6.4.3.3.
Impact on businesses and public authorities ................................................................. 198
Impacts of Policy Option 2 (Harmonization and extensive safeguards for consumers
addressing all problem drivers) ............................................................................................................. 199
6.4.4.1.
Economic Impacts .......................................................................................................... 199
6.4.4.2.
Who would be affected and how ................................................................................... 200
6.4.4.3.
Impact on businesses and public authorities ................................................................. 201
Environmental impacts ............................................................................................................ 202
Impacts on fundamental rights regarding data protection ..................................................... 202
Social impacts......................................................................................................................... 205
6.5.
7.
COMPARISON OF THE OPTIONS ............................................................................ 208
7.1.
Comparison of options for adapting market design for the cost-effective operation of variable
and often decentralised generation, taking into account technological developments ........................ 208
7.2.
Comparison of Options for facilitating investments in the right amount and in the right type of
resources for the EU............................................................................................................................. 210
7.3.
Comparison of options for improving Member States' reliance on each other in times of system
stress and reinforcing coordination between Member States for preventing and managing crisis
situations ............................................................................................................................................. 213
7.4.
Comparison of options for addressing the causes and symptoms of weak competition in the
energy retail market ............................................................................................................................ 215
7.5.
Synergies, trade-offs between Problem Areas and sequencing .............................................. 217
Synergies .................................................................................................................................. 217
Trade-offs ................................................................................................................................ 219
Sequencing of measures .......................................................................................................... 220
8.
8.1.
8.2.
20
MONITORING AND EVALUATION.......................................................................... 220
Future monitoring and evaluation plan .................................................................................. 220
Annual reporting by ACER and evaluation by the Commission ............................................... 221
Annual reporting by ACER ....................................................................................................... 221
kom (2016) 0863 - Ingen titel
1730752_0021.png
Evaluation by the Commission ................................................................................................ 221
8.3.
8.4.
8.5.
Monitoring by the Electricity Coordination Group .................................................................. 221
Operational objectives ........................................................................................................... 222
Monitoring indicators and benchmarks .................................................................................. 223
9.
GLOSSARY AND ACRONYMS.................................................................................... 225
21
kom (2016) 0863 - Ingen titel
1730752_0022.png
1.
1.1.
I
NTRODUCTION
Background and scope of the market design initiative
Context of the initiative
1.1.1.1.The gradual process of creating an internal electricity market
Well-functioning energy markets that ensure secure energy supplies at competitive prices
are key for achieving growth and consumer welfare in the European Union.
Since 1996, the European Union has put in place legislation to enable the transition from
an electricity system traditionally dominated by vertically integrated national incumbents
that owned and operated all the generation and network assets in their territories to
competitive, well-functioning and integrated electricity markets. The first step was the
adoption of the First Energy Package (1996 for the electricity sector and 1998 for the gas
sector), which allowed for the partial opening of the market where the largest consumers
were given the right to choose their supplier. The Second Energy Package (2003)
introduced changes concerning the structure of the vertically integrated companies (legal
unbundling), the preparation of the full opening of the market by 1 July 2007 and the
reinforcement of the powers of the national regulators. The most recent comprehensive
reform of European energy market rules, the Third Internal Energy Market Package
(2009)
1
('Third Package') has principally aimed at improving the functioning of the internal
energy market and resolving structural problems.
Since the adoption of the Third Package, electricity policy decisions have enabled
competition and increasing cross-border flows of electricity, notably with the introduction
of so called "market coupling"
2
and "flow-based" capacity allocation. In spite of significant
differences in the maturity of markets in Europe, overall electricity wholesale markets are
increasingly characterised by fair and open competition, and
though still insufficient
competition is also taking root at the retail level.
1.1.1.2.The Union's policy concerning climate change
The decarbonisation of EU economies is at the core of
the EU’s agenda for climate change
and energy. The targets in the Climate and Energy Package (2007) require Member States
to cut their greenhouse gas emissions by 20% (from 1990 levels), to produce 20% of their
energy from renewable energy sources (RES), and to improve energy efficiency by 20 %
(the
'2020 targets').
3
In 2011, the European Union committed to reduce greenhouse gas emissions to 80-95%
below 1990 levels by 2050. For this purpose, the European Commission adopted an Energy
1
2
3
Section 1.1.2.1 provides a more detailed explanation of the Third Energy Package.
A mechanism that manages cross-border electricity flows in an optimal way, smoothing out price
differences between Member States.
http://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52008DC0030&from=EN
22
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0023.png
Roadmap
4
and a roadmap for moving to a competitive low carbon economy
5
exploring
the transition of the energy system in ways that would be compatible with this greenhouse
gas reductions target while also increasing competitiveness and security of supply. The
2050 roadmap will require a higher degree of decarbonisation from the electricity sector
compared to other economic sectors.
These ambitions were reaffirmed by the European Council of October 2014, which
endorsed targets for 2030 of at least 40 % for domestic greenhouse gas emissions reduction
(compared to 1990 levels), at least 27 % for the share of renewable energy consumption,
binding at EU level and at least 27 % energy savings, to be reviewed by 2020, having in
mind an EU level of 30% (the
'2030 targets').
6
At the Paris climate conference (COP21) in December 2015, 195 countries adopted the
first-ever legally binding global climate deal. The European Council of March 2016
confirmed the EU's commitment to implement the 2030 targets. The Paris Agreement was
ratified by the European Union and entered into force on 4 November 2016..
1.1.1.3.Paradigm shift in the electricity sector
The Union's goals for climate change and energy have led to a paradigm shift in the means
employed to generate electricity: since the adoption of the Third Package, there has been
a move towards the deployment of capital-intensive low marginal cost, variable and often
decentralised electricity from RES E (mostly from solar and wind technologies) that is
expected to become more pronounced by 2030.
The increasing penetration of RES E is driven
inter alia
by the objective to reduce
greenhouse gas emissions in line with the 2020 and 2030 targets. The 2030 greenhouse gas
emission reduction target is to be delivered through reducing emissions by 43% compared
to 2005 for the sectors in the EU's ETS
7
(including the electricity sector and industry) and
by 30% compared to 2005 for the sectors outside the ETS. Within the electricity sector,
the reduction of greenhouse gas emissions is supported by the Renewable Energy
Directive
8
, the ETS and the additional national policies by Member States to increase the
share of renewables in the energy mix.
The Renewable Energy Directive established a European framework for the promotion of
renewable energy, setting mandatory national renewable energy targets for achieving a
20% EU share of renewable energy in the final energy consumption and a 10% share of
4
5
6
7
8
http://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52011DC0885&from=EN
COM (2011) 112;
http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:52011DC0112
http://www.consilium.europa.eu/uedocs/cms_data/docs/pressdata/en/ec/145397.pdf
The ETS works on the
'cap and trade'
principle. A
'cap',
or limit, is set on the total amount of certain
greenhouse gases that can be emitted by the factories, power plants and industrial installations in the
system. The cap is reduced over time so that total emissions fall. This policy instrument equally fosters
penetration of RES E as it renders production of electricity from non- or less-emitting generation
capacity comparatively more economical in relation to more carbon intensive capacity.
Directive 2009/28/EC on the promotion of the use of energy from renewable sources, OJ L 140/16,
5.6.2009
23
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0024.png
energy from renewable sources in transport by 2020. These objectives have translated into
a need to foster the increased production of electricity from reneweble energy sources.
9
In parallel with the increased deployment of variable and decentralized RES E, the
increasing digitalisation of electricity networks and the environment behind the meter now
enables many elements of the electricity system to be operated more flexibly and
efficiently in the context of RES E generation. It also allows smaller actors to play an
increasingly important part in the market on both the supply side and
crucially
the
demand side, potentially untapping a vast new system resource.
From the consumer's perspective, increasingly intelligent grids unlock a host of other
possibilities, including innovative new products and services, lower entry barriers for new
suppliers, and improved billing and switching. This promises to unlock value and improve
the consumer experience
provided the legislative framework adapts to the changing
needs and possibilities. Indeed, fully engaging end consumers will be essential to realizing
the full benefits that the digital transformation can bring in terms of grid flexibility.
Moreover, electricity demand will progressively reflect the increasing electrification of
transport and heating.
The challenges the EU's electricity systems face are reflected in the European Commission
Communication of February 2015 on
“A Framework Strategy for a Resilient Energy Union
with a Forward-Looking
Climate Change Policy”
10
where the Commission announced a
new electricity market design linking wholesale and retail markets. As part of the
legislative reform process needed to establish the Energy Union, it also announced new
legislation on security of electricity supply.
In the light of the Energy Union Framework Strategy, the present impact assessment
reflects and analyses the need and policy options for a possible revision of the main
framework governing electricity markets and security of electricity supply policies in
Europe. The new electricity market design contributes strongly to the overall Energy Union
objectives of securing low carbon energy supplies to the European consumers at least costs.
1.1.1.4.The vision for the EU electricity market in 2030 and beyond
The Energy Union Framework Strategy sets out the vision of an Energy Union "with
citizens at its core, where citizens take ownership of the energy transition, benefit from
new technologies to reduce their bills, participate actively in the market, and where
vulnerable consumers are protected".
Well-functioning energy markets that ensure secure
energy supplies at competitive prices are important for achieving growth and consumer
welfare in the European Union. The future of the entire energy sector will, to a significant
extent, be shaped by the evolution of the electricity sector, which is key to addressing
climate change. With the quick ratification of the global Paris Agreement on climate
change and its subsequent entry into force, it becomes clear how important it is for all
9
10
Moreover, following the 2030 targets set by the European Council in October 2014, the Commission
published a Communication on A Framework Strategy for a Resilient Energy Union with a Forward-
Looking Climate Change Policy of February 2015 confirming the political commitment for the European
Union to become the world leader in renewable energy.
EC (2015a) - COM(2015) 80 final
24
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
parties to the agreement, including the EU, to deliver on the clean energy transition on the
ground. In fact, amongst all sectors that make up our energy system, electricity is the most
cost-effective to decarbonise. Currently 27.5% of Europe's electricity is produced from
renewable energy sources. The share of RES E in electricity generation needs to almost
double by 2030 in order for the EU to meet its 2030 energy and climate targets cost-
effectively. This will require creating the right conditions for the massive amount of
investment needed for this energy transition to come about. At the same time electricity
markets will have to adapt to the radical change in the structure of the generation pattern
which will foremost require creating a more flexible market, going across borders, that is
able to allow more active participation of a much wider range of actors.
The EU's vision of the electricity system in 2030 is therefore based on a functioning market
that is adapted to implementing the decarbonisation agenda at least cost together with a
revised EU ETS. A well-functioning electricity market is also the most efficient tool to
ensure secure electricity supplies at the lowest reasonable cost.
The transition of the energy system towards the 2030 vision
The starting point is the existing reality, which dates back to an era with large-scale,
centralised power plants, largely fuelled by fossil fuels, had the key aim of supplying every
home and business in a delineated area
typically a Member State
with as much
electricity as they wanted, and in which consumers
households, businesses and industry
were passive users.
However, the electricity market is undergoing profound change and requires a new set of
rules to ensure secure supplies, competitiveness while enabling cost-effective
decarbonisation. The electricity market of the next decade will be characterised by more
variable and decentralised electricity production, an increased interdependence between
Member States and new technological opportunities for customers to reduce their bills and
actively participate in electricity markets through demand response, self-consumption or
storage.
The electricity market design initiative aims to improve the functioning of the internal
electricity market in order to allow electricity to move freely to where and when it is most
needed, empower consumers, reap maximum benefits for society from cross-border
competition and provide the right signals and incentives to drive the right investments
compatible with climate change, renewable energy and energy efficiency ambitions.
The proposed initiative constitutes a next-step in a wider and longer evolutionary process
that will guide the EU's electricity markets towards the 2030 vision.
The 2030 electricity market is highly flexible and provides a level playing field amongst
all
forms of generation as well as demand response…
The bulk of the new generation capacity is likely to come from renewable sources, mainly
wind and sun that are variable and predictable only to a limited extent. The future
electricity market will therefore need to be more flexible and liquid than today and allow
for integrated short-term trading. This would also set the ground for renewable energy
producers
who will over time acquire increasing share in generation - to equally access
energy wholesale markets and to compete on an equal footing with conventional energy
producers. Short-term markets will also allow Member States to share their resources
across all "time frames" (forward trading, day-ahead, intraday and balancing), taking
25
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
advantage of the fact that peaks and weather conditions across Europe do not occur at the
same time. This would provide maximum opportunity to meet the flexibility needs and
balance the market. The sequence of forward markets and spot markets - day-ahead,
intraday and balancing - will optimise prices and the system in the short-run and will reveal
the true value of electricity and, therefore, provide appropriate investments signals in the
long-run.
The closer to real time electricity is traded (supply and demand matched), the less the need
for costly interventions by TSOs to maintain a stable electricity system. Although TSOs
would have less time to react to schedule deviations and unexpected events and forecast
errors, the liquid, better interconnected balancing markets, together with the regional
procurement of balancing reserves and more balancing actors and products available from
both demand and supply side, would be expected to provide them adequate and more
efficient resources in order to manage the grid and facilitate RES E integration.
All this will help to create a level playing field not only among all modes of generation but
also the demand side. At the same time market distortions and rules that artificially limit
or favour the access of certain technologies to the grid would be removed. All market
participants would become gradually responsible for balancing their position in the market,
bearing financial responsibility for the imbalances they cause and would, therefore, be
incentivised to reduce the risk of such imbalances. The most cost-efficient sources of
electricity would be used first, curtailment of generation due to limited transmission and
distribution infrastructure would be a measure of last resort and confined to situations in
which no market-based responses (including storage and demand response) are available,
and subject to transparent rules known in advance to all market actors and adequate
financial compensation. All resources would be remunerated in the market on equal terms.
…and active consumers.
Ensuring that all consumers
big and small
can actively participate in the energy market
would unlock a vast system resource that could play an important role in reducing system
costs. Technology
including smart grids and smart homes - is already available and will
further develop to enable consumers to modulate their demand while maintaining comfort
and reducing costs.
In the future, consumers would be sufficiently incentivised to benefit from these
opportunities and thus demand response would be provided by all willing consumer
groups, including residential and commercial consumers either directly or through
intermediaries (like aggregators). This would further increase the flexibility of the
electricity system and the resources for the TSOs and DSOs to manage it. At the same time
it should lead to a much more efficient operation of the whole energy system.
Consumers would be able to react to price signals on electricity markets both in terms of
consumption and production; they would consume when prices are low, when there is
plenty of electricity available, and reduce their consumption at times of low electricity
production and high prices. To make this possible, consumers have access to a fit-for-
purpose smart metering system, smart homes and storage as well as electricity supply
contracts with prices linked dynamically to the wholesale markets.
More and more consumers would produce their own electricity. Such decentralised
production further strengthens security of supply and helps to implement the
decarbonisation agenda as most of this production comes from renewable sources. If
26
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0027.png
combined with local storage solutions, consumers could significantly contribute to
balancing the distribution grids at local level. Analysis suggests that this development will
be progressive, and that most consumers would still remain connected to the distribution
grid to use it as back-up for when the prosumers' own generation is inadequate (e.g. for
sustained periods of low sunlight) or for the opportunity to sell excess electricity to the
market (e.g. during prolonged sunny periods when their installed storage is at full
capacity).
Reducing barriers to market entry for electricity suppliers and consumer engagement
notably phasing out price regulation
results in increased competition at the retail level
allowing consumers to save money through better information and a wider choice of action.
This also helps drive the uptake of innovative new products and services that increase
system flexibility through demand response whilst catering to consumers' changing needs
and abilities.
In addition, DSOs would be enabled and incentivised, without compromising their
neutrality as system operators, to manage their networks in a flexible and cost-efficient
way
inter alia through revised tariff structures.
Increased cross-border trade is a pillar of the electricity market.
Competition and cross-border flows of electricity would further increase, with fully
coupled markets where price differences between Member States are smoothened out.
Electricity wholesale markets will be characterised by fair and open competition, including
across borders. Cooperation between TSOs will be enhanced by regional operational
centres. The cross-border cooperation of TSOs would be accompanied by an increased
level of cooperation between regulators and governments. An adequate cross-border
infrastructure remains crucial to underpin a well-functioning electricity market.
Increasingly investments are triggered by the market with a decreasing need for state
subsidies.
The enhanced market design, the revised renewables directive and the strengthened ETS
will all help to improve the viability of RES E investments, in particular as follows:
-
Where the marginal producer is a fossil fired power plant, a higher carbon price
translates into higher average wholesale prices. The existing surplus of
allowances is expected to decrease due to the implementation of the Market
Stability Reserve and the higher Linear Reduction Factor, reducing the current
imbalance between supply and demand for allowances;
greater system flexibility will be critical for better integration of RES E in the
system, reducing their hours of curtailment and the related forgone revenues;
improving overall system flexibility is equally essential to limit the merit-order
effect
11
and thus in avoiding the erosion of the market value of RES E produced
electricity;
the revision of priority dispatch rules, removal of must-run units, increasing
demand response and storage, together with the better functioning of the short-
term markets will strongly reduce or even eliminate the occurrence of negative
-
-
11
Also occasionally referred to as the 'cannibalisation effect'.
27
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
-
-
-
-
prices
leading again to higher average wholesale prices (especially during the
hours with significant variable RES E generation);
improved rules for intraday and balancing markets will increase their liquidity
and allow access to those markets for all resources, thus helping generators
reduce their balancing costs;
removing existing (explicit or implicit) restrictions for the participation of all
resources to the reserve and ancillary services markets will allow RES E to
generate additional revenues from these markets;
price signals reflecting the actual value of electricity at each point of time, as
well as the value of flexibility, will ensure that the flexible assets most needed
for the system are invested in or, at least, are less likely to be decommissioned.
Low exit barriers to facilitate exit of overcapacities.
The above mentioned changes will all help to improve the competitive situation of RES E
and reduce the need for dedicated support.
The results of the modelling for this Impact Assessment indicate that investments in the
most mature renewable technologies could be driven by the market by 2030 (such as
certain solar PV and onshore wind). At the beginning of the period, generation over-
capacity in certain areas, weaker investment signal from the ETS and low wholesale market
prices and still high RES E technology costs, make the case for investments in RES E
technologies more difficult. The underpinning modelling and analysis, points that the RES
E funding gap in 2020 is gradually reducing towards 2030 as the market conditions
improve. Less mature RES E technologies, needed for meeting the 2030 and 2050 energy
and climate objectives, such as off-shore wind, will likely need some form of support to
cover at least a fraction of total project costs (complementing the revenues obtained from
the energy markets) throughout the 2021-2030 period.
The picture also depends on regions. RES E technologies could be more easily financed
by the market in the regions with the highest potential (e.g. onshore wind in the Nordic
region or solar in Southern Europe), while RES E could continue to require support in the
British Isles and in Central Europe. Conditions however also depend on the cost of capital.
At the same time it has to be acknowledged that whether and what point in time financing
of RES E through markets alone will actually take off remains difficult to predict. This is
because financing of capital intensive technologies such as most RES E through markets
based on marginal cost pricing will remain challenging. In the absence of measures that
address system flexibility, higher penetration of RES with low marginal cost could reduce
the market value that such RES E can actually achieve. Removing barriers to the
flexibilisation of demand and improving the responsiveness of demand and supply to price
signals stands out as a key measure in this regards in order to further stabilise the revenue
of RES E producers from the market.
On the other hand the future capacity of RES to be financed through the market will also
depend on certain conditions outside of the market design and ETS prices, such as
continued decrease in the costs of technologies, availability of capital at a reasonable price,
social acceptance and sufficiently high and stable fossil fuel prices.
While the market reforms described above are therefore no regret options to facilitate RES
investment, support schemes will still be needed at least for a transitional period. It is
therefore essential to further reform such schemes to make them as market-oriented as
possible.
28
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
… with a market-based
and more Europeanised approach to support schemes to cover any
investment gap .
Where needed, support will be (i) cost-effective and kept to a minimum, and (ii) will create
as little distortions as possible to the functioning of electricity markets, and to competition
between technologies and between Member States. The legal frame for RES E support
schemes would ensure sufficient investor certainty over the 2021-2030 period and require
the use (where needed) of market-based and cost-effective schemes, based on the design
of emerging best practices. Auctions could introduce competitive forces to determine the
level of support needed on top of market revenues and incentivise RES E producers to
develop business models that maximise market-based revenues. The use of tenders would
imply a natural phase-out mechanism for support, determining the remaining level of
support required to bridge any financing gap. The continued participation of small and
local actors, including energy communities, in the energy transition should be ensured in
this process.
The market should also provide, as a principle, security of supply.
By 2030, the market, as described above, could in principle successfully attract the required
investments to ensure adequate matching of supply and demand.
Today, most of the EU's power markets have more capacity than needed. However, with
demand increasing, e.g. due to E-Mobility and heat pumps, and older power plants retiring
supply margins are likely to get tighter. Therefore, a legal framework needs to be in place
to allow for the formation of electricity prices that send the signals for tomorrow's
investments. In this context, scarcity prices will become more and more important to
provide the right incentives for the operation of resources (including for demand response)
when they are most needed. Hedging products which suppliers can buy to protect
themselves against peaks are already available now and more innovative tools are expected
to be brought forward by market participants without the need for additional intervention
by national authorities. This will also provide opportunities for generators (who will be
natural provider of such hedging tools) to secure further revenues.
In the new market framework capacity mechanisms might only be considered if a residual
risk to security of supply can be proven after underlying market distortions have been
removed and the contribution of market integration to security of supply has been taken
into account.
The legal framework will provide tools to facilitate an objective case-by-case judgement
on whether the introduction of capacity mechanisms is needed and set out measures to
ensure that their potentially distortive effects are kept at a minimum, while placing them
in a more regional context. Accordingly, their need would have to be proven against an
EU-wide system adequacy assessment and they would have to allow for cross-border
participation to minimise distortions of investment incentives across the borders. Capacity
mechanisms would be designed in a way as to not discriminate against different generation
technologies and demand side capacities. Additionally, where need has been demonstrated
for such mechanisms, Member States should take into account how such mechanisms
would impact the achievement of the decarbonisation objectives.
29
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0030.png
Member States should regularly review their resource adequacy
12
situation and phase out
capacity mechanisms once the underlying market or regulatory concerns have been
resolved.
Despite best efforts to build an integrated and resilient power market, crisis situations can
never be excluded. The potential for crisis situation increases with climate change (i.e.
extreme weather conditions) and with the emergence of new areas that are subject to
criticalities (i.e. malicious attacks, cyber-threats). Such crises tend to often have an
immediate cross-border effect in electricity. The legal framework would provide tools to
ensure that national security of supply policies are better coordinated and aligned to tackle
possible crisis situations, in particular those that affect several countries at the same time.
Scope of the initiative
1.1.2.1.Current relevant legislative framework
EU's electricity markets are currently regulated at EU level by a series of acts collectively
referred to as the "Third Package"
13
.
The main objectives of the Third Package were:
-
-
-
Improving competition through better regulation, unbundling and reducing
asymmetric information;
Improving security of supply by strengthening the incentives for sufficient
investment in transmission and distribution capacities; and,
Improving consumer protection and preventing energy poverty.
The Third Package mainly focused on improving the conditions for competition as
resulting from previous generations of legislation by improving the level playing field. The
most important root cause for the lack of competition identified at the time
14
was the
existence of vertically integrated companies, which not only controlled essential facilities
(such as electricity transmission systems) but also enjoyed significant market power in the
wholesale and, often, retail markets. Many of the measures associated with the Third
Package sought to directly or indirectly address this issue, such as by improving the
12
13
14
As not only generation, but also demand response or storage can solve problems of situations in which
demand exceeds production, this Impact Assessment uses the term "resource adequacy" instead of
"generation adequacy" (other authors refer to "system adequacy").
The relevant elements of the Third Package as regards electricity are Directive 2009/72 of the European
Parliament and of the Council of 13 July 2009 concerning common rules for the internal market in
electricity and repealing Directive 2003/54/EC, OJ L 211, 14.8.2009, p. 55–93; Regulation (EC) No
714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the
network for cross-border exchanges in electricity repealing Regulation (EC) No 1228/2003. OJ L 211,
14.8.2009, p. 15–35 and Regulation (EC) No 713/2009 of the European Parliament and of the Council
of 13 July 2009 establishing an Agency for the Cooperation of Energy Regulators. OJ L 211, 14.8.2009,
p. 1–14. The Third package also covered other acts, in particular acts related to the regulation of gas
markets. However, only one of these acts is pertinent for the present impact assessment
the Gas
Directive.
In the impact assessment for the Third Package (SEC(2007) 1179/2
http://ec.europa.eu/smart-
regulation/impact/ia_carried_out/docs/ia_2007/sec_2007_1179_en.pdf.
30
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0031.png
unbundling regime, strengthening regulatory oversight, improving the conditions for cross-
border market integration and lowering entry barriers such as by improving transparency.
The Third Package also created the possibility to enact secondary legislation concerning
cross-border issues, often referred to as network codes or guidelines ('network codes')
15
,
and provided a mandate for developing these network codes (as well as other tasks related
to the EU's electricity markets) to transmission system operators within the
ENTSO-E
16
and to national regulatory authorities, within the Agency for the Cooperation of Energy
Regulators ('ACER')
17
.
The main framework for electricity security of supply in the Union is currently Directive
2005/89/EC ("Security
of Electricity Supply Directive'
or
'SoS Directive'")
18
. This SoS
Directive requires Member States to take certain measures with the view to ensuring
security of supply, but leaves it by and large to the Member States how to implement these
measures. The Third Package complemented the SoS Directive and superseded
de facto
some of its provisions.
1.1.2.2.Policy development subsequent to the Third Package
The present initiative builds on previous related policy initiatives and reports that
intervened since the adoption of the Third Package and the Security of Electricity Supply
Directive, in particular:
-
-
"Report on the progress concerning measures to safeguard security of electricity
supply and infrastructure investment"
COM (2010) 330 final
19
;
"Delivering the internal electricity market and making the most of public
interventions"
(C(2013) 7243). This Communication was accompanied
inter alia
by a Commission Staff working document (SWD(2013)438) entitled
"Generation
Adequacy in the internal electricity market
guidance on public intervention";
Communication on the "Progress
towards completing the Internal Energy Market"
COM(2014) 634 final. This Communication emphasized that energy market
integration has delivered many positive results but that, at the same time, further
steps are needed to complete the internal market;
"Communication on Energy Security"
(COM(2014)330). This Communication
emphasised
inter alia
the need achieve a better functioning and a more integrated
energy market;
Special Report by the European Court of Auditors
"Improving the security of
energy supply by developing the internal energy market: more efforts needed".
This
-
-
-
15
16
17
18
19
For an overview of these network codes and guidelines and their pertinence to the present initiative,
please refer to Annex VII.
https://www.entsoe.eu/about-entso-e/inside-entso-e/official-mandates/Pages/default.aspx
http://www.acer.europa.eu/en/The_agency/Mission_and_Objectives/Pages/default.aspx
Directive 2005/89/EC of the European Parliament and of the Council of 18 January 2006 concerning
measures to safeguard security of electricity supply and infrastructure investment, OJ L 33, 4.2.2006, p.
22–27.
http://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52010DC0330&from=EN
31
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0032.png
-
-
-
-
-
-
special report made nine recommendations to reap the benefits of market
integration
20
;
"Communication on energy prices and costs in Europe"
(COM(2014) 21 /2) and
the accompanying "Energy
prices and costs report"
(SWD(2014)020 final 2)
highlighting
inter alia
the competiveness of the EU's retail electricity markets, the
missing link between wholesale and retail prices and the need for EU cooperation
by DSOs as well as the Energy prices and costs report (SWD(2016)XX
21
, this
report
inter alia
that shed light on the drivers of retail and wholesale price
developments;
"Delivering a new deal for energy consumers"
(COM(2015) 339). This
Communication laid out the Commission's intention to enable all consumers to
fully participate in the energy transition, taking advantage of new technologies that
enable wholesale and retail markets to be better linked.
The Commisison published a study on
"Investment perspectives in electricity
markets"
22
Technical Report
23
by the European Commission on "The
economic impact of
enforcement of competition policies on the functioning of EU energy markets".
The
report includes an assessment of the intensity of competition in the energy
markets
24
(both wholesale and retail) and points out that, between 2005 and 2012,
the intensity of competition in European energy markets may have declined
25
.
The Commission Staff working document (SWD(2015)249) entitled
"Energy
Consumer Trends 2010 - 2015"
presents market research into the problems that
energy consumers continue to be confronted with.
The Commission launched a a sector inquiry into national capacity mechanisms,
The resulting
"Interim Report of the Sector Inquiry on Capacity Mechanisms"
(SWD SWD(2016) 119 final)
26
points out that there is a lack of adequate
assessment of the actual need for capacity mechanisms. It also appears that some
capacity mechanisms in place could be better targeted and more cost effective. It
emphasizes the need to design capacity mechanisms with transparent and open
rules of participation and a capacity product that does not undermine the
functioning of the electricity market, taking into account cross-border participation.
1.1.2.3.Scope and summary of the initiative
In line with the Union's policy on climate change and energy, the proposed initiative aims
at deepening energy markets and setting a framework governing security of supply policies
that enables the transition towards a low carbon electricity production.
20
21
22
23
24
25
26
http://www.eca.europa.eu/en/Pages/DocItem.aspx?did=34751
Report to be published in conjunction with the present impact assessment..
"Energy Economic Developments, Investment perspectives in electricity markets".
Institutional paper
003, 1 July 2015
http://ec.europa.eu/economy_finance/publications/eeip/pdf/ip003_en.pdf
Published on 16.11.2015, at
http://ec.europa.eu/competition/publications/reports/kd0216007enn.pdf
Ibid
Section 3.3 of the non-technical summary at p. 23.
Based on the productivity dispersion and the Boone indicator over this period,
ibid
Section 3.4
"Summary
of key findings"
at p. 25.
Published
on
13.04.2016
at:
:
http://ec.europa.eu/competition/sectors/energy/capacity_mechanism_report_en.pdf
32
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0033.png
The transition towards a low carbon electricity sector as well as technical progress will
have profound implications on the manner in which the electricity sector is organised and
the roles of market actors and consumers, not all of which can be foreseen with accuracy
today. As it cannot be predicted how the electricity markets and progress of innovation
will look like in a few decades from now, the proposed initiative constitutes a next step in
a wider and longer evolutionary process that will guide the EU's electricity markets
towards the future. The initiative will consequently not address the challenges that might
arise when operating a fully decarbonised power system.
27
This initiative also aims at improving consumer protection and engagement for both
electricity and gas consumers
28
.
Organisation and timing
1.1.3.1.Follow up on the Third Package
Full and timely transposition of the Directives of the Third Package has been a challenge
for the vast majority of the Member States. In fact, by the end of the transposition deadline
(March 2011), none of the Member States had achieved full transposition. However,
progess has been made and at present all of the infringement proceedings
29
for partial
transposition of the Electricity Directive have been closed as the Member States achieved
full transposition in the course of the proceedings.
In addition to ensuring compliance of national rules with the Third Package, the
Commission has carried out assessments to identify and resolve problems concerning
incorrect transposition or bad application of the Third Package. On this basis, the
Commission has opened EU Pilot cases against a number of Member States. As of 7th July
2016, 8 of these EU Pilot cases have resulted in infringement procedures where,
inter alia,
the violation of the EU electricity market rules is at stake.
In January 2014 the Directorate General for Energy of the European Commission ('DG
ENER') launched a public consultation on retail markets for energy.
Whilst preparing the single market progress report (COM(2014) 634 final), published on
13 October 2014, DG ENER decided to study a number of changes to the current
legislation.
The Commission (DG ENER) started in 2015 the preparatory work for the present impact
assessment to assess policy options related to the internal energy market for electricity and
27
28
29
For some of the arising issues and challenges see Chapter 2.3 in Investment Perspectives in Electricity
Markets, European Commission, DG EFCIN, 2015
http://ec.europa.eu/economy_finance/publications/eeip/pdf/ip003_en.pdf
With regards to gas consumers, only the consumer-related provisions of the Gas Directive are concerned:
Article 3 and Annex I. These address issues such as public service obligations, metering, billing and a
broad range of consumer rights that Member States shall ensure.
The Commission opened 38 infringement cases against 19 Member States for not transposing or for
transposing only partially the Directives.
33
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0034.png
to security of electricity supply and consulted in July 2015 the public on a new energy
market design (COM(2015) 340 final)
30
.
In April 2015, the Commission (DG Competition) launched a sector inquiry into national
capacity mechanisms. The Commission interim report and the accompanying Commission
staff working document, adopted on 13 April 2016 have provided a significant input for
the proposed initiative. This will be further completed by the final report.
1.1.3.2.Consultation and expertise
The Commission has conducted a number of wide public consultations on the different
policy areas covered by the present Impact assessment which took place between 2014 and
2016. In addition to the public consultations, it has organised a number of targeted
consultations with stakeholders throughout 2015 and 2016
31
.
Given the cross-cutting nature of the planned impact assessment work, the Commission
set up an inter-service steering group which included representatives from a selected
number of Commission Directorate Generals. The inter-service steering group held regular
meetings to discuss the policy options of the proposed initiatives and the preparation of the
impact assessment
32
.
In parallel, the Commission has also conducted a number of studies mainly or specifically
for this impact assessment
33
.
1.2.
Interlinkages with parallel initiatives
The proposed initiatives are strongly linked to other energy and climate related legislative
proposals brought forward in parallel with the present initiative equally aimed at delivering
upon the five dimensions of the Energy Union, namely energy security, solidarity and trust,
a fully integrated European energy market, energy efficiency contributing to moderation
of demand, decarbonisation, research, innovation and competitiveness. These other energy
related legislative proposals include:
The Renewable Energy Package comprising the new Renewable Energy Directive
and bioenergy sustainability policy for 2030 ('RED
II')
The RED II covers a number of measures deemed necessary to attain the EU binding
objective of reaching a level of at least 27% RES in final energy consumption by 2030
across the electricity, heating and cooling, and transport sectors. As regards electricity in
particular, the Renewables Directive proposes a framework for the design of support
schemes for renewable electricity, a framework for renewable self-consumption and
renewable energy communities, as well as various measures to reduce administrative costs
and burden.
30
31
32
33
https://ec.europa.eu/energy/sites/ener/files/documents/1_EN_ACT_part1_v11.pdf
https://ec.europa.eu/energy/en/consultations/public-consultation-new-energy-market-design
For more information on the consultation process, please refer to Annex 3
For more information on inter-service steering group, please refer to Annex 1.
For the list of studies and a summary description, please refer to Annex 5.
and
34
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0035.png
Conversely, measures aimed at the integration of RES E in the market, such as provisions
on priority dispatch and access previously contained in the renewables directive are part
of the present market design initiative. The reflections on a revised Renewables Energy
Directive will include specific initiatives on support schemes for market-oriented, cost-
effective and more regionalised support to RES up to 2030 in case Member States were
opting to have them as a tool to facilitate target achievement. The Renewable Package is
expected to deal with legal and administrative barriers for self-consumption, whereas the
present package will address market related barriers to self-consumption.
The Renewable Energy package has synergies with the present initiative as it seeks to adapt
the current market design, optimised for large-scale, centralised power plants, to a suitable
one for the cost-effective operation of variable, decentralised generation of electricity
whilst taking into account technological progress creating the conditions for a cost efficient
achievement of the binding EU RES target in the electricity sector.
The enhanced market design will improve the viability of RES E investments, but
electricity market revenues alone might not prove sufficient in attracting renewable
investments in a timely manner and at the required scale to meet EU's 2030 targets. The
MDI and RED II impact assessments thus jointly come to the conclusion that the improved
electricity market, in conjunction with a reformed EU ETS could, under certain conditions,
deliver investments in the most mature renewable technologies (such as solar PV and
onshore wind). The underpinning modelling and analysis, points that the RES E funding
gap in 2020 is gradually reducing towards 2030 as market conditions improve. Less mature
RES E technologies, needed for meeting the 2030 and 2050 energy and climate objectives,
such as off-shore wind, will likely need some form of support to cover at least a fraction
of total project costs (complementing the revenues obtained from the energy markets)
throughout the 2021-2030 period. These technologies are required if RES E technologies
are to be deployed to the extent required for meeting the 2030 and 2050 energy and climate
objectives, and provide an important basis for the long-term competitiveness of an energy
system based on RES E.
Similarly, the progressive reform of RES E support schemes as proposed by the RED II
initiative, building on the Guidelines on State aid for environmental protection and energy
2014-2020 ('EEAG'), is a prerequisite for the results of the present initiative to come about.
In order to ensure that a market can function, it is necessary that market participants are
progressively exposed to the same price signals and risks. Support schemes based on feed-
in-tariffs prevent this and would need to be phased-out
with limited exemptions
and
replaced by schemes that expose all resources to price signals, as for instance by means of
premium based schemes. Such schemes would be made even more efficient by setting aid-
levels through auctioning as RES E investments projects will then be incentivised to
develop business models that optimise market based returns
34
.
The issue is explored in more detail in section 6.2 of the present impact assessment and, in
particular, the RED II impact assessment.
34
See Box 7 and Annex IV for more information
35
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0036.png
Commission guidance on regional cooperation
The forthcoming guidance on regional cooperation may set out general principles for
regional cooperation across all five dimensions of the Energy Union, described how these
principles are being addressed in this initiative and other legislative proposal for
Renewables and Energy Union governance, and will offer suggestions on how regional co-
operation, where it applies, can be made to work in practice.
The present initiative seeks to improve market functioning, and calls for a more regional
approach to system operation and security of supply. The guidance document should help
Member States best achieve regional co-operation, including in areas where the present
initiative mandates effective co-operation (e.g. the initiative calls on Member States to
prepare risk preparedness plans in a regional context, cf. infra).
The Energy Union governance initiative
The Energy Union governance initiative aims at ensuring a coordinated and coherent
implementation of the Energy Union Strategy across its five dimensions with emphasis on
the EU's energy and climate targets for 2030. This is established through a coherent
combination of EU-level and national action, a strengthened political process and with
reduced administrative burden.
With these objectives in mind, the draft Regulation is based on two pillars:
-
Streamlining and integration of existing planning, reporting and monitoring
obligations in the energy and climate fields, in order to reduce unnecessary
administrative burden;
A political process between Member States and the Commission with close
involvement of other EU institutions to support the achievement of the Energy
Union objectives, including notably the 2030 targets for greenhouse gas emission
reductions, renewable energy and energy efficiency.
-
In relation to this initiative the governance initiative will also streamline reporting
obligations by Member States and the Commission that are presently enshrined in the Third
Package.
The Energy Efficiency legislation ('EE')
35
and the related Energy Performance of
Buildings Directive ('EPBD')
36
including the proposals for their amendment.
In general terms, energy efficiency measures interact with the present initiative as they
affect the level and structure of electricity demand. In addition, energy efficiency measures
can alleviate energy poverty and consumer vulnerability. Besides consumer income and
energy prices, energy efficiency is one of the major drivers of energy poverty.
35
36
Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy
efficiency, amending Directives 2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC and
2006/32/EC; OJ L 315, 14.11.2012, p. 1–56.
Directive 2010/31/EU of the European Parliament and of the Council of 19 May 2010 on the energy
performance of buildings. OJ L 153, 18.6.2010, p. 13–35.
36
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0037.png
The provisions currently still in the current energy efficiency legislation concerning
metering and billing (to the extent related to electricity) may become part of the present
initiative as these relate to consumer conduct and their participation in the market which
are important issues in the context of the present initiative. This logic is reinforced by the
fact that the Third Package already contains closely related provisions on smart metering
deployment and fuel mix and comparability provisions in billing.
Similarly, all provisions on priority dispatch for Combined Heat and Power ('CHP')
previously contained in the energy efficiency legislation will be set out in the present
initiative as these provisions relate to the integration of these resources in the market and
as they are very similar to the priority dispatch provisions for RES E, also dealt with in the
present initiative.
The provisions previously contained in the energy efficiency legislation on demand
response will be set out in the present initiative
37
because these relate to incentivising
flexibility in the market and participation of consumers in the market, both core subjects
of the present initiative. This logic is reinforced by the fact that the Third Package already
contains related provisions on demand response.
The Commission Regulation establishing a Guideline on Electricity Balancing
('Balancing Guideline')
The Balancing Guideline constitutes an implementing act that will be adopted using the
Electricity Regulation as a legal basis. The Balancing Guideline is closely related to the
present initiative. This is because efficient, integrated balancing markets are an important
building block for the consistent functioning of wholesale markets which in turn are needed
for a cost effective integration of RES E into the electricity market.
The Balancing Guideline aims at harmonising certain aspects of the EU's balancing
markets, with a focus on optimising the cross-border usage that TSOs make of the
balancing reserves that each have decided to contract individually, such as harmonisation
of the pricing methodology for balancing; standardisation of balancing products and merit-
order activation of balancing energy.
The present initiative seeks in contrast to focus on a more integrated approach to deciding
and contracting of the balancing reserves, as opposed to their usage, which touches upon
the optimal allocation of the cross-border transmission capacities and a regional approach
to balancing reserves.
Thus, the Balancing Guideline deals principally with exchanges of balancing energy
whereas the present initiative focusses on the exchange and sharing of balancing capacity.
The latter issue is much more political than the exchange of balancing energy and closely
related to other questions dealt with in the present initiative, such as regional TSO
cooperation or the reservation of transmission capacities. The assessments of the two
37
In a manner that will preserve DG Energy's ability to continue infringing Member States that have not
correctly implemented what is now Article 15(8) of the Energy Efficiency Directive.
37
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0038.png
initiatives are fully coherent. Indeed, the implementation of the guidelines on electricity
balancing is part of the baseline for the present impact assessment
38
.
Other relevant instruments
Other relevant instruments are the Commission proposal for setting national targets for
2030 for the sectors outside the EU's ETS, the revision of the EU's ETS for the period after
2020, EU's competition instruments and the EU state aid rules applicable to the energy
sector and clarified in the EEAG. and the decarbonisation of the transport sector initiative.
The manner in which this policy context is interacting with the present initiative is explored
further in section 4.2.
2.
2.1.
P
ROBLEM
D
ESCRIPTION
Problem Area I: Market design not fit for an increasing share of variable
decentralized generation and technological developments
The European Union's policy to fight global warming will require the electricity systems
to shift from a generation mix that is mostly based on fossil fuels to a virtually decarbonised
power sector by 2050. Indeed, with the 2030 targets agreed by the October 2014 European
Council (EuCo 169/14) the share of electricity generated from renewable sources is
projected to be close to 49% of total electricity produced, while their share in total net
installed capacity is projected to be 62.45%
39
.
Table 1: RES E % share in total net electricity generation
Year
2000
2005
422
467
RES E total (TWh)
Total net generation (TWh)
2,844
3,119
RES E
15%
15%
Source: PRIMES; based on EUCO27 scenario
2010
683
3,168
22%
2015
916
3,090
30%
2020
1,193
3,221
37%
2025
1,443
3,317
43%
2030
1,654
3,397
49%
Whereas renewable electricity can be produced by a variety of technologies, most new
installed capacity today is based on wind and solar power. By 2030, this is expected to be
even more pronounced.
Table 2: Share of variable RES E (solar and wind power) in RES E and total net
generation
Year
2000
Variable RES E (TWh)
22
422
Total RES E (TWh)
Variable RES E in RES E
5%
Variable RES E in total net generation
1%
Source: PRIMES; based on EUCO27 scenario
2005
72
467
16%
2%
2010
171
683
25%
5%
2015
378
916
43%
12%
2020
618
1,193
52%
19%
2025
820
1,443
57%
25%
2030
995
1,654
62%
29%
The patterns of electricity production from wind and sun are inherently more variable and
less predictable when compared to conventional sources of energy (e.g. fossil-fuel-fired
38
39
See also Section 5.1.2 of the present impact assessment and in the Annex IV on the modelling
methodology.
These figures are based on the PRIMES EUCO27 results.
38
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0039.png
power stations) or flexible RES E technologies (e.g. biomass, geothermal or hydropower).
Weather-dependent production also implies that output does not follow demand.
Consequently, there will be times when renewables could cover a very large share
even
100%
of electricity demand and times when they only cover a minor share of total
consumption. While the demand-side and decentralized power storage could in theory
react to the availability of renewable energy sources and even to extreme variations, current
market arrangements do not enable most consumers to actively participate in electricity
markets either directly through price signals or indirectly through aggregation.
While renewable technologies and individual projects differ significantly in size (from
rooftop solar on households with 5 to 20 kW to several hundreds of MW for large offshore
wind parks), the majority of renewable investments are developed at comparatively small
scale. Given that the typical installation size of an onshore wind farm or a solar park is
generally multiple
40
times smaller than of a conventional power station, the number of
power producing units and operators will increase significantly. Consequently, the
transition towards more renewables implies that more and more power will be generated
in a decentralised way. Market roles and responsibilities will have to be adapted.
Finally, these new installations will not necessarily be located next to consumption centres
but where there are favourable natural resources. This can create grid congestion and local
oversupply.
The transition towards a low carbon electricity production poses a number of challenges
for the cost-effective organisation and operation of Europe's power system and its
electricity markets. The existing market framework was designed in an era in which large-
scale, centralised power stations, primarily fired by fossil fuels, supplied passive customers
at any time with as much electricity as they wanted in a geographically limited area
typically a Member State. This framework is not fit for taking up large amounts of variable,
often decentralised electricity generation nor for actively involving more consumers in
electricity markets.
The main underlying drivers are: (i) the inefficient organisation of short-term electricity
markets and balancing markets, (ii) exemptions from fundamental market principles, (iii)
consumers that do not actively engage in the market, (iv) consumers do not actively engage
in the market and demand response potential remains largely untapped; and (v) distribution
networks that are not actively managed and grid users are poorly incentivised.
40
The largest solar PV park in the EU is the 300 MW Cestas Park in France,
http://www.pv-
magazine.com/news/details/beitrag/frances-300-mw-cestas-solar-plant-
inaugurated_100022247/#axzz4Cxalbrhc.
The largest wind farm is the offshore farm "London array"
with 630 MW distributed over 175 turbines. By comparison, the largest nuclear power plant in Europe
is the Gravelines plant in France, with a net capacity of 5460MW. The largest coal-fired power station
in Europe is the Polish Bełchatów plant with a capacity of 5420 MW.
39
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0040.png
Driver 1: Short-term markets, as well as balancing markets, are not efficiently
organised
Today's short-term markets are not efficiently organised, because they do not give all
resources
conventional power, renewables, the demand-side, storage
equal
opportunities to access these markets and because they do not fully take into account the
possible contribution of cross-border resources. The latter problem often originates from a
lack of coordination between national entities and a lack of harmonisation of rules, while
the former relates to the trading products themselves, e.g. their commitment period, which
sometimes are too restrictive to allow for a level playing field of all kinds of resources
41
.
Short-term markets play a major role in any liberalised power system due to the
characteristics of electricity as a product. Electricity must be generated and transmitted as
it is consumed. The overall supply and demand needs to be in balance in physical terms at
any given point in time. This balance guarantees the secure operation of the electricity grid
at a constant frequency. Imbalances between injections and withdrawals of electricity
render the system unstable and, ultimately, may give rise to a black-out.
As a consequence, market participants need to be incentivised to have a portfolio of
electricity injections into and withdrawals from the network that net-out. Market
participants can adjust their portfolio by revising production and consumption plans and
selling or buying electricity
42
. Efficient and liquid markets with robust price signals are
crucial to guide these decisions
43
.
The fact that the production patterns from weather dependent RES E can only be predicted
with acceptable accuracy within hours, creates challenges for market parties and for system
operation. In the absence of efficient and liquid short-term electricity wholesale markets,
system operators have to take actions to balance the system and manage network
41
42
43
EPRG Working paper 1614 (2016) "Overcoming
barriers to electrical energy storage: Comparing
California and Europe"
by F. Castellano Ruz and M.G. Pollitt concludes: "In
Europe, there is a need
to clarify the definition of EES, create new markets for ancillary services, design technology-neutral
market rules and study more deeply the necessity of EES."
Depending on the delivery period, bulk electricity can be traded on "spot markets" or "forward markets".
Spot markets are currently mainly "day-ahead markets" on which electricity is traded up to one day
before the physical delivery takes place. On "forward markets", power is traded for delivery further
ahead in time.
IEA "Re-powering
markets"
(2016) suggests:
"A market design with a high temporal and geographical
resolution is therefore needed".
40
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0041.png
congestions once the production forecasts become more precise. Moreover, operators of
RES E are unable to adjust their portfolios once the production forecasts become more
precise, leaving them exposed to risks and costs, when they deviate from their plans. An
increasing penetration of RES E thus requires efficient and liquid short-term markets that
can operate until very shortly before the time of physical delivery i.e. the moment when
electricity is consumed. The entire electricity system must become more flexible, also
through the progressive introduction of new flexible resources such as storage, to
accommodate variations in RES E production.
Current trading arrangements are however not optimised for a world in which market
participants have to adjust portfolios on short notice. The manner in which the trading of
electricity is arranged and the methods for allocating the network capacity to transmit
electricity are organised, allow for efficient trading of electricity in timeframes of one or
more days ahead of physical delivery. These arrangements befit well a world of
conventional electricity production that can be predictably steered but not the new
electricity landscape with a high share of renewables with limited forecasting abilities in a
day-ahead timeframe.
The current market framework already envisages that these short-term adjustments can be
made in intraday markets to correct. However, whilst liquidity has increased over the past
few years, there remains significant scope for further increases in these markets
44
. As way
of illustration, in 2014, in the intraday timeframe, only five markets in Europe had a ratio
of traded energy to demand of greater than 1%
45
. Further, progress remains in connecting
('coupling') national intraday markets in the same way as day-ahead markets. This can lead
to a low level of cross-border competition in intraday markets. In 2014 only 4.1% of
available interconnection capacity at the intraday stage was used, compared to 40% at day-
ahead.
Improving liquidity of intraday markets requires addressing various issues, including
removing the barriers that today exist for trading power across borders as well as providing
proper incentives to rebalance portfolios by trading until short notice before markets close.
In addition, technical rules of the market (i.e. products, bid sizes, gate closure times) are
often not defined with renewables or demand response in mind creating
de facto
barriers
for its participation.
Specific issues include a variation in commitment periods across Europe, with some
Member States choosing 15-minute and other Member States choosing 60-minute
products, and the time to which market participants can trade, which can be as short as 5
minutes or, in some instances, upto several hours before real time. There is also a difference
in how markets are organised: in continuously traded markets, transactions are concluded
throughout the trading period every time there is a match between bids and offers.
Transactions are concluded differently in auction markets, where previously collected bids
and offers are all matched at once at the end of the trading period.
The last market-based measure to net out imbalances between injections and withdrawals
of electricity is the balancing market. As such, the balancing market is not solely a
44
45
See Annex 2.2 for further details.
Spain (12.1%) Portugal (7.6%), Italy (7.4%) Germany (4.6%) Great Britain (4.4%). ACER,
Market
Monitoring Report 2015
41
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0042.png
technicality ensuring system stability but has significant commercial implications and, in
turn, implications for competition. Procurement rules often fit large, centralised power
stations but do not allow for equal access opportunities for smaller (decentralised)
resources, renewables, demand-side and batteries. ACER's market monitoring reports
revealed high levels of concentration within national balancing markets. TSOs are often
faced with few suppliers or (in case of vertically integrated TSOs) procure balancing
reserves from their affiliate companies. This, combined with a low degree of integration,
enables a limited number of generators to influence the balancing market outcome.
Moreover, the procurement rules can lower the overall economic efficiency of the power
system by creating so-called must-run capacity, i.e. capacity that does not (need to) react
to price signals from other markets, because it generates sufficient revenues from balancing
markets.
Beside procurement
rules,
there is a potential issue with procurement
volumes
due to
national sizing of reserves. Possible contributions of neighbouring resources are not
properly taken into account, thus over-estimating the amount of reserves to be procured
nationally.
Driver 2: Exemptions from fundamental market principles
Two fundamental principles of today's market framework are that (i) market participants
should be financially responsible for any imbalance in their portfolio and that (ii) the
operation of generation facilities should be driven by market prices. For a number of
reasons a wide range of exceptions from these principles exist today which could lead to
distortions, thus diminishing market efficiency.
The principle of financial responsibility for imbalances is often referred to as balancing
obligation. In many Member States, some market participants are fully or partly exempted
from this obligation, notably many renewable energy but also CHP generators. Exemptions
are typically granted on policy grounds, e.g. the existence of policy targets for renewables.
Such a special treatment constitutes a challenge for the cost-effective functioning of
electricity markets, because these technologies represent a significant share in total power
generation already and are expected to further grow in importance in the forthcoming
decade. For RES E, exemptions from balancing responsibility were initially justified on
the basis of significant errors in production forecasts being unavoidable (as production for
many RES E technologies is based on wheather) and on the absence of liquid short-term
markets which would have allowed RES E generators to trade electricity closer to real
time, thus reducing the error margin. Significant improvements have been made in
wheather forecasts, reducing the error margin. Part of these improvements was based on
financial incentives from increased balancing responsibilities
46
. Furthermore, cross-border
integration and liquidity of short-term markets has improved over the last years, with
further progress expected over the coming years, such as through the progressive
penetration of storage, and following the present proposal. Thus, the underlying reasons
for the exemption of RES E from this principle have to be revisited.
46
ENTSO-E provided figures that following the introduction of balancing responsibility in one Member
States, the average hourly imbalance of PV installations improved from 11.2 % in 2010 to 7.0 % in
March 2016, and the average hourly imbalance of wind improved from 11.1 % to 7.4 % over the same
period.
42
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
A consequence of this lack of balancing obligation is that plant operators have no incentive
to maintain a balanced portfolio. The balancing obligation is typically passed on to the
responsible system operator, a regulated party, meaning that their balancing costs will be
socialised. This represents a market distortion and lowers the liquidity and efficiency of
short-term markets as the concerned market operators do not become active on the short-
term market to balance their portfolio. So the absence of full balancing responsibility is in
fact a major driver preventing the emergence of liquid and efficient short-term markets.
Moreover, costs arising from forecast errors for renewables are likely higher than
necessary due to a lack of incentive to minimise them by short-term market operations.
This creates a higher than necessary burden on consumers' electricity bills.
The principle that the operation of generation facilities should be driven by market prices
is also referred to as economic dispatch. When a unit's variable production costs are below
market price, it is economically efficient to dispatch it first, because the operator generates
(gross) profits from selling electricity. This principle guarantees that power is produced at
the lowest cost to reliably serve consumers, while taking into account operational limits.
However, priority dispatch deviates from this principle, by giving certain technologies
priority independent of their marginal cost. This represents a market distortion and leads
to a sub-optimal market outcome.
Given the expected massive increase in share of wind and solar technologies, it is likely
that unconditional dispatch incentives for these technologies will aggravate the situation,
as will the fact that certain RES E technologies and often CHP have positive variable
production costs. The review of priority dispatch rules for RES E is thus closely related to
the review of rules on public support in the RED II. Compared to the impact on RES E
from low marginal cost technologies, fully merit order-based dispatch has more significant
impact on conventional generation (CHP and indigenous fuels) and high marginal cost
RES E (e.g. RES E based on biomass), as these technologies will not be dispatched first
under the normal merit order. Achieving merit order based dispatch will in these cases
allow to use flexibility resources to their maximum extent, creating e.g. incentives for CHP
to use back-up boilers or heat storage to satisfy heat demand in case of low electricity
demand, and use flexible biomass generation to satisfy demand peaks rather than
producing as baseload generation.
Similarly, the principle of priority access reduces system efficiency in situations of
network congestion. When individual grid elements are congested, the most efficient
solution is often to change the dispatch of power generation or demand located as closely
as possible to the congested grid element. Priority rules deviate from this principle, forcing
the use of other, potentially much less efficient resources. With sufficient transparency and
legal certainty on the process for curtailment and redispatch, and financial compensation
where required, priority access should be limited to where it remains strictly necessary.
43
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0044.png
R&D results
47
:
In relation to dispatching and curtailment, the Integral project showed that load-shedding
based on software tools and remote control can be a useful tool to manage grid constraints and prevent
network problems. It demonstrated that load-shedding can be done on a procurement basis by the grid
operator and is a viable alternative to RES E curtailment. Thus, the grid operator can find the most cost-
efficient solution on market based terms as opposed to taking recourse to simply curtailing certain sources
of generation.
Driver 3: Consumers do not actively engage in the market and demand response
potential remains largely untapped
The active participation of consumers in the market is currently not being promoted,
despite technical innovation such as smart grids, self-generation
48
and storage equipment
that allow consumers
even smaller commercial and residential consumers
to generate
their own electricity, store it, and manage their consumption more easily than ever. While
more and more consumers have access to smart meters and distributed renewable energy
resources such as roof-top solar panels, heat pumps and batteries, a minor share manages
their consumption and these resources actively.
Large-scale industrial consumers already are active participants in electricity markets.
However, the vast majority of other consumers neither has the ability nor the incentive to
take consumption, production and investment decisions based on price signals that reflect
the actual value of electricity and grid infrastructure. The metering and billing of
consumers does not allow them to react to prices within the time frames in which wholesale
markets operate. And even where technically possible, many electricity suppliers appear
reluctant to offer consumer tariffs that enable this. This leads to the
overconsumption/underproduction of electricity at times when it is scarce and the
underutilisation/overproduction of electricity at times when it is abundant.
Indeed, current markets do not enable us to reap the full benefits of technological progress
in terms of reducing transaction costs, reducing information asymmetries, and (thereby)
reducing barriers to market participation for smaller commercial and residential
consumers.
Periods of abundance and scarcity will increasingly be driven by high levels of RES E
generation. To deal with an increased share of variable renewables generation in an
efficient way, flexibility is key. Traditionally, almost all flexibility was provided in the
electricity systems by controlling the supply side. However, it is now possible to provide
demand side flexibility cost effectively. New technological developments such as smart
metering systems, home automation, etc. but also new flexible loads such as heat pumps
and electric vehicles allow for the reduction of demand peaks and, hence, significantly
reduce system costs.
47
48
Technological developments are both part of the drivers that affect the present initiative and part of the
solutions of the identified problems they affect. Therefore reference is made to finding of various
research and development projects that provide insights where these are pertinent. A list of the research
and development projects mentioned in this box and their findings relevant to the present impact
assessment is provided in Annex 8.
The specific issue of self-generation and self-consumption is analysed in detail in the Impact Assessment
for the RED II.
44
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0045.png
The current theoretical potential of demand response adds up to approximately 100,000
MW and is expected to increase to 160,000 MW in 2030. This potential lies mainly with
residential consumers, and its increase will greatly depend on the uptake of new flexible
loads such as electric vehicles and heat pumps.
Figure 1: Theoretical demand response potential 2016 (in MW)
50000
45000
40000
35000
30000
25000
Industrial
20000
15000
10000
5000
0
Commercial
Residential
Source: Impact Assessment support Study on downstream flexibility, demand response and
smart metering, COWI, 2016
For the industrial sector demand response is mainly related to flexible loads in electric steel
makings. In the commercial sector, a high theoretical potential exist for ventilation of
commercial buildings while in the residential sector mainly freezers and refrigerators, and
the electric heater with storage capacity show a high theoretical potential.
45
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0046.png
Figure 2: Theoretical potential of demand response per appliance
Theorertical potential of demand response per
appliance
Residential heat circulation pumps
Electric storage heater residential sector
Storage hot water residential sector
Residential AC
Dish washers
Laundry driers
Washing machines
Residential refrigerators/freezers
Waste water treatment
Pumps in water supply
Electric storage heater commercial sector
Storage hot water commercial sector
AC Commercial Buildings
Ventilation Commercial Buildings
Cooling Hotels/Restaurants
Cold storage houses
Cooling Retail
Industrial Building Ventilation
Industrial Cooling
Air Seperation
Calcium Carbide
Cement
Electric Steel
Paper Recycling
Paper Machines
Mechanical Pulp
Chlorine
Zinc
Copper
Aluminum
0
4000
8000
12000
16000
MW
2030
2020
2010
Source: Impact Assessment support Study on downstream flexibility, demand response and
smart metering, COWI, 2016
Approximately 30-40% of this potential can be considered technically and economically
viable and, hence, can expected to be activated if the right technologies, incentivising
mechanisms and market arrangements are in place. Demand response service providers
(often referred to as aggregators) can play an important role in activating this potential by
enabling smaller consumers and distributed generation in general to interact with the
market and have their resources being managed based on price signals, or provide
balancing or grid congestion services. These aggregators effectively reduce transaction
46
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
costs and information asymmetries in the market, enabling a large number of smaller
and/or distributed resources to praticipate.
Of this potential, currently only around 21,000 MW demand response is used in the market.
Approx. 15,000 MW are contracted from large industrial consumers through direct
participation in the market while approx. 6,000 MW come from residential consumers who
are on traditional time of use tariff (usually just differentiating between day and night).
Only in the Nordic markets a slow uptake of dynamic price contracts linked to the
wholesale market is taking place. This shows that especially in the residential and
commercial sector with a theoretical potential of more than 70,000 MW the uptake of
deman dresponse is slow.
The main reasons for residential and commercial consumers not taking part in the demand
response schemes are mostly technical but can also be explained by currently relative small
benefits for those consumer groups:
-
The technological prerequisites are not yet installed and even where smart meters
are being rolled out they do not always have the functionalities necessary for
consumers to take active control of their consumption;
-
Dynamic electricity price contracts are only available for commercial/residential
consumers in very few Member States and hence consumers do not have a
financial incentive to shift consumption;
-
In many Member States, third-party service providers helping consumers to
manage their consumption can not freely engage with consumers and do not have
full access to the markets;
-
In many European markets price spreads are reletively small and price peaks either
not incur often or only lead to peak prices that are slightly higher than the average
price which makes demand response currently not very interesting from a financial
point of view. However, with an increase in renewables generation this price
spreads are likely to increase and participating in demand response will become
more profitable for consumers in the future. Variable network tariffs can equally
contribute to increasing the price spread;
-
Consumers are more likely to participate in demand response when they have
significant single loads such as electric heating or electric boilers that are easy to
shift. In that respect the uptake of electric vehicles and heat pumps will also open
new opportunities for consumers to engage in demand response;
-
Finally, automatisation is key to untap the full potenial of demand response in the
residential and commercial sector. Considering the relatively small economic
benefit residential consumers are likley to realise by participating in demand
response it is essential that theparticipation does not require active efforts but
devices can react automatically to price signals. Hence, interoperability of smart
metering systems will be crucial for the uptake of demand response.
In addition, the current design of the electricity market has not evolved to fully accomodate
demand side flexibility. It was meant for a world where consumers are passive consumers
of electricity that do not actively participate in the market. Hence, current market
arrangements at both the wholesale and retail level often make it very difficult for demand-
side flexibility to compete on a level playing field with generation:
47
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
-
-
-
-
-
Similar to RES E, consumption is variable and subject to forecast errors. As a
consequence, it is often infeasible for most individual customers to offer demand-
response many days ahead of the moment when electricity is actually consumed
The liquidity of intraday markets
where demand response at short notice can
fetch a high price
is currently limited, providing little incentive to offer demand-
side flexibility;
Procurement timeframes for balancing reserves capacity have generally long lead
times (week-, month- or year-ahead) for which demand response cannot always
secure firm capacity.
Balancing markets often require that units can offer both upward regulation (i.e.
increasing power output) and downward regulation (i.e. reducing power output;
offering demand reduction) at the same time, making it difficult for demand
response to participate in those markets;
And finally, product definitions make it difficult for aggregated loads to compete
in many markets.
The table below summarizes in which Member States markets are open to demand
response and the volume of demand response contracted. While demand response is
allowed to participate in most Member States, volumes of more than 100MW can only be
found in 13 Member States.
48
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0049.png
Table 3: Participation of explicit Demand Response in different markets
Member State
Demand Response
in energy markets
Demand Response
in balancing
markets
Demand
Response in
Capacity
mechanisms
Estimated
Demand
Response for
2016 (in MW)
104
689
0
0
0
49
566
0
810
1689
860
1527
30
48
4131
7
0
Austria
Yes
Yes
Belgium
Yes
Yes
Yes
Bulgaria
No
No
Croatia
No
No
Cyprus
No market
No market
Czech Republic
Yes
Yes
Denmark
Yes
Yes
Estonia
Yes
No
Finland
Yes
Yes
Yes
France
Yes
Yes
Yes
Germany
Yes
Yes
Yes
Greece
No (2015)
No
Hungary
Yes
Yes
Ireland
Yes
Yes
Yes
Italy
Yes
No
Yes
Latvia
Yes
No
Yes
Lithuania
unclear
No
Luxembourg
No information
No information
Malta
No market
No market
Netherlands
Yes
Yes
170
Poland
Yes
Yes
No
228
Portugal
Yes
No
40
Romania
Yes
Yes
79
Slovakia
Yes
Yes
40
Slovenia
No
Yes
21
Spain
Yes
No
Yes
2083
Sweden
Yes
Yes
Yes
666
UK
Yes
Yes
Yes
1792
Total
15628
Source: Impact Assessment support Study on downstream flexibility, demand response and smart metering,
COWI, 2016
R&D results:
VSync demonstrated that PV or wind generation, if equipped with a technology as
demonstrated in the VSync project, can replace the inertia that large power plants possess that is needed to
reduce frequency variations. Therefore, such technologies could in principle be used to provide balancing
services to the TSO.
EvolvDSO has identified and worked-out the details of future roles for actors active in the management of
power systems at the distribution level. The project identifies ways in which flexibility of resources
connected at distribution level could be revealed, valorised, contracted and exploited by various actors of the
power system. It identified roles that could be fulfilled by DSOs and by market parties and asks that these
are clarified
Several European demonstration projects such as ECOGRID-EU, Integral, EEPOS, V-Sync and S3C have
provided evidence that demand response is sufficiently mature from a technical point of view, while stressing
the need to removing market related barriers to its deployment.
In particular, Integral and ECOGRID-EU show that valuing flexibility through price signals is possible and
easy, that local assets can participate and earn money in the wholesale market, and that the economic viability
depends on the value of flexibility. Integral also demonstrated that flexibility of a household's energy
consumption (and hence the ability to provide demand response) was higher than initially expected, probably
due to the automated response that did not require active consumer participation. ECOGRID-EU showed
that a customer with manual control gave a 60 kW total peak load reduction while automated or semi-
automated customers gave an average peak reduction of 583 kW
.
49
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0050.png
RES E and flexible electricity systems
Demand response, like other measures that improve the degree of flexibility in the system,
have an connection to the ability of RES E to finance itself in the market, through what is
often referred to as the 'merit order effect'.
49
During windy and sunny days the additional
electricity supply reduces the prices. Because the drop is larger with more installed
capacity, the market value of variable renewable electricity falls with higher penetration
rate, translating into a gap to the average market value of all electricity generators over a
given period. Inflexible markets where demand and generation are non-responsive to price
signals (including through measures such as priority dispatch or 'must-run' obligations)
render this effect more pronounced. This effect is already visible today in certain Member
States, and in the absence of measures, can be expected to become even more relevant as
renewables penetration increases further.
At the one hand, this implies that as renewables are further gaining market shares in the
coming decade, the regulatory framework should not only incentivise the deployment of
renewables where costs are low (e.g. due to abundant wind or solar resources), but also
where and when the value of the produced electricity is the highest. On the other hand, by
improving the market framework in which RES E operates by rendering it more flexible,
unnecesarry erosion of the value of RES E assets can be prevented.
Reference is made to the box in Section 6.2.6.3 and Section 6.2.6.4 for further information.
Driver 4: Distribution networks are not actively managed and grid users are poorly
incentivised
Most of the time, the present regulatory framework does not provide appropiate tools to
distribution network operators to actively manage the electricity flows in their networks.
It also does not provide incentives to customers connected to distribution grids to use the
network more efficiently. Because smaller consumers have historically participated in the
broader electricity system only to a limited extent, currently no framework exists that puts
such incentives in place. This has led to fears over the impact that the deployment of
distributed resources could have at system-level (e.g. that the costs of upgrading the
network to integrate them would outweigh their combined benefits in other terms).
Moreover, the regulatory framework for DSOs, which most of the times is based on cost-
plus regulation, does not provide proper incentives for investing in innovative solutions
which promote energy efficiency or demand-response and fails to recognise the use of
flexibility as an alternative to grid expansion.
With RES E being a source of electricity generation that is often decentralised in nature,
DSOs are gradually being transformed from passive network operators primarily
concerned with passing-on electricity from the transmission grid to end-consumers, to
network operators that, not unlike TSOs, actively have to manage their grids. At the same
49
See Hirth, Lion,
"The Market Value of Variable Renewables",
Energy Policy, Volume 38, 2013, p.
218-236). The merit order effect is occasionally also referred to as the 'cannibalisation effect'.
50
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0051.png
time, technological progress allows distribution system operators to reduce network
investments by managing locally the challenges that more decentralised generation brings
about. However, outdated national regulatory frameworks may not incentivise or even
permit DSOs to make these savings by operating more innovatively and efficiently because
they reflect the technological possibilities of yesteryear. The resulting inflexibility of
distribution networks significantly increases the cost of integrating more RES E
generation, particulary in terms of investment.
R&D results:
Reduced network investment by managing locally decentralised generation is demonstrated
in European projects like: SuSTAINABLE, MetaPV, evolvDSO, PlanGridEV, BRIDGE and REServices
50
.
According to EvolvDSO, flexibility procurement and activation by DSOs are not addressed in the regulatory
framework in most Member States: they are not excluded in principle but not incentivised either and, because
they are not explicitly addressed, this creates uncertainty for the DSO to apply them.
The REServices study has analysed the possible services that wind and solar PV energy can provide to the
grid in theory but concludes that they are not able to (in the Member States analysed) due to the way the
market rules are defined.
The project SuSTAINABLE demonstrated that intelligent management supported by more reliable load and
weather forecast can optimise the operation of the grid. The results show that using the distributed flexibility
provided by demand-side response can bring an increase of RES E penetration while, at the same time, avoid
investments in network reinforcement, and this leads to a decrease in the investment costs of distribution
lines and substations.
The BRIDGE project recommended that products for ancillary services should be consistent and
standardized from transmission and down to the local level in the distribution network. Such harmonization
will facilitate the participation of demand-side response and small-scale RES in the markets for these
services, and thereby increase the availability of the services, enable cross-border exchanges and lower
system costs.
Tests in the project PlanGridEV with controllable loads (demand response, electric vehicles) performed in a
large variety of grid constellations have shown that peak loads could be reduced (up to 50%) and more
renewable electricity could be transported over the grid compared to scenarios with traditional distribution
grid scenarios. As a result, critical power supply situations can be avoided, and grids, consequently, do not
call for reinforcement
Both MetaPV and EvolvDSO suggest that a DSO makes a multiannual investment plan that takes into
account flexibility it can purchase from connected demand-side response or self-producers and consumers
(MetaPV suggests to do this through a cost-based analysis)
MetaPV also demonstrated that remotely controllable inverters connecting PV-panels to the distribution grid
can offer congestion management services to the distribution grid (in the form of voltage control obtained
via reactive power modulation). This increases the capacity of the distribution grid to integrate intermittent
RES by 50%, at less than 10% of
the costs of ‘traditional’ investments in hardware such as copper.
2.2.
Problem Area II: Uncertainty about sufficient future generation investments
and uncoordinated capacity markets
In light of the 2030 objectives, considerable new investment in electricity generation
capacity will be required. The power sector is likely to play a central role in the energy
transition. First, it has been the main sector experiencing decarbonisation since the last
50
A list of the research and development projects mentioned in this box and their findings relevant to the
present impact assessment is provided in Annex 8.
51
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0052.png
decade and its challenges still remain high. Second, in the near future, the power sector is
expected to support the economy in reducing its dependence on fossil fuels, notably in the
transport and heating and cooling sectors.
Generation capacity in the EU increased sharply from 2009 onwards due to the addition of
new renewables technologies to the already existing capacity. The composition of the
capacity mix progressively changed. Nuclear capacity started declining in recent years
(2010-2013) due to phasing out decisions in some Member States. Other conventional
capacity showed a decline in 2012-2013 as well
51
.
The largest part of the required new capacity will be variable wind and solar based,
complemented by more firm, flexible and less carbon-intensive forms of power generation.
At the same time, in light of the ageing power generation fleet in Europe with more than
half of the current capacity expected to be decommissioned by 2040
52
, it is important to
maintain sufficient capacity online to guarantee security of supply. The modelling results
nevertheless indicate that investment needs in additional thermal capacity will be limited
especially in the period 2021-2030. According to PRIMES EUCO27, about 81% of net
power capacity investments will be in low-carbon technologies, of which 59% in RES E
and 22% in nuclear generation
53
.
Table 4: Investment Expenditure (including new construction, life-time extension
end refurbishment) in generation capacity by technology (average over 5 year
period) in MEuro'13
Period
Nuclear
Renewable energy
Hydro (pumping
5,995
2,557
excl.)
Wind
9,238
17,095
Solar
1,556
9,019
Other renewables
-
2
Biomass-waste fired
2,626
3,438
Geothermal heat
100
90
Thermal
11,989
14,019
Solids fired
1,029
1,237
Oil fired
639
373
Gas fired
7,595
8,880
Hydrogen plants
-
-
Total (incl. CHP)
30,280
43,430
Source: PRIMES; based on EUCO27 scenario
2000-2005
1,502
16,789
2005-2010
739
28,672
2010-2015
270
43,393
3,289
19,614
20,487
3
4,157
110
13,391
5,333
362
3,427
1
57,054
2015-2020
6,291
38,957
2,239
28,553
7,870
295
11,779
182
17,151
2,610
75
2,505
-
62,399
2020-2025
11,011
25,217
354
14,059
10,581
223
465
-
3,355
870
33
1,987
-
39,583
2025-2030
14,312
21,911
633
14,219
6,728
332
433
-
3,274
192
9
2,641
-
39,497
51
52
53
See on this and for further information,
European Commission, Investment perspectives in electricity
markets,
Institutional
Paper
003,
July
2015,
page
8.
http://ec.europa.eu/economy_finance/publications/eeip/pdf/ip003_en.pdf.
World Energy Outlook 2015, IEA
The challenge to attract sufficient investment in RES E is examined in detail in the RED II impact
assessment
52
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0053.png
At the same time, short-term market prices at wholesale level have decreased substantially
over the past years. In parallel with high fossil fuel prices, European wholesale electricity
prices peaked in the third quarter of 2008; then fell back as the economic crisis broke out,
and slightly recovered between 2009 and 2012. However, since 2012 wholesale prices have
been decreasing again. Compared to the average of 2008, the pan-European benchmark for
wholesale electricity prices were down by 55% in the first quarter of 2016, reaching 33
EUR/MWh on average, which was the lowest in the last twelve years
54
.
Figure 3 on pan-European wholesale market prices
Source: Platts and European power exchanges
Prices declined for a number of reasons
55
including (i) a decrease in primary energy prices
(e.g. coal, and more recently also natural gas), (ii) an increasing imbalance between the
supply and demand for carbon allowances, leading to a surplus of over 2 billion allowances
by 2012 and a corresponding decrease in carbon allowance prices
56
, and (iii) an
54
55
56
See the "main findings" of Section 1.1 on Wholesale electricity prices from the 2016 Commission Staff
Working Document accompanying the forthcoming
'Report on energy prices and costs in Europe'.
The influence of each market factor might strongly very across different regions. For example, the share
of renewables and carbon prices have strong impact on wholesale price evolution in North Western
Europe, while in Central and Eastern Europe the main price driver is the share of coal and gas in the
generation mix.
Between April 2011 and May 2013 carbon emission allowance contracts underwent a significant price
fall (decreasing from 17 EUR/tCO2e to 3.5 EUR/tCO2e) reflecting the fall in demand for allowances
due to the recession. Since April 2013 carbon prices have increased, reaching an average auction clearing
price of €7,62/tCO2e in 2015.
(See:
http://ec.europa.eu/clima/policies/ets/auctioning/docs/cap_report_201512_en.pdf).
The extent to which the carbon price impacts the wholesale power price depends on the carbon intensity
of the marginal power producer.
53
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0054.png
overcapacity of power generation facilities
57
, putting a downward pressure on wholesale
prices.
Overcapacity was, in turn, caused by: (i) a drop in electricity demand as electricity
consumption decoupled from an already low economic growth
58
, (ii) over-investments in
thermal plants
59
, (iii) the increasing proportion of renewables with low marginal costs
driven by EU policies, (iv) barriers to decommission capacity
60
, and (v) continuing
improvement in the field of coupling national electricity markets
61
, leading to an increased
sharing of resources among Member States
62
.
As a result, for most regions in Europe current electricity wholesale prices do not indicate
the need for new investments into generation capacity. There are, however, doubts whether
the market, as currently designed, would be able to produce investment signals in case
generation capacities were needed. Independently of current overcapacities of most regions
in Europe, a number of Member States anticipate inadequate generation capacity in future
years and introduce capacity mechanisms at national level.
57
58
59
60
61
62
In parallel with decreasing fossil fuel and carbon prices (resulting in decreasing marginal costs of
electricity generation(, and the generation overcapacity, the share of renewable energy sources (wind,
solar, biomass, also including hydro) has been gradually increasing over the last few years. In most of
the EU countries fossil fuel costs set the marginal cost of electricity generation, being decisive for the
wholesale electricity price. However, increasing share of renewables in the electricity mix, together with
significant baseload generation capacities, shifted the generation merit order curve to the right, resulting
in lower equilibrium price set by supply and demand. Consequently, we can say that increasing share of
renewable energy sources, in an already oversupplied market, have significantly contributed to low
wholesale electricity prices in the EU markets.
Consumption of electricity in the EU decoupled from economic growth during the last few years due to
energy efficiency gains.
Investment decisions in the electricity sector are typically taken long before returns on investment are
effectively earned, due to the time to construct new power plants. At the same time, the decentralised
nature of investment decision-making means that each generator has limited information about the
generation capacity that competitors will make available in the coming years. The result is what has
been referred to as boom-bust cycles: alternate periods of shortages and overcapacity resulting from lack
of coordination in the investment decisions of competing generators.
In some Member States, there is an overcapacity situation that is in fact artificially extended by clear
regulatory exit barriers, which in the short-term depress market prices and in the mid/long-term ruin the
investment incentives.
In parallel, progressing market integration decreased price divergence within the EU. Indeed in the first
quarter of 2008 the price difference between the most expensive and the cheapest European wholesale
electricity market was 44 EUR/MWh, eight years later this difference has shrunk to 24 EUR/MWh.
Based on "main findings" from 2016 costs and prices report and underlying studies, published in
conjunction with the present impact assessment
See also Box 9 behind section 6.4.6 for more on overcapacity, market exit and prices
54
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0055.png
Driver 1: Lack of adequate investment signals due to regulatory failures and
imperfections in the electricity market
The internal energy market is built on competitive (short and long-term) wholesale power
markets where price signals are central to guide market participants production and
consumption decisions. Short-term prices signal prevailing supply and demand conditions
while long-term prices are formed according to expectations about future supply and
demand. Conditions, such as for example shortages or oversupply that are expected to
prevail in the future will not only determine short-term (spot) prices but also impact long-
term (forward, futures) prices.
In around half of Member States sales achieved at short and long term markets determine
the bulk of generators' income
63
. This income is required to cover their full costs, mainly
fuel, maintenance and amortisation of assets (i.e. investments). These arrangements are
often referred to as energy-only markets. In the other half of Member States there are also
measures (either market based or non-market based) in place to pay generators for keeping
their capacity available (capacity mechanisms or 'CM's), regardless as to whether they are
producing electricity or not
64
. For generators who operate on the market these payments
represent an additional income next to their earnings on the wholesale markets for energy.
Capacity payments, thus, represent additional support to maintain and/or develop capacity.
Irrespective whether generators are expected to earn their investments solely on the
'energy-only' market or whether they can also rely on additional payments for capacity,
wholesale power prices are central to provide the right signals for efficient market
63
64
See below, figure 1 and ACER Market Monitoring Report 2014; generators may also collect additional
income from offering their capabilities, including the availability of (short-term) electricity to TSO's
who rely on them to manage the system (i.e. short-term balancing and ancillary Services)
"Capacity
mechanisms exist worldwide both in regulated and in non-regulated markets":
CIGRE paper
C5-213, "Capacity
Mechanisms: Results from a World Wide Survey",
H. Höschle, G. Doorman (2016).
55
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0056.png
operations. For the EU-target model
65
to function properly, prices need to be able to
properly reflect market conditions
66
.
Price signals and long-term confidence that costs can be recovered in reasonable payback
times are essential ingredients for well-functioning market. In a market which is not
distorted by external interventions, the variability of the spot price on the wholesale
market, plays a role in signalling the need of investment in new resources. In the absence
of the right short- and long-term price signals, it is more likely that inappropriate
investment or divestment decisions are taken, i.e. too-late decisions or technology choices
that turn out to be inefficient in the long run. Price differentials between different bidding
zones should determine where generation and demand should ideally be located,
67
.
In 2013 the Commission published an assessment identifying reasons why the market may
fail to deliver sufficient new investment to ensure generation adequacy
68
. These reasons
are a combination of market failures and regulatory failures. For example when consumers
cannot indicate the value they place on uninterrupted electricity supply, the market may
not be effective performing its coordination function. Equally however, regulatory
interventions, as well as the fear of such interventions, such as price caps and bidding
restrictions (regardless as to whether effectively restricting price formation at that moment
or only later) limit the price signal for new investments. Likewise the prices on balancing
markets operated by TSOs should not undermine the price signals from wholesale markets.
Power generators and investors have argued that regulatory uncertainty and the lack of a
stable regulatory framework undermine the investment climate in the Union compared to
other parts of the world and to other industries.
In fact, current market arrangements often do not allow prices to reflect the real value of
electricity, especially when supply conditions are tight and when prices should reflect its
scarcity, affecting the remuneration of electricity generation units that operate less often
but provide security and flexibility to the system.
These regulatory failures are amplified by the increasing penetration of RES E. RES E is
capacity that often has a cost structure typified by low operational costs
69
, resulting in more
65
66
67
68
69
The "Electricity
Target Model"
aims at integrating wholesale power markets by harmonising the way
how transmission capacity is allocated between Member States. Central to it is market coupling which
is based on the, so-called, "flow based" capacity calculation, a method that takes into account that
electricity can flow via different paths and optimises the representation of available capacities in meshed
grids. The implementation of the target models in gas and electricity is equivalent to achieving the
completion of the internal energy market.
Evidently, efficient market outcome also presumes that all assets are treated equally in terms of the risks
and costs to which they are exposed and the opportunities for earning revenues from producing
electricity i.e. they operate on a level playing field as is esually fostered by the present intiative.
See on price signals, European Commission,
Investment perspectives in electricity markets,
Institutional
Paper
003,
July
2015,
pages
32
and
following.
(http://ec.europa.eu/economy_finance/publications/eeip/pdf/ip003_en.pdf
See also SWD(2013) 438 "Generation
Adequacy in the internal electricity market - guidance on public
interventions",
Section 3 .
Cost structures vary according to the underlying technology deployed. In general, wind and solar
technologies have very low operational costs whereas the opposite is true for biomass fuelled generation.
56
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0057.png
frequent periods with low wholesale prices. The variability of RES E production moreover
decreases the number and predictability of the periods when conventional electricity
generators are used, thereby increasing the risk profile and risk premiums of all
investments in electricity resources
70
. Whereas market participants are used to hedging
risks, and market trading arrangements are adapting to allow more risks to be covered, the
risk profile of investments will become more pronounced. This increases the need to ensure
that prices reflect the real value of electricity to ensure plants can cover their full costs,
even if they are operating less frequently.
The current market arrangements are constructed around the notion of price zones
delimited by network constraints. The price differences between such zones should drive
investments to be located where they relieve congestion by rewarding investments in areas
typified by high prices. The congestion rents collected by network operators to transport
electricity from low to high price zones are meant to be used to relieve congestion by
maintaining and constructing interconnection capacity.
However, today the delineation of price zones in practice does not reflect actual
congestion, but national borders. This prevents the establishment of prices that reflect local
supply and demand, which leads to the phenomenom of loop flows, which can reduce the
interconection capacity made available for cross-border trading and leads to expensive out-
of-market redispatching and significant distortions to prices and investment signals in
neighbouring bidding zones. To illustrate this, ACER has estimated, in their Market
Monitoring Report
71
, that reductions in cross-border capacity due to loop flows resulted in
a welfare loss of EUR 445 million in 2014. Further, the costs of re-dispatch and
countertrading to deal with inaccurate dispatch can be high. In 2015 the total cost for
redispatching within the German-Austria-Luxembourg bidding zone was approximately
EUR 930 million
72
. There is also evidence that cross-border capacity is being limited in
order to deal with internal contraints, again limiting cross-border trading opportunities.
The impacts of this can be significant. For example, when looking at the capacity between
Germany and the Nordic power system, the Swedish regulatory authority noted significant
capacity limitations, concluding that these were mostly due to internal contraints, and
found that losses amounted to a total of EUR 20 million per annum in Norway and
Sweden
73
.
A further issue that can potentially distort investment is that of network charges on
generators. This includes charges for use of the network, both at distribution-level and
transmission-level (tariffs), as well as the charges applied to generators for their connection
(connection charges). There is significant variation across the EU on the structure of these
charges, which are set at Member State-level. For instance, some Member States do not
70
71
72
73
Generators' expectations about future returns on their investments in generation capacity are affected
not only by the expected level of electricity prices, but also by several other sources of uncertainty, such
as increasing price volatility. The increasing weight of intermittent renewable technologies makes prices
more volatile and shortens the periods of operation during which conventional technologies are able to
recoup their fixed costs. In such circumstances, even slight variations in the level, frequency and duration
of scarcity prices have a significant impact on the expected returns on investments, increasing the risk
associated to investing in flexible conventional generation technologies.
"Market
Monitoring report 2014"
(2015) ACER, Section 4.3.2 on unscheduled flows and loop flows.
ENTSO-E Transparency Platform, at https://transparency.entsoe.eu/
"Capacity limitations between the Nordic countries and Germany"
Swedish Energy Markets
Inspectorate (2015)
57
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0058.png
apply any tariffs to generators, others apply them based on connected capacity and others
based on the amount of electricity produced. Some include locational signals within the
tariff, some do not. With regards to connection charges, some calculate them based only
on the direct costs of accessing the system (shallow) and others include wider costs, such
as those of any grid reinforecement required (deep). Such variations can serve to distort
both investment and dispatch signals.
Driver 2: Uncoordinated state interventions to deal with real or perceived capacity
problems
The uncertainty on whether the market will bring forward sufficient investment, or keep
existing assets in the market, has, in a number of Member States, fuelled concerns about
system adequacy, i.e. the ability of the electricity system to serve demand at all times.
Certain Member States have reacted by introducing CMs designed to support investment
in the capacity that they deem necessary to ensure a secure and acceptable level of system
adequacy.
These measures often take the form of either dedicated generation assets kept in reserve or
a system of market wide payments to generators for availability when needed.
Figure 4: Capacity Mechanisms in Europe
2015
Strategic reserves for DK2
region from 2016-2018 (and
potentially from 2019-2020)
Strategic reserve (since 2007)
Capacity auction
(since 2014 - first delivery in
2018/19)
Capacity payment
(since 2007)
considering reliably options
Capacity requirements
(certification started 1 April
2015)
Capacity payment (since 2008)
Tendering for capacity
considered but no plans
Strategic reserve
(since 2004 ) - gradual phase-
out 2020 and considering a
permanent market system
after 2020
Debate pending
Strategic reserve
(from 2016 on, for 2 years,
with possible extension for 2
years)
Strategic reserve
(since 1 November 2014)
Reliability option
(first auction end 2016, first
delivery contracted capacity is
expected in 2021)
New Capacity Mechanism
under assessment by COMP
(Capacity payments from 2006
to 2014)
Capacity Payment (Since 2010
partially suspended between
May 2011 and December 2014)
No CM (energy only market)
CM proposed/under consideration
CM operational
Source:
"Market
Monitoring Report 2014"
(2015) ACER.
These initiatives by Member States are based on non-aligned perceptions and expectations
as to the degree the electricity system can serve electricity demand at all times and a
58
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0059.png
reluctance to rely on the contribution the EU system as a whole can make to the adequacy
of the system of a given Member State.
74
As reflected in the Interim Report of the Sector Enquiry
75
led by DG Competition, many
existing CMs have been designed without a proper assessment of whether a security of
supply problem existed in the relevant market. Many Member States have not adequately
established what should be their appropriate level of supply security (as expressed by their
'reliability standard') before putting in place a CM.
Methods of assessing resource adequacy vary widely between Member States
76
, which
make comparison and cooperation across borders difficult. Many resource adequacy
assessments take a purely national perspective and may substantially differ depending on
the underlying assumptions made and the extent to which foreign capacities
77
as well as
demand side flexibility
78
are taken into account. This, in turn, means some Member States
force consumers to over-pay for 'extra' capacities they do not really need.
74
75
76
77
78
Indeed, a majority of Member States expect reliability problems due to resource adequacy in the future
even though such problems have been extremely rare in the past five years. Such issues have only arisen
in Italy on the Islands of Sardinia and Sicily which are not connected to the grid on the mainland.
See also SWD(2016) 119 final
"Interim report of the Sector Inquiry on Capacity Mechanisms",
http://ec.europa.eu/competition/sectors/energy/state_aid_to_secure_electricity_supply_en.html
For more details, see annex 5.1. See also
"Generation adequacy methodologies review",
(2016), JRC
Science for Policy Report and CEER (2014), "Assessment
of electricity generation adequacy in
European countries".
According to the CEER report,
"the extent to which current generation adequacy reports take the
benefits of interconnectors into account varies a lot: 4 reports still model an isolated system (Norway,
Estonia, Romania, and Sweden); 2 reports use both interconnected and isolated modelling (France and
Belgium); 3 report methodologies are being modified to include an interconnection modelling; 9 reports
simulate an interconnected system (UK, the Netherlands, Czech republic, Lithuania, Finland, Belgium
and Ireland, while France and Italy use both methods)."
According to the CEER report,
"only 3 countries include demand response as a separate factor in their
load forecast methodology i.e. the UK, France and Spain. In Norway and Finland, the contribution from
demand response is not included as separate factor, but peak load estimation is based on actual load
curves which include the effect of demand response. Sweden does not consider demand response, and
do not assume that consumers respond to peak load in their analysis."
59
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0060.png
Table 5: Deterministic vs probabilistic approaches to adequacy assessments
Source: European Commission based on replies to sector inquiry, see below for a description of capacity
margin, LOLP, LOLE, and EENS
79
The introduction of CMs fundamentally change wholesale electricity markets because
generators and other capacity providers are no longer paid only for the electricity they
generated but also for their availability. Worse however is that CMs when introduced in
an uncoordinated manner can be inefficient and distort cross-border trade on wholesale
electricity markets.
In the short-term, CMs may lead to distortions if their design affects natural price formation
in the energy market (e.g. bidding behaviour of generators) and therefore alter production
decisions (operation of power generating plants) and cross-border competition. For
instance, a possible distortion is when generators in a market applying a CM, receive
(capacity) payments which are determined in a way that affects their electricity generation
bids into the market, while in a neighbouring "energy-only" market generators do not. This
may tilt the playing field for generators on either sides of the border. Another example
might be if strategic reserves (a particular form of CMs) are dispatched 'too-early' impeding
the market's ability to establish equilibrium between supply and demand. This can cause
or contribute to a 'missing money' problem as strategic reserves would outcompete existing
(or future) generators who, at least partly, rely on scarcity rents to cover their costs.
CMs may also influence investment decisions (investment in plants and their locations),
with potential impacts in the long term. If contributions from cross-border capacity are not
appropriately taken into account, they may lead to over-procurement of capacity in
countries implementing CMs, with a detrimental impact on consumers.
CMs may also cause a number of competition concerns. In this respect, the Sector Inquiry
identifies substantial issues in relation to the design of CMs in a number of Member States.
First, many CMs do not allow all potential capacity providers or technologies to
79
See annex 5.1 for the definition of the different methodologies.
60
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0061.png
participate, which may unnecessarily limit competition among suppliers or raise the price
paid for the capacity
80
.
Second, capacity mechanisms are also likely to lead to over-compensation of the capacity
providers
often to the benefit of the incumbents
if they are badly designed and non-
competitive. In many Member States the price paid for capacity is not determined through
a competitive process but set by the Member State or negotiated bilaterally between the
Member State and the capacity provider. This creates a serious risk of overpayment
81
.
Third, the inquiry revealed that capacity providers from other Member States (foreign
capacity) are rarely allowed to directly or indirectly participate in national CMs
82
. This
leads to market distortions as additional revenues from CMs remain reserved to national
companies. This is particularly problematic in case of dominant national incumbents
whose dominant position may even be strengthened by a national CM.
Lastly, although there is a challenge to design penalties that avoid undermining electricity
price signals which are important for demand response and imports, where obligations are
weak and penalties for non-compliance are low, there are insufficient incentives for plants
to be reliable.
All in all, the Sector Inquiry highlights that "a
patchwork of mechanisms across the EU
risks affecting cross-border trade and distorting investment signals in favour of countries
with more ‘generous’ capacity mechanisms. Nationally determined generation adequacy
targets risk resulting in the over-procurement of capacities unless imports are fully taken
into account. Capacity mechanisms may strengthen market power if they for instance, do
not allow new or alternative providers to enter the market. Capacity mechanisms are also
likely to lead to over-compensation of the capacity providers
often to the benefit of
incumbents
if they are badly designed and non-competitive."
All of these issues can
undermine the functioning of the internal energy market and increase energy costs for
consumers.
As reflected in the Sector Inquiry, the heterogeneous development of capacity mechansims
has led to fragmented markets across the EU. The Sector Inquiry highlights that "the
different types of capacity mechanisms are not equally well suited to address problems of
security of supply in the most cost effective and least distortive way".
80
81
82
In some cases, certain capacity providers are explicitly excluded from participating or the group of
potential participants is explicitly limited to certain providers. In other cases, Member States set
requirements that have the same effect, implicitly reducing the type or number of eligible capacity
providers. Examples are size requirements, environmental standards, technical performance
requirements, availability requirements, etc.
In Spain for example, the price for an interruptibility service almost halved after a competitive auction
was introduced.
For example, Portugal, Spain and Sweden appear to take no account of imports when setting the amount
of capacity to support domestically through their CMs. In Belgium, Denmark, France and Italy, expected
imports are reflected in reduced domestic demand in the CMs. The only Member States that have
allowed the direct participation of cross-border capacity in CMs are Belgium, Germany and Ireland. For
more details, see annex 5.2.
61
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0062.png
The Sector Inquiry concludes that capacity payment schemes are generally problematic as
they risk over-compensating capacity providers because they rely on administrative price
setting rather than competitive allocation procedures. The risk for overcompensation is
lower for market-wide and volume-based schemes and strategic reserves. What matters is
the design of the support scheme, which can make it more or less distortive.
Several stakeholders have proposed to address investment uncertainty by dedicated
regulatory provisions encouraging and clarifying the use of long-term contracts ('LTC's)
between generators and suppliers or consumers
83
. They argue that such rules could help
mitigating the investment risk for the capital-intensive investments required in the
electricity sector, facilitating access to capital in particular for low-carbon technologies at
reasonable costs.
While mandatory LTCs may involve a risk transfer to consumers unless they are certain
they will have enduring future electricity demand, such contracts may allow them to benefit
from less volatile retail prices as electricity would be purchased long time ahead of
delivery. In terms of market functioning, it has to be stressed that current EU electricity
legislation does not discourage the conclusion of long-term electricity purchase contracts.
Even absent dedicated legislation, LTCs between a buyer and seller to exchange electricity
on negotiated terms, can anyway be freely agreed on by interested parties without any need
for further intervention by governments or regulators. Tradable wholesale contracts are
already available to market parties (albeit with limited liquidity for contracts of more than
three years
84
). A dedicated framework for hedging price risks over longer terms has just
been created with the EU Guideline on Forward Trading ("FCA Guidelines"). The only
regulatory restriction to the use of LTCs may result, in exceptional situations
85
, from EU
Treaty rules on competition law (e.g. if they are used by by dominant companies to prevent
new market entry).
It may also be noted that experience has shown that regulatory encouragement of LTCs
under EU law may also entail the risk of "lock-in risk" in the fast developing electricity
markets
86
.
Options suggested to facilitate long-term contracting include (i) socialising the costs of
guaranteeing delivery of bilateral contracts (to reduce the default risk) or (ii) introducing
long-term contracts with a regulated counterparty. Both models might, however, be
considered to be capacity mechanisms and would have to be scrutinised under the relevant
State aid rules.
83
84
85
86
See e.g. submissions to the Commission's market design consultation from a limited number of
generation companies and from energy-intensive industries.
See for further information,
CEPS Special Report,
The EU power sector needs long-term price signals,
No. 135/April 2016, page 9.
It should be noted that there is extensive guidance and case practice on the interpretation of Article 81
and 82 with respect to long-term energy contracts available.
The fast changing electricity markets may require different generation solutions than today (e.g. due to
new storage technology). See also the example of guaranteeing revenues for solar power producers for
timeframes ten years ago which proved to be higher than necessary in retrospective due to technological
developments.
62
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0063.png
2.3.
Problem Area III: Member States do not take sufficient account of what
happens across their borders when preparing for and managing electricity
crisis situations
In spite of best efforts to build an integrated and resilient power system, electricity crisis
situations may occur. Whilst most incidents are minor
87
, the likelihood of larger-scale
incidents affecting the European electricity system might well be on the rise due to extreme
weather conditions
88
, climate change (giving rise to extreme and unpredictable weather
conditions, which already today constitute a major challenge to electricity systems)
89
, fuel
shortage
90
and a growing exposure to cybercrime and terrorist attacks in Europe. Already
in 2014 a series of cyberattacks by the so-called "Energetic
Bear"
targeted several energy
companies in Europe and US, highlighting the increasing vulnerability of the energy
sector
91
.
Where crisis situations occur, they often have a cross-border effect. Even where incidents
start locally, they may rapidly proliferate across borders. Thus, a black-out in Italy in 2003
due to a tree flashover affected the electricity systems of its neighbouring states as well,
and in 2006 the tripping of an electricity line by a cruise ship in Germany affected 15
million people and had an impact on the entire continental power system
92
.
Crisis situations may also affect several Member States at the same time as it was the case
during the prolonged cold spell in February 2012
93
, which led to a series of uncoordinated
emergency measures across Europe. Given the increasing interconnectivity of the EU's
87
In 2014 ENTSO-E identified over 1000 security of supply incidents. Most of these were minor but there
were some more serious disturbances, for example storms on 12 February 2014 leaving 250,000 homes
in Ireland without power.
https://www.entsoe.eu/Documents/SOC%20documents/Incident_Classification_Scale/151221_ENTSO-
See:
E_ICS_Annual_Report_2014.pdf
88
89
90
91
92
93
Extreme weather events are likely to affect the power supply in various ways: (i) thermal generation is
threatened by lack of cooling water (as shown e.g. in summer 2015 at the French nuclear power stations
Bugey, St. Alban and Golfech); (ii) heat waves cause high demand of air conditioning (which e.g.
resulted in price peaks in Spain in late July 2015 when occurring in parallel with low wind output); (iii)
heat waves affect grid performance in various ways, e.g. moisture accumulating in transformers (which
e.g. lead to blackouts in France on June 30
th
2015) or line overheating (leading to declaration of
emergency state by the Czech grid operator CEPS on July 25
th
in 2006) (source:
European Power Daily,
Vol. 18, Issue 123
(2016), S&P Global, Platts).
"Delivering
a secure electricity supply on a low carbon pathway",
Energy Policy no 52. 55-59 (2013),
Boston, Andy.
One example proving that such risks should be taken into account is the shortage of anthracite coal in
Ukraine in June 2016 due to the political situation in Ukraine affected the rail transport of coal. As
several Ukrainian nuclear power units were offline for maintenance in parallel, the responsible ministry
called for limiting power consumption as preventive measure. (Source:
European Power Daily, Vol. 18,
Issue 123
(2016), S&P Global, Platts).
On 23 December 2015, a cyberattack in Ukraine led to serious power cuts affecting more than 600.000
households.
The Italian blackout on 28/09/2003, due to a tree flashover, affected 55 million people in Italy,
Switzerland, Austria, Slovenia and Croatia. It led to a black-out situation to up to 24 hours and
interrupted energy of 17 GWh.
The first two weeks of February 2012 saw a prolonged colder-than-usual weather period consistently
with 12 degrees Celsius below winter average and reaching historically low temperatures exceeding 1
in 20 climatic conditions.
63
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0064.png
electricity systems and linkage of electricity markets, the risk of electricity crisis situations
simultaneously affecting several Member States are set to further rise
94
.
It should be noted that risks of cross-border electricity incidents do not stop at the European
Union's borders, given increasing links between the electricity systems of EU Member
States and those of some of its neighbours (e.g., synchronisation with Western Balkans,
common infrastructure projects between e.g., Italy-Montenegro, Romania-Moldova,
Poland-Ukraine).
Given the key role of electricity to society, electricity crisis situations entail serious costs
both economically and for the society at large
95
.
Both when preparing for and dealing with crisis situations, Member States take very
different approaches and tend to focus on their national territories and customers only,
ignoring the possible assistance of and the impact on neighbouring countries and
customers. This entails serious risks for security of supply and can also lead to undue
interferences with the internal energy market.
94
95
METIS simulation shows that the better integration of the markets would result in a propagation of the
stress hours across Member States. Additionally, the stress hours would be concentrated in periods
affecting simultaneously several Member States.
The economic impact of large scale blackouts could be estimated in billions. Thus, for instance, a
blackout in France on 26 December 1999 due to storms of unprecedented violence with devastating
effects, affected 3.5 million households (which corresponds to about 10 million people losing their
electricity supply) and entailed an economic cost of EUR 11.5 billion and interrupted energy estimated
in 400 GWh.
Recent simulations show that the damages as consequence of the power outages of 5 hours in a border
region between Belgium, France and Germany to all of the economic sectors would amount to 1 billion
Euro.
www.blackout-simulator.com;
simulation of a blackout in following NUTS regions: FR21
Champagne-Ardenne, FR41 Lorraine, FR42 Alsace, BE34 Prov. Luxembourg, BE35 Prov. Namur ,
DEC0 Saarland, DEB Rheinland-Pfalz, FR30 Nord - Pas-de-Calais, BE32 Prov. Hainaut, BE25 Prov.
West-Vlaanderen, FR22 Picardie, BE31 Prov. Brabant Wallon, BE23 Prov. Oost-Vlaanderen, DE1
Baden-Württemberg.
64
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0065.png
Driver 1: Plans and actions for dealing with electricity crisis situations focus on the
national context only
First, whilst most Member States have plans to prevent and deal with electricity crisis
situations, the content and scope of these plans varies considerably and plans tend to focus
on the national situation only
96
. Cross-border cooperation in the planning phase is scarce
and where it takes place at all, it is often limited to cooperation at the level of TSOs
97
. This
is largely due to a regulatory failure: the existing EU legal framework does not prescribe a
common approach, and rules and structures for cross-border co-operation are almost
entirely absent
98
. Cross-border cooperation is also hindered by divergent national rules.
Cooperation with Member States outside the EU is even more limited.
Further, where crisis situations do arise, Member States also tend to react on the basis of
their own national set of rules, and without taking much account of the cross-border
context. Evidence shows, for instance, that Member States have different concepts of what
an emergency situation is and entails
99
, and who should do what and when in such
situations. In particular, there is considerable uncertainty and divergence as regards what
public authorities can do in emergency situations
100
.
The fact that Member States tend to adopt national, 'going alone' approaches when
preparing for and managing crisis situations stands in strong contrast with the reality of
96
97
98
99
100
Source: Risk Preparedness Study - "Review
of current national rules and practices relating to risk
preparedness in the area of security of electricity supply"
(2016), VVA Europe, Spark Legal Network,
study prepared for DG Energy.
https://ec.europa.eu/energy/sites/ener/files/documents/DG%20ENER%20Risk%20preparedness%20fi
nal%20report%20May2016.pdf
There are examples of existing regional co-operation involving national authorities, e.g. among the
Nordic countries in the framework of Nord-BER (Nordic Contingency Planning and Crisis Management
Forum). However, this co-operation is mainly restricted to the exchange of best practices.
See the results of the evaluation, attached as Annex VI.
For instance the concept of 'emergency' is not defined in all Member States and where they exist,
definitions diverge.
This is for example the case of France, where the Government may
"take temporary measures to
attribute or suspend exploitation authorizations of electricity infrastructures".
In Portugal, the Minister
for Energy can adopt transitory and temporary safeguard measures which include the use of fuel reserves
and the imposition of demand restrictions.
65
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0066.png
today's interconnected electricity market, where the likelihood of crisis situations affecting
several Member States at the same time, is on the rise.
Where crisis situations stretch across borders (or have the potential of doing so), joint
action is needed, as well as clear rules on who does what, and when, in a cross-border
context. Uncoordinated actions and decisions in one Member State (for instance on what
to do to prevent a further deterioration of a crisis situations or on where to shed load, when
and to whom), can have serious negative effects:
For instance, as to date, several Member States still legally foresee 'export bans' (curtailing
interconnectors) in times of crisis
101
. This undermines the proper functioning of markets
and can seriously aggravate security of supply problems in neigbouring Member States,
who might no longer be able to ensure that electricity is delivered to those that need it
most. The reverse situation is also true: where in a crisis situation an interconnected state
does not restrict its own electricity consumption, it risks propagating the crisis situation
beyond its own borders.
The dangers related to a purely national, inward-looking management of electricity crisis
situations, are illustrated by an incident that occurred during a prolonged cold spell in
February 2012
102
. Confronted with a situation of unexpected shortage, one Member State
decided to resort to an export ban in an effort to protect its national consumption. This
aggravated however problems in other, neighbouring Member States, who in turn also
resorted to export bans. The ensuring cascade of export bans seriously imperiled security
of supply in an entire region of Europe
103
.
One Member State specifically includes a legal provision on export bans in its legislation; eleven more
Member States include forms of export restrictions in national law, TSO regulations or multilateral
agreements. (Source: Risk Preparedness Study - "Review
of current national rules and practices relating
to risk preparedness in the area of security of electricity supply"
(2016), VVA Europe, Spark Legal
Network, study prepared for DG Energy).
102
Another example where domestic consumption was prioritized over exports occurred in the Nordic region
over the winter 2009/2010, where the region experienced a scarcity situation (in fact a series of them
that lead to three price spikes: on December 17, January 8 and February 22) with prices reaching 1000
EUR/MWh. The initial cause was the loss of approximately 5000 MW of Swedish nuclear capacity.
Maintenance on these plants over the summer was not completed on time, and so the plants were
functioning at diminished capacity (61% of normal operating capacity, on average) into the winter
Production reached a minimum on December 18, driving prices to the technical limit. This coincided
with a winter that was already colder that average. The limited nuclear capacity continued for a period
of a few weeks, and on January 8
th
was exacerbated by a reduction in transmission capacity between
Norway and Sweden to 0MW because of higher than anticipated demand in Oslo. The Norwegian TSO,
Statnett, decided to prioritise domestic consumption over exports by eliminating the interconnector.
Finally, on February 22, continued low nuclear production combined with low hydro reservoirs in
Norway led to a general state of limited generation capacity. Statnett again reduced transmission capacity
(not to 0 MW but to 150 MW) and prices were again pushed to 1000 EUR/MWh or higher. Source: IEA
(2016):
Electricity Security Across Borders. Case Studies on Cross-Border Electricity Security in
Europe.
103
Export limitations were imposed by Bulgaria on 10 February, by FYROM on the 13 February, by Bosnia
Herzegovina on 14 February, by Greece on 15 February and by Romania on 16 February.
101
66
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0067.png
Purely national approaches to crisis prevention and management can also lead to premature
(and therefore unnecessary) market interventions, such as for instance a premature recourse
to an emergency extra reserve capacity, or to a demand interruption scheme.
Finally, different approaches to crisis prevention and management might also lead to cases
of 'under-protection. For instance, where Member States do not take the measures needed
to prevent (e.g., cyber-incidents), the entire region or even synchronous area is likely to
suffer. A similar problem might arise if Member States do not take the measures necessary
to protect assets that are critical from a security of supply perspective against possible take-
overs by foreign entities, in circumstances in which such take-overs could lead to any
undue political influence. Experience with recent take-overs (or planned take-overs) of
certain strategic energy assets in Europe shows that such risks are serious, notably where
the buyer is controlled by a third country. At this stage however, Member States address
this issue from a purely national perspective, based on national rules,
104
without taking
necessarily account of the wider European implications possible problems could have. This
could lead to situations wherein some Member States take foreign ownership risks too
lightly, whilst other Member States might overreact.
105
Evidence shows that in an inter-connected market, stronger co-operation on how to prevent
and manage crisis situations brings clear benefits: it leads to a better security of supply
overall, at a lesser cost. The recent METIS results
106
point in this direction, as well as
experiences with a few voluntary arrangements in place in parts of Europe
107
.
Driver 2: Lack of information-sharing and transparency
Today, national plans to prepare for crisis situations are not always public, nor shared
across Member States
108
. It is not clear who will act in crisis situations, and what the roles
are of the different actors (governments, TSOs, DSOs, NRAs). This makes any cross-
border co-operation in times of crisis very difficult
109
.
104
105
106
107
108
109
An increasing number of Member States adopt so called 'foreign investment screening laws', covering
notably changes of control over strategic energy assets.
See also the
Impact Assessment accompanying the proposal for a Regulation concerning measures to
safeguard security of gas supply and repealing Council Regulation 994/2010
(SWD (2016) 25 final.
See Section 6.3.3. (Impact of policy Option 2).
For example, a co-operation agreement worked out amongst Nordic countries contains detailed
arrangements on how to deal with situations of simultaneous crisis, e.g., on curtailment sharing.
Nine Member States keep Risk Preparedness Plans confidential, eight make them public and eleven
others have a mixed framework with some measures being released and others being kept confidential.
(Source: Risk Preparedness Study - "Review
of current national rules and practices relating to risk
preparedness in the area of security of electricity supply"
(2016), VVA Europe, Spark Legal Network,
study prepared for DG Energy).
A recent simulation of an electricity crisis situation across Europe, showed that Member States were
neither adequately equipped to deal with the crisis nor the consequences thereof, largely because it was
not clear who did what in which country on what moment (cf. results of VITEX 2016 exercise, organized
by the Dutch Ministry:
https://english.nctv.nl/currenttopics/news/2016/successful-international-
exercise-vitex.aspx?cp=92&cs=38
). VITEX 2016 is an international table top exercise on the
improvement of Critical Infrastructure Protection. The main goal of the exercise is to strengthen the ties
between EU Member States on this subject. VITEX 2016 aims to create a shared understanding of what
67
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0068.png
In addition, Member States do not systematically inform each other or the Commission
when they see crisis situations emerge. In fact, whilst ENTSO-E's seasonal outlooks
110
already point at the likelihood of upcoming crisis situations in Europe, Member States
affected by such crisis situations do not systematically communicate on actions they intend
to take, nor on the possible effect of such actions on the functioning of the internal market
or the electricity situation in neighbouring Member States. In fact, in spite of the fact that
Member States are legally obliged to notify the Commission in case they take 'safeguard
measures', such notifications have been very rare, and tend to take place
ex post
(e.g.,
Poland in 2015)
111
.
Likewise, there is no systematic exchange of information on how past crisis situations have
been handled.
Such lack of information-sharing and transparency limits the capacity of reaction of
potential Member States affected, may lead to premature interventions in the market, and
reduces the possible benefits that cooperation can bring.
In addition, even though the Electricity Coordination Group could be used as a tool to
discuss how to prevent and mitigate crisis situations
112
, this does not happen in practice, in
the absence of clear and proper roles given to the group, and clear obligations on Member
States to report on how they address electricity crisis situations, both
ex ante
(before
incidents occur) and
ex post.
Driver 3: No common approach to identifying and assessing risks
Whilst all Member States identify and assess risks that can affect security of supply, there
are many different understandings of what constitutes a 'risk' and methods for assessing
and addressing such risks vary considerably.
110
111
112
the Critical Infrastructures within Member States are and how European cooperation can contribute to
improve the resilience of Critical Infrastructure.
ENTSO-E has the obligation to carry out seasonal outlooks as required by Article 8 of the Electricity
Regulation. The assessment explores the main risks identified within a seasonal period and highlights
the possibilities for neighbouring countries to contribute to the generation/demand balance in critical
situations.
Poland activated a crisis protocol mid-August 2015 allowing the TSO to restrict power supplies to large
industrial consumers (load restrictions did not apply however to households and some sensitive
institutions such as hospitals). Poland notified the adoption of these measures under Article 42 of the
Electricity Directive one month after.
According to Article 2 of Commission Decision of 15 November 2012 setting up the Electricity
Coordination Group, the Group shall in particular
"promote the exchange of information, prevention and
coordinated action in case of an emergency within the Union and with third countries".
68
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0069.png
Different risks are assessed in different ways
113
, by different people
114
, and in different
time horizons
115
.
There is also no common agreement on what indicators to use to assess security of supply
overall
116
.
In the absence of a common approach to risk identification and assessment, it is difficult
to get an exact picture of what risks are likely to occur, in a cross-border context. This, in
turn, seriously hampers the possibility for relevant actors
TSOs, NRAs, Member States
to prevent and manage crisis situations in a cross-border context.
2.4.
Problem Area IV: The slow deployment of new services, low levels of service
and questionable market performance on retail markets
Retail markets for energy in most parts of the EU suffer from persistently low levels of
competition and consumer engagement. In addition, whilst information technology now
offers the possibility of greatly improving the consumer experience and making the market
more contestable, realising these benefits could be hampered by the lack of a data-
management framework that unlocks the full benefits of smart energy management to all
market actors
incumbents and new entrants alike.
These closely inter-related issues result in
the slow deployment of innovative products
that would help to make the electricity system function better in today's changing
context, as well as excessive prices for some end-consumers and/or poor levels of
service.
113
114
115
116
There exists a patchwork of types of risks covered under the assessments in the Member States. The
level of detail in which the types of risks are described varies and a high level of detail was found in
three Member States. In five Member States the types of risks to be assessed are not or very generally
described. (Source: Risk Preparedness Study - "Review
of current national rules and practices relating
to risk preparedness in the area of security of electricity supply"
(2016), VVA Europe, Spark Legal
Network, study prepared for DG Energy).
The combination of national entities (TSOs, the competent Ministries, the NRAs and the DSOs)
responsible for risk assessment and the division of their roles, which are often defined by law, vary
across the Member States. TSOs play a major role in the assessment of risks in a majority of the
countries. (Source: Risk Preparedness Study - "Review
of current national rules and practices relating
to risk preparedness in the area of security of electricity supply"
(2016), VVA Europe, Spark Legal
Network, study prepared for DG Energy).
Time horizons covered can vary from one year to fifteen years. Moreover, some Member States set no
limits of validity for their measures, others have a system of continuous updates whist at least eleven
countries do not specify time horizons. (Source: Risk Preparedness Study - "Review
of current national
rules and practices relating to risk preparedness in the area of security of electricity supply"
(2016),
VVA Europe, Spark Legal Network, study prepared for DG Energy).
A wide variety of metrics and methodologies to assess security of supply and system adequacy is used,
but there is no specific reference to an economic value of adequacy (in particular to VOLL). Several
Member States have established standards, generally in terms of LOLE targets. However, information
is lacking on the criteria (if any) used to establish those standards. Metrics and standards have been set
through subjective decision, despite the evident fact that setting a standard (and the generation or
transmission capacity necessary to achieve that standard) will have an economic impact on consumers.
(Source: "Identification
of Appropriate Generation and System Adequacy Standards for the Internal
Electricity Market"
(2016), AF Mercados, E-Bridge, REF-Em, study prepared for DG Energy).
69
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0070.png
R&D results:
Retail level innovative products and services such as dynamic pricing, self-consumption
incentives, and local flexibility and energy markets, have been tested in European projects, EEPOS,
ECOGRID-EU, Grid4EU, INTrEPID, INCREASE, DREAM, Integral
117
.
For example, ECOGRID-EU showed that the highest cost is in the installation of the automation
technologies, control systems and sensors in the household. These costs could be virtually zero in the future
when appliances are connected anyway.
Integral states that large scale implementation of demand-side response services based on a market for
flexibility requires standardised solutions (for the communication of the devices (smart meters and devices
controllers…) and for the framework within which market players communicate to each other) to reduce the
cost per household and to lower the price of the smart energy services.
Driver 1: Low levels of competition on retail markets
Competition on retail markets is multifaceted, and recent trends in several indicators
suggest that it can be improved in many Member States.
The price of energy for end consumer can be broken down into three main components: i)
energy, ii) network and iii) taxes and levies. The energy component typically includes cost
elements such as the wholesale price of the commodity and various costs of the supply
companies, including their operating costs and profit margins. The network component
mainly consists of transmission and distribution tariffs. It might also include further cost
elements such as ancillary services. The taxes & levies component includes a wide range
of cost elements that significantly vary from country to country. Levies are typically
designated to specific technology, market or socially bound policies, while taxes are
general fiscal instruments feeding into the state budget. On average in the EU in 2015
energy made up 36% of the final household consumer price, the network component 26%,
and taxes and levies 38%.
In spite of falling prices on wholesale markets (analysed earlier), overall electricity prices
for household consumers rose steadily between 2008 and 2015 at an annual rate of around
3%. This trend was largely driven by increased network charges, taxes and levies
118
, the
117
118
A list of the research and development projects mentioned in this box and their findings relevant to the
present impact assessment is provided in Annex 8.
The average network component in consumer bills has increased by 25% since 2008, and cost EU
households 5.45 euro cents per kWh in 2015. Taxes and levies increased by 70% in the same period,
70
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0071.png
various causes of which have been touched upon in the preceeding sections: the over
reliance of RES E assets on government support due to barriers to fully participating in all
markets; inflexible distribution networks that increase the cost of integrating RES E; and
fragmented balancing markets that increase the costs of ancillary services, amongst others.
However, a proxy for mark-ups
119
on the energy component of consumer bills in several
Member States also seem to be higher than could be expected, posing questions about the
extent of price competition. Indeed, whereas there has been a significant reduction in
wholesale prices between 2008 and 2015, the nominal level of the energy component of
household electricity bills actually increased in 13 Member States during this period
120
. In
these countries, the fall in wholesale prices has not translated into a reduction in the energy
component of retail prices despite the fact that this is the part of the energy bill
(representing around 36% of average household prices) where energy suppliers should be
able to compete.
Figure 5: Relationship between the wholesale price and the energy component of the
retail price in household segments in countries with non-regulated retail prices from
2008 to 2014 for electricity and from 2012 to 2014 in gas (EUR/MWh)
Source: ACER Database, Eurostat, NRAs and European power exchanges data (2014) and ACER
calculations. Note: Gas data are available only for the period 2012-2014.
Abnormally low mark-ups are equally problematic as they make it difficult or impossible
for a new supplier to compete against an incumbent. A reasonable mark-up is necessary
119
120
and stood at 7.92 euro cents per kWh in 2015. Energy taxation is not fully harmonized at the EU-level.
Source: DG ENER data.
As
defined
in
"Market
Monitoring
report
2014"
(2015)
ACER,
http://www.acer.europa.eu/Official_documents/Acts_of_the_Agency/Publication/ACER_Market_Mon
itoring_Report_2015,
pp. 288-295. This proxy essentially measures the relationship between the
wholesale price and the energy component of the retail price. However, other factors apart from the
mark-up may affect this relationship, notably including a higher proportion of fixed charges in wholesale
prices.
DG ENER Data.
71
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0072.png
for a new entrant to cover consumer acquisition and retention costs which are higher than
those of the incumbent who usually retains the most loyal (‘sticky’) customers. Mark-ups
that are too low and low levels of competition can be observed in several markets with
regulated prices (developed further on the next page)
121
.
As for non-price competition, whilst sampling data from European capitals suggest that
'choice' for consumers in European capitals widened in recent years, a closer inspection
reveals that this has largely been driven by just two products
'green' and dual-fuel
(electricity + gas) tariffs
122
. The offer and uptake of other, more innovative consumer
products, such as aggregation services or dynamic price tariffs linked to wholesale
markets
123
, remains limited.
Facilitating competition can be seen as means of improving consumer satisfaction.
However, the data indicate that there is clearly scope for improvement in this dimension,
too. According to the 2016 edition of the Commission's Consumer Scoreboard
a
comprehensive study measuring consumer conditions
electricity services rank 26
th
and
gas services 14
th
among the 29 markets for services across the EU. Indeed, the total
detriment to EU electricity consumers
124
has recently been quantified at over EUR 5 billion
annually
125
. Both markets can therefore be considered low performing from the consumer
standpoint.
High levels of market concentration also suggest that competition could be improved: The
cumulative market share of the three largest household suppliers (CR3) is greater than 70%
in 21 out of 28 Member States for electricity and in 20 out of 28 Member States for gas.
CR3 values above 70% are indicative of possible competition problems.
Also significant is the fact that some form of non-targeted price regulation for electricity
and/or gas still exists in 17 out of 28 Member States
126
. The regulation of electricity and
gas prices may result in an environment that strongly impairs healthy competition,
particularly in terms of the level of customer service, or the development and provision of
121
122
123
124
125
126
Based on Annex 5, "Market
Monitoring Report 2014"
(2015) ACER and VaasaETT 2015
Source: ACER database.
See also the evaluation as regards Demand Response.
Consumer detriment involves consumers suffering harm or damage. Research for the Commission has
suggested the following two definitions of consumer detriment, for use in different policy contexts:
1. Personal detriment
negative outcomes for individual consumers, relative to reasonable
expectations.
2. Structural detriment
the loss of consumer welfare (measured by consumer surplus) due to market
failure or regulatory failure.
"An analysis of the issue of consumer detriment and the most appropriate methodologies to estimate it;
Final report for DG SANCO by Europe Economics”
(2006) Europe Economics.
Sum of total post-redress financial detriment & monetised time loss.
"Study on measuring consumer
detriment in the European Union"
(2016) Civic Consulting,
This figure is comprised of Member States which regulate both electricity and gas prices, as well as
Member States which regulate exclusively gas or electricity prices. In addition, Commission classifies
Italy as having regulated electricity prices whereas ACER does not in their "Market
Monitoring report
2014"
(2015)
ACER,
http://www.acer.europa.eu/Official_documents/Acts_of_the_Agency/Publication/ACER_Market_Mon
itoring_Report_2015, pp 88-96,
72
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0073.png
innovative new services that consumers would be willing to pay extra for. Reliance on the
government to set prices can result in consumer disengagement. In addition, regulatory
intervention in price setting can have a direct impact on suppliers' ability to offer products
that are differentiated in terms of pricing-related aspects
dynamic price tariffs that reflect
the minute-by-minute fluctuations on wholesale markets, for example
.
When justifying price regulation Member States cite the need to protect the vulnerable and
energy poor along with the need to protect all customers against the risk of market abuse.
Around 10.2% of the EU population might be affected by the problem of energy poverty,
based on a proxy indicator measuring "the
inability to keep home adequately warm"
127
. If
energy prices continue to increase, it is likely that energy poverty across the EU will
increase and therefore more pressure to maintain energy price regulation.
Under the existing provisions in the Electricity and Gas Directive, Member States have to
address energy poverty where identified. The evaluation of the provisions found important
shortcomings stemming from the unclarity of the term
energy poverty,
particularly in
relation to consumer vulnerability, and the lack of transparency with regards to the number
of households suffering from energy poverty across Member States.
Addressing the issue of energy poverty through blanket price regulation can be
disproportionate as it affects all consumers big or small, rich or poor. It can also lead to a
chicken-and-egg problem whereby price regulation leads to distortions to the market and
low competition, which are in turn used to justify the continuation of price regulation.
Resolving this impasse would allow one of the most fundamental aspects of the market
the price mechanism
to function properly.
ACER's Retail Competition Index
a composite indicator that draws upon many of the
abovementioned statistics, as well as others
128
was developed to achieve a full picture of
retail market competitiveness which is not dependent on a single indicator. It illustrates the
disparities in retail markets that still exist between Member States, and clearly suggests
that competition can be improved in a number of them (see Graph 3).
127
128
The indicator is measured as part of the Eurostat Survey on Income and Living Conditions (EU-SILC).
1) Concentration ratio, CR3; 2) Number of suppliers with market share > 5%; 3) ability to compare prices
easily; 4) average net entry (2012-2014); 5) switching rates (supplier + tariff switching) over 2010-2014;
6) non-switchers; 7) number of offers per supplier; 8) measure of whether the market meets consumer
expectations; 9) average mark-up (2012–2014) adjusted for proportion of consumers on non-regulated
prices.
73
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0074.png
Figure 6: ACER Retail Competition Index (ARCI) for electricity household markets
in 2014
Source: ACER
Driver 2: Possible conflicts of interest between market actors that manage and
handle data
High levels of information asymmetry (between incumbents and potential entrants) and
high transaction costs impede competition and the provision of high levels of service on
retail markets for energy.
For example, studies from NRAs cite discriminatory access to information on potential
customers as a key barrier for new entrants to EU retail energy markets (Box 1 under). As
most DSOs are also energy suppliers, safeguards are necessary to prevent them using
privileged access to consumer data
especially smart metering data
to gain a competitive
advantage in their supply operations.
In addition, "unjustified" or "incorrect" invoices are one of the largest sources of electricity
and gas consumer complaints reported to the Commission
129
an issue that can be largely
resolved if accurate metering information were made quickly and readily available to
suppliers and consumers.
Information technology could directly address these issues, making the market more
contestable, facilitating the development of new services and improving the customer
experience around day-to-day operations such as billing and switching. Although 80% of
EU consumers should have smart meters by 2020, the experience from Member States that
129
These made up around 10% of all electricity and gas complaints. Source:
European Consumer
Complaints Registration System.
74
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0075.png
have already rolled them out indicates that robust rules are necessary to ensure the full
benefits of smart metering data are realised, and that data privacy is respected. Such rules,
however, are not fully developed in the existing EU legislation, and the diverse interests
of market actors who may be involved in data handling mean that they are unlikely to
emerge without regulatory intervention.
Box 1: Data management as a market entry barrier
130
Data management comprises the processes by which data is sourced, validated, stored,
protected and processed and by which it can be accessed by suppliers or customers
The necessity to adapt to different data management models for each market can have an
impact on the resources of the potential market newcomers. Non-discriminatory and
smooth accessibility of data is naturally most important during the pre-contractual phase
as well as for running contractual situations. The fact that not all countries have rolled out
smart meters yet also creates significant differences in the availability and accessibility of
data.
A standardised approach to the provision and exchange of data creates a level playing field
among stakeholders and helps to encourage new challenging market actors to enter a new
market.
Driver 3: Low levels of consumer engagement
Consumer engagement is essential for the proper functioning of the market. As such, it is
closely inter related with competition (Driver 1). However, consumers are also put-off
from engaging in the market by behavioural biases and bounded rationality that make it
harder for them to take the decision to search for, and to switch to, the best offer.
In particular, three key barriers to consumer engagement have been identified. First, the
broad variety of fees that consumers may be charged when they switch diminishes the
(perceived) financial gains of moving to a cheaper tariff in what is already a marginal
decision for many consumers. The evidence suggests around 20% of electricity consumers
in the EU currently face a fee of between EUR 5 and EUR 90 associated with switching
suppliers. A portion of those fees
affecting around 4% of consumers
may be illegal
under existing EU legislation (see Section 2.6.2).
Secondly, whereas online comparison websites play an important role in helping
consumers to make an informed decision about switching suppliers, recent reports of
unscrupulous practices have damaged consumer trust in them. Identified issues include the
130
Adapted from:
CEER Benchmarking report on removing barriers to entry for energy suppliers in EU
retail
energy
markets,
(2016)
p.
19,
http://www.ceer.eu/portal/page/portal/EER_HOME/EER_PUBLICATIONS/CEER_PAPERS/Custom
ers/tab6/C15-RMF-70-03_BR_barriers_to_entry_for_suppliers_1-Apr-2016.pdf.
See also VaasaETT
(2014), '
Market Entrant Processes, Hurdles and Ideas for Change in the Nordic Energy Market',
p.22,
http://www.nordicenergyregulators.org/wp-content/uploads/2014/12/VaasaETT-Report-
Market_Entry_Barriers.pdf.
75
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0076.png
default presentation of deals by some websites, the use of misleading language, and a lack
of transparency about commission arrangements. Indeed, a third of respondents to a recent
EU survey somewhat or strongly agreed that they did not trust comparison websites
because they were not impartial and independenct.
131
And thirdly, consumer groups report that consumers have difficulties understanding their
energy bills and comparing offers in spite of existing EU legislation aiming to facilitate
this. There is a broad divergence in national requirements around billing and consumer
satisfaction with their bills varies significantly between different Member States. Whereas
energy bills are the foremost means through which suppliers communicate with their
customers, consumers' inability to correctly answer simple questions about their own
electricity use reveals that bills are not effective in providing information that could
facilitate effective consumer choice.
132
Addressing this will be increasingly important with
the shift to more varied consumer products.
R&D results:
The project S3C has developed a toolkit for the active engagement of end users and identifies
improvements to the way and content of the communication of energy system actors with customers and
citizens.
2.5.
What is the EU dimension of the problem?
The EU's electricity market is strongly integrated physically, economically and from a
regulatory point of view. The discretion of Member States to act individually has been
substantially reduced by the resulting interdependencies and, in fact, can create significant
externalities if not adequately framed within an EU-wide context.
RES E deployment is expected to increase in all Member States. The need to spur the
emergence of a more flexible electricity system thus exists EU-wide. Moreover, as the EU
electricity system is both physically and economically integrated, non-coordinated action
is likely to increase the costs of RES E integration.
The same applies to CMs where the externalities of non-coordinated action are one of the
underlying reasons for the proposed measures. It is true that not all Member States have
enacted CMs, however the benefits of a more coordinated approach will benefit all
Member States. Member States that have implemented a CM will be able to lower their
costs by increased cross-border competition whereas the avoidance of negative spill-over
effects will benefit all Member States regardless as to whether they enacted a CM or not.
In an integrated electricity market, considering the prevention and management of
electricity crisis a purely national issue leads to serious problems. Where crisis situations
occur, they often have a cross-border effect, and can entail serious adverse consequences
for the EU as a whole. Evidence shows that non-coordinated approaches to preventing and
managing electricity crisis may seriously distort the internal electricity market and put at
risk the security of supply of neighbouring Member States.
131
132
"Study
on the coverage, functioning and consumer use of comparison tools and third-party verification
schemes for such tools"
(2013) European Commission, pp. xix, 191.
For example, less than one third of consumers recently surveyed strongly agreed that they knew what
kind of a contract they currently had (fixed price, variable price, green, etc.).
76
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0077.png
Well designed and implemented consumer policies with a European dimension can enable
consumers to make informed choices that reward them through healthy competition, and
support the European goal of sustainable and resource-efficient growth, whilst taking
account of the needs of all consumers. Increasing confidence and ensuring that unfair
trading practices do not bring a competitive advantage will also have a positive impact in
terms of stimulating growth. The consumer-related measures undertaken as part of this
initiative therefore play an essential role in the establishment and functioning of the
internal market.
2.6.
How would the problem evolve, all things being equal?
The projected development of the current regulatory framework
In the absence of additional measures, the electricity market would continue to be governed
by the Third Package and the Electricity Security of Supply Directive. Various network
codes may still be adopted and implemented
133
, such as the draft Network Code on
Emergency and Restoration and the Balancing Guideline. Whilst these network codes will
help address some of the issues identified above, they will not offer a sufficient remedy on
their own.
Solving the above-identified problems requires measures that cannot be addressed in the
current legal framework. As the network codes constitute secondary implementing
legislation designed to amend non-essential elements of the Third Package by
supplementing it, their scope is confined to the same limits drawn by the Third Package
and hence, developing new network codes cannot be expected to provide for adequate
solutions either.
In view of the fact that the proposals in essence develop new areas for which currently no
clear legal basis exist in the Third Package or in the Electricity Security of Supply
Directive, stronger enforcement is not an option either (with some limited exceptions,
which are further developed below).
Member States have developed forms of voluntary collaboration that attempt to address
some of the problems identified. However, these initiatives cannot be expected to resolve
all problems and with the same effectiveness as EU action (See also EU value added).
Regarding security of supply in particular, both the evaluation and the results of the public
consultation clearly show that Directive 2009/89 is outdated. It does not take account of
the current, fast evolving situation of the electricity market. And it offers no framework
for coordinating national policies in the area of security of electricity supply.
With regards to consumer issues, the Commission may develop guidance to tackle
implementation issues caused by difficulties in interpreting the existing legislation. In
particular, it may issue an interpretative note on the existing provisions in the Electricity
and Gas Directives covering switching-related fees, as well as further guidance on how the
dozen or so consumer Directives relevant to comparison tools should be applied.
133
For a full overview of network codes, see Annex VII.
77
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0078.png
On energy poverty, the Commission will already set up the EU Energy Poverty
Observatory using funds already secured from the European Parliament. However, the
extent to which the Observatory continues to share good practices and improve data
gathering is uncertain, as continued funding is not secured beyond the first year of
operation. Moreover, the impact of this measure may be limited as the current legislation
does not require Member States to measure energy poverty and hence to address it.
Expected evolution of the problems under the current regulatory framework
Both this and the impact assessment for the parallel RED II initiative come to the
conclusion that the electricity market, provided that it is improved, together with projected
CO2 prices, may deliver investments in most mature low-carbon technologies such as solar
PV and onshore wind by 2030. However, in the absence of a market optimised for
increasing levels of renewable penetration, achieving the 2030 objectives will only be
possible at significantly higher costs.
In the absence of a better defined framework for government interventions, the current
trend of non-coordinated implementation of national resource adequacy measures risks
proliferating, undermining the efficiency of the market to deliver efficient production and
investment decisions and defragmenting its regulatory framework.
In fact, in the absence of measures that will improve investment incentives and efficient
market functioning, it is likely that more Member States will have to take recourse to means
other than the market to secure sufficient investments for resource adequacy purposes,
setting in motion a negative spiral in which government interventions increase the need for
the subsequent one.
Failing to integrate all participants in the market means that their decisions will not be
guided by market signals, entailing the risks that their investment and production decisions
will be sub-optimal from a welfare perspective, if not distort markets.
In addition, in the absence of a clear framework for co-ordinated action between Member
States when it comes to preventing and managing crisis situations, the EU's electricity
system risks being increasingly exposed to risks of serious incidents, without the EU or its
Member States having any means to properly tackle them. There is a real risk that Member
States will continue to do as they see fit in crisis situations, thus undermining the proper
functioning of the internal electricity market.
Regarding active consumer engagement, Member States have committed to deploying
smart meters to around two thirds of the population while access to innovative services
such as demand response or in the area of self generation remains limited in many Member
States. Individual action by Member States would perpetuate current differences in the
Union regarding consumer awareness, choice and access to dynamic prices, demand
response and integrated smart services. Consumer-friendly functionalities would be taken
up partially and the flexibility consumers can provide to the electricty system would remain
largely untapped.
With regards to consumer protection and engagement, enforcement could help diminish
the illegal switching-related costs currently faced by an estimated 4% of all EU electricity
consumers. And some Member States may also voluntarily cease or reduce excessive
regulatory interventions in price-setting as their retail markets mature. However,
78
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
shortcomings in the existing legislation will greatly limit the Commission's ability to tackle
these and other consumer-related problem drivers more effectively.
The issue of energy poverty is likely to remain relevant. Pressure on energy prices may
continue as a result of the efforts to decarbonise the energy system. If energy prices grow
faster than household income, more and more households will find it difficult to pay their
energy bills. This may have a knock-on effect on Member States willingness to lift price
regulation which will ultimately impact suppliers' ability to innovate, competition and
consumer welfare. Thus, the greater the importance of enhanced transparency to estimate
the number of energy poor households.
And whilst many Member States may seek to ensure the neutral, expedient, and secure
management of consumer data, it is highly likely that national requirements will vary
significantly, leading to an uneven playing field for new suppliers and energy service
companies in the EU. Here, the only credible approach to effectively tackling the potential
conflicts of interest among market actors is a legislative one.
2.7.
Issues identified in the evaluation of the Third Package
A retrospective evaluation was carried out in parallel with the present impact assessment
and has been added as Annex VI. Its main conclusions are:
-
That the initiative of the Third Package to further increase competition and to
remove obstacles to cross-border competition in electricity markets has generally
been effective and that active enforcement of the legislation has led to positive
results for electricity markets and consumers. Markets are in general less
concentrated and more integrated than in 2009. As regards retail markets, the set
of new consumer rights introduced by the Third Energy Package have clearly
improved the position of consumer in energy markets.
However, the success of the rules of the Third Package in developing the internal
electricity market further to the benefit of customers remains limited in a number
of fields concerning wholesale and retail electricity markets.
Moreover, while the principles of the Third Package achieved its main purposes
(e.g. more supplier competition), new developments in electricity markets such as
the increase of RES E, the increase of state interventions into the electricity markets
and the changes taking place on the technological side have led to significant
changes in the market functioning in the last five years and have dampened the
positive effect of the reforms for customers. There is a gap in the existing legislation
regarding how to deal with these developments.
-
-
The conclusions of the evalution are also reflected in section 3 of each of the Annexes
1.1 throught to 7.6 to the present impact assessment.
79
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0080.png
3.
3.1.
S
UBSIDIARITY
The EU's right to act
In order to create an internal energy market, the EU has adopted three consecutive
packages of measures between 1996 and 2009 aiming at the integration and liberalisation
of the national electricity and gas markets and addressing a wide range of elements such
as market access, the improvement of the level playing field, transparency, increased rights
for consumers, stronger independence of regulatory authorities, etc. In February 2011, the
European Council set the objective of completing the internal energy market by 2014 and
of developing interconnections to put an end to any isolation of Member States from the
European gas and electricity grids by 2015. In June 2016, the European Council called for
Single Market strategies, including on energy, and action plans to be proposed by the
Commission and to be completed and implemented by 2018.
Article 194 of the Treaty on the Functioning of the European Union ('TFEU') consolidated
and clarified the competences of the EU in the field of energy. According to Article 194
TFEU, the main aims of the EU’s energy policy are to: ensure the functioning of the energy
market; ensure security of energy supply in the Union; promote energy efficiency and
energy saving and the development of new and renewable forms of energy; and promote
the interconnection of energy networks.
The planned measures of the present intiative further progress towards the objective of
improving the conditions for competition by improving the level playing field, while at the
same time adjusting to the decarbonisation targets and enhancing the solidarity between
Member States in relation to security of supply.
Therefore, Article 194 TFEU is the legal basis of the current proposal.
3.2.
Why could Member States not achieve the objectives of the proposed action
sufficiently by themselves?
The section below provides a high-level summary of the necessity of EU action, based on
the four problem areas identified in section 2.
The issue of subsidiarity is also discussed in section 6 of Annexes 1.1 to 7.6 to the present
impact assessment.
As regards the issue concerning a market design that is not fit for taking up large amounts
of variable, decentralised electricity generation and allowing for new technical
developments, it is important to note that EU action is necessary to ensure that national
markets are comparable in order to improve the functioning of the internal electricity
market and enable maximum cross-border trading to happen. EU-action is also necessary
in order to enhance the transparency in the functioning of the electricity markets and avoid
discrimination between market parties. Moreover, a number of the measures proposed to
address this issue (e.g., measures for the common sizing and procurement of balancing
reserves) require full cooperation of neighbouring TSOs and NRAs, and hence individual
Member States might not be able to deliver a workable system or might only provide
suboptimal solutions. Moreover, existing provisions under the Third Package are arguably
not sufficiently clear and robust and their implementation of such rules has highlighted
areas with room for improvement and hence EU action will be necessary to address the
identified shortcomings.
80
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
With specific respect to DSOs, distribution grids will have to integrate even greater
amounts of RES E generation in the future, and so ensuring all DSOs can efficiently
manage their networks will help to reduce distribution costs and thereby support the
achievement of EU RES targets. In addition, widely divergent distribution tariff regimes
may affect the development of the internal energy market as they affect the conditions
under which RES E generation or other resources can access the grid and participate in the
national and cross-border energy markets. EU action in these areas would thereby facilitate
the deployment of RES E and create a level playing field for flexibility services such as
demand response by ensuring a coherent approach by Member States based on common
principles. Developing this through independent Member State action would not be
feasible given the heterogeneity of current national networks and regulations.
Concerning the uncertainty about future investments in generation capacity and
uncoordinated government interventions, the measures in the proposed initiative aim at
improving the functioning of the electricity markets and at improving the coordination
between Member States for capacity mechanisms. The necessity of EU action derives from
the fact that as regards the measures for improving the functioning of the electricity
markets, these are already covered by EU legislation, although not sufficiently clearly, and
therefore an amendment to such measures to address the distortions and deficiencies
identified would require EU action. For the measures concerning the improvement of the
coordination between Member States for capacity mechanisms, given that the aim is to
address the shortcomings identified from resource adequacy assessments carried out at
national level and to develop the cross-border participation in capacity mechanisms, the
EU is best placed to provide for a harmonised framework.
In relation to the problem that Member States do not take into account of what happens
across their borders when preparing for and managing electricity crisis situations, the
necessity of EU action is based on the evidence that uncoordinated national approaches
not only lead to the adoption of suboptimal measures but that they also make the impacts
of a crisis more accute. Given the interdependency between the electricity systems of
Member States, the risk of a blackout is not confined to national boundaries and could
directly or indirectly affect several Member States. Therefore, the actions concerning
preparedness and mitigation of crisis situations cannot be defined only nationally, given
the potential impact on the level of security of supply of a neighboring Member State
and/or on the availability of measures to tackle scarcity situations.
Regarding the slow deployment of new services, low quality of services and increasing
mark-ups on retail markets, there is a clear need for EU action to ensure convergence of
national rules, which is a precondition for the development of cross-border activity in the
retail markets. Moreover, national regulations have in some instances led to distortions,
weakening the internal energy market. Such distortions can be observed in relation to the
protection of vulnerable and energy poor consumers which is a policy area characterised
by a great variety in types of public internvention across Member States, both in terms of
the definitions used and in terms of the levels of protection established. In that case EU
action is justified not only to ensure customer protection and enhanced transparency but
also to improve the functioning of the internal market through a more cohesive approach
across all markets.
81
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
3.3.
Added-value of action at EU-level
The initiative aims at amending existing EU legislation and at creating new frameworks
for cross-border cooperation, which can legally and practically only be achieved at the
European level.
National policy interventions in the electricity sector have direct impact on neighbouring
Member States. This even more than in the past as the increasing cross-border trade, the
spread of decentralised generation and more enhanced consumer participation increases
spill-over effects. No state can effectively act alone and the externalities of unilateral action
have become more important.
To illustrate, uncoordinated national policies for distribution tariffs may distort the internal
market for distributed resources such as distributed generation or storage, as such resources
will increasingly participate in energy markets and provide ancillary services to the system,
including across borders. Furthermore, the lack of appropriate incentives for DSOs may
slow down the integration of RES E, and the uptake of innovative technologies and energy
services. EU action therefore has significant added value by ensuring a coherent approach
in all Member States.
It is true that certain Member States collaborate on a voluntarily basis in order to address
certain of the identified problems (e.g. Pentalateral Energy Forum
–PLEF-,
CEEE).
However, these fora are characterised by different levels of ambition and effectiveness and
are held-back by the fact that no means exist to enforce agreements on market design
related arrangements. Moreover, even if one would presume that they would be fully
effective in these regards, they geographically cover only part of the EU electricity market.
It should be added that clear synergies exist between the present initiative and other EU
policy objectives, notably the EU's climate policies and other policy objectives in the
energy field. Indeed, a well-functioning market is the base upon which the ETS can most
efficiently deliver its goals and will permit a cost effective integration of RES E in the EU's
electricity markets.
Consequently, the objectives of this initiative cannot be achieved only by Member States
themselves and this is where action at EU-level provides an added value.
82
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0083.png
4.
4.1.
O
BJECTIVES
Objectives and sub-objectives of the present initiative
83
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0084.png
4.2.
Consistency of objectives with other EU policies
The consistency of the present initiative with various parallel initiatives in the energy
policy area was already explored in section 1.2.
The
ETS
constitutes a cornerstone of the European Union's policy to combat climate
change and its key tool for reducing industrial and electricity sector greenhouse gas
emissions cost-effectively. To achieve the at least 40% greenhouse gas emission reduction
target, the sectors covered by the ETS, which includes electricity generation, have to
reduce their emissions by 43% compared to 2005. The ETS interacts with the electricity
markets as it places a price on emissions of CO2, which is proportional to the emissions'
intensity of electricity production. This can be taken into account for both operational
decisions as well as for investment decisions, in which price expectations for the future
will also play a larger role due to the long-term nature of investments in the electricity
sector. (By contrast, decommissioning decisions may be primarily driven by short-term
considerations relating primarily to operational costs and revenues). The ETS thus
functions by affecting production and investment decision of electricity market actors
134
.
It follows that an ETS can only function if its is complemented by an efficient electricity
market is. The objectives of the ETS and the present proposals are hence complementary
to one another and mutually reinforcing.
The
Effort Sharing Decision
establishes binding annual greenhouse gas emissions for
Member States for the period 2013-2020 in sectors not covered by the ETS and forms part
of the climate and energy package. As part of the 2030 climate and energy framework, a
similar binding emission reduction framework is proposed for the period 2021-2030.
Reducing greenhouse gas emissions by 30% in effort sharing sectors below 2005 levels
can have an indirect impact on the projection for the demand of electricity in 2030 and this
has been taken into account in the Impact Assessment by using the EUCO27 scenario in
the baseline against which the impacts of the present initiative is being assessed.
The
Communication on the decarbonisation of transport in 2030
aims at setting out a
strategy covering several legislative and non-regulatory initiatives covering the transport
sector which will be subsequently proposed to contribute to meeting the agreed 2030
greenhouse gas reduction targets. The decarbonisation of transport in 2030 has an impact
on the projection for the demand of electricity in 2030, primarily via the electrification of
transport, and this has been taken into account in the Impact Assessment by using the
EUCO27 scenario in the baseline against which the impacts of the present initiative is
being assessed. The efficient integration of electric vehicles into the electricity system
requires incentivising their charging to take place at times of low electricity demand and/or
134
The existing imbalance between the supply and demand for ETS allowances has limited the impact of
the carbon price in recent years. However, the agreement in 2014 to postpone the auctioning of 900
million allowances, and the decision in 2015 to introduce a Market Stability Reserve from 2019 onwards,
as well as the proposal to revise the EU ETS, including a higher annual reduction to the number of
allowances in the ETS from 2021 onwards, will gradually address the surplus of allowances. With the
introduction of the auctioning of allowances as the default method of allocation for installations in the
power sector from 2013 onwards and a single EU wide limit or cap on the overall number of allowances
in the system, the EU ETS already provides a largely harmonised incentive for decarbonisation at EU
level.
84
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0085.png
high supply. The present initiative aims at enabling and rewarding consumers to manage
their consumption, including when charging their electric vehicles, actively via demand
response thus enabling smart charging. In essence, electric vehicles will thus become part
of the supply of flexibility to the electricity system.
EU's competition instruments and, in particular, the EU state aid rules are applicable to the
energy sector. They have been clarified in the
Guidelines on State aid for environmental
protection and energy 2014-2020
135
. These EEAG aim at supporting Member States in
reaching their 2020 targets while addressing the market distortions that may result from
subsidies granted to RES. To this end, the EEAG promote a gradual move to market-based
support for RES E. They also include provisions on aid to energy infrastructure and rules
on aid to secure adequate electricity capacity, allowing Member States to introduce CMs
when there is a real risk of insufficient electricity generation capacity. The objectives and
the rules of the EEAG are set to avoid undue competition distortions from national support
provided in the energy sector. The proposed initiative to strenghten efficient, integrated
and functioning electricity markets is complementary to this framework.
The existing EEAG already go a considerable way in guiding CMs. The present initiaitve
intends to complement this framework. For instance:
-
The EEAG require that state intervention in support of resource adequacy must be
necessary. The MDI impact assessment
136
thus explores options for creating a
robust framework for assessing the EU's adequacy situation which could give a
good sense how much intermittent renewables can contribute to security of supply
or to what extent Member States can rely on supplies from their neighbours. Today,
Member States introduce capacity mechanisms based on national reports which
assess these factors very differently and underestimate the contribution of RES E
or foreign supplies to a Member States' security of supply. Therefore a genuine and
high quality assessment which will help assessing real needs and question
unfounded national claims.
The EEAG already require that national capacity markets are open to foreign
resources. However, organising effective foreign participation in national
mechanism requires active contributions of several parties. The MDI impact
assessment
137
explores options for defining clear roles and responsibilities to
capacity providers, transmission system operators and regulators so that foreign
participation becomes effective and that investment incentives are not distorted
across the borders.
-
The proposed changes on the new performance based remuneration framework for DSOs
would also support the
Digital Single Market Strategy
in the sense that those would
provide further incentives to enable cross sector synergies in electronic communication
infrastructure deployment allowing win win solutions for the cost efficient and timely
smartening of grids and high speed connectivity for EU citizens, also decreasing the digital
divide and providing the backbone for digital products and services which have the
potential to support all aspects of the lives of EU citizens, and drive Europe's economic
135
136
137
http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A52014XC0628(01)
See the preferred option in problem area II
See the preferred option in problem area II
85
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0086.png
recovery. The proposed measures would complement from the energy regulatory side the
measures already introduced with Directive
2014/61/EU
which aims at reducing the cost
of high speed broadband infrastructure deployment partly via cross sector synergies.
The proposed measures do in general have no interaction with the fundamental rights laid
down in the
Charter of Fundamental Rights,
with the exception of the processing of
personal data and improvement of consumer protection. These elements are discussed in
more detail in section 6.4.6, Annex 7.1 and Annex 7.3.
The New Skills Agenda for Europe
focuses on skills as an elevator to people's
employability and prosperity, in line with the objective of a "social triple-A" for Europe.
It will promote life-long investment in people, from vocational training and higher
education through to digital and high-tech expertise and the life skills needed for citizens'
active engagement in changing workplaces and societies. The energy transition will bring
significant shifts in employment and skill sets required for employees active in the energy
sector as traditional means of generation will be replaced by RES E. This transition is
however primarily driven by EE and RED II related measures as well as national choices
as to the generation mix. More relevant for the present initiative are the measures aiming
at inducing the development of the retail markets from electricity supply markets towards
including more service oriented product offerings facilitating the participation of
consumers in the electricity market.
As regards
consumer rights,
the Unfair Commercial Practices Directive is the overarching
piece of EU legislation regulating unfair commercial practices in business-to-consumer
transactions. It applies to all commercial practices that occur before (i.e. during advertising
or marketing), during and after a business-to-consumer transaction has taken place. Where
sector-specific EU law is in place and its provisions overlap with the provisions of the
UCPD, the corresponding provisions of the sector-specific EU rules prevail, so no
contradictions exist.
Research, Innovation and Competitiveness
being Energy Union's 5
th
dimension, cuts
across all its elements. The Strategic Energy Technology Plan implements the energy
union's fifth dimension, promotes research and innovation for low carbon technologies,
contributing to the transformation of the EU's energy system and creating jobs, growth and
global export opportunities in the fast-growing clean-technology sector. Technological
developments create opportunities for citizens to turn from being passive consumers of
electricity into prosumers that actively manage their consumption, storage and production
of electricity and participate in the market and allow for the increasing penetration of
distributed resources. A new Research, Innovation and competitiveness strategy,
encompassing energy, transport and industrial competitiveness aspects is expected to be
presented in the months to come. This strategy builds on the achievements of the SET Plan
and further addresses the R&I challenges particularly towards industrialisation of
innovative low carbon technologies.
The present initiative is fully coherent as it seeks to remove barriers for the participation
of consumers, for bringing new resources to the market and seeks to improve price
formation with a view to create the conditions for new business models to emerge and for
innovative products to be absorbed by the market.
86
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
5.
P
OLICY OPTIONS
A fully functioning European wide electricity market is the best means to ensure that
electricity can be delivered to consumers in the most cost-efficient way at any time. To
continue fulfilling that purpose, the electricity market needs to be able to adapt to the
significant increase of variable renewable electricity production, integrate new enabling
technologies such as smart grids, smart metering, smart-home, self-generation and storage
equipment, empower citizens to take ownership of the energy transition and assure security
of electricity supply at least costs. Market mechanisms may need to be complemented by
initiatives which help preventing and managing electricity crisis situations.
Any EU action aimed at strengthening the market should build on the gradual liberalisation
of the EU energy markets resulting from the three Energy Packages described earlier in
this document.
The following policy options have been considered to address the problems of today's
electricity market and to meet the broad energy policy objective of ensuring low carbon
electricity supply to European customers at least costs. In assessing all possible options to
achieve this broad objective, the following approach was taken:
-
Identification of the main areas where initiatives might be needed to achieve
the main objectives of a new electricity market design. These Problem Areas
are set out in Box 2 below: "Overview of Problem Areas".
To address each Problem Area a set of high level options was identified (set-
out in the following paragraphs). Each of these high level options groups
options for specific measures.
A bottom-up assessment was performed for each specific measure, comparing
a number of options in order to select the preferred approach. The assessments
of the specific measures can be found in the Annexes to the present impact
assessment.
-
-
To help the reader, a table matching the assumed measures for each high level option is
included at the end of each problem area with references to the Annexes.
87
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0088.png
Box 2: Overview of Problem Areas
Problem Area I:
Market design not fit for taking up large amounts of variable,
decentralised electricity generation and allowing for new
technological developments
Problem Area II:
Problem Area III:
Uncertainty about sufficient future investments in generation
capacity and un-coordinated government interventions
Member States do not take sufficient account of what happens
across their borders when preparing for and managing electricity
crisis situations
Problem Area IV:
5.1.
The slow deployment of new services, low levels of service and
poor retail market performance
Options to address Problem Area I (Market design not fit for an increasing
share of variable decentralized generation and technological developments)
Overview of the policy options
With a significant part of the produced electricity coming from variable renewable sources
and distributed resources, new challenges will be arising in terms of security of supply and
electricity price volatility. The options examined here aim to address these challenges in
the most cost-effective way for the whole European electricity system. These system cost
savings will be passed on to consumers by way of lower network charges. They will also
make it easier for RES E assets to earn a higher fraction of its revenues through the market.
Two possible paths were identified: the path of enhancing current market rules in order to
increase the flexibility of the system, retaining to a certain extent the national operation of
the systems (with more or less coordination assumed depending on the related sub-options)
and the path of moving to a fully integrated approach.
Box 3: Overview of the Policy Options for Problem Area I
Each policy option consists of a package of measures which address the drivers of the
problem. In the following sub-sections, the high level policy options and the packages of
measures they contain are described. Details on the individual measures are included in
the Annexes. It is then explained if any of those options are to be discarded at this stage,
prior to assessment, or whether other options were considered but were discarded from the
outset. The section is closed by a table summarising all specific measures included in each
88
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0089.png
option and references to the Annexes where each measure is described and asessed in more
detail.
The relevant Annexes addressing the policy options below in more detail are: 1.1 to 3.4.
Option 0: Baseline Scenario
Current Market Arrangements
Under this option no new legislation is adopted, but there is some effort to implement
existing legislation including via the adoption of so-called network codes or guidelines.
The network codes, provided for in Article 6 and the guidelines provided for in Article 18
of the Electricity Regulation specify technical rules on the operation of European electricty
markets
138
. They are, as such, only designed to amend non-essential elements of the
Electricity Regulation and can only be adopted in areas specifically mentioned in the above
mentioned Articles.
139
Under these limitiations, network codes/guidelines are not the suitable instrument to
achieve all objectives of this initiative. For instance, whereas the implementation of the
Guideline on Capacity Allocation and Congestion Management ('CACM Guideline') will
bring a certain degree of harmonisation of cross-border intraday markets, gate closure
times and products for the intraday, as well as a market clearing, there is no guarantee that
the local market will adapt to reflect the cross-border approach and practices (auctions /
continuous trading) and local intraday markets across Europe will continue to remain non-
harmonised. This means that the EU-wide intraday market coupling envisaged by the
CACM Guideline will not be able to reach its full potential.
The Balancing Guideline is expected to bring certain improvements to the balancing
market, namely the common merit order list for activation of balancing energy, the
standardisation of balancing products and the harmonisation of the pricing methodology
for balancing. Nonetheless, other important areas like balancing capacity procurement
rules, frequency, geographical scope and sizing will not be affected by this regulation.
Priority dispatch rules, must-run priorities and other technology specific rules related to
the scheduling and operation of the system do not change at all with the adoption of
network codes. The same applies for the possibility for demand and distributed resources
to access the markets, and to compete on a level playing field with thermal generation. The
baseline assumes that demand response exists only in countries where it currently has
access to the market, with only industrial consumers being able to participate.
Overall, this option assumes that the future situation will remain more or less the same as
today, except from some specific measures included in the network codes (as above). The
138
139
More detail as regards network codes and guidelines is provided in Annex VII.
CIGRE paper C5-202 (2016): "Market
coupling, facing a glorious past?"
by R.Hirvonen, A.Marien,
B.Den Ouden, K.Purchala, M.Supponen, describes the past and future challenges of implementing
market coupling.
89
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0090.png
baseline does not consider explicitly any type of existing support schemes for power
generation plants, neither in the form of RES E subsidies nor in the form of CMs
140
.
Stakeholders' opinions
141
:
None of the respondents to the public consultation expressed
the opinion that there is no need for further upgrade of the current market arrangements.
142
Option 0+: Non-regulatory approach
Whilst systematically considered
143
, no such option could be identified
144
.
Stronger enforcement provides little scope for improving the level playing field among
resources. To the extent the lack of a level playing field is due to the variety of provisions
in national law, a clear and transparent EU framework is a prerequisite for any
improvement. If the lack of a level playing field is due to exemptions in the EU regulatory
framework, stronger enforcement of these would actually be counter productive. In this
regard, the Evaluation report indicates that the rules of the Third Energy Package appear
to be insufficient to cope with the challenges facing the European electricity system.
145
Moreover, voluntary cooperation has resulted in significant developments in the market
and a lot of benefits. However, it it unlikely to provide for appropriate levels of
harmonisation or certainty to the market and legislation is needed in this area to address
the issues in a consistent way.
The current EU regulatory framework contains very limited rules on balancing and
intraday markets in a manner that allow to strengthening these short-term markets. In
particular, the Third Package does not address regional sizing and procurement of
balancing reserves nor contain rules allowing achieving a larger degree of harmonisation
of intraday trading arrangements.
Given that the existence of Regional Security Coordinators ('RSCs') depends on the
implementation of the System Operation Guideline, RSCs may only be fully operational
140
141
142
143
144
145
More details on the baseline and the reasons for not considering existing support schemes can be found
in Annex IV.
Stakeholders' opinions are reflected through-out Section 5 (and occasionally Section 6) of the main text
of this impact assessment to provide insides into their views as to the various options considered.
Stakeholder views are moreover reflected in detail in Section 7 of of each of the Annexes 1.1 throught
to 7.6 to the present impact assessment.
Some stakeholders propose to preserve only particular rules of the current market arrangements, while
being supportive to other Commission proposals for upgrading of the electricity market. E.g., one
stakeholder is supportive to more aligned framework for balancing markets and European measures to
incentivise demand side flexibility and in the same time supports the priority dispatch and priority access
for renewables. Similarly, one stakeholder strongly supports measures to incentivise the demand side
response and strengthening the powers of ACER, but considers that power exchanges should not be
subject to governance rules as well as that redesigning of the balancing markets is the task of Member
States and not the EU.
For each measure the opportunities for stronger enforcement have also been assessed in the annexes
with measures associated with each option. References to the relevant annexes are provided in Sections
5.1.7, 5.2.9, 5.3.8 and 5.4.6
The Commission has conducted
and is still conducting
a systematic
ex-officio
compliance check of
national legislation with the Third Energy Package. While EU-Pilot or formal infringement procedures
are still ongoing, they will however not be able to fulfil the policy objectives of the proposed measures.
See Section 7.3.1., 7.34 and 7.3.4 of the Evaluation.
90
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0091.png
around mid-2019. Hence, stronger enforcement is currently not a possible option. Any
progress beyond the framework in the System Operation Guideline and the application of
other network codes would depend on the voluntary initiatives of TSOs. However, these
voluntary initiatives would be limited due to constraints deriving from differing national
legal frameworks.
As to demand response, stronger enforcement of existing provisions in the electricity and
energy efficiency directives are unlikely to untap the potential of flexibility. This is because
the existing provisions give Member States a high degree of freedom that has proven not
to be specific enough to ensure a full removal of existing market barriers.
Evidence suggests that voluntary cooperation will not result in progress in this area, as
there has been to date already significant opportunity to effect the necessary changes
voluntarily.
In the case of DSOs the current EU regulatory framework does not provide a clear set of
rules when it comes to additional tools that DSOs can employ to improve their efficiency
in terms of costs and quality of service provided to system users. Moreover, the current
framework does not address the role of DSOs in activities which are expected to have a
key impact in the development of the market (e.g. data management).
Option 1: EU Regulatory action to enhance market flexibility
Electricity production from wind and sun is more variable and less predictable than
electricity production from conventional sources of energy. Due to this, there will be times
when renewables cover a very large share of electricity demand and times when they only
cover a minor share of it. The large scale integration of such variable electricity production
thus requires a more flexible electricity system, one which matches the variable production.
Options to deliver the desired flexibility may comprise:
a. Abolishing (i) those measures that enhance the inflexibility of the current system,
namely priority dispatch for certain technologies (e.g. RES E, CHP, indigenous
fuels) and "must-runs" of conventional generation, (Creating
a level playing field)
and (ii) barriers preventing demand response from participating in the energy and
reserve markets;
b. In addition to the measures under a), better integrating short-term markets,
harmonizing their gate closure times and bringing them closer to real-time, in order
to take advantage of the diversity of generation resources and demand across the
EU and to improve the estimation and signalling of actual flexibility needs
(Strengthening
the short-term markets);
c. In addition to the measures under a) and b),
pulling all flexible distributed
resources
concerning generation, demand and storage,
into the market
via proper
incentives and a market framework better adapted to them, based on active
91
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0092.png
aggregators, roll-out of smart-metering and time-of-use supply tariffs linked to the
wholesale prices.
146
The sub-options described above reflect a different degree of ambition to change the
market, as well as the different views expressed among stakeholders on how strong the
proposed interventions should be. Sub-option 1(a) (level playing field) retains a more
national status of the markets, Sub-option 1(b) (strengthening short-term markets) moves
also to more regionally coordinated markets, while Sub-option 1(c) (demand
response/distributed resources) makes an additional step towards a more decentralised
electricity market and system.
European Parliament:
"…[I]n order to achieve
the climate and energy targets, the
energy system of the future will need more flexibility, which requires investment in all four
flexibility solutions
flexible production, network development, demand flexibility and
storage"[.]
147
European Economic and Social Committee:
"The goal of a low-carbon energy supply,
with a high proportion of adjustable renewable energy sources, can only be achieved in
the short to medium term if all market participants (including new ones) have at their
disposal enough options that afford flexibility, such as sufficient storage capacity, flexible,
consumer-friendly demand options and flexible power generation technologies (e.g.
cogeneration), as well as adequately upgraded and interconnected power distribution
infrastructure. Other conditions are that consumers must receive adequate, timely and
correct information, they must have the chance to develop their own marketing
opportunities and the necessary investments in technology and infrastructure should pay
off. None of this is currently the case"
148
.
Stakeholders' opinions:
In the public consultation on Market Design Initiative most
stakeholders supported full integration of renewable energy sources into the market e.g.
through full balancing obligation and phasing-out priority dispatch. Also, most
146
147
148
IEA "Re-powering
markets"
(2016) suggests:
… “dispatching” demand response as a generator
requires complex market rules. Demand response can only be assessed according to a baseline
consumption levels, which are difficult to define and can lead to hidden subsidies. Setting the right level
of remuneration for aggregators has proven to be complex. Instead, dynamic pricing should be
encouraged, using new measurement and automation technologies such as smart meters.
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, Recital C.
Opinion of the European Economic and Social Committee on the ´Communication
from the Commission
to the European Parliament, the Council, the European Economic and Social Committee and the
Committee of the Regions
Launching the public consultation process on a new energy market
design´(COM
(2015) 340 final) (2016/C 082/03), OJ C 82, 3.3.2016, p. 13-21, § 1.4.
http://eur-lex.europa.eu/legal-
content/EN/TXT/?uri=uriserv:OJ.C_.2016.082.01.0013.01.ENG&toc=OJ:C:2016:082:TOC
92
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0093.png
stakeholders agree with the need to speed up the development of integrated short-term,
balancing and intraday, markets.
5.1.4.1.Sub-option 1(a): Level playing field amongst participants and resources
The first group of measures aims at removing market distortions resulting from manifold
different regulatory rules for generation from different sources. Creating a level playing
field among all generation modes and restoring the economic merit order curve is an
important prerequisite for a well-functioning electricity market with prices that reflect
properly actual demand and supply conditions. For this reason the measures described here
are an integral part of all sub-options under Option 1.
The measures considered under this option would mainly target the removal of existing
market distortions and create a level playing field among technologies and resources. This
could involve abolishing rules that artificially limit or favour the access of certain
technologies to the electricity market (such as so-called "must-run" provisions, rules on
priority dispatch and access and any other rules discriminating between resources
149
).
Industrial consumers would become active in the wholesale markets, both for energy and
reserves, in all Member States. All market participants would become balance responsible,
bearing financial responsibility for the imbalances caused and thus being incentivized to
reduce the risk of such imbalances. Dispatch and redispatch decisions would be based on
using the most efficient resources available, curtailment should be a measure of last resort
which is limited to situations in which no market-based resources are available (including
storage and demand response), and only subject to transparent rules.
Therefore, all resources would be remunerated in the market on equal terms. This would
not mean that all resources earn the same revenues, but that different resources face the
same prices for equal services. In most cases the TSO should follow the merit order,
allowing the market to define the dispatch of available resources, using the inherent
flexibility of resources to the maximum potential (e.g. by significantly reducing must-run
generation, creating incentives for the use of heat storage combined with CHP and the use
of biomass generation in periods of peak demand rather than as baseload, and using
demand response or storage where it is more efficient than generation). Where resources
are used on the basis of merit order (thus on the basis of the marginal cost for using a
particular resource at a given point in time)
150
, supply costs are reduced.
Imposing additional obligations increases the risk and hence the financing costs of some
technologies such as RES E. Part of this risk will be hedged through the more liquid
intraday and balancing markets resulting from the full implementation of the Network
Codes, in combination with the increased participation of resources due to the removal of
must-run and priority dispatch provisions. These obligations should be also accompanied
by measures that reduce their costs of compliance, such as the introduction of transparent
149
150
See in detail Annex 1(1)
1.
Where marginal costs are based on the use of fuel, this can also result in lower CO2 emissions. However,
inflexible conventional plants will include the cost of starting or stopping power generation into their
market bids, thus possibly deciding to operate at a price below their fuel costs. In this case, the cost of
not operating the power plant exceeds the cost of operating it.
93
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0094.png
curtailment rules. Additionally, exemptions from certain regulatory provisions may, in
some cases, be required. This can e.g. be the case for emerging technologies, which,
although they are not yet competitive, need to reach a minimum number of running hours
to gather experience. For certain generators, particularly small RES E (e.g. rooftop solar),
exemptions can be furthermore justified to avoid excessive administrative efforts related
to being active on the wholesale markets.
Stakeholders' opinions:
151
Most stakeholders support the full integration of all
technologies into the market, e.g. through full balancing obligations for all technologies,
phasing-out priority dispatch and removing subsidies during negative price periods.
Also stakeholders from the renewable sector often recognize the need to review the priority
dispatch framework. However, in their view, a phase-out of priority dispatch for renewable
energy sources should only be considered if (i) this is done also for all other forms of power
generation, (ii) liquid intraday markets with gate closure near real-time exist, (iii) balancing
markets allow for a competitive participation of wind producers; (short gate closure time,
separate up/downwards products, etc.), and (iv) curtailment rules and congestion
management are transparent to all market parties.
Cogeneration sector stakeholder seek for a least parity between CHP and RES E.
European Parliament:
"European
Parliament […]stresses that a new market design for
electricity as part of an increasingly decentralised energy system must be based on market
principles, which would stimulate investment, ensure that SMEs have access to the energy
market and unlock a sustainable and efficient electricity supply through a stable,
integrated and smart energy system[...]"
152
"European
Parliament […] [i]nsists that, with the increasing technical maturity and
widespread use of renewable energy sources, subsidy rules must be geared to market
conditions, such as feed-in premiums, in order to keep costs for energy consumers within
reasonable bounds[.]"
153
151
152
153
More detailed depictions of stakeholder's opinions are provided in Sections 7 of each annexe describing
the more detailed measures i.e. annexes 1.1 to 7.6 of the Annexes to the Impact Assessment.
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, §5.
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, §52.
94
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0095.png
"European Parliament […] recalls the existing provisions of the Renewable Energy
Directive, which grant priority access and dispatch for renewables; suggests that these
provisions should be evaluated and revised once a redesigned electricity market has been
implemented which ensures a more level playing field and takes greater account of the
characteristics of renewable energy generation[.]"
154
Council:
"[…] Renewable energy sources should become an integrated part of the
electricity market by ensuring a level playing field for all market participants and enabling
renewable energy producers to be fully involved in the market, including in balancing their
portfolio and reacting to market price signals."
155
European Electricity Regulatory Forum, Florence:
"The Forum stresses that the
renewables framework for the post 2020 period should be based on an enhanced market
design, fit for the full integration of renewables, a strong carbon price signal through a
strengthened ETS, and specific support for renewables, that when and if needed, should
be market based and minimise market distortions. To this end, the Forum encourages the
Commission to develop common rules on support schemes as a part of the revision of the
Renewables Directive that facilitate a market based and more regionalised approach to
renewables."
156
5.1.4.2.Sub-option 1(b): Strengthening short-term markets
Sub-option 1(b) (strengthening short-term markets) includes the measures described under
1(a) (level playing field ) and a set of additional measures, further enhancing the measures
foreseen in the CACM and EB Guidelines (and are assumed as part of the baseline). As
explained above, variable RES E have fundamentally different generation characteristics
compared to traditional fuel based generation (e.g. variability, only short-term
predictability). An important additional step would therefore be to have more liquid and
better integrated short-term markets, going beyond what the implementation of technical
implementing legislation ("Network Codes") will achieve, setting the ground for
renewable energy producers to better access energy wholesale markets and to compete on
an equal footing with conventional energy producers. Short-term markets will also allow
Member States to share their resources across all "time frames" (forward trading, day-
ahead, intraday and balancing), taking advantage of the fact that peaks and weather
conditions across Europe do not occur at the same time.
Also, the closer to real time electricity is traded (supply and demand matched), the less the
need for costly TSO interventions to maintain a stable electricity system. Although TSOs
would have less time to react to deviations and unexpected events and forecast errors, the
liquid, better interconnected balancing markets, together with the regional procurement of
154
155
156
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, §54.
See
Messages from the Presidency on electricity market design and regional cooperation
(2016), Note
to the Permanent Representatives Committee/Council, Annex, paragraph 4.
http://data.consilium.europa.eu/doc/document/ST-8400-2016-INIT/en/pdf
31st EU Electricity Regulatory Forum, 13-14 June 2016, Draft Conclusions, §6.
https://ec.europa.eu/energy/sites/ener/files/documents/Draft%20conclusions%20FINAL14June.pdf
https://ec.europa.eu/energy/sites/ener/files/documents/Draft%20conclusions%20FINAL14June.pdf
95
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0096.png
balancing reserves, would be expected to provide them with adequate and more efficient
resources in order to manage the grid and facilitate RES E integration.
In order to support these actions and mainly in order to be able to optimally exploit
interconnections along all "time frames", a number of measures are assumed to be taken:
gate closure times could be brought closer to real-time to provide maximum opportunity
for the market to balance its positions before it becomes a TSO responsibility and some
harmonisation would be brought to trading products for intraday markets in order to further
incentivize cross-border participation of market parties. The sizing of balancing reserves
and their procurement would be harmonized in larger balancing zones, allowing to reap
benefits of cross-border exchange of reserves and use of the most efficient reserves
available.
At the same time, the integration of national electricity systems, from the market and
operational perspectives, requires the enhancement of cooperation between TSOs. The
creation of a number of regional operational centres ('ROCs'), with an enlarged scope of
functions, an optimised geographical coverage compared to the existing regional security
coordinators and with an enhanced advisory role for all functions, including the possibility
to entrust them decision-making responsibilities for a number of relevant issues, could
contribute to better TSO cooperation at regional level.
157
Measures on enhanced
cooperation between TSOs could be accompanied by an increased level of cooperation
between regulators and governments.
158
All these options would be expected to strongly incentivize participation in the intraday
and balancing markets, further increasing their liquidity, while at the same time minimizing
TSOs' interventions.
Stakeholders' opinions:
Most stakeholders agree with the need to speed up the
development of integrated short-term (intraday and balancing) markets. A significant
number of stakeholders argue that there is a need for legal measures, in addition to the
technical network codes under development, to speed up the development of cross-border
balancing markets. Many stakeholders note that the regulatory framework should enable
RES E to participate in the market, e.g. by adapting gate closure times and aligning product
specifications.
European Parliament:
"European Parliament […][c]alls for the completion of the
integration of internal market and balancing and reserve services by fostering liquidity
and cross-border trading in all market timeframes; urges that efforts to achieve the
ambitious goals of the Target Model regarding intraday and balancing markets be speeded
157
158
For more details concerning policy measures for the establishment of ROCs, refer to Option 1 in Annex
2.3.
For more details concerning policy measures for the enhanced cooperation between regulators and
governments, refer to Option 1 in Annex 3.4.
96
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0097.png
up, starting with the harmonisation of gate closure times and the balancing of energy
products[.]"
159
Council:
"An integrated European electricity market requires well-functioning short term
markets and an increased level of cross-border cooperation with regard to day-ahead,
intraday and balancing markets, without hampering the proper functioning of the
networks, as this will enhance security of supply at lower costs for the system and
consumers"
160
.
European Economic and Social Committee:
"The EESC underlines the particular
importance of intraday trade as a way of ensuring meaningful trade involving
VREs[variable renewable energies]"
161
.
European Electricity Regulatory Forum, Florence:
"The Forum supports the view that
further steps are needed beyond agreement and implementation of the Balancing
Guideline. In particular, further efforts should be made on coordinated sizing and cross--
border sharing of reserve capacity. It invites the Commission to develop proposals as part
of the energy market design initiative, if the impact assessment demonstrates a positive
cost--
benefit, which also ensures the effectiveness of intraday markets"
162
.
"The Forum Acknowledges the significant progress being made on the integration of cross
- border markets in the intraday and day--
ahead timeframes, and considers that market
coupling should be the foundation for such markets. Nevertheless, the Forum recognises
that barriers may continue to exist to the creation of prices that reflect scarcity and invites
the Commission, as part of the energy market design initiative, to identify measures needed
to overcome such barriers"
163
.
"[T]he Forum invites the Commission to identify those aspects of national intraday
markets that would benefit from consistency across the EU, for example on within--
zone
gate closure time and products that should be offered to the market. It also requests for
action to increase transparency in the calculation of cross--
zonal capacity, with a view to
maximising use of existing capacity and avoiding undue limitation and curtailment of
cross--
border capacity for the purposes of solving internal congestions"
164
.
159
160
161
162
163
164
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, § 46.
See
Messages from the Presidency on electricity market design and regional cooperation
(2016), Note
to the Permanent Representatives Committee/Council, Annex, paragraph 6.
http://data.consilium.europa.eu/doc/document/ST-8400-2016-INIT/en/pdf
31st EU Electricity Regulatory Forum, 13-14 June 2016, Draft Conclusions, §3.5.
https://ec.europa.eu/energy/sites/ener/files/documents/Draft%20conclusions%20FINAL14June.pdf
30
th
meeting of the European Electricity Regulatory Forum, Florence, 3-4 March 2015, Conclusions, §3,
https://ec.europa.eu/energy/sites/ener/files/documents/Conclusions%20-
%20Florence%20Forum%20-%20Final.pdf
30
th
meeting of the European Electricity Regulatory Forum, Florence, 3-4 March 2015, Conclusions, §
4,
https://ec.europa.eu/energy/sites/ener/files/documents/Conclusions%20-
%20Florence%20Forum%20-%20Final.pdf
30
th
meeting of the European Electricity Regulatory Forum, Florence, 3-4 March 2015, Conclusions, §
5,
97
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0098.png
"The Forum stresses that, whilst scarcity pricing in short--
term markets is critical to
creating the right signals, the importance of hedging opportunities and forward/future
markets in creating more certainty for investors and alleviating risks for consumers must
not be overlooked. Further, it considers that the Commission must recognise the risks of
State Interventions undermining scarcity pricing signals"
165
.
5.1.4.3.Sub-option 1(c): Pulling demand response and distributed resources into the
market
166
Sub-option 1(c) (demand response/distributed resources) includes the measures described
under 1(a) (level playing field) and 1(b) (strengthening short-term markets), as well as a
set of additional measures, aiming at using the full potential of demand response, storage
and distributed generation. The previous options would introduce a level playing field for
all resources and improve the short-term market framework. They would, however, not
include any measure intending to pull all the additional available potential from distributed
resources into the market. Such resources are most importantly demand response,
distributed RES E and storage.
167
A significant part of the current costs for the electricity system stem from the new
challenges of variable generation for the system, notably the increased need to deal with
supply peaks and unexpected generation gaps. As the elecricity grid requires a constant
balance of demand and supply, grid operators need to take costly measures. Demand
response, distributed RES E and storage can play an important role to reduce these costs.
The measures considered under Option 1(c) bring demand response from all consumer
groups, including residential and commercial consumers
168
, and storage as additional
https://ec.europa.eu/energy/sites/ener/files/documents/Conclusions%20-
%20Florence%20Forum%20-%20Final.pdf
165
30
th
meeting of the European Electricity Regulatory Forum, Florence, 3-4 March 2015, Conclusions, §
6,
https://ec.europa.eu/energy/sites/ener/files/documents/Conclusions%20-
%20Florence%20Forum%20-%20Final.pdf
166
This set of measures could have been introduced alternatively as Sub-Option 1(b), thus before the
improved short-term market functioning related measures, as a further enhancement to the rules creating
a level-playing field for all technologies. However, the benefits from the participation of these additional
resources in the market are enhanced via their participation in the balancing markets and the procurement
of reserves. Introducing this set of measures in the context of improved short-term market functioning
therefore allows the full benefits of them to be realised. See also footnote 294, Section 6.1.7.
167
RSCAS Research report (2015), "Conceptual
framework for the evolution of the operation and regulation
of electricity transmission systems towards a decarbonised and increasingly integrated electricity
system in the EU"
by J.-M.Glachant, J.Vasconcelos, V.Rious, states:
"EU has a target model for the EU
internal market and for the transmission system operation.
It has none for EU “RES pocket markets”
and for the distribution system operation".
168
As big industrial consumers are assumed to already participate directly in the market in Option 1(a)
(level playing field), this sub-option extends the participation of demand response to all consumer groups
(including residential and commercial consumers) who, because of their small individual loads, can enter
the market only through third party service providers, e.g. aggregators. At the same time though the
described measures are expected to significantly increase the DR potential for all categories, including
industrial consumers who do not wish to engage directly in the market and by allowing DSOs to procure
additional flexibility services.
98
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0099.png
resources into the market, especially to the balancing market. This would even further
increase the flexibility of the electricity system and the resources for the TSOs to manage
it. At the same time it should lead to much more efficient operation of the whole energy
system.
This option would include more in particular:
Enabling consumers to directly react to price signals on electricity markets both in terms
of consumption and production, by giving consumers access to a fit-for-purpose smart
metering system, enabling suppliers to measure and settle electricity consumption close to
real time, as well as requiring suppliers to offer consumers electricity supply contracts with
prices linked dynamically to the wholesale spot market that will enable consumers to
directly react to price signals on electricity markets both in terms of consumption and
production.
Box 4: Benefits and risks of dynamic electricity pricing contracts
The preferred policy option is to provide all consumers the possibility to voluntarily choose
to sign up to a dynamic electricity price contract and to participate in demand response
schemes. All consumers will however have the right to keep their traditional electricity
price contract.
Dynamic electricity prices reflect
to varying degrees
marginal generation costs and
thus incentivise consumers to change their consumption in response to price signals. This
reduces peak demand and hence reduces the price of electricity at the wholesale market.
Those price reductions can be passed on to all consumers. At the same time, suppliers can
pass parts of their wholesale price risk on to those consumers who are on dynamic
contracts. Both aspects can explain why, according to the ACER/CEER monitoring report
2015, on average existing dynamic electricity price offers in Europe are 5% cheaper than
the average offer.
While consumers on dynamic price contracts can realise additional benefits from shifting
their consumption to times of low wholesale prices they also risk facing higher bills in case
they are consuming during peak hours. Such a risk is deemed to be acceptable if taking
this risk is the free choice of the consumer and if he is informed accurately about the
potential risks and benefits of dynamic prices before signing up to such a contract.
Aggregators are companies that act as intermediaries between the electricity system and
distinct agents in the electricity system, mainly small, individual resoures but that exist in
large numbers, and which are usually located in the distribution grid (consumers,
prosumers and producers).
169
Developing a comprehensive framework for demand, supply
and storage aggregators would facilitate their participation in the market and thus increase
flexibility in the energy system and complement large generation connected to the
169
EPRG working paper 1616 (2016),
"Which Smart Electricity Services Contracts Will Consumers
Accept?"
by L-L.Richter and M.G.Pollit states:
"By combining appropriate participation payments with
sharing of bill savings, service providers could attract the number of customers required to provide the
optimal level of demand response."
99
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0100.png
transmission grid.
170
Larger storage facilities can be connected at distribution or
transmission level, and provide services on a peer basis with other providers.
R&D results:
The economic and technical viability of the concept of aggregation has already been
demonstrated in European projects like: Integral, IDE4L, Grid4eu, INTrEPID, INCREASE, DREAM. The
ability of small-scale RES to participate in the balancing market or contribute to solving grid congestion has
been demonstrated in European projects like: V-Sync and MetaPV.
In order to pull all available resources into the market, it is also important to enable and
incentivise DSOs, without compromising their neutrality as system operators, to manage
their networks in a flexible and cost-efficient way, This could be achieved by establishing
a performance-based remuneration framework for DSOs that would reward them for
innovating and improving overall efficiency of their networks through synergies with other
actors, making full use of energy storage, and/or investing in electronic communication
infrastructure. This would be enabled by the deployment of intelligent infrastructure and
by ensuring coherence with other Commission policies in the field of the Digital Single
Market and the General Data Protection Regulation
171
.
Measures under this option would also include defining the conditions under which DSOs
may acquire flexibility services without distorting the markets for such services, and
putting in place distribution tariff structures that send accurate price signals to all grid
users. Such initiative would be aimed at facilitating the integration of the increasing
amounts of variable RES E generation that will be connected directly to distribution grids
in the future.
Stakeholders' opinions:
Many stakeholders identified a lack of smart metering systems
offering the full functionalities to consumers and dynamic electricity pricing (more flexible
consumer prices, reflecting the actual supply and demand of electricity) as one of the main
obstacles to kick-starting
demand side response,
along with the distortion of retail prices
by taxes/levies and price regulation.
Other factors include market rules that discriminate against consumers or aggregators who
want to offer demand response, network tariff structures that are not adapted to demand
response and the slow roll-out of smart metering. Some stakeholders underline that demand
response should be purely market driven, where the potential is greater for industrial
customers than for residential customers. Many replies point at specific regulatory barriers
to demand response, primarily with regards to the lack of a standardised and harmonised
framework for demand reponse (e.g. operation and settlement). A number of respondents
also underline the need to support the development of aggregators by removing obstacles
for their activity to allow full market participation of renewables. Many submissions
170
171
CIGRE paper C5-304 (2016), B. Guédou and A. Rigard-Cerison, RTE France says:
"One
can learn,
from French experience, that building an appropriate market for DSR requires to benefit from a strong
political commitment (intense involvement from the administration, the regulatory authorities and the
TSO) and to solve some key issues, requiring innovative answers both on the regulatory side and the
technical side (e.g. role of aggregators / independent DR operators, adaptation of the regulatory
framework to enable competition, role of TSOs and DSOs, data collection and privacy…)".
This would entail also close cooperation with TSOs, as elaborated for example in CIGRE paper C2-111:
"Increased
cooperation between TSO and DSOs as precondition for further developments in ancillary
services due to increased distributed (renewable) generation",
M.Kranhold, 50Hertz Transmission
GmbH (2016)
100
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0101.png
highlight the crucial role of scarcity pricing for kick-starting demand response at industrial
and household level.
Regarding the role of DSOs, the respondents consider active system operation, neutral
market facilitation and data hub management as possible functions for DSOs. Some
stakeholders point at a potential conflict of interests for DSOs who are able to actively
menage their networks where these DSOs are also active in the supply business,
emphasizing that the neutrality of DSOs should be ensured. A large number of the
stakeholders stressed the importance of data protection and privacy, and consumer's
ownership of data. Furthermore, a high number of respondents stressed the need of specific
rules regarding access to data. As concerns a European approach on distribution tariffs, the
views are mixed; the usefulness of some general principles is acknowledged by many
stakeholders, while others stress that the concrete design should generally considered to be
subject to national regulation.
European Parliament:
"European Parliament […] considers that this framework should
promote and reward flexible storage solutions, demand-side response technologies,
flexible generation, increased interconnections and further market integration, which will
help to promote a growing share of renewable energy sources and integrate them into the
market[.]"
172
"European Parliament[…] recalls that the transition to scarcity pricing implies improved
mobilisation of demand response and storage, along with effective market monitoring and
controls to address the risk of market power abuse, in particular to protect consumers;
believes that consumer engagement is one of the most important objectives in the pursuit
of energy efficiency, and that whether prices that reflect the actual scarcity of supply in
fact lead to adequate investment in electricity production capacity should be evaluated on
a regular basis[.]"
173
"European parliament […][c]onsiders that energy storage has numerous benefits, not
least enabling demand-side response, assisting in balancing the grid and providing a
means to store excess renewable power generation; calls for the revision of the existing
regulatory framework to promote the deployment of energy storage systems and other
flexibility options, which allow a larger share of intermittent renewable energy sources
(RES), whether centralised or distributed, with lower marginal costs to be fed into the
energy system; stresses the need to establish a separate asset category for electricity or
energy storage systems in the existing regulatory framework, given the dual nature
generation and demand
of energy storage systems[.]"
174
Council:
"The future electricity retail markets should ensure access to new market players
(such as
aggregators and ESCO’s) on an equal footing and facilitate introduction of
innovative technologies, products and services in order to stimulate competition and
growth. It is important to promote further reduction of energy consumption in the EU and
172
173
174
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, § 5.
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, § 10.
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, § 28.
101
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0102.png
inform and empower consumers, households as well as industries, as regards possibilities
to participate actively in the energy market and respond to price signals, control their
energy consumption and participate in cost-effective demand response solutions. In this
regard, cost efficient installation of smart meters and relevant data systems are essential.
Barriers that hamper the delivery of demand response services should be removed"
175
.
European Electricity Regulatory Forum, Florence:
"The Forum recognises that the
development of a holistic EU framework is key to unlocking the potential of demand
Response and to enabling it to provide flexibility to the system. It notes the large
convergence of views among stakeholders on how to approach the regulation of demand
response, including: the need to engage consumers; the need to remove existing barriers
to market access, including to third--
party aggregators; the need to make available
dynamic market--
based pricing; the importance of both implicit and explicit demand
response; and the cost--
efficient installation of the required technology"
176
.
Option 2: Fully Integrated EU market
This option considers measures that would aim to deliver a single truly pan-European
electricity market via relatively far-reaching changes to the current regulatory framework,
aiming at the full integration of electricity markets and system operation, and at mobilising
all available flexibility of the EU-wide system.
For a fully integrated EU market, one would need to significantly change the current
regulatory approach of the internal market. The current EU wholesale market design of the
Third Package provides for a coordination framework between grid operators and national
regulators and sets some rules for certain issues which are relevant for cross-border
exchange of electricity (e.g. coordinated electricity trading and grid operation measures).
However, under the Third Package, regulatory decisions are in principle left to Member
States, the 28 national regulators and the 42 European grid operators if not otherwise
provided in the Third Package.
Leaving scope for national decision-making on trading and system operation may lead to
inefficiencies due to unsufficiently coordinated and contradicting decisions. A more
centralised regulatory approach could therefore be considered to achieve more integrated
EU markets.
Under this option, procurement of balancing reserves would be performed directly at EU
level, instead of a regional level. For system operation, this could mean shifting from a
system of separate national TSOs to an integrated system managed by a single European
Independent System Operator ("EU
ISO").
System operation (including real time
175
176
See
Messages from the Presidency on electricity market design and regional cooperation
(2016), Note
to the Permanent Representatives Committee/Council, Annex, paragraph 8.
http://data.consilium.europa.eu/doc/document/ST-8400-2016-INIT/en/pdf
31st EU Electricity Regulatory Forum, 13-14 June 2016, Draft Conclusions, §1.
https://ec.europa.eu/energy/sites/ener/files/documents/Draft%20conclusions%20FINAL14June.pdf
102
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0103.png
operation) and planning functions could be performed by this EU ISO, which would be
competent for the whole Union.
177
In order to optimally deal with congestion between countries and to let the market transmit
the right price signals, this option would entail to move from zonal to nodal pricing
178
. The
values of available transmission capacities would be calculated centrally and could be
closely coordinated across market regions, thereby taking advantage of all information
available among the TSOs in different grid arreas and also taking into account the
interrelationship between different interconnectors. As a result, it is assumed that more
interconnector capacity is made available to the market(s) and resources are expected to
be utilized more efficiently across regions.
In general, Option 2 would not only entail coordination, approximation and harmonisation
of selected topics relevant for national market and grid operation rules, but also to apply
the same rules and specifications for products and services across the EU, including
centrally fixed rules for electricity trading, for common EU-wide procurement of reserves
and central system planning and operation. Such centralised integrated market would also
provide for mandatory smart meter roll-out and a full EU framework for incentive-based
demand response to better exploited demand reponse. Under Option 2, also distribution
tariff structures would be harmonised, stronger unbundling rules for DSOs be created as
well as harmonised renumeration methodologies that ensure DSOs' incentives to invest in
innovative and efficient technologies.
ACER would need to gain significant competences and take over most NRAs'
responsibilities directly or indirectly related to cross-border and EU-level issues. ENTSO-
E would need to be formally separated from its members' interest and take up more
competences.
179
Such measures, intended to optimise the cost-efficiency and flexibility of the European
electricity system, would involve going significantly beyond the measures described under
Option 1, requiring also particularly far-reaching institutional changes.
Stakeholders' opinions:
No stakeholder expressed support for the possibility of designing
measures leading to the creation of a fully integrated EU electricity market. For example,
as regards the establishment of an EU Independent System Operator, a number of
stakeholders emphasized that while it is necessary to reinforce TSO coordination, this
should take place through a step-wise regional integration of system operation
177
178
179
For more details on policy option concerning the establishment of an EU ISO, please refer to Option 3
in annex 2.3.
Nodal Pricing is a method of determining prices in which market clearing prices are calculated for a
number of locations on the transmission grid called nodes. Each node represents the physical location
on the transmission system where energy is injected by generators or withdrawn by loads. The price at
each node represents the locational value of energy, which includes the cost of the energy and the cost
of delivering it, i.e. losses and congestion
For more details on ACER's and ENTSO-E's enhanced competences in a fully integrated EU market,
refer to Option 2 in Annex 3.4.
103
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0104.png
For Option 1 and 2: Institutional framework as an enabler
Each set of proposed measures under Options 1(a) to 1(c), as well as (2), will necessitate
a different degree of reinforcement of the institutional framework of the EU's electricity
markets. Since the harmonisation of regulatory aspects (e.g. gate closure times, rules for
the curtailment of cross-border capacities, bidding zones etc.) often has different economic
impacts in different Member States, an institutional framework is needed to find the
necessary compromises. Experience has shown that it will generally be more difficult to
achieve ambitious harmonisation goals with an institutional framework that grants veto
rights to each national regulator or TSO (i.e. in cooperative institutions applying
unanimous decision-making). An alignment or harmonisation of aspects concerning the
electricity market design is therefore more likely to happen with an institutional framework
which applies (qualified) majority decision-making or which replaces the decision-making
by 28 different regulators/TSOs by a central body which takes the decision in the European
interest
180
.
A robust institutional framework constitutes a pre-requisite for the integration and proper
functioning of the EU market. For this reason, it is necessary that the institutional
framework reflects the realities of the electricity system and the resulting need for regional
cooperation as well as that it addresses existing and anticipated regulatory gaps in the
energy market.
In order to effectively establish a level playing field between all potential market
participants and resources (Sub-option 1(a) (level playing field)), it is necessary to
reinforce ACER's competences at EU level in order to address regulatory gaps already
identified in the implementation of the Third Package and ensure the oversight over
entities and functions with relevance at EU level.
When markets and market regulation achieve a regional dimension (Sub-option
1(b)(strenghening short-term markets)), the institutional framework needs to be adapted
accordingly, if it is to remain efficient and effective. Currently, the EU institutional
framework is based on the complementarity of regulation at national and EU law. Hence,
the regulatory framework would then need to be reinforced to address the need for
additional regional cooperation. In this regard, ACER's competences and NRAs'
cooperation at regional level should be enhanced, corresponding to increased regional
TSO cooperation and to the implementation of network codes and guidelines at regional
level. The mandate of ENTSO-E could be clarified to strengthen its obligation to take a
European / internal market perspective and to emphasize its transparency and monitoring
obligations. The role of power exchanges in cross-border electricity issues should be
acknowledged and they should be involved in all regulatory procedures relevant for them.
Finally the use of congestion income should be altered, increasing the proportion spent on
investments that maintain or increase interconnection, thus creating the basis for the
regional co-operation through a strongly interconnected system
181
.
180
181
The transfer of decisions on cross-border cost allocation to the Director of ACER is one example of
decision-making by an independent supranational body. See Article 12(6) of Regulation 347/2013
(TEN-E Regulation).
As is in fact discussed under Option 1 of Problem Area II
104
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0105.png
In order to facilitate distributed resources to participate in the market (Sub-option 1(c)
demand response/distributed resources), DSOs must become more active at European level
and have increased responsibilities and tasks, similar to those of the TSOs. Their role
should be formalised into a European organisation with an efficient working structure to
render their participation effective and independent. In particular, whereas DSOs are
currently represented at EU level by four associations (Eurelectric, Geode, CEDEC and
EDSO), none of these has the necessary characteristics to represent the sector by engaging
in tasks that might include the codification of formal EU market rules: Either they or their
members are listed as lobbyists on the EU Transparency Register, none of their
memberships is representative of all EU DSOs, and none has the explicit mandate to
represent EU DSOs in such activities.
Finally, Option 2 requires significantly restructuring the institutional framework, going
beyond addressing the regulatory gaps and moving towards more centralised institutional
structures with additional power and responsibilities, particularly for ACER and ENTSO-
E.
Stakeholders' opinions:
Opinions with regard to strengthening ACER’s
powers are
divided. There is clear support for increasing ACER's legal powers by many stakeholders.
However, the option to keep the
status quo
is also visibly present, notably in the
submissions from Member States and national energy regulators. While some stakeholders
mentioned a need for making ACER'S decisions more independent from national interests,
others highlighted rather the need for appropriate financial and human resources for ACER
to fulfil its tasks.
With regard to ENTSO-E, stakeholders' positions are divided as to whether ENTSO-E
needs strengthening remain divided. Some stakeholders mention a possible conflict of
interest in ENTSO-E’s
role –
being at the same time an association called to represent the
public interest, involved e.g. in network code drafting, and a lobby organisation with own
commercial interests
and ask for measures to address this conflict. Some stakeholders
have suggested in this context that the process for developing network codes should be
revisited in order to provide a greater a balance of in interests.
Some submissions advocate for including DSOs and stakeholders in the network code
drafting process. While a majority of stakeholders support governance and regulatory
oversight of
power exchanges,
particularly as regards the market coupling operator
function, other stakeholders are sceptical whether additional rules are needed for power
exchanges given the existing rules in legislation on market coupling (in the CACM
Guideline).
European Parliament:
"European Parliament […][n]otes the importance of effective,
impartial and ongoing market monitoring of European energy markets as a key tool to
ensure a true internal energy market characterised by free competition, proper price
signals and supply security; underlines the importance of ACER in this connection, and
105
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0106.png
looks forward to the Commission’s position on new and strengthened powers for ACER on
cross-border issues[.]"
182
"European Parliament […][s]tresses that in most cases renewables are fed in at
distribution system level, close to the level of consumption, and therefore calls for DSOs
to play a greater role as facilitators and to be more closely involved in the design of
European regulatory framework and in the relevant bodies when it comes to drawing up
guidelines on issues of concern to them, such as demand-side management, flexibility and
storage, and for closer cooperation between DSOs and TSOs at the European level[.]"
183
Summary of specific measures comprising each Option
The following table summarizes the specific measures comprising each package of
measures, as well the corresponding specific measure option considered under each high
level option
184
. The detailed presentation and assessment of each measure can be found in
the indicated Annex.
182
183
184
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, § 70.
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, § 63.
The preferred options for the specific measures set out in the annex are highlighted in the table in green.
106
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
Table 6: Summary of Specific Measures investigated for Problem Area I
107
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0108.png
Specific Measures
Option 0
Option 1(a)
Option 1(b)
Option 1(c)
Option 2
Baseline
Priority Access and
Dispatch
(Annex 1.1)
+ Balancing
Responsibility
(Annex 1.2)
+ RES providing non-
frequency ancillary
services
(Annex 1.3)
+ Reserves Sizing and
Procurement
(Annex 2.1)
+ Remove distortions
for liquid short-term
markets
(Annex 2.2)
+ TSO Co-operation
(Annex 2.3)
+ Demand Response
(Annex 3.1)
Maintain priority dispatch
for RES, indigenous fuels
and CHP
(Annex 1.1.4 Option 0)
Financial balancing
responsibility under EEAG
(Annex 1.2.4 Option 0)
Services continue to be
Principles for transparent, non-discriminatory market-based framework for
provided by large
the provision of these services
conventional generation
(Annex 1.3.4 Option 2)
(Annex 1.3.4 Option 0)
National sizing of balancing reserves, frequency of
Regional sizing and procurement of balancing
procurement as today (e.g. many products, not
reserves, daily procurement of upward/downward
necessarily separete upwards/downwards
products
products)
(Annex 2.1.4 Option 2)
(Annex 2.1.4 Option 0)
Selected harmonisation of national intraday markets
National non-harmonised intraday markets
of gate closure times and products, with gradual
implementation
(Annex 2.2.4 Option 0)
(Annex 2.2.4 Option 2)
Upgrade RSCs to Regional Operational Centres
Regional Security Coordinators (RSCs) to perform
(ROCs) centralising additional functions over
five tasks at regional level for national TSOs
relevant geographical areas
(Annex 2.3.4 Option 0)
(Annex 2.3.4 Option 0)
Give consumers access to
enabling technologies that will
Smart meter rollout remains limited in geographical scope and
expose them to market price
functionalities, market barriers to aggregators persist, and the full
signals and a common European
potential of demand response and self-consumption remains untapped
framework defining roles and
(Annex 3.1.4 Option 0)
responsibilities of aggregators
(Annex 3.1.4 Option 2)
Option (a) +
Option 1(a), 1(b) +
Level playing
Strengthening
Demand response/distributed
field
short-term
resources
markets
Abolish priority dispatch and introduce clear curtailment rules to replace
priority access, with the exception of emerging technologies and small
CHP and RES E plants
(Annex 1.1.4 Options 2 and 3)
Balancing responsibility for all parties, with the exception of emerging
technologies and small CHP and RES E plants
( Annex 1.2.4 Option 2)
Fully integrated markets
Fully abolish priority dispatch and
access
(Annex 1.1.4 Option 1)
Full balancing responsibilities for all
parties
(Annex 1.2.4 Option 1)
EU market framework for such services
(Annex 1.3.4 Option 1)
European sizing and procurement of
balancing reserves, daily procurement of
upward/downward products
(Annex 2.1.4 Option 3)
Full harmonisation and coupling of
intraday markets
(Annex 2.2.4 Option 1)
Creation of Regional or EU Independent
System Operators
(Annex 2.3.4 Options 2 and 3)
Mandatory smart meter roll out and full
EU framework for incentive based
demand response
(Annex 3.1.4 Option 3)
108
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0109.png
Specific Measures
Option 0
Option 1(a)
Option 1(b)
Option (a) +
Strengthening
short-term
markets
Option 1(c)
Option 1(a), 1(b) +
Demand response/distributed
resources
Specific requirements and
conditions for 'active' DSOs;
Clarification of DSO's role in
specific tasks; Enhanced DSO-
TSO cooperation (Annex 3.2.4
Option 1)
EU-wide principles on
remuneration schemes; NRAs
monitor the performance of
DSOs (Annex 3.3.4 Option 1)
EU wide principles to make
tariffs structures become more
transparent and more accurately
reflect the impact of each
system user on the grid,
especially during different times
of the day; NRAs to implement
more detailed requirements
(Annex 3.3.4 Option 1)
Option 2
Baseline
Level playing
field
Fully integrated markets
+ Ensuring that DSOs
become active and
remain neutral towards
other market actors
(Annex 3.2)
+ A performance-based
remuneration
framework for DSOs
(Annex 3.3)
Broad variety of national approaches to DSO roles and responsibilities
(Annex 3.2.4 Option 0)
EU framework for a specific set of DSO
tasks and stricter unbundling rules
(Annex 3.2.4 Option 2)
Broad variety of national approaches to DSO compensation
(Annex 3.3.4 Option 0)
Fully harmonize remuneration
methodologies (Annex 3.3.4 Option 2)
+ Distribution tariffs
that send accurate price
signals to grid users
(Annex 3.3)
Broad variety of national approaches to distribution tariffs
(Annex 3.3.4 Option 0)
Fully harmonize distribution tariff
structures through concrete requirements
(Annex 3.3.4 Option 2)
+ Adapting Institutional
Framework to reality of
integrated markets
(Annex 3.4 institutional
framework)
Retain Status Quo (no
change)
(Annex 3.4.4 Option 0)
Adapt institutional framework to the new realities of the electricity system
and the resulting need for additional regional cooperation and to address
regulatory gaps (relevant to each respective policy sub-option)
(Annex 3.4.4 Option 1)
Restructure the EU Institutional
Framework providing for more
centralised institutional structures
(Annex 3.4.4 Option 2)
109
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0110.png
5.2.
Options to address Problem Area II (Uncertainty about sufficient future
generation investments and uncoordinated capacity markets)
Overview of the policy options
A number of Member States anticipate inadequate generation capacity in future years and
plan to introduce or have already introduced unilateraly, unaligned capacity mechanisms.
Capacity mechanisms remunerate the guaranteed availability of electricity resources (e.g.
generation or demand response) rather than paying for electricity actually delivered. The
current regulatory market design does provide for rules on capacity mechanisms
185
. While
it does not prohibit nor encourage capacity mechanisms, the Third Package is, in principle,
built on the concept of an "energy-only" market, in which generators are remunerated
mainly based on the energy delivered
186
. Undistorted cross-border markets should provide
for the necessary investment signals to ensure stable generation at all times. Price signals
should drive production and investment decisions, whereas price differentials between
different bidding zones should determine where facilities should ideally be located,
provided that all assets are treated equally in terms of the risks and costs to which they are
exposed and the opportunities for earning revenues from producing electricity i.e. they
operate within a level playing field.
Several Options will be considered to address the concerns regarding investment certainty
and fragmented approaches to CMs:
Box 5: Overview of the Policy Options for Problem Area II
Each policy option consists of a package of measures which act upon the drivers of the
problem. Some of the options differ according to whether generators can only rely on
energy market payments or whether they receive additional remuneration from CMs.
Option 1 (Improved energy-only markets) would be based on additional measures to
further strengthen the internal electricity market (complementing the measures described
above in options 1(a) (level playing field), 1(b) (strengthening short-term markets) and (c)
185
186
Capacity markets are only indirectly addressed, e.g. through the obligation for Member States under the
Third Package to maximise cross-border capacities (see e.g. Art. 16 (3) of Regulation 714/2009) and to
avoid unnecessary limitations of cross-border flows, e.g. through State Interventions.
It may be noted that generators can receive additional revenues from providing frequency reserves,
which could be described as a form of (short-term) capacity markets.
110
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0111.png
(demand response/distributed resources) presented in Problem Area I). Under this option,
CMs would no longer be allowed. Option 2 and 3 would also include the proposed
measures to strengthen the internal energy market as presented in Option 1, but also
propose possible measures to better align national CMs. The possibility to set up a
mandatory EU-wide CM is described in Option 4.
The following sub-sections describe the policy options and the packages of measures they
comprise. It then explains which options can be discarded at this stage, prior to assessment,
as well as present other options that were considered but were discarded from the
beginning. A table summarising all specific measures for each option is provided at the
end of this section.
The relevant Annexes addressing the policy options below are: 4.1 to 5.2.
Option 0: Baseline Scenario
Current Market Arrangements
Under the baseline scenario, price formation on electricity wholesale markets is
constrained, e.g. through price caps. Prices may not be able to reach levels which truly
reflect the value of energy when the demand and supply balance is tight and, hence,
electricity is scarce. Therefore price signals from wholesale markets would, in times of
scarcity, be distorted and revenue streams of generators cannot properly reflect their value
to the system. This affects, in particular, the remuneration of assets that can provide
flexibility to the electricity system, regardless to whether this concerns flexible generation
capacity, electricity storage or demand response.
At this stage most electricity markets in Europe face generation overcapacities. In this
situation, price caps do in practice not matter
scarcity prices cannot be expected anyway.
However, once old capacities will have exited the market and the power mix has adjusted
(see in this regard the analyses presented in section 6.2.6.3), true price formation would be
essential to produce signals for new investments. This could not happen as long as price
caps exist.
Price signals are also not aligned with structural congestion in the transmission grid, thus
not revealing the locations where investments would relieve congestion and production
decisions. TSOs then can only operate sub-optimally the existing network and need to take
frequent congestion management measures. Although the CACM Guideline provides a
process for reviewing price or bidding zones, the current process lends itself to maintaining
the
status quo
(mostly price zones along Member State borders), making this the most
plausible assumption for the baseline. This is because there are likely to be competing
interests at stake. In particular, some Member States are unlikely to want to amend bidding
zones where it would create price differentials within their borders; it is sometimes
considered to be right for all consumers to pay the same price within a Member State, and
for all producers to receive the same price. The current legislation does not, therefore,
provide for the socially optimal solution to be agreed.
187
Based on perceived or real resource adequacy concerns, several Member States take
actions concerning the introduction of national resource adequacy measures or the
187
For more details concerning the deficiencies of current legislation concerning bidding zone
configuration, see Sections 4.2.2 and 4.2.3 of Annex 4.2 to this Impact Assessment.
111
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0112.png
imposition of regulatory barriers to decommissioning. These measures are usually based
on national resource adequacy assessments and projections, which may substantially differ
depending on the underlying assumptions made and the extent to which foreign capacities
as well as demand side flexibility are taken into account in calculations. Some of these
concerns and projections are a result of the current market arrangements.
The Commission's current tool to assess whether government interventions in support of
resource adequacy are legitimate is state aid scrutiny. The EEAG require among others a
proof that the measure is necessary, technological neutral and allows for explicit cross-
border participation. However, the EEAG do not clarify how an effective cross-border CM
regime could be deployed.
The baseline is common with the one presented in 5.1.2, with only two differences: (a)
presence of price caps based on current practices and (b) existence of structural congestion
in the transmission grid.
Stakeholders' opinions:
None of the respondents to the public consultation took the view
that the current market arrangements were sufficient and no further measures are required.
Option 0+: Non-regulatory approach
Whilst systematically considered
188
, no such policy option could be identified.
This option would entail relying on existing legislation to improve the current market
arrangements. The likelihood of seeing any meaningful change as a result of this process
is minimal. Existing provisions under EU legislation are arguably not sufficiently clear and
robust. In this regard, the Evaluation report indicates that the rules of the Third Energy
Package appear to be insufficient to cope with the challenges facing the European
electricity system.
189
In addition, certain areas, like resource adequacy, are not addressed
in the Third Package. Consequently, the Evaluation report concludes that the Third
Package does not not ensure sufficient incentives for private investments in the new
generation capacities and network because of the minor attention in it to effective short-
term markets and prices which would reflect actual scarcity.
190
Voluntary cooperation has resulted in significant developments and a lot of benefits (e.g.,
the PLEF, whereby some Member States have voluntarily decided to cooperate and deliver
a regional resource adequacy assessment). However it may not provide for appropriate
levels of harmonisation across all Member States and certainty to the market and
legislation is needed in this area to address the issues in a consistent way.
Option 1: Improved energy market - no CMs
Option 1 assumes that European electricity markets, if sufficiently interconnected and
undistorted, can provide for the necessary price signals to incentivise investments into new
generation. Wholesale markets would be strengthened by a set of specific measures aiming
at improving price signals so as to deliver the necessary investments based only on price
188
189
190
For each measure the opportunities for stronger enforcement has been assessed in the annexes.
See Section 7.3.1 and 7.3.3 of the Evaluation.
See Sections 7.3.2 of the Evaluation.
112
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0113.png
signals. CMs, whether at national, regional or European level would not be justifiable to
secure electricity supplies under this option as the market should be incentivising
investments.
Even if such price signals concern the spot price on the wholesale market corresponding
to the day-ahead market, these prices are the reference for the forward market and would
thus have a long-term effect. Having as a starting point the reformed market design as
described in section 5.1.4.3
191
, it is additionaly assumed that no administrative mechanisms
directly affecting investments and price signals are allowed to be in place, in the form of
CMs or (below Value of Lost Load
192
or 'VoLL') price caps. In the case of the latter this
would be effected by ensuring that any technical limits imposed by power exchanges are
merely that, and are raised in the event they are reached, and, in order to provide maximum
investor confidence, an end-date, after which such limits must not be below VoLL.
The strengthened short and long-term markets and the participation of distributed
generation offer the necessary flexibility required to integrate variable RES E into the
market. Combined with the removal of (below VoLL) price caps,
193
the market should be
able to drive investments towards the needed flexible assets, such as storage and demand
response, and sufficient generating capacity. Furthermore, proper incentives are introduced
aiming to unlock the flexibility that can be provided by existing assets, such as demand
response and storage.
At the same time price signals could drive the geographical location of new investments
and production decisions, via price zones aligned with structural congestion in the
transmission grid. The location of the price zone borders would be decided through a robust
regulatory decision-making process. Price differentials between these price zones should
help determine where investments are needed and make the best use of natural resources
(particularly important for RES E, but also for interconnectors) and, for those assets
already deployed, which one will be producing. Such locational prices would also provide
efficient signals for the location of demand
for example new energy intensive industries
would choose to locate in areas where there is excess generation and therefore low
prices.
194
Measures would also be taken to further restrict the practice of limiting cross-
border capacity in order to deal with internal network contraints and, finally, measures
would be taken to minimise, in the long-term, the most significant investment and
operational distortions on generators arising as a result of network charges.
195
Stakeholder's opinions:
A majority of answering stakeholders is in favour an "energy-
only" market (possibly augmented however with a strategic reserve, which is a form of a
capacity market). Many stakeholders share the view that properly designed energy markets
would make capacity mechanisms gradually redundant. Many generators and some
191
192
193
194
195
Sub-option 1(c) (demand response/distributed resources) from problem area I was used as the basis here,
as it was identified as the preferred option when comparing the respective options in Section 7.1.
Value of Lost Load is a projected value reflecting the maximum price consumers are willing to pay to
be supplied with electricity
For more detail on policy measures related to the removal of price caps, refer to Annex 4.1.
For more detail on policy measures related to the improvement of locational signals, refer to Annex 4.2.
For more detail, refer to Annexes 4.3 and 4.4.
113
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0114.png
governments disagree and are in favour of capacity remuneration mechanisms (assessed in
Options
2, 3 and 4).
A
large majority of stakeholders agreed that scarcity pricing is an important element in the
future market design. While single answers point at risks of more volatile pricing and price
peaks (e.g. political acceptance, abuse of market power), others stress that those respective
risks can be avoided (e.g. by hedging against volatility).
A large number of stakeholders agreed that scarcity pricing should not only relate to time,
but also to locational differences in scarcity (e.g. by meaningful price zones or locational
transmission pricing). While some stakeholders criticised the current price zone practice
for not reflecting actual scarcity and congestions within bidding zones, leading to missing
investment signals for generation, new grid connections and to limitations of cross-border
flows, others recalled the complexity of prices zone changes and argued that large price
zones would increase liquidity.
Many submissions highlight the crucial role of scarcity pricing for kick-starting demand
response at industrial and household level.
European Parliament:"…[N]ational
capacity markets make it harder to integrate
electricity markets and run contrary to the objectives of the common energy policy, and
should only be used as a last resort once all other options have been considered, including
increased interconnection with neighbouring countries, demand-side response measures
and other forms of regional market integration[.]"
196
"European Parliament […] [i]s
sceptical of purely national and non-market-based capacity mechanisms and markets,
which are incompatible with the principles of an internal energy market and which lead to
market distortions, indirect subsidies for mature technologies and high costs for
end-consumers; stresses, therefore, that any capacity mechanism in the EU must be
designed from the perspective of cross-border cooperation following the completion of
thorough studies on its necessity, and must comply with EU rules on competition and State
aid; believes that better integration of national energy production into the EU energy
system and the reinforcement of interconnections could reduce the need for, and cost of,
capacity mechanisms[.]"
197
Option 2: Improved energy market
CMs only when needed, based on a common
EU-wide adequacy assessment)
198
This Option includes the measures to strenghten the internal energy market (as described
in Option 1 above), i.e. every Member State is assumed to have in place a well-functioning
energy market.
196
197
198
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, Recital H.
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, § 24.
Further elements of this option are presented in Annex 5.1.
114
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0115.png
In addition to Option 1 however, Member States would be allowed to implement national
CMs, but only under certain conditions. Additional measures are proposed in order to avoid
negative consequences of uncoordinated CMs for the functioning of the internal market,
building on the EEAG' state aid Guidelines and the Sector Inquiry on CMs.
To address the problem of diverging and purely national assessments of the needs for CMs,
ENTSO-E would be required under this option to propose a methodology for an EU-wide
resource adequacy assessment. The upgraded methodology should be based on transparent
and common assumptions
199
and ENTSO-E would carry out the assessment anually. The
prerequisite for a Member State to implement a CM or prohibit capacity from exiting the
market would be that ENTSO-E's assessment indicated a lack of generation capacity and
where markets cannot be expected to close the gap. This would avoid that back-up
capacities are developed based on a purely national perspective (i.e. national adequacy
assessments, using different methodologies and not taking into account the generation
potential across borders).
When proposing or applying CMs, Member States would need to introduce resource
adequacy targets, which can be diverging (as an expression of their diverging preference
for resource adequacy). The standards should be expressed in a unique format to become
comparable across the EU
as Expected Energy Non Served ('EENS'), and it should be
derived following a methodology provided by ENTSO-E which takes into account the
value that average customers in each bidding zone put on electricity supplies (Value of
Lost Load
'VoLL').
Stakeholders' opinions:
There is almost a consensus amongst stakeholders on the need
for a more aligned method for resource adequacy assessment. A majority of answering
stakeholders supports the idea that any legitimate claim to introduce CMs should be based
on a common methodology. When it comes to the geographical scope of the harmonized
assessment, a vast majority stakeholders call for regional or EU-wide resource adequacy
assessment, while only a minority favour a national approach. There is also support for the
idea to align adequacy standards across Member States.
European Parliament:
"[…]stresses the importance of a common analysis of resource
adequacy at regional level, facilitated by the Agency for the Cooperation of Energy
Regulators (ACER) and the European Network of Transmission System Operators
(ENTSO-E), and calls for the transmission system operators (TSOs) of neighbouring
199
The ENTSO-E assessment should have the following characteristics:
i. It should cover all Member States
ii. It should have a granularity of Member State/ bidding zone level to enable the analysis of national/
local adequacy concerns;
iii. It should apply probabilistic calculations that consider dynamic characteristics of system elements
(e.g. start-up and shut-down times, ramp up and ramp-down
rates…)
iv. It should calculate generation adequacy indicators for all countries (LOLE, EENS, etc.)
v. It should appropriately take into account foreign generation, interconnection capacity, RES , storage
and demand response
vii. Time span of 5-10 years
115
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0116.png
markets to devise a common methodology, approved by the Commission, to that end;
highlights the enormous potential of strengthened regional cooperation[…]"
200
Council:
"Member States considering implementing capacity mechanism should take into
account synergies of cross-border regional cooperation and avoid any disincentive for
investment in interconnection, while minimising market distortion"
201
.
Option 3: Improved energy market - CMs only when needed, based on a common
EU-wide adequacy assessment, plus cross-border participation
202
Option 3 includes the measures to strenghten the internal energy market as described in
Option 1 above. It also includes the requirement for national CMs to be justified by a
European adequacy assessment (see Option 2). In addition, Option 3 would however
provide for design rules for better compatibility between national CMs, also building on
the EEAG state aid guidelines and the Sector Inquiry on CMs notably in order to facilitate
cross-border participation ('blue-print') .
To date, in order to comply with EEAG, Member States have to individually organise, for
each of their borders separately, the necessary cross-border arrangements involving a
multitude of parties (e.g. resource providers, regulators, TSOs).
This option would provide a harmonised cross-border participation scheme across the EU
by setting out procedures including roles and responsibilities for the involved parties (e.g.
resource providers, regulators, TSOs).
Stakeholders' opinions:
Most of the stakeholders including Member States agree that a
regional/European framework for CMs are preferable. Indeed, 85% of market participant
respondents and 75% of public body respondents to the sector inquiry on Capacity
Mechanisms
203
felt that rules should be developed at EU level to limit as much as possible
any distortive impact of CMs on cross national integration of energy markets. Member
States might instinctively want to rely more on national assets and favour them over cross-
border assets. It is often claimed that in times of simultaneous stress, governments might
choose to 'close borders' putting other Member States who might actually be in bigger need
in trouble.
European Parliament:
"[…][c]alls for cross-border
capacity mechanisms to be
authorised only when the following criteria, inter alia, are met: a. the need for them is
confirmed by a detailed regional adequacy analysis of the production and supply situation,
including interconnections, storage, demand-side response and cross-border generation
resources, on the basis of a homogeneous, standardised and transparent EU-wide
methodology which identifies a clear risk to uninterrupted supply; b. there is no possible
alternative measure that is less costly and less market-intrusive, such as full regional
200
201
202
203
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, § 14.
See
"Messages from the Presidency on electricity market design and regional cooperation"
(2016), Note
to the Permanent Representatives Committee/Council, Page 2.
http://data.consilium.europa.eu/doc/document/ST-8400-2016-INIT/en/pdf
Further elements of this option are presented in Annex 5.
"Interim Report of the Sector Inquiry on Capacity Mechanisms"
SWD(2016) 119 final.
http://ec.europa.eu/competition/sectors/energy/capacity_mechanisms_swd_en.pdf
116
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0117.png
market integration without restriction of cross-border exchanges, combined with targeted
network/strategic reserves; c. their design is market-based and is such that they are
non-discriminatory in respect of the use of electricity storage technologies, aggregated
demand-side response, stable sources of renewable energy and participation by
undertakings in other Member States, so that there is no cross-border cross-subsidisation
or discrimination against industry or other customers, and it is ensured that they only
remunerate the capacity strictly necessary for security of supply; d. their design includes
rules to ensure that capacity is allocated sufficiently in advance to provide adequate
investment signals in respect of less polluting plants; e. sustainability and air quality rules
are incorporated in order to eliminate the most polluting technologies (consideration
could be given to an emissions performance standard in this connection) […]"
204
Option 4: Mandatory EU-wide or regional CMs
Under this option based on regional or EU-wide resource adequacy assessments, entire
regions or ultimately all EU Member States would be required to roll-out CMs on a
mandatory basis. The design of the CMs would follow a EU 'blue print' (i.e. a set of design
requirements for CMs), with the required resource adequacy target to be set at regional or
EU level. This approach would assess
and address
adequacy concerns at a regional or EU
level. Decisions on whether to introduce CMs or not would no longer be left with
individual Member States, but an EU-wide CM would be created, as a mandatory
additional layer to the "energy-only" market. Differences between Member States (e.g.
whether all areas within larger regions actually face adequacy challenges, or network
congestions) would not justify exception from the obligation to introduce a CM.
Discarded Options
Option 0+ will not be further analysed as no means were identified to implement it.
Option 4 does not consider the significant regional differences when it comes to resource
adequacy. The EU-wide or region-wide roll-out would disregard existing congestions in
the European network and it would consequently over- or underestimate the resource
adequacy in single bidding zones/ Member States belonging to a wider region. As a result
CMs might need to be introduced in bidding zones/Member States that do not face any
adequacy concerns. Alternatively, emerging resource adequacy problems in certain
bidding zones/Member States might not be identified and addressed appropriately. In
addition, as a number of Member States rely on energy-only markets to provide for the
necessary investments in their power systems it would not be appropriate to force them to
adopt CMs.
Summary of specific measures comprising each Option
The following table summarizes the specific measures comprising each package of
measures, as well the corresponding specific measure option considered under each high
204
European Parliament,
Report on Towards a New Energy Market Design
(2015/2322(INI)), Committee
on Industry, Research and Energy, 21.6.2016, § 25.
117
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0118.png
level option
205
. The detailed presentation and assessment of each measure can be found in
the indicated Annex.
205
The preferred options for the specific measures set out in the annex are highlighted in the table in green.
118
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0119.png
Table 7: Summary of Specific Measures Examined for Problem Area II
Specific Measures
Option 0
Option 1
Improved
energy
market/ no
CM
Option 2
Improved energy
market/ CMs only
when needed,
based on a common
EU-wide adequacy
assessment)
Option 3
Option 4
Baseline (Current market
arrangements)
Improved energy market/ CMs
only when needed, plus cross-
border participation)
Mandatory EU-wide or
regional CMs
Specific Measures related to the
Energy Market
+ Price Caps
(Annex 4.1)
+ Locational Price Signals
(Annex 4.2)
As in section 5.1.2
Lower than VoLL
(Annex 4.1.4 Option 0)
Price Zones defined based on
arrangements in CACM Guideline
(4.2.4 Option 0)
Limited harmonisation of the
methodologies setting
transmission tariffs
(Annex 4.3.4 Option 0)
Limited restrictions on the use of
congestion income
(Annex 4.4.4 Option 0)
As in section 5.1.4.3
At VoLL
(Annex 4.1.4 Option 2)
Strengthened process for deciding on price zones, leading to the definition
of zones based on systematic congestion in networks
(4.2.4 Option 3)
More concrete principles on the setting of transmission tariffs and other
network charges.
(Annex 4.3.4 Option 2)
Nodal Pricing
(4.2.4 Option 1)
Full harmonisation of the
methodologies setting
transmission tariffs
(Annex 4.3.4 Option 3)
+ Transmission Tariff Structures
(Annex 4.3)
+ Congestion Income
4.4)
(Annex
Further prescription on the use of congestion income, with the aim of an even more European approach
(Annex 4.4.4 Option 1)
Common EU-wide assessment by ENTSO-E becomes the basis for MS to introduce CMs
(Annex 5.1.4 Option 3)
No EU framework
with rules for cross-
border participation
(Annex 5.2.4 Option
0)
+ Resource Adequacy Plans
(Annex 5.1)
+ Cross-border Participation of
CMs
(Annex 5.2)
National plans following different methodologies
(Annex 5.1.4 Option 0)
No EU framework with rules for
cross-border participation
(Annex 5.2.4 Option 0)
N/A
Harmonized EU framework for cross-border participation
(Annex 5.2.4 Option 1)
119
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0120.png
5.3.
Options to address Problem Area III (When preparing or managing crisis
situations, Member States tend to disregard the situation across their borders)
Overview of the policy options
With the intention to meet the objectives set out in the previous section, the Commission
services have identified several policy options ranging from an enhanced implementation
of the existing legislation to the full harmonization and decision making at regional level.
Option 0 represents the baseline or the measures currently in place. Each policy option
consists of a package of measures combining existing tools, possible updated and improved
tools and new tools which act upon the drivers of the problem. This section finalizes with
a table summarising all specific measures comprising each option.
The relevant Annex addressing the policy options below is Annex 6.
Table 8: Overview of the Policy Options for Problem Area III
Option 0: Baseline scenario
Purely national approach to electricity crises
Under the baseline scenario, Member States would continue identifying and addressing
possible crisis situations based on a national approach, in accordance with their own
national rules and requirements.
There would be no rules or structures facilitating and guaranteeing a proper identification
of cross-border crisis situations
206
and ensuring that Member States take the necessary
action to deal with them, in co-operation with one another. Whilst some co-operation
between Member states could take place (e.g., between the Nordic countries as well as
within the context of the PLEF
207
), in practice such cooperation would remain entirely
206
207
In the framework of the SESAME project (which was financed under FP7) tools were developed for the
identification of grid and production plants vulnerabilities and for estimating the damage resulting from
network failures. However, this project had a more national focus (in particular on Romania and Austria)
and the identification and management of cross-border crisis was outside the scope of this project
(https://www.sesame-project.eu/).
Pentalateral Energy Forum, consisting of the Ministries, NRAs and TSOs of BENELUX, Germany,
France, Austria, Switzerland.
120
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0121.png
voluntary, and might be hampered in practice by different national rules and procedures,
and a lack of appropriate structures at regional and EU level.
Innovative tools
208
have been also developed for TSOs in the area of the system security
in the last years, improving monitoring, prediction and managing secure interconnected
power systems and preventing, in particular, cascading failures
209
. In addition, the recently
adopted network codes and guidelines bring a certain degree of harmonisation on how to
deal with electricity systems in different states (normal state, alert state, emergency state,
black-out and restoration) and should bring more clarity as to how TSOs should act in
crisis situations, and as to how they should co-operate with one another. However, network
codes and guidelines focus on technical issues and co-operation between TSOs (in
implementation of the current legal framework). They do not offer a framework ensuring
a proper co-ordination and co-operation between Member States on how to prepare for and
handle electricity crisis situations, in particular in situations of simultaneous scarcity.
210
For instance, political decisions such as where to curtail, to whom and when, would still
be taken nationally, by reference to very different national rules and regulations. In
addition, any cross-border assistance in times of crisis would be hampered by a lack of
common principles and rules governing co-operation, assistance and cost compensation.
Finally, risks would still assessed and adressed on the basis of very different methods, and
from a national perspective only.
Stakeholders' opinions:
Stakeholders agree that the current framework does not offer
sufficient guarantees that electricity crisis situations are properly prepared for and handled
in Europe. They also take the view that, whilst network codes and guidelines will offer
some solutions at the technical level, there is a need for a better alignment of national rules
and cooperation at the political level
211
.
Option 0+: Non-regulatory approach
As current legislative framework established by the SoS Directive set general principles
rather than requires Member States to take concrete measures, better implementation and
enforcement actions will be of no avail.
208
209
210
211
ITESLA project (which was financed under FP7) developed methods and tools for the coordinated
operational planning of power transmission systems, to cope with increased uncertainties and variability
of power flows, with fast fluctuations in the power system as a result of the increased share of resources
connected through power electronics, and with increasing cross-border flows. The project shows that
the reliance on risk-based approaches for corrective actions can avoid costly preventive measures such
as re-dispatching or reduced the overall risk of failure.
In addition the AFTER project (which was financed under FP7) also developed tools for TSOs to
increase their capabilities in creating, monitoring and managing secure interconnected electrical power
system infrastructures, being able to survive major failures and to efficiently restore service supply after
major disruptions (http://www.after-project.eu/).
In addition, whilst the guidelines and codes require TSOs to co-operate, they do not require them to
engage in joint action (e.g. through the ROCs).
See for examle the answers to the public consultation of the International Energy Agency, ENTSO-E.
121
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0122.png
In fact, as the progress report of 2010 shows
212
, the SoS Directive has been implemented
across Europe, but such implementation did not result in better co-ordinated or clearer
national policies regarding risk preparedness.
In addition, the evaluation of the SoS Directive has revealed the existence of numerous
deficiencies in the current legal framework
213
. It highlights the ineffectiveness of the SoS
Directive in achieving the objectives pursued, notably contributing to a better security of
supply in Europe. Whilst some of its provisions have been overtaken by subsequent
legislation (notably the Third Package and the TEN-E Regulation), there are still regulatory
gaps notably when it comes to preventing and managing crisis situations.
The evaluation also reveals that the SoS Directive intervention is no longer relevant today
as it does not match the current needs on security of supply. As electricity systems are
increasingly interlinked, purely national approaches to preventing and managing crisis
situations can no longer be considered appropriate. It also concludes that its added value
has been very limited as it created a general framework but left it by and large to Member
States to define their own security of supply standard. Whilst electricity markets are
increasingly intertwined within Europe, there is still no common European framework
governing the prevention and mitigation of electricity crisis situations. National authorities
tend to decide, one-sidedly, on the degree of security they deem desirable, on how to assess
risks (including emerging ones, such as cyber-security) and on what measures to take to
prevent or mitigate them.
The recently adopted network codes and guidelines offer some improvements at the
technical level, but do not address the main problems identified.
In addition, today voluntary cooperation in prevention and crisis management is scarce
across Europe and where it takes place at all, it is often limited to cooperation at the level
of TSOs. It is true that certain Member States collaborate on a voluntary basis in order to
addresss certain of the problems identified (e.g. Nord-BER, PLEF). However, these
initiatives have different levels of ambition and effectiveness, and they geografically cover
only part of the EU electricity market. Therefore, voluntary cooperation will not be an
effective tool to solve the problems identified timely in the whole EU.
Option 1: Common minimum rules to be implemented by Member States
Under Option 1, Member States would have to respect a set of common rules and principles
regarding crisis prevention and management, agreed at the European level ('minimum
harmonisation'). In particular, Member States would be obliged to develop national
Risk
Preparedness Plans
('Plan') with the aim to avoid or better tackle crisis situations. Plans
could be prepared by TSOs, but need to be endorsed at the political level. Plans should be
based on an
assessment
of the most relevant crisis scenarios originated by rare/extreme
risks. Such assesment would be carried out in a national context (as is the case today), but
would have to based on a common set of rules. In particular, Member States would be
required, for instance, to consider at least the following risks: a) rare/extreme natural
212
213
Report on the progress concerning measures to safeguard security of electricity supply and
infrastructure investment
COM (2010) 330 final.
See Evaluation of the EU rules on measures to safeguard security of electricity supply and infrastructure
investment (Directive 2005/89/EC).
122
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0123.png
hazards, b) accidental hazards which go beyond N-1, c) consequential hazards such as fuel
shortage, d) malicious attacks (terrorist attacks, cyberattacks).
Plans would have to respect a set of common minimum requirements. They would need to
set out who does what to prevent and to manage crisis situations, including in a situation
of a crisis affecting more than one countrry at the same time. More specifically on
cybersecurity,
Member States would need to set out in the Plans how they will prevent
and manage cyberattack situations. This would be combined with soft guidance on
cybersecurity in the energy sector, based on the NIS Directive
214
. Member States would
also be required to set out how they ensure that assets that are important from a security of
supply perspective, are protected against undue influences in case ownership control
changes.
Plans should be adopted by relevant governments / ministries, following an inclusive
process, and (at least some parts of the Plans) should be rendered public. Plans should be
updated on a regular basis.
In addition, under Option 1 there would be
new common rules and principles governing
crisis management,
in replacement of the current Article 42 of the Electricity Directive,
which allows Member States to take 'safeguard measures' in crisis situations. All crisis
management actions (whether taken at the level of the TSOs or at the level of governments)
would need to respect three principles:
-
'Market comes first':
Non-market measures (such as obligatory demand reduction
schemes) should only be introduced as a means of last resort, when duly justified,
and should be temporary in nature. Use of such measures should not undermine
market and system functioning;
'Duty to offer assistance':
Member States would be obliged to address electricity
crisis situations, in particular situations of a simultaneous crisis, in a spirit of co-
operation and solidarity. This means agreeing in advance on practical solutions on
e.g. where to shed load and how much in cross-border crisis situations, subject to
financial compension (which is also to be agreed upon in advance).
'Transparency and information exchange':
Member States should inform each
other and the Commission without undue delay when they see a crisis situation
coming (e.g., as a result of a seasonal outlook pointing at upcoming problems) or
when being in a crisis situation. They should also be transparent about measures
taken and their effect, both when taking them and afterwards.
-
-
The main benefits this option would bring is better preparedness, due to the fact that a
common approach is followed across Europe, thus excluding the risk that some Member
States being 'under-prepare'. In addition, better preparedness is likely to reduce the chances
of premature market interventions, where Member States act in a transparent manner and
214
Directive (EU) 2016/1148 of the European Parliament and of the Council of 6 July 2016 concerning
measures for a high common level of security of network and information systems across the Union, OJ
L 194, 19.07.2016, p. 1-30.
123
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0124.png
on the basis of a clear set of rules. By imposing obligations to cooperate and lend
assistance, Member States are also less likely to 'over-protect' themselves against possible
crisis situations, which in turn will contribute to more security of supply at a lesser cost.
Since a 'minimum' harmonisation approach would be followed, Member States would have
still room to take account of national specificities, where needed and appropriate.
Stakeholders' opinions:
A large majority of stakeholders is in favour of risk preparedness
plans based on common rules and principles, as a tool to ensure a more common and more
transparent approach. Consulted stakeholders
215
agree on the need for a common approach
what Member States can do in crisis situations and call for more transparency.
Option 2: Common minimum rules to be implemented by Member States, plus
regional co-operation
Option 2 would build on Option 1. It would include all common rules included in Option
1 (i.e., define a set of minimum obligations Member States would need to respect). In
addition, it would put in place rules and tools to ensure that effective cross-border co-
operation takes place, in a regional and EU context. Given the interlinked nature of EU's
electricity systems, enhanced regional co-operation brings clear benefits when it comes to
preventing and managing crisis situations.
First, under Option 2, there would be a
systematic assessment of rare/ extreme risks at
the regional level.
The identification of crisis scenarios would be carried out by ENTSO-
E, who would carry out such assessments in a regional context. To achieve this, ENTSO-
E would be able to delegate all or part of its tasks to the ROCs. This regional approach
would ensure that the risks originating across borders, including scenarios of a possible
simultaneous crisis, are taken into account. The crisis scenarios identified by ENTSO-E
would be also discussed in the Electricity Coordination Group, to ensure that a coherent
and transparent approach is followed across Europe. For
cybersecurity,
building on
Option 1, the Commission would propose the development of a network code/guidelines
which would ensure a minimum level of harmonization in the energy sector throughout the
EU
216.
The Risk Preparedness Plans would contain two parts
a part reflecting national
measures and a part reflecting measures to be pre-agreed in a regional context.
The
latter part includes in particular preparatory measures such as simulations of simultaneous
crisis situations in neighbouring Member States
("stress tests" in regional context
organised by ENTSO-E who can delegate all or part of its tasks to the ROCs); procedures
for
cooperation
with other Member States in different crisis scenarios, as well as
215
216
See for example the Public Consultation answers of the Dutch and Latvian Governments, GEODE,
CEDEC, EDF UK, TenneT, Eurelectric and Europex welcoming risk preparendess plans.
The network code/guidelines should take into account at least: a) methodology to identify operators of
essential services for the energy sector; b) risk classification scheme; c) minimum cyber-security
prerequisites to ensure that the identified operators of essential services for the energy sector follow
minimum rules to protect and respond to impacts on operational network security taking the identified
risks into account. A harmonized procedure for incident reporting for the energy sector shall be part of
the minimum prerequisites.
124
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0125.png
agreements on
how to deal with simultaneous electricity crisis situations.
Through such
regional agreements, Member States would be required to define in advance, in a regional
context, how information will be shared, how they will ensure that markets can work as
long as possible, and what kind of assistance will be offered accross borders, For instance,
Member States would be required to agree in advance in which situations and according to
what priorities customers would be curtailed in simultaneous crisis situations. The regional
coordination of plans would build trust and confidence between Member States, which is
crucial in times of crisis. It would also allow optimising scarce resources in times of crisis,
whilst ensuring that markets can work as long as possible.
The regional parts of the Plans should be pre-agreed in a regional context. Such regionally
co-ordinated plans would help ensure that increased TSO cooperation is effectively
matched by a more structured cooperation between Member States.
217
For this reason,
Member States would be called upon to co-operate and agree in the context of the same
regional settings as are used for the ROCs. Effective regional co-operation and agreements
would help ensure that electricity crisis situations are dealt with in the most effective
manner, whilst respecting the needs of electricity consumers and systems at large.
To facilitate cross-border cooperation, Member States should designate one 'competent
authority', belonging either to the national administration or to the NRA.
Additionally,
ENTSO-E
would be required to develop a
common method
for carrying
out short-term risk assessments, to be used in the context of seasonal outlooks and weekly
risk assessments by TSOs.
To allow for a precise monitoring,
ex-ante
and
ex-post,
of how well Member States'
systems perform in the area of security of supply, harmonised security of supply
indicators
would be introduced, as well as obligation on Member States
to inform the Electricity
Coordination Group and the Commission on crisis situations,
their impact and the
measures taken. This would enhance transparency, comparability and mutual trust in
neighbours.
Further, in this option, the role of the
Electricity Coordination Group
218
would be
reinforced, so that it can act as an effective forum to monitor security of supply in Europe
and oversee the way (possible) electricity crisis situations are dealt with. For instance, the
Group would be asked to review the cross-border crisis scenario's developed by ENTSO-
E and to review
ex ante
risk preparedness plans put in place by Member States. The Group
could issue recommendations and develop best practice. Overall, the reinforcement of its
tasks and powers would contribute to enhance cooperation and to build trust and
confidence among Member States.
For cases of crisis, in particular simultaneous scarcity, also ENTSO-E sees a need for
"not only on a
technical level but political cooperation"
and plans which
"should cover extreme crisis situations beyond
the measures provided by e.g. network codes and RSCs services"
(Source: ENTSO-E (2016):
"Recommendations to the regulatory framework on risk preparedness (WS5)").
218
The members of the Electricity Coordination Group are Member States authorities (ministries competent
for Energy), National Regulatory Authorities, ACER and ENTSO-E.
125
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
217
kom (2016) 0863 - Ingen titel
1730752_0126.png
Figure 7: Overview of measures in Option 2
Source: DG ENER
Stakeholders' opinions:
The majority of consulted stakeholders are in favour of regional
coodination of risk preparedness plans
219
and a stronger co-ordinating role of the
Electricity Coordination Group
220
. Various stakeholders make the case for a common
methodology for assessing risks in various time horizons, to detect cross-border crisis
situations and guarantee comparability of results
221
. Several stakeholders also see a need
for clear rules and
ex-ante
cross-border agreements to ensure that markets function as long
as possible in (simultaneous) crisis situations
222
.
The
European Electricity Regulatory Forum, Florence:
The Florence Forum welcomes
a more co-ordinated approach to risk preparedness based on risk preparendess plans and a
common framework for how to deal with (simultaneous) crisis situations, including the
principle that the market should act first
223
.
219
220
221
222
223
See for example the Public Consultation answers of the Finish, Dutch, Norwegian governments, TenneT
and the German Association of Local Utilities.
See for example the Public Consultation answers of the Dutch government and ENTSO-E.
See for example the Public Consultation answers of the Dutch government, EDF, ENTSO-E.
See for example ENTSO-E's presentation on Capacity Mechanisms (TOP 2.4) from the Florence Forum
in June 2016 (available here:
https://ec.europa.eu/energy/en/events/meeting-european-electricity-
regulatory-forum-florence).
See conclusions from Florence Forum, March 2016, paragraph 10.
126
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0127.png
"The Forum recognises the need for more co-ordination across Member States and clearer
rules on coping with electricity crisis situations. It encourages the Commission to quickly
bring the draft Emergency and Restoration Network Code forward for discussion with the
Member States. It also welcomes the Commission's work on a new proposal on risk
preparedness in the electricity sector and considers that risk preparedness plans and
common framework for how to deal with critical situations should be its key builing blocks.
It stresses the need that all action on risk preparedness should respect the principle that
the market should act first."
The European Parliament
224
calls for more regional co-operation, notably as regards
'action to be taken in the event of an electricity crisis, in particular when such a crisis has
cross-border effects,'
and calls on the Commission
'to propose a revised framework to that
end".
Council:
The Council recognizes the responsibility of Member States for ensuring security
of supply but sees a "benefit
from a more coordinated and efficient approach",
"a
necessity
to work on a further harmonization of of methods for assessing norms and indicators for
security of supply"
and "a
need to develop a more common approach to preparing for and
managing crisis situations within the EU".
225
Option 3: Full harmonisation and decision-making at regional level
Building on Option 2, under Option 3 the
risk preparedness plans
would be developed
on
regional level.
This would allow a harmonised response to potential crisis situations in
each region. On
cybersecurity,
Option 3 would go one step further and nominate a
dedicated body (agency) to deal with cybersecurity in the energy sector. The creation of
the agency would guarantee full harmonisation on risk preparedness, communication,
coordination and a coordinated cross-border reaction on cyberincidents.
Crisis would have to be managed according to the regional plans
agreed among
Member States. The Commission would determine the key elements of the regional plans
such as: commonly agreed regional load-shedding plans, rules on customer categorisation,
a harmonised definition of protected customers at regional level or specific rules on crisis
information exchanges in the region.
Regarding
crisis handling,
under Option 3, a
detailed 'emergency rulebook'
would be
put in place, containing an exhaustive list of measures that can be taken by Member States
in crisis situations, with detailed indications as regards what measures can be taken, in
what circumstances and when.
224
225
See European Parliament:
Towards a New Energy Market Design
(2016), Werner Langen, paragraph
68.
See
Messages from the Presidency on electricity market design and regional cooperation
(2016), Note
to the Permanent Representatives Committee/Council, paragraph 7.
127
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0128.png
Stakeholders' opinions:
The results of the public consultation showed that only few
stakeholders were in favour of regional or EU wide plans. Some stakeholders mentioned
the possibility to have plans on all three levels (national, regional and EU)
226
.
Whilst stakeholders generally acknowledge the need for more commonality and more
regional co-operation on risk prevention and management, there is no support for a fully
harmonised approach based on rulebooks
227
.
Discarded Options
Option 0+ was disregarded as no means for enhanced implementing of the existing acquis
were identified.
Summary of specific measures comprising each Option
The following table summarizes the specific measures to be taken under each option
228
. A
more detailed discussion can be found in annex.
226
227
228
See for example the Public Consultation answers of Latvian government, EDSO, GEODE, Europex.
See for example the Public Consultation answers of the Finish and German governments.
The preferred options for the specific measures set out in the annex are highlighted in the table in green.
128
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0129.png
Table 8: Sumary of Specific Measures Examined for Problem Area III
Specific
Measures
Option 0
Option 0+
Option 1
Option 2
Option 3
Baseline
Non-regulatory
approach
Common minimum EU rules for
prevention and crisis management
Common minimum EU rules plus regional
cooperation, building on Option 1
Full harmonisation and full
decision-making at regional
level, building on Option 2
All rare/extreme risks
undermining security of supply
assessed at the EU level, which
would be prevailing over
national assessment.
Assessments
Rare/extreme risks
and short-term risks
related to security of
supply are assessed
from a national
perspective.
Risk identification &
assessment methods
differ across Member
States.
This option was
disregarded as no
means for
enhanced
implementing of
the existing acquis
nor for enhanced
voluntary
cooperation were
identified.
Member States to identify and assess
rare/extreme risks based on common risk
types.
ENTSO-E to identify cross-border electricity
crisis scenarios caused by rare/extreme risks,
in a regional context. Resulting crisis
scenarios to be discussed in the Electricity
Coordination Group.
Common methodology to be followed for
short-term risk assessments (ENTSO-E
Seasonal Outlooks and week-ahead
assessments of the RSCs).
129
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0130.png
Member States take
-
measures to prevent
and prepare for
electricity crisis
situations focusing on
national approach,
and without
sufficiently taking
into account cross-
border impacts.
Plans
No common approach
to risk prevention &
preparation (e.g., no
common rules on
how to tackle
cybersecurity risks).
-
Member States to develop mandatory
national Risk Preparedness Plans setting
out who does what to prevent and
manage electricity crisis situations.
Plans to be submitted to the Commission
and other Member States for
consultation.
Plans need to respect common minimum
requirements. As regards cybersecurity,
specific guidance would be developed.
-
Mandatory Risk Preparedness Plans including
a national and a regional part. The regional
part should address cross-border issues (such
as joint crisis simulations, and joint
arrangements for how to deal with situations
of simultaneous crisis) and needs to be agreed
by Member States within a region.
Plans to be consulted with other Member
States in the relevant region and submitted for
prior consultation and recommendations by
the Electricity Coordination Group.
Member States to designate a 'competent
authority' as responsible body for coordination
and cross-border cooperation in crisis
situations.
Development of a network code/guideline
addressing specific rules to be followed for the
cybersecurity.
Extension of planning & cooperation
obligations to Energy Community partners.
Mandatory Regional Risk
Preparedness Plans, subject to
binding opinions from the
European Commission.
Detailed templates for the plans
to be followed.
A dedicated body would be
created to deal with
cybersecurity in the energy
sector.
-
130
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0131.png
Each Member State
takes measures in
reaction to crisis
situations based on its
own national rules
and technical TSO
rules.
No co-ordination of
actions and measures
beyond the technical
(system operation)
level. In particular,
there are no rules on
how to coordinate
actions in
simultaneous crisis
situations between
adjacent markets.
No systematic
information-sharing
(beyond the technical
level).
Monitoring of
-
security of supply
predominantly at the
national level.
ECG as a voluntary
information exchange
platform.
-
Minimum common rules on crisis
prevention and management (including
the management of joint electricity crisis
situations) requiring Member States to:
(i) not to unduly interference with
markets;
(ii) to offer assistance to others where
needed, subject to financial
compensation, and to;
(iii) inform neighbouring Member States
and the Commission, as of the moment
that there are serious indications of an
upcoming crisis or during a crisis.
Minimum obligations as set out in Option 1.
Cooperation and assistance in crisis between
Member States, in particular simultaneous
crisis situations, should be agreed ex-ante; also
agreements needed regarding financial
compensation. This also includes agreements
on where to shed load, when and to whom.
Details of the cooperation and assistance
arrangements and resulting compensation
should be described in the Risk Preparedness
Plans.
Crisis is managed according to
the regional plans, including
regional load-shedding plans,
rules on customer
categorisation, a harmonized
definition of 'protected
customers' and a detailed
'emergency rulebook' set forth at
the EU level.
Crisis
management
Systematic discussion of ENTSO-E
Seasonal Outlooks in ECG and follow
up of their results by Member States
concerned.
Monitoring
Systematic monitoring of security of supply in
Europe, on the basis of a fixed set of indicators
and regular outlooks and reports produced by
ENTSO-E, via the Electricity Coordination
Group.
Systematic reporting on electricity crisis
events and development of best practices via
the Electricity Coordination Group.
A European Standard (e.g. for
EENS and LOLE) on Security
of Supply could be developed to
allow performance monitoring
of Member States.
131
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0132.png
5.4.
Options to address Problem Area IV (Slow deployment and low levels of
services and poor market performance)
Overview of the policy options
To recap, the drivers in this Problem Area are:
-
Low levels of competition on retail markets;
-
Low levels of consumer engagement;
-
Market failures that prevent effective data flow between market actors.
Each policy option consists of a package of measures that addresses the problem drivers in
a different way and to a different extent. They aim to tackle the existing competition and
technical barriers to the emergence of new services, better levels of service, and lower
consumer prices, whilst ensuring the protection of energy poor consumers.
Box 5: Overview of the Policy Options for Problem Area IV
In the following sub-sections the policy options and the packages of measures they
comprise are described. This section is closed by a table summarising all specific measures
comprising each option.
The relevant annexes addressing the policy options below are: 7.1 to 7.6.
Option 0: Baseline Scenario - Non-competitive retail markets with poor consumer
engagement and poor data flows
Under this option no new legislation is adopted, there are no further efforts to clarify the
existing legislation through guidance, and no additional work through non-regulatory
means to address the problem drivers. It assumes that the future situation will remain more
or less the same as today.
Stakeholders' opinions:
A significant number of stakeholders consider that the level of
competition in retail markets is too low and there is no record of significant support for
current market arrangements and their organic development. The sole exception is on
billing information, where energy suppliers and industry associations indicate that there
may be little scope for EU action to ensure bills facilitate consumer engagement in the
market due to subsidiarity considerations.
132
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0133.png
Option 0+: Non-regulatory approach to address competition and consumer
engagement
Under this option, the problem drivers are addressed to the greatest extent possible without
resorting to new legislation. This means strengthening enforcement to tackle cases of the
non-transposition or incorrect application of existing legislation, new Commission
guidance to tackle implementation issues related to difficulties in interpreting the existing
legislation, and examining new soft law provisions to address gaps in the legislation itself.
To improve competition, bilateral consultations are held with Member States to
progressively phase out price regulation, starting with prices below costs. Should it be clear
that Member State interventions in price setting are not proportionate, justified by the
general economic interest or not compliant with any other condition specified in the current
EU acquis
229
, then enforcement action is taken under the existing
acquis
and recent Court
judgements, which require these criteria. Section 7.1.1 of the Evaluation argues that the
regulation of electricity and gas prices limits consumer choice, restricts competition, and
discourages investment.
To improve consumer engagement, the Commission issues an interpretative note on the
existing provisions in the Electricity and Gas Directives covering switching-related fees.
Section 7.1.1 and Annex IV of the Evaluation show that the current framework remains
both complex and open to interpretation with regard to the nature and scope of certain key
obligations.
The Commission works to ensure the dissemination and uptake of the key cross-sectorial
principles for comparison tools. Enforcement action follows. Nevertheless, Section 7.3.5
and Annex V of the Evaluation show that the relevance of the existing legislation is
challenged by the fact that it is not adapted to reflect new ways of consumer-market
interaction, such as through comparison tools.
The Commission also develops a Recommendation on energy bills that builds upon the
recommendations prepared by the Citizen's Energy Forum's Working Group on e-Billing
and Personal Energy Data Management
230
. Section 7.1.1 and Annex V of the Evaluation
show that there is poor consumer satisfaction with energy bills, and poor awareness of
information conveyed in bills. This suggests that there may still be scope to improve the
comparability and clarity of billing information.
Finally, to better protect energy poor and vulnerable consumers
231
, the Commission
establishes the EU Energy Poverty Observatory which will contribute to the sharing of
good practices and strengthens enforcement around existing requirements for National
229
230
231
Article 3(2) of the Electricity Directive and of the Gas Directive
https://ec.europa.eu/energy/sites/ener/files/documents/20131219-e-billing_energy_data.pdf
As a result of the Third Energy Package, Member States have to defined and protect vulnerable
consumers in energy markets. The evaluation of the provisions related to consumer vulnerability found
the definitions of vulnerable consumers to vary widely across Member States. ACER grouped these
definitions in two groups (i) explicit definitions when characteristics of vulnerability are stated in the
definition such as age, income, or health; and (ii) implicit definitions when vulnerability is linked to be
beneficiary of a social support measure. A study commissioned by DG ENER concluded that energy
poverty is usually a narrower term than vulnerability as it mostly refers to lack of affordability of energy
services.
133
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0134.png
Regulatory Authorities to monitor disconnection rates
an area identified as lacking in the
Evaluation (Section 7.1.1 and Annex III).
However, no action is taken to address the market failures that prevent effective data flow
between market actors. As this involves tackling possible conflicts of interest among
market actors, non-regulatory measures were not deemed appropriate to credibly
addressing this problem driver. Section 7.3.6 and Annex IX of the Evaluation show that
the current legislation was not designed to address currently known challenges in managing
large, commercially valuable consumption data flows.
By tackling regulatory interventions in price setting, this option would enable suppliers to
profitably develop value-added products, thus fostering innovation in energy retail
markets. It would also promote the consumer-driven uptake of such innovative products
by addressing switching fees, unreliable comparison tools and unclear bills
each a key
barrier to consumer engagement.
Stakeholders' opinions:
There are no explicit opinions among the stakeholders on a non-
regulatory approach. However, some of the points raised by the stakeholders, like
increased transparency on switching suppliers, exit fees, comparison tools as well as
transparent bills, may be addressed by non-regulatory measures.
Option 1: Flexible legislation addressing all problem drivers
Under this option, all problem drivers are addressed through new legislation that provides
Member States leeway to adapt their laws to the conditions in national markets.
To improve competition, Member States progressively phase out blanket price regulation
by a deadline specified in new EU legislation, starting with prices below costs.
Transitional, targeted price regulation for vulnerable consumers is permitted (e.g. in the
form of social tariffs), allowing a case-by-case assessment of the proportionality of
exemptions to price regulation that takes into account the social and economic
particularities in Member States.
To both improve competition and reduce transaction costs in the market, consumer data
management rules that can be applied independently of the national data-management
model are put in place. These include criteria and measures to ensure the impartiality of
market actors involved in data handling, as well as the implementation of standardised,
national data formats to facilitate data access. These measures aim at eliminating barriers
to entry associated with data access, and helping all market actors provide a higher level
of service to consumers through the efficiencies that information technology offers.
To increase consumer engagement, the use of contract termination fees is restricted. Such
fees are only permissible for the early termination of fixed-term contracts, and they must
be cost-reflective. Consumer confidence in comparison websites is fostered through
national authorities implementing a certification tool for the most useful and reliable
websites in their markets. In addition, high-level principles ensure that energy bills are
clear, easy to understand, and free from unnecessary information, whilst leaving Member
States some scope to tailor billing format and content to national requirements. Certain
134
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0135.png
information elements in bills would be mandatory and would need to be prominently
displayed to facilitate the comparison of offers and switching.
232
Finally, to better protect energy poor and vulnerable consumers, an improved, principle-
based EU legal framework to support Member State action on vulnerable and energy poor
consumers is put in place. A generic adaptable, definition of energy poverty based on
household income and energy expenditure is included in the legislation for the first time.
Member States would measure and report energy poverty with reference to household
income and energy expenditure, and NRAs would publish the number of disconnections
due to non-payment
figures they should already be collecting under the current
legislation. These actions are taken cumulatively, on top of the non-regulatory measures
on energy poverty described in Section 5.4.3.
These measures build upon the existing provisions on energy poverty in the Electricity and
Gas Directives which state that Member States must adress energy poverty where it is
identified. They offer the necessary clarity about the meaning of energy poverty, as well
as, the transparency with regards to the number of household in energy poverty. Better
monitoring of energy poverty across the EU will, on one hand, help Member States to be
more alert about the number of households falling into energy poverty, and on the other
hand, peer pressure will also encourage Member States to put in place measures to reduce
energy poverty. Since currently available data can be used to measure energy poverty, the
administrative cost is limited
233
. Likewise, the actions proposed do not condition Member
States on their primary competence of social policy, hence, respecting the principle of
subsidiarity.
Taken together, this option would strongly promote innovation on retail markets by
ensuring that new entrants and energy service companies receive non-discriminatory
access to consumer data
access that will allow these market actors to develop and offer
the value-added products that (integrated) incumbents have not. A firm commitment to
phase out blanket price regulation would enable suppliers in many Member States to
differentiate their offers to consumers through non-price competition. And by tackling
financial barriers to switching, improving the availability of comparison tools and helping
consumers understand important information in their bills; this option would increase
consumer engagement with the market and the selective pressure for new services.
Stakeholders' opinions:
Feedback indicates that the general principles put forward as part
of Option 1 would likely enjoy broad support amongst stakeholders. The sole exception
would be the measures on billing information, where energy suppliers and industry
associations have stated that there may be little scope for EU action. However, even here,
the general principles proposed in this option would give broad leeway to Member States
to tailor national requirements to the conditions and consumer preferences in each market.
232
233
EPRG Working paper 1515 (2015), "Why
Do More British Consumers Not Switch Energy Suppliers?"
by X. He D. Reiner:
"We conclude that policies which emphasize simplification of energy tariffs,
increasing convenience of switching, improving consumers’ concerns about energy issues, improving
consumers’ confidence to exercise switch are likely to increase consumer activity."
See Annex 7.1, Table 16.
135
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0136.png
Option 2: EU Harmonization and extensive safeguards for consumers addressing
all problem drivers
Under this option, all problem drivers are addressed through new legislation that aims to
provide maximum safeguards for consumers and the extensive harmonisation of Member
State action throughout the EU.
To improve competition, Member States progressively phase out all blanket price
regulation, starting with prices below costs, by a deadline specified in new EU legislation,
as per Option 1 (flexible legislation). However, exemptions to price regulation are defined
at the EU level in terms of either: a) a price threshold to be defined based on principles
ensuring coverage of the cost incurred by the energy undertakings above which Member
States may set retail prices; and/or b) a consumption threshold below which household
may benefit from a regulated tariff.
To both improve competition and reduce transaction costs in the market, a standard
consumer data handling model is enforced. This assigns the responsibility for data handling
to a neutral market actor, such as a TSO or independent third-party, eliminating all
possibility of conflicts of interest. Nationally standardised formats are devised to facilitate
data access to all market actors concerned, including cross-border access.
To increase consumer engagement, all switching-related fees are banned, including
contract termination fees. NRAs establish comparison websites to ensure consumers have
access to at least one neutral comparison resource, alongside private sector offerings. In
addition, the format and content of energy bills is partially harmonized through the
inclusion of a standard 'comparability box' that prescriptively presents key information in
exactly the same way in every EU bill.
Finally, to better protect energy poor and vulnerable consumers, a uniform EU framework
to monitor energy poverty and reduce disconnections is put in place. A specific,
harmonised definition of energy poverty is included in EU legislation referring to
households that fall below the poverty line after meeting their required energy needs. In
order to measure energy poverty, Member States survey the energy efficiency of their
national housing stock and calculate the amount of energy, and costs, required to make all
housing comfortable. These survey results are reported to the Commission.
In addition, a host of preventive measures on disconnections are put in place: (i) Member
States are to give all customers at least two months (approximately 40 working days) notice
before a disconnection from the first unpaid bill; (ii) before a disconnection, all customers
receive information on sources of support, and are offered the possibility to delay payments
or restructure their debts; and (iii) the disconnection of vulnerable consumers is prohibited
in winter.
234
These actions are taken cumulatively, on top of the non-regulatory measures
on energy poverty described in Sections 5.4.3.
As with Option 1 (Flexible legislation), this option would strongly promote innovation on
retail markets through non-discriminatory access to consumer data, a firm commitment to
phase out blanket price regulation, and by tackling barriers to consumer engagement.
However, any negative impacts to competition resulting from the stronger, and more
234
Similar legislation is already in place in 14 Member States.
136
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0137.png
costly, safeguards for the vulnerable and energy poor may also reduce the availability of
new services. In addition, Member States may be better suited to design disconnection
safeguard schemes to ensure that synergies between general national social service
provisions and disconnection safeguards are achieved.
Stakeholders' opinions:
Whilst many stakeholders support the objectives Option 2 aims
to achieve, several have flagged reservations regarding the prescriptive approach to
achieving them. In particular, NRAs have voiced their unease over an over-prescriptive
EU billing format, and recommend that the decision on whether or not to allow contract
exit fees is best taken at the national level. NRAs also point out that it is their role to define
the appropriate methodologies for applicable price regulation. Most of the Member States
consider that the model for data handling should be best decided at national level. And
finally, whilst many stakeholders have supported comparison tool accreditation schemes
(Option 1
flexible legislation), none have called for government authorities to provide
comparison tools exclusively.
Summary of specific measures comprising each Option
The following table summarizes the specific measures comprising each package of
measures, as well the corresponding specific measure option considered under each high
level option.
235
The detailed presentation and assessment of each measure can be found in
the indicated Annex.
235
The preferred options for the specific measures set out in the annex are highlighted in the table in green.
137
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0138.png
Table 9: Summary of Specific Measures Examined for Problem Area IV
Specific
Measures
Option 0
Baseline
Energy poverty
and
disconnection
protection
(Annex 7.1)
Option 0+
Non-regulatory approach
EU observatory for energy
poverty. Sharing of good
practices and increase efforts
to correctly implement
legislation (Annex 7.1.4
Option 0+)
Option 1
Flexible legislation
Option 2
Harmonization and extensive consumer safeguards
Introducing a specific, harmonised definition of energy
poverty in EU legislation, a comprehensive EU
framework to monitor energy poverty based on an energy
efficiency survey of the housing stock, and a host of
preventive measures to avoid disconnections (Annex 7.1.4
Option 2)
Requiring MS to progressively
phase out price regulation for
households below a certain
consumption threshold to be
defined in new EU legislation
or by MS, with support from
Commission services
(Annex 7.2.4 Option 2a)
Requiring MS to phase
out below cost price
regulation by a
deadline specified in
new EU legislation
(Annex 7.2.4Option
2b)
Sharing of good
practices(Annex 7.1.4
Option 0)
Introducing a generic adaptable, definition
of energy poverty in EU legislation, and
setting an EU framework to monitor
energy poverty (Annex 7.1.4 Option 1)
Price regulation
(Annex 7.2)
Making use of existing acquis to continue bilateral
consultations and enforcement actions to restrict price
regulation to proportionate situations justified by manifest
public interest
(Annex 7.2.4 Option 0)
Requiring MS to progressively phase out
price regulation for households, starting
with prices below costs, by a deadline
specified in new EU legislation, while
allowing transitional, targeted price
regulation for vulnerable customers
(Annex 7.2.4 Option 1)
EU data management rules that can be
applied independently of the national data-
management model (Annex 7.3.4 Option
1)
Flexible legislative measures to further
limit switching-related charges,
establishing a certification scheme to
improve consumer confidence in
comparison tools, and making information
in bills clearer through minimum content
requirements (not format) (Annexes 7.4.4,
7.5.4 and 7.6.4 Option 1)
Data
management
(Annex 7.3)
Member States are primarily responsible on deciding roles
and responsibilities in data handling (Annex 7.3.4 Option 0)
A standard EU data management model (data hub)
(Annex 7.3.4 Option 2)
Consumer
engagement
(Annexes 7.4, 7.5
and 7.6)
Lacklustre consumer
engagement persists,
diminishing the demand
for new services and
competitive pressure in the
market
Improved EU guidance and
Recommendations on
switching-related charges and
comparison tools (Annexes
7.4.4, and 7.5.4 Option 0+)
Outlawing all switching-related charges, making all
national authorities offer (or fund) an independent
comparison tool, and full EU harmonization of the
presentation of certain information in bills (Annexes
7.4.4, 7.5.4 and 7.6.4 Option 2)
138
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0139.png
6.
A
SSESSMENT OF THE IMPACTS OF THE VARIOUS POLICY OPTIONS
This section assesses the impacts of the options under each Problem Area. The analysis focuses
on the broad impacts of those options. The impacts of the specific measures included in each
option are assessed in more detail in separate annexes attached to this impact assessment.
Each option was assessed both quantitatively and qualitatively, in an effort to capture at the
highest possible detail the impacts of the underlying measures within each option. When
reliable quantitative analysis or information was not available, the assessment could only be
performed qualitatively, based on specific criteria.
6.1.
Assessment of economic impacts for Problem Area I (Market design not fit for an
increasing share of variable decentralized generation and technological
developments
Methodological Approach
6.1.1.1.Impacts Assessed
The market design options are examined on the basis of their effectiveness in addressing the
identified problems and achieving the desired objectives, while at the same time facilitating the
delivery of the 2030 climate and energy targets
236
in a cost-efficient and secure way for the
whole of Europe.
As the examined measures focus on the better functioning of the electricity markets
237
,
economic impacts are in particular analysed with respect to competition, cost-efficiency, better
utilization of resources, as well as impacts on security of electricity supply.
The effect of the measures on the wholesale markets will induce indirect social impacts and
have limited effect on innovation and research. The effects of energy market related polices on
employment are primarily associated with the policy measures seeking to secure the
achievement of the 2030 decarbonisation objectives
238
. They will therefore not be assessed in-
depth for all options.
Some indirect environmental impacts are also expected, due to the different types of fuel used
for power generation, as a well-functioning flexible electricity market would incentivize the
increase of low carbon generation.
236
237
238
See:
http://ec.europa.eu/clima/policies/strategies/2030/index_en.htm
.
Note that these options are not touching the issue of investment, which is examined under Problem Area II.
Therefore the same power generation mix is assumed for all options.
Reference is hence made to the impacts assessments for the EE and RED II initiatives and the one elaborated
in the context of Communication from the Commission to the European Parliament, the Council, the European
Economic and Social Committee and the Committee of the Regions, "A
policy framework for climate and
energy in the period from 2020 up to 2030"
(SWD(2014) 15 final)
139
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0140.png
Other significant impacts, direct or indirect, are not expected for the examined options, unless
specifically noted.
The assessment is presented individually for each option, with qualitative analysis and
interpretation of quantitative results. Summary tables reporting the modelling results for all
options are included in section 6.1.6.
6.1.1.2.Modelling and use of studies
For most of the quantitative analysis, the METIS
239
modelling software was used to underpin
the findings on the impact of the different options. METIS is a modular energy modelling
software covering with high granularity (geographical, time) the whole European power system
and markets. Simulations adopted a Member State-level spatial granularity and an hourly
temporal resolution for year 2030 (8760 consecutive time-steps per year), capturing also the
uncertainty related to demand and RES E power generation.
For consistency with all parallel European Commission work on the 2030 Energy and Climate
Framework, in the Red II, EE and Effort Sharing Regulation impact assessments, METIS was
set-up (calibrated) such as to reflect as close as possible
240
the year 2030 projection of the power
sector in the PRIMES EUCO27 scenario. The PRIMES EUCO27 scenario
241
, built on the EU
Reference Scenario 2016, ensures a cost-efficient achievement of at least 40% GHG reduction
(including agreed split of reductions between ETS and non-ETS), 27% RES and 27% EE target.
A stand-alone analysis of the impact of potential policies promoting downstream price and
incentive based demand response, at all customer segments (industrial, commercial,
residential), has also been undertaken (detailed information hereon can be found in Annex 3.1).
The options analysed looked at how to reach the full potential of demand response in order to
reduce overall system costs, considering (i) both price and incentive based demand response,
and their combination, as well as (ii) the level of access of demand service providers to the
market (access rules and incentives), and (iii) customers' ability to react (by means of access to
required technologies-smart metering, tariff structures and knowledge) for engaging in price
based demand response. The analysis focused on the assessment of the theoretical potential of
demand response, based on the nature of the electricity use/ability to shift demand by different
clusters of consumers, its current level, and how the different options are likely to increase the
share of the theoretical potential being realised, as well as in the estimation of associated cost
and benefits.
6.1.1.3.Summary of Main Impacts
Figure 8 below summarizes the annual quantified benefits of the assessed options for 2030
242
,
as presented in detail in sections 6.1.2 to 6.1.5. It illustrates the significant benefits of the
239
240
241
242
A detailed description of the METIS model can be found in Annex IV, including details on the implemented
modelling methodology.
A detailed description of the METIS calibration to PRIMES EUCO27 can be found in Annex IV.
More details on the methodological approach followed concerning the baseline, on EUCO27, as well as on
the coherence with the scenarios of all parallel initiatives can be found in Annex IV.
All impacts were assessed for one full year (8760 hours) reflecting projected situation in 2030. Reported
figures are in annual real terms (€'13).
140
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0141.png
measures under Options 1 to adapt the market design, with annual savings in 2030 of EUR 5.9
billion only for Sub-option 1(a) (level playing field), EUR 8.6 billion for 1(b) (strengthening
short-term markets) and EUR 9.5 billion for Sub-option 1(c) (demand response/distributed
resources). For Option 2 (fully integrated market) the calculated benefits would amount to EUR
10.6 billion.
Figure 8: Annual cost savings for Problem Area I in 2030 by option
Source: METIS
6.1.1.4.Overview of Baseline
243
(Current Market Arrangements)
244
Under the baseline, the power system in 2030 relies heavily for energy on RES E generators,
as well as conventional generation which is to a large degree inflexible. In particular, the share
of RES E in electricity generation has almost reached 50%, thus being equal to the share of all
other conventional generation together (i.e. gas, coal, lignite, nuclear, oil). The share of variable
generation (solar and wind) in total generation approaches 30% across Europe. Concerning
conventional generation, nuclear holds a 22% share, coal and lignite a 15% share, and natural
gas 13%. The respective shares tend to differentiate across EU regions, based on the
particularities of each region (Figure 9).
243
244
The assumptions concerning the baseline can be found in Section 5.1.2 and in Annex IV.
Although all modelling work was based on the PRIMES EUCO27, the PRIMES scenario has as a basic
assumption the existence of well-functioning competitive markets. As this is the ultimate goal of the assessed
measures, the baseline departs form EUCO27, reflecting the observed distortions or inefficiencies of current
market arrangements.
141
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0142.png
Figure 9: Shares of Electricity Generation per Region
245
in EU in the Baseline
Region 5
Region 4
Region 3
Region 2
Region 1
0%
10%
Region 1
Variable RES
Generation
Hydro
Biomass, Waste
& Other RES
Gas
Oil
Solids
Nuclear
27%
10%
5%
9%
0%
21%
27%
20%
30%
Region 2
14%
49%
8%
7%
0%
4%
18%
40%
50%
Region 3
34%
4%
15%
24%
0%
1%
22%
60%
70%
Region 4
48%
19%
3%
12%
0%
4%
14%
80%
90%
100%
Region 5
29%
19%
7%
20%
0%
17%
7%
Source: METIS
A number of rules affecting dispatch remain in place, most notably priority dispatch
246
for RES
E and that certain technologies are considered as must-run
247
, reflecting current practices and
nominations in the market. In fact special dispatch rules concern 60% of total installed capacity
(752 GW on a total of 1,247 GW).
245
246
247
For the modelling purposes, an indicative split of Europe into five regions was made as follows (Cyprus was
excluded as assumed not directly interconnected to the rest countries):
Region 1 (CE):
Austria, Belgium, Czech Republic, Demark, France, Germany, Hungary, Luxembourg,
Netherlands, Poland, Slovakia, Slovenia
Region 2 (NEE):
Estonia, Finland, Latvia, Lithuania, Sweden and Norway.
Region 3 (NWE):
Ireland and UK
Region 4 (SWE):
Portugal and Spain
Region 5 (SEE):
Bulgaria, Croatia, Cyprus, Greece, Italy, Malta, and Romania
In "Evaluating
the impacts of priority dispatch in the European electricity market",
Oggioni et al (2014), show
using a stylized model that significant increase of wind penetration under priority dispatch can cause even the
collapse of the EU Target Mode. Test-runs performed using METIS came to a similar conclusion. Initial runs
lead to significant hours of loss of load for many MS. In order to resolve this issue a "softened" definition for
priority dispatch was assumed for the modelling, allowing the curtailment of units (which should not be
normally the case under priority dispatch) but at a cost.
In general, when scheduled in day ahead, must-run units cannot be decommitted during intraday and are
required to operate at least at their technical minimum level. For the scope of the modelling, coal and lignite
units were assumed as being must-run in the baseline. Day-ahead scheduling was assumed though always
optimal (so only units with priority dispatch were assumed to disrupt the economic merit order in day-ahead,
namely biomass) for each national market, which may not be true in practice due to nominations, scheduling
practices, etc. Modelling performed with PRIMES/IEM, results presented in Section 6.2.6.1, captured also the
effect of nominations and other practices in the baseline.
142
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0143.png
Figure 10: Projected Generation Capacity in 2030 per Member State in GW
248
250
Nuclear
200
Solids
Oil
150
Gas
100
Biomass, Waste
& Other RES
50
Hydro
Variable RES
Generation
-
Source: METIS
Another factor reducing the flexibility of the European power system is the limited allocation
of interconnection capacity during intraday and balancing time frames, as well as the varying
gate closures and products, which in practice reduce the opportunities for trading in the short-
term markets and thus their liquidity.
Reserves are procured on a national level and in many cases in infrequent intervals
249
, with
corresponding services mainly provided by (large) thermal generators and only in some
Member States by industrial consumers.
Demand response, storage (excl. hydro) and distributed generation have very limited
participation in the market. In most cases available products are not customized for these
resources, minimum thresholds exist for participating in the market, etc. At the same time, a
large part of the generation, mainly RES E, are not balance responsible and do not have a strong
incentive to perform accurate forecasts and declare accurate schedules in the day-ahead market
(the share of variable generation is about 42% of total generation capacity). As a consequence,
the observed imbalances are large, leading to increased needs for frequency reserves.
The deficiencies of the current regulatory framework create significant inflexibility to the
system operation; the inflexibility in turn increases further the need for reserves (notably so-
called replacement reserves)
250
. Close to real-time, the TSOs can mainly rely either on units
248
249
250
Please note that the assumed generation capacities in the baseline have certain differences compared to the
ones in EUCO27 PRIMES scenario, as a preliminary version of EUCO27 was used for the calibration. Further
details can be found in Annex IV.
For the scope of the modelling, a yearly procurement by (large) thermal generators and hydro has been
assumed for countries with no reserve market, while daily optimal procurement is modelled in countries with
such markets. More details can be found in Annex IV and in
"Electricity Market Functioning: Current
Distortions, and How to Model Their Removal"
COWI (2016).
It should be emphasized that METIS does not include a grid model. Thus the main use of replacement reserves
('RR'), to address grid (non-frequency related) issues, is not captured. The implemented methodology can only
143
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
AT
BE
BG
CH
CY
CZ
DE
DK
EE
ES
FI
FR
UK
GR
HR
HU
IE
IT
LT
LU
LV
MT
NL
NO
PL
PT
RO
SE
SI
SK
kom (2016) 0863 - Ingen titel
1730752_0144.png
providing replacement reserves or on very flexible (and expensive) units to avoid loss of load
(peakers). In this context, in METIS replacement reserves provide than 600 GWh of electricity
in the baseline, mainly in Poland and South East Europe. The same applies for RES E
curtailment, as curtailment is the only alternative to the encountered stress of the system and
the lack of available flexible resources: 13.0 TWh of RES E is found to be curtailed on an
annual basis, mainly in the Iberian Peninsula (8.3 TWh) and UK/Ireland (4.1 TWh).
Policy Sub-option 1(a) (Level playing field amongst participants and resources)
6.1.2.1.Economic impacts
The restoration of the economic merit order curve in the wholesale electricity market has a
direct and
significant positive impact
to the cost-efficient operation of the power system,
leading to tangible reductions of the costs consumers. It would also allow to feed in (and
remunerate from the market) more RES E (notably from wind and solar) to the system.
With special rules concerning unit dispatching eliminated (i.e. must-runs, priority dispatch), the
TSOs are able to schedule and re-dispatch units more efficiently. As a result (in conjunction
with the other measures under this option):
-
-
-
-
total costs of the power system are reduced by 7%;
the activation of replacement reserves is reduced by about 500 GWh;
RES E curtailments (e.g. wind and solar) decline by 4.7 TWh
251
; and,
the occurrence of negative prices is completely eliminated
252
.
Figure 11 - which presents the merit order
253
at a given hour - illustrates how preferential
dispatch rules for certain technologies shift the merit order to the right, resulting in price
decreases but at the same time in an increase of the overall costs for the system. The example
shown for biomass priority dispatch is also applicable for must-runs and priority dispatch of
other (expensive) technologies. Restoring the economic merit order thus reduces the overall
costs for the power system at times where these technologies would be out-of-the-money, while
increasing the electricity price during these hours.
251
252
253
be considered as a proxy in an effort to capture a part of the impacts of RR. As some of the scenarios (Options
0 (baseline) and 1(a)( level playing field)) were characterised by important values of Loss of Load during the
intraday time frame, it was assumed that this was addressed by replacement reserves. To compute the costs
related to RR, first the intraday loss of load curve was identified at country level and then the amount of peaker
capacity needed to bring the Loss of Load duration down to 3 hours in each country was computed. A cost of
60k EUR/MW/y for peaker units and fuel costs of 180 EUR/MWh was assumed.
From a system perspective, it can sometimes be economical to reduce the generation of wind and solar in
order to maintain the system balance.
This result is directly linked with the modelling assumption that all electricity is traded in the market.
Each generation fleet is represented as a block, as large as its power capacity and as high as its generation
cost. Without distortions, the market dispatches the lowest (cheapest) blocks until demand is met. The
generation cost of the most expensive dispatched power plant sets the clearing price.
144
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0145.png
Figure 11: Merit order effect of priority dispatch
With
biomass priority dispatch
Without
biomass priority dispatch
Source: METIS
Focusing on priority dispatch, which was found to be the main distortion for the day-ahead
market scheduling for the modelling
254
, the biggest impacts on generation would be observed
in Denmark, UK and Finland, where biomass holds a large share of generation capacity. The
removal of priority of dispatch would have a considerable effect on expensive biomass
production
255
, which in most cases is dispatched out of the merit order. It can also be expected
that the share of CHP generation would be negatively affected, due to the relatively inflexible
character of CHP production
256
. On the other hand, removing priority dispatch rules would
benefit variable RES E which could expand its production (due to the reduction in curtailments).
More importantly, variable RES E producers could significantly increase their revenues due to
the increase of the wholesale prices (partly due to the elimination of negative prices)
257
. Overall,
the removal of priority dispatch and must-runs helps better integrating variable RES E
generation and leads to significant system costs reductions and thus cost savings for consumers.
254
255
256
257
Data availability on must-runs, nominations and other practices affecting the day-ahead schedule, leading to
an operation of the system deviating from the economic merit order, was very limited and thus were not
captured by the model. The impacts of must-runs were captured however for the intraday market and amounted
to around EUR 0.5 billion.
The Commission's study indicates that up to 85% of biomass generation could be affected by removing priority
dispatch. This result is also partly due to the assumption of having only one fuel for biofuel/biogas, this being
exclusively wood, rendering biomass very expensive. Note also that the analysis focuses on electricity
dispatch and does not examine why would a biomass (or any other) plant want to operate with losses in the
wholesale market (most likely an additional revenue stream like income from selling heat or some kind of
operational support would be required), as is often the case today. A more complete analysis of this result is
presented under environmental impacts, Section 6.1.6.
As part of the limitations of the modelling, one should note that the effects of removing priority dispatch from
CHP are not captured in the assessment. In particular CHP and small scale RES E are not modelled as separate
assets. It can be expected though that the results on biomass would be applicable also to a large part of the
CHP generation, unless they are able to recover their losses from the heat market or are industrial CHP, in
which case industrial opportunity costs need to be considered.
Because of biomass' assumed flexibility, a part of the lost revenues is recovered from its participation in
reserve procurement and balancing energy activation
145
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0146.png
Figure 12: Effect of removal of special dispatch rules to negative prices
Source: METIS
The above also leads to an increase of the share of Combined Cycle Gas Turbines ('CCGTs') in
power generation
258
. RES E generation enters the market merit order, thus catering for more
efficient price formation in the day-ahead and intraday markets. The removal of priority
dispatch will offer access on equal terms to all resources. Moreover, it will more than double
the competitive segment of the market, which in the baseline was only 40% of the market.
As more resources participate under the same competitive rules in the markets, markets would
become more competitive
259
. This implies an increase in wholesale prices as they will now
reflect the actual marginal cost of generation instead of one technically lowered via rules
affecting dispatch
260
. As a result, this will lead to a much more cost-efficient operation of the
power system, and consequently to a 7% decrease of its total cost.
Finally, the extension of balance responsibility to all generating and consuming entities, offers
a strong incentive for variable RES E and other balance responsible parties to improve their
forecasting, bid more accurately in the day-ahead market and be more active in the intraday
markets. This leads to smaller imbalances and a lower requirement for reserve procurement by
the TSOs. In particular the needs for mFRR are reduced by around 30%. This, combined with
the capability of the demand response to also participate
261
in the reserve procurement and
balancing markets, leads to a more cost-efficient reserve procurement process.
258
259
260
261
Share of CCGT in total net electricity generation increases from 12.3% to 15.1%.
See for a more detailed discussion of the arguments for and against maintaining priority dispatch in Annex 1.
The elimination of the significant hours with negative prices also contributes to the increase of the average
wholesale price.
Note though that as no measures are assumed to be implemented here for incentivizing the wider participation
of demand response, only industrial consumers are assumed to be participating in the respective markets.
146
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0147.png
6.1.2.2.Who would be affected and how
Abolishing priority dispatch and priority access would mainly affect RES E producers using
biofuels and CHP
262
and operators that benefit from priority dispatch when producing using
indigenous resources fuels (if their marginal costs are substantial). For low marginal cost,
variable generators, such as wind and solar power plants, the impact is actually positive, which
will be amplified by measures to enable RES E access to ancillary services markets.
In any event, all generators will benefit from increased transparency and legal certainty on
redispatch and curtailment rules. For TSOs, the removal of priority dispatch and priority access
would also facilitate grid operation.
Introducing balancing responsibilities (with exemption possibilities for emerging
technologies
263
and or small installations
264
) will mainly impact generators currently exempted
or partly shielded from balancing responsibility. Accordingly, this measure will mean they have
to increase their efforts to remain in balance (e.g. through better use of weather forecasts)
though at the costs of being exposed to financial risks.
6.1.2.3.Administrative impact on businesses and public authorities
The removal of priority dispatch, priority access and ensuring compliance with the balancing
rules would give rise to administrative impacts for RES E (and CHP) generators, in particular
for operators of very small installations. This administrative impact can however be
significantly reduced by facilitating aggregation, allowing the joint operation and management
of a large number of small plants (as discussed in more detail under Option 1(c)).
Impacts of Policy Sub-option 1(b) (Strengthening short-term markets)
6.1.3.1.Economic Impacts
Strengthening short-term electricity markets improves market coupling across time-frames,
leads to a more efficient utilization of interconnector capacity and reduces the amount of
required reserves, as well as their cost.
The efficiency of the intraday markets is improved due to the harmonization of their market
specifications, including the transition to continuous trade and harmonisation of gate closures,
as well as by an improved allocation of interconnector capacity across time-frames.
Harmonising intraday markets across Europe
265
allows to further reduce RES E curtailment by
460 GWh and the utilisation of replacement reserves by 100 GWh. Note that curtailment is not
only reduced in countries where implicit auctions were not implemented in Option 1(a) (level
262
263
264
265
As part of the limitations of the modelling, one should note that the effects of removing priority dispatch from
CHP are not captured in the assessment. See also footnote 254.
In the PRIMES EUCO27 scenario, the emerging technologies of tidal and solar thermal generation (other
technologies having insignificant shares) are projected to have a total installed capacity of 7.26 GW (0.7% of
total generation capacity) and produce 10 TWh of electricity in 2030 (0.3% of total generation).These shares
only slightly increase by 2050.
In the PRIMES EUCO27 scenario, RES E small-scale capacity is projected in 2030 to reach 85 GW (7.8 %
share in generation capacity) and produce 96 TWh of energy (2.9% share of total generation).
Continuous trading was modelled as consecutive hourly implicit auctions.
147
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0148.png
playing field), but in already implicitly coupled regions too. Thus, extending the coupled area
also benefits already coupled countries such as Germany, since it can export more of its variable
RES generation. The effects are illustrated in Figure 13.
Figure 13: Positive impacts of harmonising intraday markets across Europe
266
Source: METIS
By improving the methodologies for reserve dimensioning and procurement of balancing
reserves, the need for balancing reserves is further reduced compared to Option 1(a). Certain
improvement comes from the separation of the bids and prices for up and down regulation in
order to reflect their true underlying marginal costs, which may be different both for generation
and load
267
. The separate provision of downwards reserves greatly improves the efficiency of
the system, as now thermal plants are not forced to be online to provide such reserves. Another
means is via the procurement of reserves on a day-ahead basis, thus their sizing being able to
reflect the hourly needs for these services, while at the same time allowing the most efficient
resources at a given hour to be procured as reserves by the TSO.
The reduction in the reserve needs though is mainly achieved by the regional reserve
dimensioning and more efficient exchange and sharing of balancing capacity among TSOs, as
the generation and consumption patterns differs between Member States according to the
generation mix, renewable energy sources and differences in energy consumption. Thus, the
79.6 GW of reserve needs (FCR + FRR) in Option 0, is reduced to 65.8 GW in Option 1(a)
The figures presented in this paragraph show the impact of implicit intraday auctions only. Other measures of
Option 1(b) (strengthening short-term markets), in particular interconnection reservation at day-ahead for
reserve procurement, tend to increase intraday costs.
267
Although the separation of upward and downward balancing was initially foreseen for this initiative, and thus
assessed herein, it may be introduced earlier in the EB GL.
266
148
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0149.png
(level playing field) and to only 42.3 GW in Option 1(b) (strengthening short-term markets) (a
reduction of 47% compared to the baseline).
It is important to note that the reduction in FRR
268
is stronger in the well-interconnected regions
(about 50% reduction), namely Central Europe, the Nordics and South / South East Europe,
while the benefits for UK/Ireland and Spain/Portugal are smaller due to their limited
interconnection (about 20% reduction). In order to achieve these reductions from the sharing of
reserves, the Member States need to ensure that sufficient interconnection capacity is reserved
for this purpose, in order to ensure that despite the lower reserve requirements, the national
ability to balance the system remains the same
269
. The amount of capacity that needs to be
reserved for this purpose is on average approximately 6%
270
of the Net Transfer Capacities
('NTCs'), with actual values varying significantly per interconnector and per hour of the day.
Similarly, different market areas have different access to flexible resources and such flexible
resources are vital to the cost-efficient integration of renewable electricity generation. TSOs
may not only procure smaller volumes of reserves but providers of relatively cheap flexibility
resources may supply a larger volume thereof. Hence, overall balancing market payments are
reduced, while at the same time more interconnection capacity can be given to the market by
reducing transmission reliability margins ('TRMs').
An interesting observation coming from the assessment is the increased generation by baseload
thermal plants, compared to more flexible thermal plants. In particular, the electricity
generation of nuclear, CCGTs, coal and lignite plants increases by 10%, while the generation
of gas and oil peakers reduces by 50% compared to the baseline
271
. The reason is that by sharing
resources between countries and decreasing reserve needs, the baseload plants do not need to
retain part of their capacity on stand-by for supplying reserves and thus can increase the
quantities of energy they generate. At the same time, though, flexible plants end up competing
for reduced amounts of reserve needs, thus their revenues are significantly reduced compared
to Option 0 (baseline) and Option 1(a) (level playing field)/ Therefore, better interconnecting
268
269
270
271
Both mFRR and aFRR
Adopting a regional approach to reserve dimensioning results in lower reserve requirements because of the
statistical cancellation that can occur between imbalances originating from different countries. As a result the
reserve needs are lower when adopting a regional dimensioning approach. The regional reserve need is then
translated into minimal reserve requirements at national level by using an allocation criteria (in METIS case
the national annual demand). However a national TSO still has to face the same level of risk - the imbalances
on its Control Area remain the same
and the minimal reserve requirements may not be sufficient to balance
its system. As a consequence, national TSOs have to reserve a share of the interconnection capacity for
reserves, so that the other countries can assist it to balance the system. METIS does not explicitly model
reserve exchanges, but risk pooling.
Considering that for Option 1(b) an assumption was made that the NTC capacities were increased by 5%,
reflecting e.g. the reduced TRM compared to Option 1(a) due to the increased co-operation between MS via
ROCs, it is interesting to notice that the average capacity that needs to be reserved for sharing balancing
reserves is around the same level. On the other hand this does not signify something, as the averaging hides
the huge variability among hours and interconnectors.
It should be noted that the analysis excludes the effect that increased generation by thermal plants would have
on the carbon market and how this in turn would indirectly impact electricity generation.
149
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0150.png
markets and making them more flexible serves as a second option for bringing more flexibility
into the system, complementary to but also competing with flexible generation plants.
Enhancing TSO regional coordination through the establishment of regional operational centres
and by optimising market, operational, risk preparedness and network functions from the
national to the regional level will entail significant efficiency gains and increase social
welfare.
272
For example, the regional sizing and procurement of reserves via ROCs could lead
to benefits of EUR 3.4 billion compared to benefits of EUR 1.8 billion from national sizing and
procurement of reserves based on daily probabilistic methodologies.
273
Significant welfare
benefits would,
inter alia,
derive from the more efficient use of infrastructure and from a
decrease of financial losses that would otherwise result from the disconnection of demand in
case of generation shortages.
6.1.3.2.Who would be affected and how
Improving short-term markets will affect all generation operators to a certain extent but it will
in particular improve the ability of
variable RES E operators
to participate in the market.
Improving intraday and balancing markets would impact the work of the
TSOs
and
Power
Exchanges,
because of their involvement in the operation of these markets. On the one hand
this will require operating the system and organising trade within shorter timeframes. On the
other hand, the shorter timeframe will allow TSOs to benefit from significant efficiencies and
to reduce the risk of system problems.
TSOs
will also be affected through the need to
collaborate closer with neighbouring TSOs through ROCs and through the changes to the
balancing markets which they operate. This has the positive effect of requiring TSOs to consider
systematically the impact of their actions on their neighbouring TSOs.
6.1.3.3.Administrative impact on businesses and public authorities
The administrative impact on
businesses
is marginal as compared with the baseline.
Power exchanges
and
TSOs
would have to review and adapt their business practises to
facilitate the changes to the market functioning as envisaged under this option. Notably,
changes will have to be made to trading arrangements for intraday and balancing products.
TSOs would collaborate through ROCs, which will have to be set up. The setting up of the
ROCs can be estimated to cost between 9.9 and 35.6 million Euros per entity, depending on the
functions and degree of responsibilities attributed to the ROCs.
274
Whereas these costs are not insignificant, these costs of several million Euros (which would be
covered and compensated by grid fees) are minor when compared with the benefits this option
will bring.
272
273
274
For more information on the assessment of the economic impact of ROCs, please refer to Table 2 of Annex
2.3 of the Annexes to the Impact Assessment.
"Integration
of electricity balancing markets and regional procurement of balancing reserves",
COWI (2016).
"Integration
of electricity balancing markets and regional procurement of balancing reserves",
COWI (2016).
150
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0151.png
Impacts of Policy Sub-option 1(c) (Pulling demand response and distributed resources
into the market)
6.1.4.1.Economic Impacts
The series of measures assumed in this Option include (i) the adaptation of balancing products
closer to what distributed resources like demand response, variable RES and small scale storage
can provide, (ii) the facilitation of the participation of distributed resources in the market mainly
via aggregators and (iii) stronger incentives for the roll-out of smart-meters. These measures
significantly improve the efficiency of the market and the reduce costs.
The market set-up under Option 1(c) provides the opportunity to variable RES E to better
manage their imbalances due to forecast errors at lower cost (due to more competitive prices),
but also to receive additional revenues for any flexibility they can provide to the market.
Similarly, demand is offered the incentives and capability to respond to market prices and thus
complete existing electricity markets. This can be achieved by either shifting load from hours
of peak demand to hours with low demand (e.g. via storage or changing consumption partterns)
or by simply adjusting consumption (when load cannot be shifted or is not really needed)
275
.
Available data coming from a standalone analysis
276
performed on the impact of potential
policies promoting downstream price- and incentive-based demand response, at all customer
segments (industrial, commercial, residential), show that demand response can be of great
service, and deliver net benefits to the system as a whole while engaging all consumer segments.
More in particular, it has been demonstrated that demand response schemes can lead to a
reduction of the peak demand and thereby of the required backup capacity in both the
transmission and distribution networks. This also translates into lower investment needs.
The analysis has shown that in a business as usual scenario (reflected in Option 0) demand
response can account for approximately 34 GW, of which 19 GW will come from incentive and
15GW from price based demand response. With a supporting policy framework in place, as in
Option 1(c), demand response can account for approximately 57 GW in 2030, of which 39 GW
will come from incentive and 18 GW from price based demand response.
Allowing small-scale producers, storage and consumers to participate in the market, e.g.,
through aggregated bids, creates incentives for demand side response and flexible solutions,
pulls the above potential in the market and creates a more dynamic market. New flexible
resources are made available for reserve procurement and balancing market. These resources
bring significant short-term and mid-term flexibility
277
to the system, contributing to the more
efficient handling of scarcity situations and integrating variable RES E. This abundance of
275
276
277
As part of the limitations of the modelling approach, these benefits were not fully assessed because of data
unavailability. Therefore the same load profile was used, based on the ENTSO-E’s
TYNDP assumptions,
without being known at which extent it already included some DR (at least for EV charging)
See Annex 3.1 and "Impact
Assessment support Study on downstream flexibility, demand response and smart
metering",
COWI (2016).
For more details on the flexibility needs of the system and how storage, interconnections and demand response
can answer such needs please see "METIS
Study S7: The role and need of flexibility in 2030. Focus on Energy
Storage",
Artelys (2016).
151
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0152.png
available resources significantly reduces the cost of the power system and, most importantly,
the load payments to EUR 253 billion, from EUR 278 billion in the baseline and EUR 293
billion in Option 1(a).
These reported savings
278
are mainly a result of a significant shift in the provision of reserves
from thermal plants to demand side response (incl. storage) and wind. For example, while in
Option 1(b) (strengthening short-term markets), gas was providing about 20 GW of reserves,
hydro 19 GW and coal 3 GW, under Option 1(c) demand response partly replaces the above
plants by providing 5 GW of reserves. In particular demand response and small scale storage
(electric vehicles and heating storage) become the main providers of upward synchronized
reserves, providing 33% of corresponding needs
279
. Wind provides an additional 90 MW of
upwards synchronized reserves and 330 MW of downward synchronized reserves.
6.1.4.2.Who would be affected and how
The new provisions opening up the markets to aggregated loads and demand response will bring
business opportunities for aggregators, new energy service providers, and suppliers who choose
to expand their portfolio of services, but will also affect generators who are likely to face
reduced turnover from lower peak prices and from providing reserves.
Furthermore, demand side flexibility, along with access to real time data coming from smart
metering, will help the network operators optimise their network investments and cost-
effectively manage their systems. In the case of TSOs, it also allows for the better calculation
of settlements and balancing penalties based on real consumption data. On the other hand,
suppliers may face higher imbalances and resulting penalties as their customers change
consumption patterns.
Finally, end consumers are expected to benefit from more competition, access to wider choice,
and the possibility to actively engage in price based and incentive based demand response, and
hence from reduced energy bills. Even those end users who choose not to participate in demand
response schemes could still profit from lower wholesale prices that result from demand
response, assuming that the respective price reductions are passed on to consumers.
Box 6: The possibility of large-scale grid disconnection
Looking forward, our modelling (the EUCO27 scenario) shows a continuation of the general
trend of rising retail electricity prices through to 2030, stabilising from 2035 onwards. Given
the decreasing costs of small-scale renewable generation and storage technologies, concerns
have been raised that this trend could result in a growing number of prosumers becoming self-
278
The proposed measures are expected to also have an impact on the day-ahead market, but as explained in Annex
IV this was not possible to assess due to the lack of sufficient detailed data. Benefits from load shifting or load
reductions were not assessed with METIS due to the lack of a dynamic profile for demand and storage, which
would better capture the reactions of demand to market prices. These impacts were captured though with
PRIMES/IEM, results presented in Section 6.2.6.1. The benefits of demand response and its full potential is
analysed in more detail in Annex 3.
279
The analysis shows the demand response does not provide any downwards balancing at all (by increasing
demand when needed), as this is provided at a much lower cost by RES and conventional generation (by
decreasing generation and saving fuel costs). This result is subject to the limitations of the modelling that does
not use dynamic load profiles for demand and storage. Therefore the relevant benefits are most likely
underestimated in the assessment.
152
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0153.png
sustainable and disconnecting from the electricity network
a development that could have
several consequences.
On the one hand, this potential 'flight from the grid' could see the remaining connected
ratepayers bear an increasing share of the burden of contributing to public finances and
financing the electricity network. On the other, grid costs may actually fall as distributed
generation and storage assets enable network operators to more efficiently manage the grid and
connect remote customers.
Predicting the full extent and implications of this trend is difficult given the current
uncertainties, including regarding future cost reductions in small scale renewables and storage
technologies, and the lack of real-world case studies. Nevertheless, our analysis suggests that
this development will be progressive, and that the risks of large scale disconnections are limited
given the difficulties of achieving complete self-sufficiency throughout the year.
In particular, even if decentralised generation and storage becomes competitive, it is
questionable whether self-sufficient prosumers will fully disconnect from the grid.
Disconnecting would imply losing the grid as back-up for when their own generation is
inadequate (e.g. for sustained periods of low sunlight). It would also mean that prosumers
forego the opportunity to sell excess electricity to the market (e.g. during prolonged sunny
periods when their installed storage is at full capacity). This is one of the reasons why the MDI
aims at ensuring full access of prosumers to electricity markets.
It should be added that the discussion of disruptive large scale disconnections is not only
connected with distributed resources but to the perception that consumers are increasingly
confronted with perverse incentives and hidden subsidies. To address this, the initiative includes
measures that should lead to more cost-reflective distribution tariffs i.e. tariffs that allocate the
costs of the grid fairly amongst system users. Cost-reflective tariffs will send the right long-
term economic signals to system users and allow a market-driven move towards a more efficient
electricity system, which will contribute to limiting network tariffs and lead to investments that
are economically rational and efficient.
What is certain is that public authorities and network operators will have to adapt in order to
effectively manage the challenges of any transition towards a more decentralized electricity
system, and make the most of the opportunities this presents. Completely self-sufficient
consumers who do not wish to be connected to the grid should not contribute to the grid costs.
6.1.4.3.Impact on businesses and public authorities
The measures proposed to enable the uptake of demand response are designed to reduce market
barriers for new entrants and provide them with a stable operating framework. This is
particularly important for start-ups and small and medium-sized enterprises ('SMEs') who
typically offer innovative energy services and products. However, these measures may
introduce an additional administrative impact for Member States and their competent
authorities that will be required to clearly define in such a new setting: (i) roles and
responsibilities of aggregators, as well as (ii) arrangements for consumers' entitlement to
participate in price based demand response schemes, including their access to the enabling
smart metering infrastructure. At the same time, access to smart metering will support consumer
153
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0154.png
engagement, with better informed and more selective consumers also making it easier for NRAs
to ensure proper functioning of the national (retail) energy markets
280
.
Moreover, thanks to the wider deployment of smart metering, the distribution system operators
will be in a position to lighten, and improve, some of their administrative processes (linked to
meter reading, billing, dis/re-connection, switching, identification of system problems,
commercial losses), and offer increased customer services
281
. Similarly, transmission system
operators will optimise their settlement and balancing penalty calculations, as they can make
use of real time data coming from smart metering
282
.
Impacts of Policy Option 2 (Fully integrated EU market)
6.1.5.1.Economic Impacts
By creating a centralised, fully integrated European market with market design features and
procedures in place in order to deal with grid constraints and increase the available
interconnection capacity offered to the market (e.g. due to the further reduction of security
margins and the implementation of flow based market coupling across time-frames), the
European power system can be operated even more efficiently than in the options above.
Benefits coming from the further improvements in the dimensioning and procurement of
balancing reserves, now on a European level, as well as the better utilization of interconnectors
by the EU Independent System Operator, lead to further reductions of the total costs compared
to Option 1(c) by 1.5%. Reserve needs are further reduced by 30% compared to Option 1(c)
and 63% compared to the baseline, although downwards reserves, which have a low
procurement cost, are mainly procured on a national level, in order to use interconnectors
mainly for exchanging electricity instead of reserving it for potential assistance to/from the
neighbours.
The results indicate that although the economic benefits of moving from a national to a regional
approach (Option 1(b) (strengthening short-term markets)) are significant, the move towards a
more integrated European approach (Option 2) has a less significant economic value-added, as
most of the benefits have already been harvested by moving towards a regional approach. On
the other hand this result is also subject to the limitations of the modelling, not being able to
280
281
282
See Annex1(c).1, Stakeholders views; Reference CEER discussion paper
"Scoping of flexible response",
3
May 2016
“Bringing
intelligence to the grids
case studies”
(2013) Geode Report;
http://www.geode-eu.org/uploads/REPORT%20CASE%20STUDIES.pdf;
also
“Eurelectric
policy statement on smart meters”
(2010);
http://www.eurelectric.org/media/44043/smart-
metering-final-2010-030-0335-01-e.pdf
“Towards
smarter grids: developing TSO and DSO roles and interactions for the benefit of
consumers”
(2015) ENTSO-E;
https://www.entsoe.eu/Documents/Publications/Position%20papers%20and%20reports/150303_ENTSO-
E_Position_Paper_TSO-DSO_interaction.pdf;
“Market
design for demand side response”
(2015) ENTSO-E
Position paper;
https://www.entsoe.eu/Documents/Publications/Position%20papers%20and%20reports/entsoe_pp_dsr_web.
pdf
154
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0155.png
capture the positive impacts from the more efficient operation of the network (since METIS
does not include detailed network modelling).
6.1.5.2.Who would be affected and how
Under this option, TSOs, DSOs, power exchanges, electricity undertakings in general as well
as Member States and competent authorities would be subject to far-reaching organisational
changes (e.g. EU ISO and EU Regulator instead of national TSOs and regulators), and bound
by fully harmonised rules setting out the full integration of the EU electricity market. This
increases the likelihood that these rules may be difficult to implement in specific countries. This
could lead to high resource requirements amongst these stakeholders, public authorities and
Member States, that may be ultimately borne by consumers.
6.1.5.3.Impact on businesses and public authorities
The creation of a fully integrated European electricity market can be considered the most
efficient of all the options and could, in the long run, avoid frictions from coordination and
provide for a high quality electricity system with a high degree of security of supply. Under this
option, it could be argued that in the long run the impact on stakeholders (e.g., TSOs, DSOs,
power exchanges, electricity undertakings, etc.) may be reduced, since the integration of the
electricity market would ensure a high degree of consistency.
However, this option would entail significant changes compared to the current state of the art
of the electricity systems across the EU. It would be necessary to build new entities, processes
and methods without being able to draw upon established practice (e.g., for the establishment
of an EU ISO). Hence, there is a risk that this would lead to disruptions and would require a
significant amount of time to become operational.
This option would also reduce the scope to take into account regional specificities and to draw
upon established regional actors. This option would reduce the scope to develop rules at the
regional level between the parties involved in organising the cross-border trade and system
operation. This is because the key framework as well as the institutional structure would already
be set out at the pan-European level.
In light of the above, it should be noted that the political and administrative effort required
under this option would be considerable.
Environmental impacts of options related to Problem Area I
The measures proposed in this Problem Area aim to improve the cost-efficiency and the
flexibility of the power system. By doing so, climate-friendly variable RES E can be better
integrated in the market; resources are used more efficiently, and unnecessary fuel-based
generation (e.g. backup generation needed because of missing rules for cross-border short-term
markets) can be avoided by better using the aggregation potential of the internal market. Using
the full potential of demand response has also a positive effect on the environment. If
consumption can be shifted more easily to off-peak times, less backup generation from fuel-
based plants is needed.
On the other hand, the removal of privileged rules for certain production forms may lead to a
shift from some RES E production (i.e. biomass) to other generation types which will not only
be wind and solar, but also fossil fuel-based. Therefore, although direct CO
2
emissions from
155
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0156.png
the power sector decrease while moving from Option 1(a) to Option 1(c), from 615 Mt CO
2
to
600 Mt C0
2
, METIS results show an increase when moving from the baseline to Option 1(a) by
60 Mt CO
2
. The analysis of the impact on emissions is, however, complex
283
.
The removal of priority dispatch from biomass (as well as from any other resource, including
must-run generation) is pivotal in restoring the economic merit order in the power markets and
significantly increasing their economic efficiency. Such a measure would discontinue the use
of expensive biomass as baseload generation, replacing it by the marginal technologies (mainly
coal and gas). Expensive biomass would then mainly be used in the power sector as a flexible
generation technology, as well as for providing reserves.
The replacement of biomass by gas and coal could lead in the short-term to increasing
emissions. The environmental impacts of the market design measures cannot though be
examined in isolation from all other complementary energy and climate policies. At the EU
level, the reduction in greenhouse gas emissions within the sectors covered by the EU ETS is
guaranteed by the declining cap which in turn ensures that the emissions reductions objective
is met cost-effectively. In the event of an increase in emissions from certain changes in the
power sector mix, the corresponding increase in demand for allowances would raise the carbon
price leading to an increase in abatement through other means, whether this is through a fuel
switch in power generation elsewhere or an emissions reduction in other ETS sectors. Due to
the binding limit on overall emissions a reduction in the use of biomass would therefore
eventually result in the same amount of GHG emissions over time, with a different fuel mix at
a lower total system cost.
The main effects of removing priority dispatch for biomass are therefore:
-
only cheaper fractions of biomass are being used (such as waste streams), while the
more expensive one is being used as flexible dispatchable generation, rather than
subsidised baseload;
-
overall higher CO
2
prices and lower generation costs, and higher wholesale electricity
prices (but most likely lower retail prices, as no subsidies will need to be recuperated
outside the wholesale market).
-
more favourable conditions for gas, with more operating hours;
The possible increase in emissions in the power sector is in reality the effect of current energy
policies for RES E (and specifically the incentives given by the subsidization of biomass) and
not of electricity market related policies. By removing the distortions currently present in the
electricity markets, the market is able to give clearer signals on the interactions between climate
and energy policies and help identify the right balance between cost and resource efficiency
and emissions reduction.
Summary of modelling results for Problem Area I
The analysis shows that although today electricity markets function much better than in the
past, there are still significant gains to be harvested. Restoring the merit order and creating a
283
It should be noted that the analysis excludes the effect that increased generation by thermal plants would have
on the carbon market and how this in turn would indirectly impact electricity generation.
156
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0157.png
level-playing field for all technologies can reduce the operational cost
284
from EUR 83.4 billion
in Option 0 to EUR 77.5 billion in Option 1(a). Another EUR 2.7 billion can be saved by further
strengthening and linking the short-term markets; EUR 0.9 billion by better integrating demand
response and RES E into the market; and EUR 1.1 billion from fully integrating EU markets.
Overall, the measures under Option 1(c) can lead to cost reductions up to 11.4% compared to
the baseline, while the additional measures under Option 2 would raise this to 12.7%.
When considering the above results, three important points need to be made. First of all the cost
saving estimates for each option are directly related to the volume of traded energy (and
reserves) they concern. Option 1(a) (level playing field) affects all market frames, but most
notably the day-ahead, where the largest volume of trades takes place. Options 1(b)
(strengthening short-term markets) and Option 2 (fully integrated markets) focus on
interconnections (for all market time frames), intraday and balancing; traded volumes there are
only a fraction of the ones of the day-ahead. Option 1(c) (demand response/distributed
resources) concerns mainly the balancing and reserve markets
285
. Secondly, the effect of the
measures on the intraday and balancing traded volumes is much greater, but more difficult to
quantify, as it is bi-directional (upwards and downwards compared to the day-ahead scheduled
energy) and complementary to the day ahead market
286
. Finally the proposed blocks of
measures were deemed as the most efficient ones, but also were found to have limited impact
on the reported results
287
.
Apart from the cost savings, which relate only to the generation side costs, it is important to
also examine the final cost of the wholesale market for the consumers, referred to below as
'Load Payments' (see Glossary). With the removal of all special rules affecting dispatch, the
wholesale price begins reflecting the actual marginal value of electricity and thus increases; this
affects also the Load Payments which increase by 5%. Subsequent Options though bring more
resources into the market, better utilizing the interconnections and further improving the cost-
efficiency of the market, gradually reducing the Load payments by 6% in Option 1(b)
(strengthening short-term markets), 9% for Option 1(c) (demand response/distributed
resources) and 11.5% for Option 2 (fully integrated market) compared to the baseline. The
above are equivalent to a reduction of the wholesale market cost for the consumer
288
from 78
EUR/MWh in the baseline to 71 EUR/MWh for Option 1(c) and 70 EUR/MWh for Option 2.
284
285
286
287
288
Cost reflects the operational cost of the electricity system (reflecting mainly fuel cost and CO
2
cost). Lower
cost implies a more efficient operation of the system.
The proposed measures are expected to also have an impact on the day-ahead market, but this was not possible
to assess due to the lack of sufficient detailed data. See also footnote 278.
There are two important connections with the day-ahead market. The closer the day-ahead schedule matches
the optimal dispatch (based on realized demand and generation), the smaller the need to act in the shorter term
markets; and how interconnection is split between day-ahead and intraday. For this reason it is preferable to
look at the results as a whole and not separately for each market frame.
A sensitivity performed with METIS introducing the Option 1(c) measures (demand response/distributed
resources) before Option 1(b) (strengthening short-term markets) shows a marginal improvement of Option
1(c) benefits by EUR 0.3 billion, despite the much higher potential for improvement still available in the
market in the context of this Option.
If these costs were shared equally among consumers.
157
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0158.png
Table 10: Monetary Impacts (in billion EUR) of the assessed Options (for EU28+NO+CH
in 2030)
Monetary Impacts (billion EUR)
289
Option 0
Option
1(a)
Level
playing
field
76.9
0.9
-0.3
0.5
-0.8
77.5
5.9
293
-15
Option
1(b)
Strengtheni
ng short-
term
markets
73.5
1.2
0.1
0.7
-0.6
74.8
8.6
262
16
Option
1(c)
Demand
response/
distributed
resources
72.7
1.1
0.1
0.7
-0.6
73.9
9.5
253
25
Option 2
Baseline
Cost day-ahead
Cost intraday
Cost balancing
upwards
downwards
Total cost
Cost savings
Load Payments
day-ahead
Load Payment
Savings
Source: METIS
82.5
1.4
-0.5
0.7
-1.2
83.4
-
278
-
Fully integrated markets
72.4
0.3
0.1
0.7
-0.6
72.8
10.6
246
32
The monetary impacts described in Table 10 are very closely linked to the impacts of the
measures on the wholesale prices. In Option 1(a) (level playing field) the increase of the
competitive segment of the market from 40% (due to priority dispatch and must-runs) to 100%
is the main driver for a more cost-efficient operation of the system, with no negative prices
observed in the performed model runs, leading in the end to higher day-ahead prices. In parallel
the reserve prices are generally lowered, due to the reduction of the inflexibility in the system.
Only mFRR upwards prices increase, as these services are now primarily offered by peaking
units.
In Options 1(b) (strengthening short-term markets) the trends reverse, as more resources enter
the market, thus lowering day-ahead prices. The better utilized interconnection capacity and the
improved functioning of the reserve markets allows baseload plants to produce more electricity
in the day-ahead, while the more flexible (and expensive) plants become the main providers of
reserves. As a consequence, balancing prices tend to increase (together with intraday prices).
Subsequently, the introduction of demand response and the provision of reserves by RES E in
Option 1(c) (pulling demand response and distributed resourced into the market) further lower
wholesale prices (as more resources enter the market), with the exception of downwards reserve
prices which increase
290
. Finally the impacts of Option 2 (fully integrated markets) are similar
to the ones of Option 1(b) (strengthening short-term markets).
289
290
Unless otherwise noted, figures in all tables represent annual numbers for 2030. The geographical context is
always noted in the title of each graph and in some cases it also covers NO and possibly CH because of the
market coupling of EU Member States with these countries.
Downwards balancing activation is a benefit (fuel savings) for the system, while there is no gain (in METIS)
to increase demand.
158
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0159.png
Table 11: Impacts (EUR/MWh) to Average Annual Wholesale Prices (for EU28 in 2030)
Average Wholesale Prices (EUR/MWh)
Option 0
Baseline
Day-ahead Market
Price
291
Balancing Price -
aFRR upwards
Balancing Price -
aFRR downwards
Balancing Price -
mFRR upwards
Balancing Price -
mFRR downwards
Source: METIS
Option 1(a)
Level playing
field
82.5
58.3
52.5
82.3
65.2
Option 1(b)
Strengthening
short-term
markets
73.9
76.2
54.4
85.6
64.7
Option 1(c)
Demand
response/
distributed
resources
71.3
71.3
59.8
76.3
58.4
Option 2
Fully
integrated
markets
69.6
72.3
60.6
76.3
58.3
78.4
71.9
52.8
72.1
70.1
An interesting aspect to examine is the distributional impact of the various options on the
generator surplus (i.e. revenues above cost) and consumer surplus (i.e. cost below VoLL). It is
important to note that this should not be interpreted as an investment or "missing money"
analysis, since the modelling used here is static (based on the same set of capacities across the
options). The issue of investments is analysed in Section 6.2.6.3, using a dynamic investment
model (PRIMES/OM).
With the day-ahead prices significantly affected by the measures, so does generator surplus (i.e.
revenues above cost). The distributional impacts on the market players though are concentrated
on thermal generators, with competitive RES E generators even increasing their day-ahead
revenues (not considering the additional revenues from the other markets).
Although in the baseline thermal generation seems to be making reasonable revenues, sufficient
in many cases to cover fixed costs
especially for gas units
the improvements in the market
design introduced in Options 1(b) (strengthening short-term markets), 1(c) (demand
response/distributed resources) and 2 (fully integrated markets) lead to a significant decrease
of their revenues, turning their operation to loss-making. Note, this result is a large extent due
to the static modelling approach followed here and the increased competition in the market, as
a result of bringing more resources into it and better utilising interconnections (thus better
sharing national resources across EU). With the power generation capacities remaining constant
across Options, this leads to a market with increasing resources participating (to the point of
oversupply) and more intense competition, thus shrinking revenues.
291
EU weighted average price on Member States' demand
159
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0160.png
Table 12: Generator Surplus
292
(in EUR/kW) for different plant categories (for EU28 in
2030)
Generator Surplus (EUR/kW)
Option 0
Baseline
Solids
OCGT
CCGT
Nuclear
Hydro
Solar
Wind onshore
Wind offshore
Source: METIS
394
112
191
451
204
65
117
176
Option 1(a)
Level playing
field
393
102
178
490
215
73
133
204
Option 1(b)
Strengthening
short-term
markets
146
34
39
435
200
74
137
211
Option 1(c)
Demand
response/
distributed
resources
124
19
29
418
194
74
137
213
Option 2
Fully
integrated
markets
108
9
22
413
190
75
137
213
Similarly, the introduced measures have certain consequences on the generation production,
although these tend to be relatively limited. Summarizing what has already been discussed in
the dedicated assessment of each option, and presented in Table 13:
-
The main impact on the electricity generation patterns appears in Option 1(a), when
dispatch begins reflecting the economic merit order. Most notably, biomass generation
is replaced mainly by gas and coal generation.
Otherwise, generation patterns remain relatively stable across Options, except for some
shifting of gas generation to nuclear in Option 1(b) (strengthening short-term markets).
This comes as a result of the more efficient interconnection allocation and procurement
of reserves, which leads to the utilisation of nuclear and lignite plants mainly for
producing energy, while the more expensive gas plants are used more for reserves and
balancing.
RES E curtailment and activation of replacement reserves is steadily reduced across all
options, as all measures introduce more and more flexibility to the system. In fact
replacement reserves are no longer needed in Option 2.
Procurement of Balancing Reserves also decreases substantially, from 79.6 GW in the
baseline to only 29.6 GW in Option 2. The gradual drop in the required reserves is an
outcome of the specific measures assumed in each case and explained in more detail in
the assessment of the respective options.
-
-
-
292
Reported surplus concerns day-ahead and reserve market revenues. Some additional revenues (but minor in
comparison) should be expected from the intraday and balancing markets (but were difficult to identify and
report).
160
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0161.png
Table 13: System Operation Results (for EU28+NO+CH in 2030)
Option 0
Option 1(a)
Level playing
field
Option 1(b)
Strengthening
short-term
markets
Option 1(c)
Demand
response/
distributed
resources
Option 2
Fully integrated
markets
Baseline
Net Electricity Generation (TWh)
Total
Biomass & Waste
Hydro
293
Wind
Solar
Lignite
Nuclear
Coal
Gas
Others
RES Curtailment
(GWh)
3618
236
632
722
303
269
755
237
455
10
13.0
3606
78
623
726
303
274
775
272
545
10
8.3
3599
73
618
728
303
278
800
274
515
10
6.0
3588
72
609
729
303
279
803
268
516
10
5.0
3586
71
607
729
303
280
804
266
515
10
4.6
Balancing Procurement (GW)
Reserve
Dimensioning
of which FCR
of which aFRR
of which mFRR
Reserves via
interconnections
294
Replacement
Reserves
Activation
295
(GWh)
Source: METIS
79.6
12.4
20.5
46.6
-
600
65.8
12.4
20.4
33.1
-
100
42.3
12.4
10.1
19.8
12.2
80
42.3
12.4
10.1
19.8
11.7
60
29.6
12.4
6.0
11.1
18.7
0
In terms of distributional impacts across the EU regions, results are strongly related to the
respective generation mix of each region, as well as to how well interconnected each region is
to the others. For the regions with significant biomass generation (e.g. region 3), there are
significant cost savings when moving from the baseline to Option 1(a) (level playing field).
293
294
295
Hydro includes pumped hydro storage whose utilisation decreases from Option 0 to Option 2.
The reserves via interconnections are computed as the difference between the reserves needed to face the
national risks and the procured reserves.
Activated for avoidance of Loss of Load
161
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
Similarly, the benefits of Option 1(b) (strengthening short-term markets) and Option 2 (fully
integrated markets) are more significant for the Member States that are better interconnected
(Regions 1 and 2). Option 1(c) (demand response and distributed resources) reduces costs for
all regions, except for Region 5, as the competition with additional reserve resource decreases
the cost for reserve procurement. Similar observations apply for the load payments and the
wholesale prices. It is also worth noting how wholesale prices tend to converge as markets
become more harmonised and better functioning, with the exception of Region 4 (Spain &
Portugal), which has a limited interconnection to the rest of EU only via France.
162
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0163.png
Table 14: Distributional Impacts
regional perspective
296
(for EU28 in 2030)
Option 0
Baseline
Option 1(a)
Level playing
field
Option 1(b)
Strengthening
short-term
markets
Option 1(c)
Demand
response/distributed
resources
Option 2
Fully
integrated
markets
Total cost
Day Ahead Market (billion EUR)
Region 1
Region 2
Region 3
Region 4
Region 5
42.1
6.9
13.3
5.5
14.3
40.3
5.5
10.7
5.3
14.9
39.4
4.8
9.6
5.0
14.6
38.9
4.5
9.4
4.9
14.9
38.6
4.4
9.3
5.0
14.9
Total Load Payments
Day-Ahead Market (billion EUR)
Region 1
Region 2
Region 3
Region 4
Region 5
157
36
26
17
37
161
40
31
18
37
138
34
30
19
36
131
32
30
19
36
126
30
30
19
37
Average Day-Ahead Market Price (EUR/MWh)
Region 1
Region 2
Region 3
Region 4
Region 5
Source: METIS
88.1
87.6
63.3
49.6
70.9
90.6
97.2
75.5
53.2
71.8
77.3
81.6
73.8
55.2
70.6
73.3
78.0
73.0
54.6
70.6
70.6
73.6
73.0
55.5
70.8
296
Regions as indicated in footnote 244.
163
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0164.png
6.2.
Impact Assessment for Problem Area II (Uncertainty about future generation
investments and fragmented capacity mechanisms)
Methodological Approach
6.2.1.1.Impacts Assessed
Similarly to Problem Area I, the assessment focused on the economic impacts of the examined
options. The emphasis though is not on the operation of the power system and the integration
of RES E, but on whether the market revenues can incentivize the necessary investments and
most importantly
on the relevant cost for the consumer. Inefficiencies resulting from
fragmented approaches to CMs are also considered.
The impacts of the options to the environment and the society, excluding their economic
aspects, are directly linked with the changes in the generation capacities of each option. Other
significant, direct or indirect, impacts for the examined options were not identified.
The assessment is presented individually for each option, with qualitative analysis and
references to quantitative results. The detailed modelling results for the various options, along
with their interpretation, are presented in section 6.2.6.
6.2.1.2.Modelling
The modelling for this part was performed using PRIMES/OM, a specific version of the
PRIMES model that can assume different types of competition in the electricity market, as well
as model how CMs affect the investment decisions of the market participants. PRIMES/OM
was selected over METIS for this part of the analysis, because it can model in detail the
investment decisions of the market participants over an extended time-period, namely until
2050, while at the same time being able to capture the effect of different bidding behaviours
from the side of the market participants (necessary to assess the impact of scarcity pricing).
In addition, PRIMES/IEM (a day-ahead and unit commitment simulator developed by NTUA)
was used to assess in more detail the benefits of the energy-only market. Contrary to METIS
297
,
PRIMES/IEM places more emphasis on accurately simulating the market behaviour of
generators by assuming specific bidding strategies followed by the market participants and
departing from the usual marginal cost assumption
298
. Moreover, PRIMES/IEM was able to
capture the effect of introducing locational price signals, as it includes a network model. Further
297
298
Due to the differences in the two modelling approaches and underpinning assumptions of METIS and
PRIMES/IEM, a direct comparison of the two sets of modelling results could be misleading.
The marginal cost assumption is perhaps the most usual assumption in the dispatch type of models, as it helps
focus more on the effect of market design measures and departs from competition or behavioural issues.
However, one cannot capture well the effect of measures like scarcity pricing under the marginal cost bidding
assumptions, as the prices would fluctuate between the marginal cost of the most expensive running plant and
VoLL (or price cap), which is not what is observed in practice in the market.
164
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0165.png
details on both models and the methodological approach followed can be found in Annex IV,
as well as in the relevant NTUA report
299
.
The above tools were complemented by a study performed using METIS, analysing the revenue
related (weather-driven) risks faced by conventional generation and how these could be
mitigated, while also identifying the value of co-ordinated solutions
300
.
6.2.1.3.Overview of Baseline (Current Market Arrangements)
The baseline reflects the current market arrangements of Problem Area I, similar to what is
described in section 6.1.1.4. In addition it is assumed that Member States put in place price
caps, as well as that there may be systemic congestion in the transmission grid.
Comparing the baselines of Problem Areas I and II in modelling terms, certain differences exist
in terms of figures and assumptions, mainly reflecting the differences in the respective
modelling approaches
301
intended to better capture the options assessed in each Problem Area,
as well as their calibration to a different version of EUCO27
302
. Under this baseline:
-
-
-
-
-
-
Price caps apply as today
303
;
Units bid according to bidding functions by plant category
304
and not marginal costs;
The unit commitment simulator applies a flow-based allocation of interconnections;
Modelling includes more detailed information on generation capacities, including
vintages, technology types and technical characteristics of plants;
The day-ahead market covers only part of the load, as is the case today. A large part
of the energy (especially produced by inflexible units) is nominated.
The baseline of this Problem Area fully reflects EUCO27.
Nevertheless, both models identify similar trends concerning the operation and the revenues of
the various generation types, as already presented in Problem Area I.
299
300
301
302
303
304
"Methodology
and results of modelling the EU electricity market using the PRIMES/IEM and PRIMES/OM
models",
NTUA (2016)
"METIS
Study S16: Weather-driven revenue uncertainty for power producers and ways to mitigate it",
Artelys
(2016)
Further details can be found in Annex IV.
METIS had to be calibrated to PRIMES much earlier than PRIMES/IEM. Therefore, a preliminary version of
EUCO27 was used as the basis for the calibration. The main differences of the two versions concerning the
power sector can be found in Annex IV.
For more details please see: "Electricity
Market Functioning: Current Distortions, and How to Model Their
Removal",
COWI (2016).
The basis is the marginal fuel cost of the plant, increased by a mark-up defined hourly as a function of scarcity,
calculated for each market segment in which the respective plant category usually operates (e.g. peak, mid-
merit, baseload). Further details can be found in Annex IV.
165
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0166.png
Impacts of Policy Option 1 (Improved energy markets - no CMs )
6.2.2.1.Economic Impacts
Option 1 assumes that Member States can no longer put in place CMs. The analysis is hence
solely based on a strengthened energy-only market.
With sufficient economic certainty, investments should in principle be able to take place based
on the electricity price signal alone, provided that the price signal is not significantly distorted.
Further, the electricity price, and its behaviour, should stimulate not only investment in
sufficient capacity when needed (be it production or demand), but also in the right type of
capacity. A steady electricity price, one that does not vary significant on an hour-to-hour basis,
should steer investment to the types of capacity that can operate steadily at lowest production
cost. A rapidly fluctuating electricity price should steer investment to capacity that can ramp-
up and ramp-down very quickly and can take advantage of high prices at short notice and avoid
operation when prices are too low. The shift to variable generation will increasingly require
fast-ramping and highly flexible generation and cause the market exit of less flexible types of
generation capacity. Investment uncertainty and varying prices are not a unique feature to the
electricity industry
305
.
In this way, the effect of variable renewables, insofar as their deployment will increase the
variability of the electricity price, should stimulate investment in the flexible capacity needed
to keep the system in balance at all times. Ensuring that prices can reflect market fundamentals
is key to this and removing as many potential distortions on electricity prices is critical to
enabling it to play this function.
Indeed, the analysis performed with PRIMES/OM supports the arguments above, showing that
an energy-only market can in general deliver cost-efficiently the necessary investments in
thermal capacity (especially flexible one). The enhanced market design will also improve the
viability of RES E investments, but electricity market revenues alone might not prove sufficient
in attracting investments in RES E in a timely manner and at the required scale to meet EU's
2030 targets. (See in this regard also the box on RES E investments in Section 6.2.6.3).
Moreover, PRIMES/IEM results show that undistorted, energy-only markets can significantly
decrease load payments by around EUR 50 billion
306
in 2030. The largest part of these savings
is attributable to the improvements in the short-term markets and the participation of demand
response in the market, representing EUR 20 billion and EUR 26 billion savings respectively
in 2030. The implementation of measures introducing a level playing for all technologies and
removing price caps brings EUR 5 billion savings in 2030 and at the same significant more
cost-efficiency to the system, as explained in Section 6.1.2.1.
305
306
See in this respect e.g. the report by Frontier Economic on
"Scenarios for the Dutch electricity supply system",
p. 134.
https://www.rijksoverheid.nl/documenten/rapporten/2016/01/18/frontier-economics-2015-scenarios-
for-the-dutch-electricity-supply-system
The benefits become almost double compared to Option 1(c) as assessed with METIS, due to the additional
distortions included in the baseline and measures to address them, on top of the expected differences due to
the different modelling approach. The two figures give a satisfactory range on the possible benefits for Europe
from an improved energy only market design.
166
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0167.png
As resources are better utilised across the borders compared to the baseline, and demand can
better participate in markets, undistorted energy-only markets are able to improve the overall
cost-efficiency of the power sector significantly. Equally, it can ensure resource adequacy (See
in the regard also Section 6.2.6.3).
It thus follows that by improving the energy markets, the need of government intervention to
support investments in electricity resources is reduced
6.2.2.2.Who would be affected and how
As this option encompasses to the largest extent the options discussed under Problem Area 1,
the assessment made there as to who would be affected and how applies here as well.
With regard to more variable pricing, they will benefit owners of flexible resources, such as
flexible
generation capacity, storage and demand response,
and incentivise them to come to
or stay in the market. In this end, they will provide the motor for more innovative services and
assets to be deployed.
End consumers
will be affected insofar as changes to the wholesale price are passed on to them
in their retail price. However, more variable prices will not necessarily be felt by end-consumers
as they can be hedged (particularly households) against this volatility in their retail contracts or
through wholesale market arrangements. In fact, more variable pricing will incentivise the
development of more sophisticated energy wholesale market products allowing price and
volume risks to be hedged more effectively.
Power exchanges
would be impacted by removal
of price caps as they will be required to introduce changes to systems and practices.
Minimising investments and dispatch distortions due to transmission tariff structures would
mostly affect
generators.
Positive impacts on their revenues would be expected due to lower
connection charges or tarrifs.
TSOs
will be affected by improvements in locational price signals as it would likely mean that
they hold and operate networks over more than one price zone. To a lesser extent this applies
to
power exchanges
as these are often already operating in different price zones today.
Spending of the congestion income to increase cross-border capacity may have impact on
end
consumers,
where the congestion income is used for the reduction of tariffs. But this should be
outweighed by the positive effect of more cross-border capacity being available, and the benefit
this has on competition and energy prices.
6.2.2.3.Administrative impact on businesses and public authorities
As this option encompasses to the largest extent the options discussed under Problem Area I,
the assessment made there as regards administrative impacts made there also applies here
307
.
Overall, the administrative impact on
businesses and public authorities
should be limited as,
even if the measures associated with Option 1 (in addition to those assessed under Problem
307
For the impact of the additional measures (removing price caps, introduction of locational price signals, etc.),
a detailed analysis is also presented in Annexes 4.1 to 4.4.
167
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0168.png
Area I) require changes, they are not fundamentally different from the tasks performed already
under the baseline scenario.
More variable pricing will incite the development of more sophisticated energy wholesale
market products allowing price and volume risks to be hedged more effectively. This should
help reduce lower overall risks to
businesses.
Impacts of Policy Option 2 (Improved energy markets
CMs only when needed, based
on a common EU-wide adequacy assessment)
6.2.3.1.Economic Impacts
This option builds on a strengthened energy market (Option 1). Indeed, as developed in Section
2.2.1, undistorted energy price signals are fundamental irrespective of whether generators are
solely relying on energy market income or also receive capacity payments. Therefore, the
measures aimed at removing distortions from energy-only markets are 'no-regrets' and assumed
as being integral parts of Options 2 and 3.
In addition, the option assumes the presence of CMs but only in those Member States for which
a resource adequacy assessment performed at European level has demonstrated a resource
adequacy problem. As no restrictions are placed on these CMs, it is assumed they foresee
implicit cross-border participation (i.e. only taking into account imports and exports in the
dimensioning of the CM, without any remuneration of foreign capacity).
In order to highlight the importance of considering the regional aspects in a generation adequacy
assessment, Artelys performed an independent study
308
assessing the capacity savings that can
be obtained from a European approach in capacity dimensioning for resource adequacy in
comparison to a resource adequacy assessment conducted at Member State level.
The mode used jointly optimises peak capacities given security of supply criteria
309
for two
reference cases
without cooperation (capacities are optimised for each country individually,
as if countries could not benefit from the capacities of their neighbours) vs. with cooperation
(capacities are optimised jointly for all countries, taking into account interconnection capacities
(i.e. NTCs). The difference in installed capacity between the two cases reveals the savings could
be made from cooperation in investments.
Results show that almost 80 GW of capacity savings across the EU can be achieved with
cooperation in investments. This represents a gain of EUR 4.8 billion per year of investments
310
when comparing the two extremes. A reason for these savings is that Member States have
different needs in terms of capacity with peak demands that are not necessarily simultaneous.
Therefore, they can benefit from cooperation in the production dispatch and in investments. It
should be noted that this figure does not assess at which stage Member States are currently (i.e.
308
309
310
"METIS Study S16: Weather-driven revenue uncertainty for power producers and ways to mitigate it",
Artelys
(2016). The results of this study are spelled-out in more detail in Annex 2.2.
A value of 15k€/MWh for loss of load is used and system adequacy is assessed on 50 years of hourly weather
data. For more details on the characteristics of capacity dimensioning, see Annex 2.2.
The 80 GW of capacity savings are a result of optimal investment decisions on EU level, based on an EU
approach vs a national approach. Efficient market functioning can also provide efficient investment signals
leading to more efficient investments. See section 6.2.6.3.
168
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
whether some Member States already benefit from the capacities of their neighbours), as the
benefits have already been reaped by some. It should also be noted that this figure does not
include savings on production dispatch, which could lead to much higher monetary benefits.
PRIMES/OM was used to assess the impact of introducing CMs on a certain number of
countries, with the CMs foreseeing implicit cross-border participation. The runs assumed that
four countries were justified based on a EU-wide adequacy assessment, to have a CM: UK,
Italy, Ireland and France. This assumption was based on a selection of countries from the Sector
Inquiry on Capacity Mechanisms (as the model always ensures that the expected security of
supply levels are always met).
The analysis shows that the introduction of CMs lowers wholesale prices, but to a limited
degree, primarily in the MS introducing CMs, but also to all EU countries due to the assumed
well-functioning markets. On the other hand this does not translate to reduced Load Payments
for the consumers on a EU level, as the CM related costs slightly exceed the reductions in the
cost of the wholesale energy market in 2030. This difference though becomes quite significant
in the longer term, making Option 1 cheaper than Option 2 by an average of EUR 4
billion/annum when comparing over the period 2021-2050. Interestingly enough, the
consumers of the Member States introducing CMs face a EUR 7 billion increase in costs in
2030, while the cost for all other EU Member States drop by a similar amount.
6.2.3.2. Who would be affected and how
EU-wide resource adequacy assessments would benefit
consumers
through maintaining high
standards of security of supply while lowering costs through reduced risk of over procurement
of local assets as foreign contribution to national demand and demand side flexibility would be
sufficiently taken into account.
ENTSO-E
would be required to carry out an EU-wide resource adequacy assessment based on
national raw data provided by TSOs (as opposed to a compilation of national assessments).
ENTSO-E
would also have to provide an updated methodology with probabilistic calculations,
appropriate coverage of interdependencies, availability of RES E and demand side flexibility
and availability of cross-border infrastructure.
NRAs/ ACER
would be required to approve the
methodology used by ENTSO-E for the resource adequacy methodology and potentially
endorse the assessment.
TSOs
would be obliged to provide national raw data to ENTSO-E
which will be used in the EU-wide resource adequacy assessment.
Member States
would be better informed about the likely development of security of supply
and would have to exclusively rely on the EU-wide resource adequacy assessment carried out
by ENTSO-E when arguing for CMs.
With the updated methodology provided by ENTSO-E, intermittent
RES generators/ demand-
side flexibility
would be less likely to be excluded from contributing to resource adequacy.
6.2.3.3.Impact on businesses and public authorities
The main burden would be for ENTSO-E having to provide for a single 'upgraded' methodology
and to carry out the assessment for all EU countries. Important to note is that ENTSO-E has
already been carrying out an EU-level resource adequacy assessment based on Union
legislation. However, the methodology used has to be upgraded which would require increased
manpower. Nonetheless, the
administrative costs
of this 'updated' assessment are expected to
169
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0170.png
be marginal compared to the economic benefits that would be reaped. It is estimated that these
these costs
311
would range from EUR 4-6 million per year (representing mainly personnel and
IT costs).
Impacts of Policy Option 3 (Improved energy market
CMs only when needed, plus
cross-border participation)
6.2.4.1.Economic Impacts
This option builds on Option 2, i.e. a strengthened energy market and CMs only in Member
States where justified by a European adequacy assessment. In addition, this option provides an
EU framework for explicit cross-border participation in CMs.
Explicit cross-border participation lowers overall system costs compared to implicit
participation, as it corrects investment signals and enables a choice between local generation
and alternatives. As more capacity will be participating in the CM, than in the implicit
participation case, competition will be more intense and thus CM payments lower. In addition,
the enhanced competition will extend also to the wholesale market, thus leading to lower market
clearing prices.
Based on the same setup as in Option 2 (Improved energy market
CMs only when needed,
based on EU resource adequacy assessment) only now with explicit cross-border participation
(i.e. remunerating foreign resources for their services) instead of only implicit (i.e. only taking
into account imports and exports in the dimensioning of the CM, without any remuneration of
foreign capacity), PRIMES/OM estimates that explicit cross-border participation would result
in significant savings. Results show that explicit participation brings savings of EUR
2 billion
(in 2030) compared to implicit participation, with savings significantly increasing in the long
run to more than EUR 100 billion over the whole projectin period of 2021-2050 (i.e. about EUR
3.5 billion per annum). The main reason is enhancement of competition in the CM auction and
the resulting lower auction prices.
By remunerating foreign resources for their services, this option is likely to better ensure that
the investment distortions of uncoordinated national mechanisms present in Option 2 are
corrected and that the internal market able to deliver the benefits to consumers.
6.2.4.2.Who would be affected and how
A positive impact of cross-border capacity mechanism would be expected on the foreign
capacity providers,
generators, interconnectors and aggregators.
They would receive the
possibility to participate directly in a national capacity auction, with availability obligations
imposed on the foreign capacity providers and the interconnecting cross-border infrastructure.
Foreign capacity providers/ interconnectors would be remunerated for the security of supply
benefits that they deliver to the CM zone and but would also receive penalties in case of non-
availability.
311
The economic costs linked to resource adequacy assessments are based on own estimations, resulting from
discussions with stakeholders and experts. For more details, see Annex 5.1.
170
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0171.png
NRAs/ACER
would be required to set the obligations and penalties for non-availability for
both participating generation/demand resources and cross-border transmission infrastructure.
ENTSO-E
would be required to establish an appropriate methodology for calculating suitable
capacity values up to which cross-border participation would be possible. Based on the ENTSO-
E methodology,
TSOs
would be required to calculate the capacity values for each of their
borders. They might potentially be penalized for non-availability of transmission infrastructure.
TSOs
would also be required to check effective availability of participating resources.
6.2.4.3.Impact on businesses and public authorities
Providing an EU framework with roles and responsibilities of the involved parties would enable
explicit cross-border participation (as already required by the EEAG). Although the cost of
designing cross-border participation in CM depends to some extent on the design of the CMs,
an expert study
312
estimated that such cost corresponds roughly to 10% of the overall cost of
the design of a CM
313
. In addition, they estimate costs associated with the operation of a cross-
border scheme i.e. additional costs if cross-border participation is facilitated to amount to 6-30
FTEs
314
for TSOs and regulators combined. Providing for an EU framework would remove the
need for each
Member State
to design a separate solution and potentially reduce the need for
bilateral negotiations between
TSOs and NRAs,
reducing the overall impact on these
authorities. According to the same study, TSOs and NRAs bear the main costs related to cross-
border participation as they have to check eligibility and ensure compliance. The study
estimates cost savings of 30% on these eligibility and compliance costs compared to the
baseline. It would also reduce complexity and the administrative impact for
businesses
operating in more than one zone.
Environmental impacts of options related to Problem Area II
The impacts of these measures to the environment are very limited, as they mainly influence
the generating capacity but not so much the operation of the units, which is the source of
emissions. The actual emissions depend on the merit order and the relation of the marginal cost
of coal in comparison to the marginal cost of gas. This in turn depends on the CO
2
price and
the relation of coal versus gas price, and not on whether there is a CM in place or not.
Overview of modelling results for Problem Area II
6.2.6.1.Improved Energy Market as a no-regret option
Several facts speak in favour of market design which relies on an improved energy market as
the driver for investment and operation. As already described in the assessment of Problem
Area I, the improvements in the wholesale market described under Option 1 of Problem Area I
(level playing field, strengthening short-term markets, pulling demand response and distributed
resources into the market) are expected to bring significant benefits and reduce the need to
correct market failures with capacity markets. These benefits are further enhanced when
considering the additional measures considered in this Option (e.g. removal of price caps, a
312
313
314
Thema (2016),
Framework for cross-border participation in capacity mechanisms
(First interim report)
The same expert study also found that the overall cost of of the design are fairly small compared to the overall
cost of the CM (remuneration of the participation ressources).
FTEs in other phases refer to (annually) recurring costs.
171
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0172.png
process which leads to the introduction of locational price signals reflecting systematic
congestion, limiting curtailments of interconnector capacity).
The benefits of further improving the market in this way, assessed this time using the
PRIMES/IEM model, are presented in Table 15 below. The level of the reported figures in
Table 15 are higher compared to Table 10 due to the inclusion of more distortions in the baseline
of PRIMES/IEM, as well as the use of scarcity bidding, instead of marginal cost bidding in
METIS
315
.
Table 15: Cost of supply in the wholesale market in the year 2030
316
Load Payments (billion EUR)
Day-
ahead
Market
Current Market Arrangements
(in context of low price caps, systematic
congestion)
Level playing field + removal of low
price caps
Strengthening short-term markets +
removal of low price caps, locational
price signals
Demand response / distributed resources
into the market + removal of low price
caps, locational price signals, demand
response in day-ahead
Source: NTUA modelling (PRIMES/IEM)
Intra Day
Market
22.1
17.1
11.6
Reserves
and
balancing
7.7
6.8
1.9
Total
356.0
351.4
331.2
326.2
327.5
317.6
300.4
4.0
1.0
305.4
Overall, despite differences in the modelling approaches, results of PRIMES/IEM are fairly
consistent with METIS results used to access the options from Problem Area I, especially
concerning the ranking of the respective options. The results indicate that the "improved energy
market" Option could significantly decrease wholesale supply costs by around EUR 50 billion
in the year 2030. As a consequence, the unit cost of generation paid by the consumers would
315
316
At the same time the assumption that CHP, small scale RES E and biomass retain (implicitly in some cases)
priority dispatch in PRIMES/IEM in the first three examined cases
but not for small scale RES in the last
one -, implies lower percentage changes when moving between the first three options, due to the smaller
generation affected by the measures, but at the same time a more significant one for the last option. More
details on the exact assumptions can be found in Annex IV.
The rows correspond to the respective options of problem area I (except Option 2). In addition though Option
1(a) (level playing field) is complemented by the removal of price caps; Option 1(b) (strengthening short-term
markets) is complemented by the introduction of locational price signals; and Option 1(c) with demand
response participating also in the day-ahead market (which could not be captured by METIS, as it captured
demand response in the intraday and balancing markets only). The last row reports the aggregate costs of
Option 1 of Problem Area II.
172
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0173.png
drop from 102.9 EUR/MWh to 94.7 EUR/MWh, the largest part of which is attributable to the
participation of demand response in the market
317
.
The above analysis highlights the importance of an improved market design, with all the
measures described under Option 1(c) of Problem Area I, together with scarcity pricing and the
proper locational signals (as added under Option 1 of Problem Area II), irrespective of whether
generators are solely relying on energy market income or also receive capacity payments.
Therefore the measures aimed at removing distortions from energy markets are considered as
'no-regrets'.
6.2.6.2.Comparison of Options 1 to 3
In order to better assess the dynamic behaviour of markets and how markets can also provide
investment signals, modelling analysis was performed using PRIMES/OM
318, 319
. Option 1
assumes an improved energy-only market for all Member States. Options 2 and 3 assume that
the improved energy-only market is complemented in certain cases by a national CM
320,321
as a
means for the Member States to address possible forecasted resource adequacy problems in
their markets, on the basis of a resource adequacy assessment performed at the European level.
The difference between the two options is that Option 3 assumes that the CM foresees rules for
effective, explicit cross-border participation, while Option 2 does not.
For the scope of this assessment, four countries were assumed to be in need of a CM: France,
Ireland, Italy and UK. This hypothesis was not based on a resource adequacy analysis, but on
the CMs examined under DG COMP's Sector Inquiry, focusing specifically on countries with
market-wide CMs. (Results could differ if different countries were selected, which is why a
sensitivity, presented below, was performed).
317
318
319
320
321
Contrary to METIS, in PRIMES/IEM demand response resources participate also in the day-ahead market,
thus bringing additional savings for the relevant Option. The impact is much more significant in this case
because the day-ahead market covers the vast majority of transactions.
PRIMES/OM delivers results complementary to the ones of market simulation models, like METIS and
PRIMES/IEM, as its focus is on investments. The main difference of PRIMES/OM with other energy system
investment models, like PRIMES, is that while PRIMES model analyses revenues/costs at the level of the
generation portfolio, the PRIMES/OM evaluates the probability of plant survival depending on the economic
performance calculated individually for each plant. A detailed description of PRIMES/OM can be found in
Annex IV.
The results will not be compared directly to the baseline as it was not technically possible to produce robustly
this scenario using PRIMES/OM. Nevertheless this does not affect the assessment, as all options build upon
the preferred option of Problem Area I.
The simulation of the CM auction by country, which is based on an estimation of a demand curve for capacity
procurement, takes into account imports and exports in the context of market integration using power flow
allocation of interconnection capacities. Therefore, the capacity procurement is configured so as to avoid
demanding for unnecessary capacities, as imports are considered to contribute to resource adequacy. Similarly,
exporting countries configure demand for capacity procurement taking into account capacity needed to
support exports.
When a country is assumed to have a CM in place, it is assumed that generators no longer follow scarcity
pricing bidding behaviour, but shift to marginal cost bidding. This is partly a result of competition, as more
generation remains in the market, as well as the expectation that when a plant gets a CM remuneration as a
result of an auction it foregoes revenues that would otherwise be needed to be covered from the day-ahead
market (e.g. because it signs a reliability option contract or a contract for differences with a strike price
effectively acting as a price cap to the generator's revenues from the energy market).
173
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
The main conclusions when comparing Options 1-3 are presented in Table 16 and can be
summarized in the following:
-
The load payments for the three Options are very comparable when assessed at the EU28
level. For the year 2030, Option 3 (Improved energy market
CMs only when needed,
plus cross-border participation) is slightly cheaper by EUR 1 billion compared to Option
1 (Improved energy markets - no CMs) and by EUR 2 billion compared to Option 2
(Improved energy markets
CMs only when needed, based on a common EU-wide
adequacy assessment);
Results actually show that Option 3 is consistently cheaper than Option 2 throughout
the projection horizon until 2050 and on a EU28 level. This is mainly due to the lower
cost of the CMs, as through the cross-border participation more resources can compete
for the relevant payments;
As a result of the above, the average annual cost of total demand is very close for Option
1 and Option 3, with the lowest cost option alternating along the years. Option 3 is
always less costly for the consumer than Option 2 though.
When comparing the Options for the whole projection period, i.e. 2021-2050, Option 1
is found to be EUR 17 billion cheaper than Option 3 (on average about EUR 0.5
billion/annum) and EUR 120 billion cheaper than Option 2 (on average EUR 4
billion/annum). The main reason for this difference is that CMs provide incentives to
retain capacity on the system that otherwise would have exited the market. This cost is
somewhat balanced by the slightly lower energy prices observed in the market, although
the final cost to the consumer comprises of both the energy and the CM cost.
-
-
-
174
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0175.png
Table 16: Main Impacts over the projection period 2020-2050 on EU28 level
2020
2025
2030
2035
2040
2045
Option 1
Option 2
Option 3
Option 1
Option 2
Option 3
Option 1
Option 2
Option 3
Option 1
Option 2
Option 3
Option 1
Option 2
Option 3
241
241
241
Load Payments (billion EUR)
316
351
419
447
312
306
352
350
428
426
454
452
557
560
553
2050
516
530
526
516
518
516
-
12
10
122
123
122
132
135
134
Load Payments for energy and reserves (billion EUR)
241
316
351
419
447
557
241
241
302
297
340
340
417
417
443
443
548
543
Load Payments to capacity mechanisms (billion EUR)
-
-
-
-
-
-
-
-
74
74
74
80
80
80
11
9
11
10
11
9
11
10
11
10
135
133
132
146
147
145
Average SMP (billion EUR)
95
103
118
115
91
89
100
100
117
117
114
114
Average cost of total net demand (EUR/MWh)
102
111
127
125
101
99
111
110
129
129
127
126
Source: NTUA Modelling (PRIMES/OM)
Note:Option 1: Improved energy markets - no CMs
Option 2: Improved energy markets
CMs only when needed, based on a common EU-wide adequacy assessment
Option 3: Improved energy market
CMs only when needed, plus cross-border participation
In order to better understand the impacts
322
of the CMs and the effect of cross-border
participation, Table 17 presents the impacts in 2030 for the three following groups of countries:
(a) the countries implementing a CM, (b) their direct neighbours and (c) the rest of the EU
countries.
Results for Option 2 shows that by introducing a CM in the assumed four countries, the actual
distribution of cost varies among the different groups of countries. Countries implementing a
CM are significantly burdened, mainly due to the cost of the CM, while their neighbours benefit
from it.
322
The impacts of CMs on the energy mix were very limited, inducing only some limited switching in electricity
generation from coal to gas plants.
175
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0176.png
In particular countries implementing the CM are burdended with an additional EUR 6.8 billion
of costs, while the cost of their neighbours drops by EUR 3.6 billion. Even the cost of the rest
of the EU countries drops by EUR 2.9 billion. The cost of energy and reserves is reduced for
all countries
323
. In the countries implementing a CM the cost is reduced about two times more
than in the rest coutries, thus leading to lower payments for energy and reserves. However,
these reductions are outbalanced by the CM costs, borne solely by the countries introducing
CMs. The CMs induce an additional EUR 11 billion of payments, part of which are attributed
to the 5 GW of capacity which would otherwise have retired early in the absence of CMs.
Moving to Option 3, i.e. assuming explicit cross-border participation in the CMs, the results
compared to Option 2 improve in terms of cost-efficiency, not only for the whole EU as
presented above, but also for the countries implementing CMs. On the other hand the benefits
for the countries without a CM are slightly reduced.
In particular, the analysis for the year 2030 shows that explicit cross-border participation is still
worse-off for the countries with a CM compared to the energy-only market, costing EUR 3.6
billion more then the energy-only market, but better than implicit cross-border participation,
which costs an additional EUR 3.2 billion to the countries with CM.
In general, modelling results indicate that a CM, compared to an energy-only market, is likelier
to keep more capacity in the system, part of which would have otherwise exited due to making
losses in the energy market. As more capacity is kept in the Member States with a CM, less
capacity is needed in the other Member States, especially the neighbouring ones, which then
rely more on imports.
As it was discussed above, these results are influenced by the specific choice of countries
assumed to have a CM. To address this issue, an additional sensitivity was performed,
comparing the cases of all Member States introducing a CM, either with implicit or explicit
cross-border participation (same applying for all). Results show that the case of CMs with
explicit cross-border participation is less costly, with load payments being EUR 7 billion less
(about 2%) in the year 2030. Half of this benefit is coming from the reduced CM payments and
half from the reduced energy and reserve payments.
323
This result is related to some specific characteristics of these countries. France is heavily exporting electricity
based on nuclear and this is not affected by the establishment of a CM in France. This is also the reason why
energy costs drop across Europe. The UK and Italy heavily depend on CCGT plants in the context of the
scenario examined and, in addition, have limited free space in interconnections, because they are saturated by
import flows of nuclear energy coming from France.
176
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0177.png
Table 17: Distributional Impacts of Options for Member States in 2030
324
Option 1
Option 2
Improved energy
markets
CMs only
when needed, based
on a common EU-
wide adequacy
assessment
140
131
79
Option 3
Improved energy
market
CMs only
when needed, plus
cross-border
participation
Improved energy
markets - no CMs
Load Payments in 2030 (billion EUR)
MS with CMs
MS directly neighbouring MS with CM
Rest of the MS
133
135
82
137
132
80
Load Payments for energy and reserves (billion EUR)
MS with CMs
MS directly neighbouring MS with CM
Rest of the MS
133
135
82
129
132
80
127
132
80
Load Payments to capacity mechanisms (billion EUR)
MS with CMs
MS directly neighbouring MS with CM
Rest of the MS
0
0
0
Average SMP (EUR/MWh)
MS with CMs
MS directly neighbouring MS with CM
Rest of the MS
104
102
103
100
100
101
98
100
101
11
0
0
10
0
0
Cancelling of Investments or Early Retirements of Capacity in 2021-2030 (GW)
325
MS with CMs
MS directly neighbouring MS with CM
Rest of the MS
Source: NTUA modelling (PRIMES/OM)
18
35
10
9
41
10
9
42
11
The main reason for the overall improved performance and reduced costs of Option 3 compared
to Option 2 is the enhancement of competition in the CM auction and the resulting lower auction
prices when allowing for explicit cross-border participation. This reduction lowers the revenues
of generators from a CM, but the probability of capacity reduction does not significantly
increase, compared to the case with implicit cross-border participation. Explicit cross-border
324
325
Impacts comparing the effects to countries assumed to have CMs and countries without. The 4 countries
assumed to have CMs in 2030 (France, Italy, UK, Ireland) were chosen based on the finding of DG COMP
Sector Inquiry. No specific assumption was made for the design of the relevant CMs. Differences are due to
the peculiarities of each national energy system, mainly related to its power mix and its level of
interconnections. Results could be different if other MS had been chosen.
The values under "cancelling of investments or early retirements of capacity" represent excess capacity which
becomes redundant due to the improved market functioning. Early retirement in the model is market-based,
coming as a result of anticipating a negative present value of earnings above operation costs in the future, in
comparison to the remaining value of the plant.
177
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0178.png
participation in the CM auctions implies that competition is stengthened not only in the CM,
but also in the electricity wholesale market.
6.2.6.3.Delivering the necessary investments
Despite the different modelling approaches followed, the analysis with both METIS and
PRIMES/IEM reach a similar conclusion: improving the electricity market design is a no regret
option for the society as a whole. It is expected to reduce both the cost of operating the power
system, as well as the final cost for the consumers.
At the same time though the two models showed that these savings come to the detriment of
the thermal generator revenues, which are expected to be reduced compared to the baseline.
This modelling conclusion is a consequence mainly of the following two reasons:
-
on one hand, the improved market design increases competition in the market, by
bringing more resources into the market and better utilisation of interconnections;
-
on the other hand, capacities are assumed to be constant due to the nature of the
modelling (static, focusing on 2030 based on the same capacities across all options).
The combination of the two points above leads to a market with overcapacity
326
and thus low
prices, since there is no scarcity and there is sufficient capacity of flexible resources. In reality
though, the low prices in a well-functioning market would serve as a signal for lower
investments and exit of loss-making generators. Therefore this overcapacity should either never
appear or only be temporary.
The above dynamic interactions were better captured with PRIMES/OM, which simulated
investment behaviour till 2050
327
. In an energy-only market context, PRIMES/OM projected
that 63 GW of capacity would either be retired early or the relevant investments would be
cancelled in the period 2021-2030. About half of it would come from (mainly old) coal plants
and another half from peaking units or steam turbines fuelled by oil and gas.
The reason for retiring capacity and cancelling investments is the unprofitable operation of the
units. From the results it is indicated that the market can be successful in maintaining CCGT in
operation and, partly, peak devices. On the other hand it does not provide sufficient incentives
to retain old coal and old oil/gas steam turbine power plants, which are loss-making.
Table 18: Power generation
328
capacity in EU28
Power Generation
Capacity (GW)
2030
2040
1,271
2050
1,504
Cancelling of Investments or Early
Retirements of Capacity (GW)
2021-2030
63
2031-2040
68
2041-2050
48
Total
1,094
326
327
328
Moreover the capacity mix is not optimal any more.
All modelling runs assume certain reliability standards are met (i.e. security of supply concerns are always
met)
Reported generation capacities do not include capacities of CHP plants. Reported figures on cancelled
investments do not include 2 GW of cancelled nuclear investments in 2021-2030 and another 2 GW in 2041-
2050.
178
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0179.png
Coal & Lignite
Peakers & Steam
turbines (oil/gas)
CCGT
Nuclear
77
12
158
110
45
6
165
124
14
6
175
122
32
28
0.3
2
45
16
7
0
33
8
4
2
Source: NTUA Modelling (PRIMES/OM)
In this context of adjusting capacities, the profitability
329
of thermal generation changes
significantly for the better. Scarcity pricing and the reduction of overcapacity are the main
drivers for this. Table 19 below shows how the adjustment of capacities, together with scarcity
pricing, would affect wholesale prices and allow thermal plants to at least recover their total
costs from the market.
Table 19: Effect of adjusting capacities to wholesale market prices in 2030
Day-Ahead Market Price
Before Adjusting Capacities
Day-Ahead Market Price
After Adjusting Capacities
103
93
103
137
44
Average Price (EUR/MWh)
Baseload
Mid-merit
Peak load
89
80
90
94
14
Spread (EUR/MWh)
Source: NTUA Modelling (PRIMES/IEM, PRIMES/OM)
330
In this context, the market seems able to deliver to a large extent the necessary investments for
all competitive technologies in the long term. A new CCGT plant, which is the marginal
technology, constructed post-2025 (when overcapacity is gradually resolving) will likely
remain profitable over the following 20 years of its operation. If this plant is part of a larger
portfolio, especially if it includes competitive RES E technologies, then it will be able to better
hedge its risks and further increase the likelihood that the whole portfolio will be profitable.
More specifically per technology:
CCGT
Scarcity bidding succeeds in maintaining the vast majority of CCGT
capacity, a large part of it being new investments in the period 2021-
2030. These plants have a variety of revenue sources (day-ahead,
intraday, balancing, reserves) and the projected increase in ETS prices
makes them economically more attractive to operate. As a result CCGT
plants are dispatched more often at full capacity.
329
Profits are highly dependent on the assumed fuel costs, technology costs and CO
2
price. Therefore the
discussion in this Section should be read in a probabilistic context, i.e. the "likelihood" of the investments
being profitable, similar to how the modelling of investment decisions was performed. Concerning the specific
assumptions used, PRIMES/OM was based on the relevant PRIMES EUCO27 projections, reported in Annex
IV.
330
PRIMES/IEM results are before capacity adjustment, PRIMES/OM after adjustment. Similar assumptions and
the same bidding strategies were used in both models, thus results are comparable, within the limitations of
each modelling approach.
179
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0180.png
Nuclear
Nuclear plants do not have any revenue issues, due to their low
marginal cost. Note that new investments in nuclear appear only in the
long-term.
These plants have the biggest revenue problems, as market revenues
prove insufficient even to cover their fuel and variable (non-fuel) costs.
There was very limited new investment in the projections even in the
baseline, so this issue mainly concerns decisions for the refurbishment
of coal plants.
Peak units and steam turbines (many of them old) do not produce
comfortable revenues until 2035
331
. Around that period though and due
to the strong investments in variable RES E and the increasing needs
for flexible capacity, the situation turns around, rendering these units
very profitable.
The situation for RES E is contrasted, depending on the level of
maturity of RES E technologies. Even if some less advanced RES E
technologies would need support to emerge as part of the power
generation mix towards 2030, this is not the case for many competitive
RES E technologies, such as hydro, onshore wind and solar PV (at least
in some parts of Europe)
332
. For a more elaborate discussion on this
point see the text box below on RES E investments and market design.
Coal / Lignite
Peak devices
RES E
(excl. biomass)
CHP
biomass)
(incl. CHP
333
remains unprofitable over the whole projection period when
considering only their electricity market related revenue streams. It
should be considered though that the main use of these plants is
assumed to be the production of industrial steam/heat, with electricity
being a side-product. Therefore, no conclusion should be made based
on these partial results. Similar for biomass (outside industrial CHP),
additional revenues are assumed to come from support schemes and
the value of heat when producing heat for district heating.
331
332
333
"METIS
Study S16"
shows that peakers’ revenues highly depend on the occurrence of scarcity hours that
happen mainly during very cold years, which constitutes an additional risk for peakers who rely on scarcity
prices to generate revenues. On the contrary, base-load producers have more stable revenues from one year to
the other.
A more detailed analysis can be found in the RED II impact assessment, specifically in Annex 5, where a
detailed analysis on the viability of RES E projects is presented for the period post-2020.
The category of CHP plants includes only those which serve industrial steam and district heating as their main
function. Other CHP plants have been appropriately distributed within the capacities of the respective
technologies.
180
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0181.png
The following table summarizes the projected profitability for all generation technologies over
the period 2020-2050:
Table 20: Average profits or losses
334
for different plant categories in the case of an energy
only market over the projected horizon 2020
2050 in EUR/kW for EU28
Total
Sol i ds
Stea m turbi nes oi l /ga s
CCGT
Pea k
Nucl ea r
La kes
Run of Ri ver
Geotherma l
Wi nd ons hore
Sol a r PV (l a rge)
RES (s ma l l )
Wi nd offs hore
Bi oma s s
Sol a r therma l
Ti da l
CHP s ol i ds
CHP ga s
CHP bi oma s s
CHP oi l
2020
-46.9
69.9
-66.2
-75.1
-53.7
-47.5
144.0
268.4
153.3
1.9
-63.0
-115.0
-6.2
-137.9
-678.7
-5,569.9
-136.9
-163.8
-338.5
-333.2
2025
9.1
94.8
-116.7
-55.6
-50.1
102.8
162.3
309.3
235.4
30.7
-1.2
-101.4
-83.8
-171.2
-666.4
-4,105.4
-203.5
-185.8
-336.1
-459.2
2030
35.7
1.6
-117.3
-23.2
-51.9
141.0
185.6
335.4
313.8
82.2
25.6
-48.5
-85.9
-141.3
-466.2
-308.5
-208.5
-169.3
-324.0
-487.9
2035
78.4
-111.5
-93.8
27.6
-11.8
249.4
205.9
355.3
438.3
117.2
58.6
34.7
-18.2
-59.0
-422.0
-252.8
-227.6
-128.4
-289.9
-372.3
2040
68.8
-80.9
-90.7
-23.5
224.2
233.8
211.9
304.9
477.1
118.5
49.0
19.1
2.6
-74.1
-385.3
-175.7
-315.5
-207.7
-292.3
-367.8
2045
129.2
-89.7
-68.5
21.1
344.1
374.5
270.5
345.3
443.4
173.1
86.1
24.9
127.7
20.5
-265.1
-116.0
-364.8
-235.5
-128.3
-629.5
2050
80.5
-207.7
-120.9
-59.6
36.8
259.4
263.4
209.0
356.1
142.1
62.5
5.0
55.9
13.2
-415.0
-130.0
-434.8
-328.0
-90.1
-413.8
Source: NTUA modelling (PRIMES/OM)
It is important to highlight that the above analysis has been performed per individual plant basis.
Although this reflects project finance type of decisions, it does not reflect portfolio-based
decisions, which are closer to the usual power sector business model for utilities, due to
economies of scale. The portfolio approach (e.g. investing in both wind and peak generators)
allows the sharing of risks between different technologies, directly improving the performance
of the investments.
Similarly the above analysis does not consider the existence of any type of contracts between
supply and demand, be it long-term contracts, futures (e.g. EEX hedging products) or even
typical contracts between utilities and residential/commercial consumers. Such contracts,
concluded on a purely voluntary market basis, would again transfer part of the risk of the
generators to consumers, in exchange of higher security of supply, protection against price
spikes and more stable payments, allowing both sides to better manage their risks. This would
in turn increase the likelihood of the investments turning out to be profitable.
The above analyses also highlights that the market, of improved along the lines with the
measures assessed in the present impact assessment, can deliver to a large extent the necessary
334
The reported results concern financial evaluation at individual plant level. In the context of PRIMES/OM,
profits or losses are defined as follows: revenues from day-ahead market, revenues from reserve market,
revenues from CM (if applicable) minus sum of fuel costs, variable non-fuel costs, O&M fixed costs and
capital costs. For capital costs the model estimates the not-yet amortized value of initial investment
expenditure for old plants (including cost of refurbishment if applicable) and the investment expenditures for
new investments. As these are aggregate numbers, they approximate but are not equal to the missing money
(as when calculating aggregate profits, one unit's losses may cancel out with another unit's profits, while when
calculating missing money you only add the losses).
181
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0182.png
investments for a wide range of technologies in the long term, thereby reducing the need for
government intervention to support investment in electricity resources.
Box 7: RES E investments and market design
Amongst all sectors that make up our energy system, electricity is the most cost-effective to
decarbonize. Currently about one fourth of Europe's electricity is produced from renewable
energy sources. Modelling indicates that the share of RES E in electricity generation needs to
almost double by 2030 in order for the EU to meet its 2030 energy and climate targets.
A functioning market is the most efficient tool to implement the decarbonisation agenda at least
costs while securing electricity supplies at all times.
The Commission's ambition for the post-2020 context is that renewable electricity generators
can earn an increasingly larger fraction of their revenues from the energy markets.
This ambition requires adapting the market design for the cost-effective operation of variable,
decentralised generation, and improving the market as the catalyst for investments by removing
regulatory failures and market imperfections. In a nutshell, markets will need to:
(a)
be more focused on short-term trading, including cross-border trading, to allow
electricity from wind and solar energy to effectively compete in the market;
(b)
link wholesale and retail markets to increase the flexibility of the system, let consumers
benefit from times of cheap electricity, let them engage in demand response systems
and produce electricity themselves; and,
(c)
become even better at generating investment signals
as a matter of principle, it should
be the market through its price signals triggering investments.
In this context, the present impact assessment investigates a number of options that improve
market functioning by removing market distortions between different types of generation, that
render the market's operation more flexible and adapted to the cost-effective operation of
variable generation and improving the conditions for the participation of decentralised, flexible
resources, such as demand and storage, into the market. Moreover, it investigates various means
to improve price signals inciting investment in the right resources and location and investments
in infrastructure.
The enhanced market design will improve the viability of RES E investments, but electricity
market revenues alone might not prove sufficient in attracting renewable investments in a
timely manner and at the required scale to meet EU's 2030 targets.
The enhanced market design and the strengthened ETS will improve the viability of RES E
investments, in particular through the following channels:
-
Where the marginal producer is a fossil fired power plant, a higher carbon price translates
into higher average wholesale prices. The existing surplus of allowances is expected to
decrease due to the implementation of the Market Stability Reserve and the higher Linear
Reduction Factor, reducing the current imbalance between supply and demand for
allowances;
-
Greater system flexibility will be critical for a better integration of RES E in the system,
reducing their hours of curtailment and the related forgone revenues; improving overall
182
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0183.png
-
-
-
-
system flexibility is equally essential to limit the merit-order effect
335
and thus in avoiding
the erosion of the market value of RES E produced electricity
336
The revision of priority dispatch rules and the better functioning of the short-term markets
will strongly reduce (even eliminate according to the analysis) the occurrence of negative
prices
leading again to higher average wholesale prices (especially during the hours with
significant variable RES E generation);
Improved market rules for intraday and balancing markets will increase their liquidity and
allow access to those markets for all resources, thus helping RES E generators reduce their
balancing costs;
Removing existing (explicit or implicit) restrictions for the participation of all resources to
the reserve and ancillary services markets will allow RES E to generate additional revenues
from these markets.
Price signals reflecting the actual value of electricity at each point of time, as well as the
value of flexibility, will help ensure that flexible capacity is properly rewarded, channelling
investment into such capacities or prevent its decommissioning.
With technology costs gradually reducing, ETS price increasing and the electricity market
prices better reflecting the value of electricity, RES E investments in the electricity market will
gradually become more and more market-based, reflecting the balance of supply and demand
for the coming years and the associated costs to each technology.
The present impact assessment and the one on the RED II thus jointly come to the conclusion
that the improved electricity market, in conjunction with a revised ETS could, under these
conditions, deliver investments in the most mature renewable technologies (such as solar PV
and onshore wind).
However, despite best efforts in market integration, electricity market revenues alone might not
prove sufficient in attracting renewable investments in a timely manner and at the required scale
to meet EU's 2030 targets. This investment gap is analysed in more details in the RES II impact
assessment. The analysis shows that the picture is dynamic, with the enhanced market design
and the strengthened ETS gradually and increasingly improving RES E profitability over the
2021-2030 period. At the beginning of the period, over-capacity, low ETS and wholesale
market prices and still high RES E technology costs, make the case for investments in RES E
technologies more difficult. However, an increasing ETS price, a more flexible and dynamic
electricity market, technology costs reductions and adjustments in capacity increasingly
facilitate investments over this period
337
.
335
336
Also referred occasionally as the 'cannibalisation effect'.
The inherent variability of wind exposure and solar radiation affects the price that variable renewable
electricity generators receive on the market (market value). During windy and sunny days the additional
electricity supply reduces the prices. Because the drop is larger with more installed capacity, the market value
of variable renewable electricity falls with higher penetration rate, translating into a gap to the average market
value of all electricity generators over a given period (See Hirth, Lion, "The
Market Value of Variable
Renewables",
Energy Policy, Volume 38, 2013, p. 218-236)
183
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0184.png
The impact assessment for RED II concludes that over the period 2021-2030 around half of the
additional RES E capacity will still need some kind of support, but with significant decrease in
the number of investments needing support towards 2030.
In particular, less mature RES E technologies, such as off-shore wind, will likely need some
form of support throughout the 2021-2030 period. These technologies are required if RES E
technologies are to be deployed to the extent required for meeting the 2030 and 2050 energy
and climate objectives, and provide an important basis for the long-term competitiveness of an
energy system based on RES E.
The picture also depends on regions. RES E technologies are more easily financed from the
market in the regions with the highest potential (e.g. onshore wind in the Nordic region or solar
in Southern Europe), while RES E continue to largely require support in the British Isles and in
Central Europe.
Additionally, it should be noted that the speed at which RES E parity
338
is reached, in addition
to the successful implementation of the MDI and ETS, also depends on factors that lay outside
of the scope of these initiatives, including: (i) continued decrease in technology costs for RES
E as well as complementary technologies (e.g. storage); (ii) the availability of (reasonably
cheap) capital, which is a function of many variables, including project-specific and RES E
framework-specific risks, but also general country risk; (iii) continued social acceptance; (iv)
sufficiently high and stable fossil fuel prices.
The need for a framework for RES E support schemes
In order to address the risks associated with investments in RES E and the chance of failing to
meet EU's 2030 target for RES, the MDI and the RED II impact assessments jointly consider
that electricity market and ETS policies need to be complemented by an improved policy
framework on RES E support schemes.
Against this background, the RED II impact assessment investigates options to ensure that, if
and where support is needed, support is only applied where needed in a manner that is: (i) cost-
effective and kept to a minimum, and (ii) creates as little distortions as possible to the
functioning of electricity markets, and to competition between technologies and between
Member States. Indeed, the market can only deliver the full benefits sketched above, if policies
fostering RES E are compatible with the market environment in which they operate.
In particular, the RED II impact assessment suggests creating a common European framework
for support schemes. The framework would be effective as it would define design principles (i)
that ensure sufficient investor certainty over the 2021-2030 and (ii) require the use (where
needed) of market-based and cost-effective schemes based on emerging best practice design
(including principles that are not covered by the current State Aid guidelines).
At the same time, the framework would be proportionate by leaving actual implementation to
the State Aid guidelines (e.g. for the definition of thresholds applicable for any foreseen
exemptions) and, most importantly, to the case by case, evidence-based, in-depth assessment
338
i.e. the moment when LCOE decreases to the level of the actual market value of the asset to be financed.
184
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0185.png
of individual schemes by the services of DG Competition .Importantly, the framework would
enshrine in legislation and expand the requirement to tender support; it would define tender
design principles, based on emerging best practice, to ensure the highest cost-efficiency gains
and to ensure market incentives are least distorted by the support mechanism.
The framework would thus strengthen the use of tenders as a natural phase-out mechanism for
support, by which a competitive bidding process determines the remaining level of support
required to bridge any financing gap
such level of support being expected to disappear for the
most mature technologies over the course of the 2021-2030 period.
The importance of a framework for RES E support schemes for the present initiative.
It is also important to note that the progressive reform of RES E support schemes as proposed
by the RED II initiative, building on the EEAG, is a prerequisite for the results of the present
initiative to come about. In order to ensure that a market can function, it is necessary that market
participants are progressively exposed to the same price signals and risks. Support schemes
based on feed-in-tariffs prevent this and would need to be phased-out, with limited exemptions,
and replaced by schemes that expose RES E to price signals, as for instance premium based
schemes. This would be further supported by setting aid-levels through auctioning as RES E
investment projects will then be incentivised to develop business models that optimise market-
based returns
339
.
How different types of CMs might affect RES E remuneration in the market
In market-wide, volume-based CMs, assets are remunerated if they can respond to specific
technical performance criteria (i.e. in practice if they are dispatchable). Hence, it is likely that
variable RES E producers (wind and solar) cannot participate in such schemes to the same
extent as dispatchable generators. As the introduction of a market-wide volume-based scheme
might render scarcity-based pricing less effective, RES E producers might receive less income
then they would otherwise be able to earn on energy-only markets. A well-designed strategic
reserve (provided it is activated (only at value of lost load and activated as a measure of last
resort (see above)), is less likely to have a negative impact on market revenues for intermittent
RES E, as such a scheme relies on commodity price signals only and does not interact with
scarcity-based pricing.
6.2.6.4.Level and volatility of wholesale prices
The analysis performed using all three models (METIS, PRIMES/IEM, PRIMES/OM)
confirms that the projected investments in low carbon technologies, combined with increased
demand response participation, are not expected to lead to the collapse of the wholesale market
prices in the short and medium term. Although there will be hours with low (or even negative)
prices, the wholesale prices will most probably be set by the marginal thermal generation
technology during most hours of the year. Table 21 presents the distribution of wholesale prices
339
See also Annex IV for more information for information on the robustness on
185
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0186.png
in 2030, assessed for the various options of Problem Area I with PRIMES/IEM. Results indicate
that the wholesale prices will fluctuate, but within reasonable limits on an EU level
340
.
Table 21: Distribution of load weighted day-ahead market prices
341
in 2030
Number of Hours
Day-ahead price
in 2030 (EUR/MWh)
Option 0
Option 1(a)
Option 1(b)
Option 1(c)
Strengthening
Fully
Level playing
Baseline
short-term
integrated
field
markets
markets
Below 60
Between 60-80
Between 80-90
Between 90-100
Between 100-110
Between 110-120
Between 120-140
Above 140
0
0
2482
3254
2197
372
455
0
0
0
2642
3290
2013
555
260
0
84
1155
2394
2870
1288
528
88
353
0
1572
3169
3121
484
0
150
264
Source: NTUA Modelling (PRIMES/IEM)
The above results do indicate that the improved market design will lead to more volatile average
hourly prices, partly due to the introduction of locational signals which reveal the different
value of electricity in the various nodes. This volatility though will be fairly restricted and will
not be the result of extreme price fluctuations between zero and VoLL. The observed price
ranges will be fairly constrained, as long as the share of variable RES E remains within certain
limits
342
. When the share of RES E, and specifically of variable RES E technologies, exceeds
these rough limits though, price volatility may increase significantly if other resources like
storage are not in place yet to absorb a large part of it.
As can be seen in the table below, in 2050 the share of RES E is projected to approach 60%. In
this case the spread between the baseload and peak load prices increases significantly, mainly
due to the lower baseload prices compared to the previous periods. The average day-ahead
340
341
342
Certain Member States though with very high RES E shares, like Spain and Portugal, and limited
interconnections are expected to have significantly more volatile wholesale prices than other Member States.
Reported results reflected assumed bidding behaviour of generators. The behaviour was relatively
conservative, reflecting though a stable condition in the market and the effects of competition (though market
power was considered). The most important assumption driving these results is that plants bid above marginal
costs and the hydro plants bid at opportunity costs. Minimum price observed (on EU28 level) was not lower
than 60 EUR/MWh, highest price did not exceed 200 EUR/MWh. There were higher and lower prices on
Member State level.
A study by METIS finds that as long as the share of solar generation is lower than 10-12% of total electricity
generation, solar production coincides with periods of high power demand and tends to smooth-out residual
demand over the day, which is expected to lead to less variable prices. This changes though considerably for
higher shares of solar. On the other hand, wind energy is directly related to variability and is a significant
driver for flexibility needs. "METIS
Study S7: The role and need of flexibility in 2030. Focus on Energy
Storage",
Artelys (2016).
186
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0187.png
market prices though remain high throughout the projection horizon, as thermal generation is
still expected to be marginal (thus setting the day-ahead market price) during most hours of the
year.
Table 22: Average wholesale prices and RES E Shares
2020
2025
2030
2035
2040
2045
2050
Average wholesale market prices
343
(EUR 13/MWh)
Average day-ahead market prices
baseload
mid-merit
peak load
Spread between average
baseload and peak load SMP
74
74
74
93
19
95
83
95
98
15
103
93
103
137
44
118
98
118
135
38
115
89
116
134
45
135
108
137
149
41
122
71
122
138
67
Share of RES E in net electricity generation (%)
Share of variable RES E
Solar
Wind
Source: NTUA modelling (PRIMES/OM)
30.8
4.8
14.4
36.0
7.7
17.0
40.4
8.9
20.4
43.0
9.4
22.7
49.6
9.9
29.3
53.2
11.1
32.1
57.5
13.6
34.1
6.3.
Impact Assessment for problem Area III (reinforce coordination between Member
States for preventing and managing crisis situations)
Methodological Approach
In this section the impacts of the different policy options are identified and assessed. The
options proposed should first and foremost be effective in improving trust of Member States to
rely on neighbours' electricity markets in times of system stress. They should also lead to a
more effective functioning of markets, with less undue market distortions. Additionally,
reinforced coordination and cooperation between Member States in the identification and
mitigation of risks and the management of crisis have also been identified as specific objectives.
The methodological approach followed for this analysis is mostly qualitative; however some
quantitative analysis is provided as well, notably via the METIS simulations.
As regards the impacts, given the administrative nature of the measures and the objectives
pursued, the most relevant impacts in terms of magnitude are the
economic
impacts.
343
Based on the modelling methodology followed, described in Annex IV, reported wholesale prices reflect the
level of electricity prices which would lead to the recovery of the full costs of generators only via the wholesale
market, on a plant by plant basis and over the lifetime of each asset in the case of an Energy only Market (i.e.
Option 1). This modelling context differs significantly from the current one, characterised by different
underlying market conditions (overcapacity, low fuel prices, distorted markets etc). See also Box 9 in Section
6.2.6.4 for a further discussion on this topic.
187
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0188.png
The measures proposed (e.g. enhanced regional coordination and information exchange)
anticipates a very limited impact, if any, on the
environment.
Therefore, the assessment does
not examine the impact of the proposed measures on the environment.
Impacts of Policy Option 1 (Common minimum rules to be implemented by Member
States)
6.3.2.1.Economic impacts
Overall, the policy tools proposed under this option should have positive effects. Putting in
place a more common approach to crisis prevention and management would not entail
additional costs for businesses and consumers. It would, by contrast, bring clear benefits to
them.
First, a more common approach would help better prevent blackout situations, which are
extremely costly. The immense costs of large-scale blackouts provide an indication of potential
benefits of improved preparation and prevention
344
.
Table 23: Overview over most severe blackouts in Europe
Number of end-
Duration,
Country & year
consumers
energy not
interrupted
served
0.86 million
2.1 hours, 18
Sweden/Denmark,
(Sweden); 2.4
GWh
2003
million (Denmark)
2 days–2 weeks,
France, 1999
1.4 - 3.5 million
400 GWh
Italy/Switzerland,
55 million
18 hours
2003
1 day
5 weeks,
Sweden, 2005
0.7 million
11 GWh
Less than 2
Central Europe, 2006
45 million
hours
Estimated costs to
whole society
EUR 145
180
million
EUR 11.5 billion
EUR 400 million
Source: SESAME: Securing the European Electricity Supply Against Malicious and Accidental Threats
A more common approach to emergency handling, with an obligation for Member States to
help each other, would help to avoid or limit the effects of potential blackouts. A more common
approach, with clear obligations to e.g., follow up on the results of seasonal outlooks, would
also reduce the costs of remedial actions TSOs have to face today. This, in turn, should have a
positive effect with a reduction of costs overall.
344
Previous blackouts in Europe had severe consequences. For example, the blackout in Italy in September 2003
resulted in a power disruption for several hours affecting about 55 million people in Italy and neighbouring
countries and causing around 1.2 billion euros worth of damage. (source:
The costs of blackouts in Europe
(2016), EC CORDIS:
http://cordis.europa.eu/news/rcn/132674_en.html).
188
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0189.png
In addition, improving transparency and information exchange would facilitate coordination,
leading to a more efficient and less costly measures.
By ensuring that electricity markets operate as long as possible also in stress situations, cost-
efficient measures to prevent and resolve crisis are prioritized.
6.3.2.2.Who would be affected and how
Option 1 is expected to have a positive effect on society at large and electricity consumers in
particular, since it helps prevent crisis situations and avoid unnecessary cut-offs. Given the
nature of the measures proposed, no major other impact on market participants and consumers
is expected.
On cybersecurity, given the voluntary approach of this option, several stakeholders (TSOs,
DSOs, generators, suppliers and aggregators) could be affected, as long as they implement the
guidance proposed. However, the impact is estimated limited as the costs of cybersecurity for
regulated entities merely need to get considered and taken into account by the regulatory
authority. Thus, the TSOs and DSOs affected could recover their costs via grid tariffs. In that
case, the pass through of costs would have an impact on consumers that could see a slightly
increased in the final prices of electricity.
6.3.2.3.Impact on businesses and public authorities
The preparation of risk preparedness plans as well as the increased transparency and
information exchange in crisis management imply a certain administrative effort
345
. However,
the impact in terms of administrative impact would remain low, as currently Member States
already assess risks relating to security of supply, and all have plans in place for dealing with
electricity crisis situations
346
.
In addition, it is foreseen to withdraw the current legal obligation for Member States to draw
up reports monitoring security of supply
347
, as such reporting obligation will no longer be
necessary where national plans reflect a common approach and are made transparent. This
would reduce administrative impacts.
345
346
347
Administrative costs are defined as the costs incurred by enterprises, the voluntary sector, public authorities
and citizens in meeting legal obligations to provide information on their action or production, either to public
authorities or to private parties.
See
Risk Preparedness Study.
Article 4 of the
Electricity Directive;
Article 7 of the
Electricity SoS Directive.
189
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0190.png
Impacts of Policy Option 2 (Common minimum rules to be implemented by Member
States plus regional co-operation)
6.3.3.1.Economic impacts
This option would lead to better preparedness for crisis situations at a lesser cost through
enhanced regional coordination. The results of METIS simulations
348
show that well integrated
markets and regional coordination during periods of extreme weather conditions (i.e. very low
temperature
349
) are crucial in addressing the hours of system stress (i.e. hours of extreme
electricity demand), and minimizing the probability of loss of load (interruption of electricity
supply).
Most importantly, while a national level approach to security of supply disregards the
contribution of neighboring countries in resolving a crisis situation, a regional approach to
security of supply results in a better utilization of power plants and more likely avoidance of
loss of load. This is due to the combined effect of the following three factors: (i) the variability
of renewable production is partly smoothed out when one considers large geographical scales,
(ii) the demands of different countries tend to peak at different times, and (iii) the power supply
mix of different countries can be quite different, leading to synergies in their utilization.
The following table compares the security of supply indicator, EENS, assessed by METIS for
the three levels of coordination (national, regional, European)
350
. It highlights the highest value
of the loss of load (electricity non-served expressed as percentage of annual load) when it is
measured in a scenario of non-coordinated approach, which does not take into account the
potential mutual assistance between countries. When cooperation takes place among Member
States, the percentage of electricity non-served significantly decreases.
Table 24 - Global expected energy non-served as part of global demand within the three
approaches for scenario ENTSO-E 2030 v1 with CCGT/OCGT current generation
capacities
Level
EENS (% of annual load)
ENTSO-E V1 scenario
National level
Regional level
European level
0,36 %
0,02 %
0,01 %
ENTSO-E 2030 v1: vision for 2030 "Slowest progress". The perspective of Vision 1 is a scenario where no common
European decision regarding how to reach the CO
2
-emission reductions has been reached. Each country has its
own policy and methodology for CO2, RES and resource adequacy.
Source: METIS
348
349
350
"METIS Study S16: Weather-driven revenue uncertainty for power producers and ways to mitigate it",
Artelys
(2016).
Even though periods with very low temperature occur rarely (9C difference between the 50 year worst case
and the 1% centile) countries can face high demand peaks (e.g. Nordic countries and France) mainly due to
the high consumption for the electric heating. As example, the additional demand for the 50 years peak
compared to the annual peak demand is 23% for France, 18% for Sweden and 17.3% for Finland.
"METIS Study S04: Stakes of a common approach for generation and system adequacy",
Artelys (2016).
190
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0191.png
The EENS for the three levels of coordination are represented on the figure below. When the
security of supply is assessed at the national level, many countries of central Europe seem to
present substantial levels of loss of load. However, since these countries are interconnected, a
regional assessment of security of supply (taking into account power exchanges within this
region) significantly decreases the loss of load levels.
Figure 14 - EENS (%) estimation by country for scenario ENTSO-E 2030 v1 with
CCGT/OCGT current generation capacities. From left to right: EENS estimated at
European, regional and national levels
CCGT: Combined Cycle Gas Turbine OCGT: Open Cycle Gas Turbine
ENTSO-E 2030 v1: vision for 2030 "Slowest progress". The perspective of Vision 1 is a scenario where no common
European decision regarding how to reach the CO
2
-emission reductions has been reached. Each country has its
own policy and methodology for CO2, RES and resource adequacy.
Source: METIS
METIS simulations also show that thanks to regional cooperation the stress situations would
decrease and concentrate in a limited number of hours that may occur simultaneously
351
.
Therefore, it highlights the need for specific rules on how Member States should proceed in
these particular circumstances, as proposed in this Option 2.
As the overall cost of the system would decrease thanks to enhanced coordination this could
have a positive impact on prices for consumers.
On the contrary, a lack of coordination on how to prevent and manage crisis situations would
imply significant opportunity costs. A recent study also evidenced that the integration of the
European electricity market could deliver significant benefits of EUR 12.5 to 40 billion until
2030. However, this amount would be reduced by EUR 3 to 7.5 billion when Member States
pursue security of electricity supply objectives following going alone approaches
352
.
351
352
Please also see in
Annexes to the Impact Assessment: Assessment of the Measures Associated with the Main
Option:
Graphs 1 and 2 in
"6. Detailed measures assessed under problem area 3: a new legal framework for
preventing and managing crises situations".
Benefits of an Integrated European Energy Market
(2013), BOOZ&CO.
191
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0192.png
6.3.3.2.Who would be affected and how
As in the case for Option 1, Option 2 is expected to have a positive effect on society at large
and electricity consumers in particular, since it helps prevent crisis situations and avoid
unnecessary cut-offs. Given that, under Option 2, Member States would be required to
effectively cooperate, and tools would be in place to monitor security of supply via the
Electricity Coordination Group, such crisis prevention and management would be even more
effective.
The measures would also have a positive effect on the business community, as there would be
much more transparency and comparability as regards how Member States prepare for and
intend to manage crisis situations. This will increase legal certainty for investors, power
generators, power exchanges but also for TSOs when managing short-term crisis situations.
Among the stakeholders the most affected would be the competent authorities (e.g. Ministry,
NRA) as actors responsible for the preparation of the risk preparedness plans (see below,
assessment of impacts on public authorities).
6.3.3.3.Impact on businesses and public authorities
The assessment of this option shows a limited increase in administrative impact, although it
would be to some extent higher than Option 1, given that national authorities would be required
to pre-agree part of their risk preparedness plans in a regional context.
However, existing experiences show that a more regional approach to risk assessment and risk
preparedness is technically and legally feasible. Further, since the regional parts of the plans
would in practice be prepared by regional co-ordination centres between TSOs, the overall
impact on Member States' administrations in terms of 'extra burdens' would be limited, and be
clearly offset by the advantages such co-operation would bring in practice.
353
In addition, more regional cooperation would also allow Member States to create synergies, to
learn from each other, and jointly develop best practices. This should, overtime, lead to a
reduction in administrative impacts.
Finally, European actors such as the Commission and ENTSO-E would provide guidance and
facilitate the process of risk preparation and management. This would also help reduce impacts
on Member States.
It should be noted, that under Option 2 (as is the case for Option 1) no new body or new
reporting obligation is being created, and that existing obligations are being streamlined. Thus,
the Electricity Coordination Group is an existing body meeting regularly, for the future it is
foreseen to make this group more effective by giving it concrete tasks. Further, national
reporting obligations would be reduced (e.g. repealing the obligation of Article 4 of Electricity
Directive) and EU-level reporting would take place within the context of existing reports and
353
The Nordic TSOs, regulators and energy authorities cooperate through
NordBER,
the Nordic Contingency
and Crisis Management Forum. This includes information exchange and joint working groups and
contingency planning for the overall Nordic power sector as a supplement to the national emergency work
and TSO cooperation (www.nordber.org).
192
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0193.png
existing reporting obligations (e.g. ACER annual report Monitoring the Internal Electricity and
Natural Gas Markets).
Impacts of Policy Option 3 (Full harmonisation and full decision-making at regional
level)
6.3.4.1.Economic impacts
The regional coordination through the regional plans would have a positive impact in term of
cost as the number of plans would be necessary less than twenty-eight plans and limited to the
number of regions. In addition, the coordination at European level would decrease slightly the
loss of load level compared to the regional coordination (EENS 0.01% compared to 0.02%).
On the contrary, on cybersecurity, the creation of a dedicated agency at EU level would have
important economic implications as this agency would be a new body that does not exist yet
and which is also not foreseen in the NIS Directive. The costs of creating this new agency are
not only limited to the creation of a new agency itself, but the costs would also have to include
the roll-out of a whole security infrastructure. For example, the estimated costs of putting in
place the necessary security infrastructure and related services to establish a comparable
national body - cross-sectorial governmental Computer Emergency Response Team ("CERT")
with the similar duties and responsibilities at national level as the planned pan-European sector-
specific agency - would be approximately EUR 2.5 million
354
per national body. This means
that the costs for the security infrastructure would be manifold for a pan-European body. In
terms of human resources, for the proper functioning of the new agency with minimum scope
and tasks at EU level, it is estimated a staff of 168 full time equivalents (considering 6 full time
equivalents per Member State sent to the EU agency). The representation from all Member
States in the agency is essential in order to ensure trust and confidence on the institution.
However, the availability of network and information security experts who are also well-versed
in the energy sector is limited.
6.3.4.2.Who would be affected and how
The obligation of regional plans would have important implications for the competent
authorities as the coordination and agreement of common issues (e.g. load shedding plan,
harmonised definition of protected customers) would be a lengthy and complex process.
On cybersecurity, the creation of the new agency at EU level would mobilize highly qualified
human resources with skills in both energy and information and communication technologies.
This could have a potential impact on national administrations and energy companies as long
as some of the experts in the field could be recruited by the new institution. However, the impact
would be limited as the representation for all Member States should be guaranteed. Therefore,
a small number of experts (around 6) per country could be recruited.
354
"Impact Assessment accompanying the document Proposal for a Directive of the European Parliament and
of the Council Concerning measures to ensure a high level of network and information security across the
Union".
SWD(2013) 32 final.
193
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0194.png
6.3.4.3.Impact on businesses and public authorities
Overall Option 3 would imply significantly administrative impact in the preparation of the
regional plans. It would require important efforts to gather information related to national and
regional circumstances and contribute to the joint task of assessing the risks and identifying the
measures to be included in the plans. In any case, it would seem difficult to coordinate within
a region the national specificities and risks originate mostly in one Member State.
The creation of a new agency on cybersecurity would imply significant administrative impacts
in the preparation and set-up of the agency, as well as in the communication structure with
already existing cross-sectorial bodies of Member States (CERTs/ Computer Security Incident
Response Teams "CSIRTs").
6.4.
Impact Assessment for Problem Area IV (Increase competition in the retail
market)
Methodological Approach
This section compares the costs and benefits of each of the policy options to address this
Problem Area in a semi-quantitative manner.
No data or methodology exists that would allow us to accurately quantify all the benefits of the
measures examined.
However, this section draws on behavioural experiments from a controlled environment to
evaluate the impact of some policy options on consumer decision-making. Where economic
impacts cannot be quantified, quantitative desktop research and case studies are used to inform
estimates of the extent of possible impacts, as well as possible winners and losers. Where
appropriate, this section aims to illustrate the possible direct benefit to consumers assuming
certain conditions. Implementation costs in terms of the impact on businesses and public
authorities were estimated using the standard cost model for estimating administrative costs.
And finally, this section also highlights important qualitative evidence that policymakers should
also incorporate into their analysis of costs and benefits.
Impacts of Policy Option 0+ (Non-regulatory approach to improving competition and
consumer engagement)
6.4.2.1.Economic Impacts
Option 0+ would lead to an estimated EUR 415 million in benefits to consumers for the period
2020-2030, which come as a result of an enforcement drive to tackle the switching costs
currently faced by an estimated 4% of all EU electricity consumers that do not comply with EU
law
355
.
355
See Annex 7.4, Section 7.4.5.
194
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0195.png
Other unquantifiable economic benefits include improved retail level competition resulting
from the phase-out of regulated prices in some Member States
356
, and more comparison tools
that comply with the Unfair Commercial Practices Directive
357
.
In addition, one may expect modest, indirect improvements to the health and well-being of
energy poor consumers from the exchange of good practices stemming from the activities of
the EU Observatory for energy poverty
358
.
In spite of these considerations, it is unlikely that Option 0+ (Non-regulatory approach) would
most effectively address the problems identified.
First, this option does not address the poor data flow between retail market actors that
constitutes both a barrier to entry and a barrier to higher levels of service to consumers. Whereas
Option 0+ is non-regulatory, a credible policy to tackle conflicts of interest among market actors
around data handling would require a legislative intervention.
Secondly, as a non-regulatory option, the effectiveness of Option 0+ is significantly limited by
shortcomings in the existing legislation. This significantly reduces the ability to address
contract termination fees (which are currently legal under EU law), the partial availability of
comparison websites in Member States, as well as energy poverty, which the current legislation
does not require Member States to measure, and hence address it.
And finally, a non-regulatory approach to tackling price-regulation may lead to a fragmented
regulatory framework across the EU given: (i) the uncertainty that surrounds the Commission's
ability to convince hold-out Member States to voluntarily cease excessive regulatory
interventions in price-setting; and (ii) the uncertainty that surrounds the success of any
subsequent legal measures to infringe Member States on the issue.
6.4.2.2.Who would be affected and how
Consumers
will benefit from more easily being able to compare offers in the market, as well
as lower financial barriers to switching. Whilst consumer prices may rise in Member States
phasing out price regulation, this would be offset by higher levels of service and the greater
availability of value added products on the market.
Member States
will benefit from a clearer understanding and measurement of energy poverty
will have indirect positive impacts on
energy poor consumers.
Suppliers
would benefit from increased access to the market of any Member State phasing out
price regulation. However, certain suppliers would also face tougher competition and increased
pressure on margins as the result of the modestly greater consumer engagement expected.
Any increase in consumer switching would increase the administrative impacts to
DSOs.
However, these costs would be passed through to end consumers.
356
357
358
See Annex 7.2, Section 7.2.5.
See Annex 7.5, Section 7.5.5.
See Annex 7.1, Section 7.1.5.
195
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0196.png
NRAs
in any Member States phasing out price regulation will need to significantly step up
efforts to monitor the market, ensure efficient competition, and guarantee consumer protection.
They will need to more closely monitor and report the number of disconnections. However, this
may be offset by a reduction in price setting interventions, and increased competition resulting
from greater consumer engagement.
6.4.2.3.Impact on businesses and public authorities
Option 0+ (Non-regulatory approach) would lead to quantifiable implementation costs of
around EUR 0.9 million for the period 2020-2030, all resulting from setting up and running an
EU Observatory for energy poverty
359
. It is anticipated that the soft law and enforcement
measures associated with making better use of the existing legislation on regulated prices,
switching fees and comparison tools would not result in significant additional costs compared
with a business as usual scenario.
Impacts of Policy Option 1 (Flexible legislation addressing all problem drivers)
6.4.3.1.Economic Impacts
Option 1 would lead to an estimated EUR 2.2 billion in direct benefits to consumers for the
period 2020-2030, which come as a result of: (i) reducing the switching-related charges faced
by 21% of household electricity consumers, and so helping them realize the potentially
significant gains of moving to a cheaper tariff
360
; (ii) further improvements to the switching rate
for both electricity and gas household consumers as a result of the improved availability of price
comparison tools
361
; (iii) an improved ability for consumers to identify the best offer in the
market through improved access to information on the bill (although the gains of this latter
intervention are not easy to quantify compared for instance with interventions aimed at making
switching less costly for consumers)
362
.
Other unquantifiable economic benefits include significantly improved retail competition
resulting from the definitive phase-out of blanket price regulation in the 17 Member States still
practicing it
363
. The impact of phasing out price regulation on retail price levels is impossible
to quantify. However, the evidence strongly suggests it will lead to higher levels of consumer
satisfaction. Indeed, even the energy component of retail bills does increase slightly in the short-
term, consumer surplus (the difference between the price of the service and the price a consumer
would be willing to pay for that service) may actually increase too as a result of the better
service levels consumers receive in the non-regulated market. In addition, retail price
competition is an important prerequisite for new services that would increase system flexibility
359
360
361
362
363
The Commission secured funding to set up the Observatory for the period 2016-2019. The costs included in
the Impact Assessment refer to the running annual cost to continue operating the Observatory. See Annex 7.4,
Table 11 and Section 7.1.5.
See Annex 7.4, Section 7.4.5.
See Annex 7.6, Section 7.6.5.
See Annex 7.4, Section 7.4.5.
See Annex 7.2, Section 7.2.5.
196
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0197.png
(benefits examined in Section 6.1.4), and should lead to lower system costs that are passed
through to consumers in both the energy and network components of bills in the longer term.
Non-discriminatory access to consumer data and nationally harmonized data formats will also
help new suppliers and service providers to enter the market and develop innovative new
products, resulting in further competition benefits and facilitating the transition to a more
flexible electricity system
364
.
Greater consumer engagement will also drive retail competition improvements, as competitive
suppliers and service providers find it easier to take market share from less competitive
alternatives. Other benefits come in terms of the higher levels of service electricity consumers
can expect from more efficient data handling, and greater consumer awareness of the market
and their own energy situation.
In addition, one may expect improvements in the targeting of measures to tackle energy poverty.
Better measurement of the number of households on energy poverty will allow Member States
and the EU to design better policies and exchange good practices. A generic definition of energy
poverty in the legislation will clarify the concept of energy poverty, improving the functioning
of the current provision and further helping knowledge dissemination and synergies across EU
policies in energy efficiency and consumer protection.
6.4.3.2.Who would be affected and how
Consumers
will benefit significantly from more easily being able to compare offers in the
market, as well as lower financial barriers to switching. Whilst consumer prices may rise in the
Member States phasing out price regulation, this would be offset by higher levels of service and
the greater availability of value added products on the market. Consumers would also benefit
from increased competition and higher levels of service resulting from rules that ensure quick
and non-discriminatory access to data.
Box 8: Impacts on different groups of consumers
The benefits of the vast majority of the measures contained in the preferred options in Problem
Areas I, II and III would manifest through lower system costs and greater system reliability,
and therefore accrue to all consumers in an even manner. However, most of the measures
contained in the preferred option of Problem Area IV, above, would benefit certain kinds of
consumers more than others.
For example, whereas energy poor households would be the chief beneficiaries of new
obligations to measure energy poverty levels, the marginally increased burdens of these
obligations would be socialized amongst other ratepayers/taxpayers. In addition, whereas
phasing out price regulation would free public finances to better protect households who qualify
for targeted social support measures (i.e. vulnerable and/or energy poor consumers), the biggest
losers from this policy would be high-volume, often higher-income consumers who have
hitherto benefitted from retail prices that have been set at artificially low levels. Both these
measures can therefore be considered progressive in nature i.e. they tend to redistribute surplus
364
See Annex 7.3, and
“Policies for DSOs, Distribution Tariffs and Data Handling”
(2016) Copenhagen
Economics, and VVA.
197
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0198.png
from relatively high-income ratepayers/taxpayers in order to increase the welfare of lower-
income ratepayers.
The measures on switching-related fees and comparison tools would predominantly benefit
consumers who are engaged in the market i.e. those who compare offers and/or switch
regularly. Whilst the measures would also increase consumer engagement levels, and whilst the
increased competition engendered by the measures would lead to more competitive offers on
the market, disengaged consumers, including consumers who may be vulnerable, will not reap
as many direct benefits.
And finally, the benefits of the billing measures would accrue predominantly to consumers who
do not engage in the market or better control their energy consumption because of insufficient
billing information or confusing bills. This may include a varied range of consumers, including
certain vulnerable consumers, or those who are time poor.
Many
Member States
will benefit from a clearer understanding of energy poverty, which will
have indirect positive impacts on
energy poor consumers.
However, Member States will also
need to collect and report more information on energy poverty as a result of requirements in
this option.
Suppliers
would benefit from increased access to the market of the Member States phasing out
price regulation. New entrants and
energy service companies
offering innovative products
would also benefit from quick and non-discriminatory access to data. However, suppliers would
also likely face increased pressure on margins as the result of the modestly greater consumer
engagement expected. Certain suppliers may need to adjust contractual conditions and reformat
their consumer bills in order to comply with new requirements on contract termination fees and
billing information. And they would likely also bear the brunt of the significant costs to protect
energy poor consumers.
As
TSOs and DSOs
are normally the market actors charged with data management, they would
be the most affected by the new data management requirements
particularly the DSOs who
currently fall below the unbundling threshold as they would need to implement further measures
to ensure non-discriminatory data handling. Any increase in consumer switching would also
increase the administrative impacts to
DSOs.
However, all these costs would be passed through
to end consumers. In addition, network operators would benefit from the anticipated entrance
of aggregators and other energy service companies who facilitate network flexibility, as a result
of non-discriminatory data flows.
NRAs
in the 17 Member States phasing out price regulation will need to significantly step up
efforts to monitor the market, ensure efficient competition, and guarantee consumer protection.
However, these impacts may be offset by increased consumer engagement, which would
naturally foster competition in the market.
6.4.3.3.Impact on businesses and public authorities
It is estimated that implementing the consumer-related elements of Option 1 (Flexible
legislation) would lead to quantifiable costs of between EUR 21 million and EUR 24 million
for the period 2020-2030. These would mainly stem from national authorities having to set up
and run certification schemes for energy comparison tools or an independently run energy
198
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0199.png
comparison tool themselves
365
. However, many suppliers would also bear costs associated with
modifying their consumer bills to comply with the modest requirements in this option
366
.
Unquantifiable impacts come in the form of the reduced contractual freedom that suppliers
have, which is associated with the restriction on contract termination fees for certain kinds of
contracts only
367
.
Implementing the energy poverty provisions in Option 1 (Flexible legislation) would result in
quantifiable costs of EUR 2.3 million for the period 2020-2030. These primarily result from
measuring energy poverty making reference to household income and household energy
expenditure using data already collected by Member States
368
.
Significant, albeit unquantifiable costs are associated with creating a level playing field for
access to data in Option 1 (Flexible legislation). In particular, ensuring that Member States
implement a standardised data format at the national level will significantly impact many
market actors (suppliers, DSOs, third parties such as energy service companies, data
administrators), who would have to redesign their IT systems to accommodate this format.
However, these costs will be mitigated by the fact that measures can be applied independently
of the data management model that each Member State has chosen. This reduces the potentially
very significant scope for sunk costs if Member States were to all conform to a common data
management model
369
.
Impacts of Policy Option 2 (Harmonization and extensive safeguards for consumers
addressing all problem drivers)
6.4.4.1.Economic Impacts
Option 2 (Harmonization and extensive safeguards) could lead up to up to EUR 3.5 billion in
direct benefits to consumers for the period 2020-2030, which come as a result of: (i) an outright
ban on all switching-related charges
370
; (ii) further improvements to the switching rate as a
result of every Member State establishing a government (funded) price comparison tool
guaranteed to work in the consumer's interest
371
; (iii) an improved ability for consumers to
identify the best offer in the market through fully standardised billing information
372
.
However, there is greater uncertainty surrounding the benefits that stem from these
interventions. Whilst an outright ban on all switching-related charges would increase the
financial incentive to switch, it could also make it more difficult to finance certain energy
service investments (i.e. solar panels or energy efficiency upgrades packaged with energy
supply contracts) if implemented poorly. It might also result in a smaller range of tariffs
365
366
367
368
369
370
371
372
See Annex 7.5, Section 7.5.5.
See Annex 7.6, Section 7.6.5.
See Annex 7.4, Section 7.4.5.
See Annex 7.1, Section 7.1.5 and Table 16.
See Annex 7.3, and “Policies
for DSOs, Distribution Tariffs and Data Handling”
Copenhagen Economics,
and VVA (2016).
See Annex 7.4, Section 7.4.5.
See Annex 7.5, Section 7.5.5.
See Annex 7.6, Section 7.6.5.
199
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0200.png
available to consumers. Not all government (funded) price comparison tools may work better
for consumers than the comparison tools already available on the market. And it may be
difficult, if not impossible, to devise a standard EU bill design that accommodates differences
in consumer preferences and market conditions in all Member States.
Whilst phasing-out blanket price regulation in the 17 Member States still practicing it would
lead to improved retail competition, defining the conditions under which price regulation could
continue at the EU level would be problematic. In particular, permitting price regulation for
households who consume below a certain price threshold would not accurately target those
most in need of assistance. In addition, permitting regulators to only set price caps above cost
would be difficult to enforce due to opaque cost structures. It also risks holding back
investments in product innovation and service quality, which require higher margins
373
. As with
Option 1 (Flexible legislation), the impact of phasing out price regulation on retail price levels
is impossible to quantify, whereas the evidence strongly suggests it will lead to higher levels of
consumer satisfaction.
Defining a specific EU data management model for all Member States, such as an independent
central data hub, would bring similar benefits to Option 1 in terms of helping new suppliers and
service providers to enter the market. In addition, it would be easier to enforce at the EU level
374
.
6.4.4.2.Who would be affected and how
Consumers
will benefit from more easily being able to compare offers in the market, as well
as lower financial barriers to switching. However, these gains may be tempered by a reduction
in the availability of beneficial products on the market. Whilst consumer prices may rise in the
Member States phasing out price regulation, this would be offset by higher levels of service and
the greater availability of value added products on the market. Consumers would also benefit
from increased competition and higher levels of service resulting from rules that ensure quick
and non-discriminatory access to data.
Energy poor consumers
in many Member States would enjoy significant benefits from the
comprehensive set of disconnection safeguards outlined as they are more likely to be on risk of
disconnection. Whilst many
Member States
will benefit from a prescriptive EU definition of
energy poverty and from better information on the energy efficiency of the housing stock, the
benefits of better measurement may not composite for the significant resources required to
survey the housing stock at national level. Energy poor and vulnerable consumers may also be
impacted by more poorly targeted support as the result of permissible instances of price setting
being defined at the EU-level, rather than being assessed on a case by case basis.
Suppliers
would benefit from increased access to the market of the Member States phasing out
price regulation. However, all suppliers would need to significantly reformat their bills in order
to comply with a standard EU bill design. They would likely also bear the brunt of the very
significant costs to protect energy poor consumers introduced under Option 2 (Harmonization
and extensive safeguards)
in particular the complete ban on winter disconnections. However,
373
374
See Annex 7.2, Section 7.2.5.
See Annex 7.3, and
“Policies for DSOs, Distribution Tariffs and Data Handling”
Copenhagen Economics,
and VVA (2016)
200
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0201.png
new entrants and
energy service companies
offering innovative products would benefit from
quick and non-discriminatory access to data.
As
TSOs and DSOs
are normally the market actors charged with data management, they would
be the most affected by the requirement to establish a standard EU data management model that
all Member States. Indeed, since many would incur significant sunk costs in adopting a model
different from their own, the impacts could be significant. However, all these costs would be
passed through to end consumers. In addition, network operators would benefit from the
anticipated entrance of aggregators and other energy service companies who facilitate network
flexibility, as a result of non-discriminatory data flows.
NRAs
in the 17 Member States phasing out price regulation will need to significantly step up
efforts to monitor the market, ensure efficient competition, and guarantee consumer protection.
However, these impacts may be offset by increased consumer engagement, which would
naturally foster competition in the market.
6.4.4.3. Impact on businesses and public authorities
It is estimated that implementing the consumer-related elements of Option 2 ((Harmonization
and extensive safeguards) would lead to quantifiable costs of between EUR 42 million and EUR
51 million for the period 2020-2030. These would mainly stem from national authorities having
to set up and run energy comparison tools
375
, and energy suppliers having to heavily modify
their consumer bills to comply with the requirements in this option
376
. Unquantifiable impacts
come in the form of the greatly reduced contractual freedom that suppliers have, which is
associated with the ban on contract termination fees
377
.
Implementing the energy poverty provisions in Option 2 (Harmonization and extensive
safeguards) would result in quantifiable costs of between EUR 1.2 billion and EUR 3.8 billion
for the period 2020-2030. Unless public authorities step in, these costs would most likely fall
on suppliers and result from: (i) the additional costs of unpaid bills resulting from the
requirement for suppliers to give all customers a disconnection notice of at least two months;
(ii) the additional costs of unpaid bills resulting from the cessation of winter disconnections;
and (iii) refinancing costs resulting from the obligation to offer all consumers the possibility to
delay payments or restructure their debt prior to disconnection
378
.
As these costs associated with disconnection safeguards are large, it is likely that this option
would result in distortions to competition in Member States where the public does not cover
these costs. Whilst suppliers active in such markets could raise margins to socialize losses from
unpaid bills, certain suppliers
especially smaller ones who are less well equipped to deal with
the additional pressure on their operations
may seek to avoid entering markets where there
are likely to be significant risks of disconnections.
Member States may be better suited to design these schemes to ensure that synergies between
national social services and disconnection safeguards are achieved. These synergies may also
375
376
377
378
See Annex 7.5, Section 7.5.5.
See Annex 7.6, Section 7.6.5.
See Annex 7.4, Section 7.4.5.
See Annex 7.1, Section 7.1.5 and Table 24.
201
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0202.png
result in public sector savings which may be significant given the substantial costs of these
measures and the overlap between social policy and disconnections for non-payment.
Very significant costs are associated with creating a level playing field for access to data in
Option 2 (Harmonization and extensive safeguards). A mandatory data handling model will
imply the administrative costs of defining and designing such a model, and more importantly
high sunk costs for existing data models and additional costs for rebuilding a new one, both in
terms of personnel costs and IT infrastructure. Designing and building a new data handling
model is a complex procedure and may well take several years of planning and implementation.
For example, in Denmark alone, the central data hub took more than 4 years to design and
develop in its simple form, and 7 years in its enhanced form, and is estimated to a cost of
approximately EUR 165 million, where approximately EUR 65 million accrued to the data hub
administrator (the TSO), and around EUR 100 million accrued to DSOs and energy suppliers
379
.
Environmental impacts
The legislative options examined above
Option 1 (Flexible legislation) and Option 2
(Harmonization and extensive safeguards)
can each be expected to have significant, albeit
indirect, environmental benefits because they enable the uptake of technologies that help the
electricity system become more flexible, thus enabling higher levels of variable and
decentralized RES E penetration. Non-discriminatory access to consumer data and a phase-out
of regulated prices will allow new entrants and energy service companies to develop and offer
value-added products such as dynamic price supply contracts, incentive-based demand response
services, green tariffs, and supply contracts with bundled energy efficiency or rooftop solar
investments. In addition, tackling the barriers to consumer engagement will increase the
selective pressure for such new services. The measures will benefit smaller consumers in
particular, the group of market actors which the analysis has shown represents the greatest
remaining source of low hanging fruit in terms of system flexibility potential.
In addition, phasing out blanket price regulation
particularly in Member States with very low
margins
will help address the high levels of electricity and gas consumption caused by
artificially low prices. This will make it easier to achieve climate objectives and provide a
proper price signal for energy efficiency investments.
Impacts on fundamental rights regarding data protection
A key building block for the completion of the Digital Single Market and the Energy Union
includes strong and efficient protection of fundamental rights in a developing digital
environment. The proposed policy measures on data management were developed in this
context, to ensure widespread access and use of digital technologies while at the same time
guaranteeing a high level of the right to private life and to the protection of personal data as
enshrined in Articles 7 and 8 of the Charter of Fundamental Rights of the EU.
As data on individual consumers' consumption and billing become central to the deployment of
distributed energy resources and the development of new flexibility services, the measures on
data management in the various policy options proposed (from compliance with data protection
379
See Annex 7.3, and
“Policies for DSOs, Distribution Tariffs and Data Handling”
Copenhagen Economics,
and VVA (2016).
202
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0203.png
legislation and the Third Energy Package - Option 0 (Baseline); to further introduction of
specific requirements on data handling responsibilities based on principles of transparency and
non-discrimination
Option 1 (Flexible legislation); and implementation of a specific data
management model to be described in EU legislation
Option 2 (Harmonization and extensive
consumer safeguards)) seek to ensure the impartiality of the entity which handles data and to
ensure uniform rules under which data can be shared. Indeed, consumers must be reassured that
their consumption and metering data remain under their control. Access to a consumer's
metering or billing details can only happen when authorised by that consumer and under the
condition that the personal data protection and privacy are guaranteed.
In this light, the data management policy options are therefore fully aligned and further
substantiate the fundamental rights to privacy and protection of personal data of Articles 7 and
8 of the Charter of Fundamental Rights of the EU, as well as with the General Data Protection
Regulation and with the Commission Recommendation on the Data Protection Impact
Assessment Template for Smart Grid and Smart Metering Environments.
Box 9: External factors and the assessment of the impacts
Price signals and long-term confidence that costs can be recovered in reasonable payback times
are essential ingredients for a well-functioning market. In a market which is not distorted by
external costs and interventions, the level and variability of the spot price on the wholesale
market, plays a role in signalling the need for investments in new resources. With external costs
and in the absence of the right short- and long-term price signals, it is more likely that
inappropriate investment or divestment decisions are taken, i.e. too-late decisions or technology
choices that turn out to be inefficient in the long run. It also renders it more likely that capacity
exits that is valuable for the system as a whole.
The impact assessment demonstrates that an improved market design can lead to a much more
efficient utilisation of resources and establish the market as a main driver of investments in
generation assets (even if only progressively and not fully for all RES E technologies (See Box
7)). This will be mainly driven by the restoration of the economic merit order curve (see Section
6.1.2, Figure 11) and the improved reflection of scarcity in short term electricity prices (see
Section 6.2.6.4, Table 21), both resulting from the measures proposed by the current initiative,
combined with the exit of non-economical units as a result of the transition towards a market
equilibrium (See section 6.2.6.3, Table 18) from the current overcapacity.
Market exit should be brought about by market forces and the initiative generally aims at
removing existing obstacles to this in regulation. Market exit is framed to some degree by the
measures proposed under Problem Area II. The extent to which a system with capacity
remuneration exacerbate or not existing excess capacity depends on how the capacity
requirement is set within the mechanism. If the system is correctly calibrated by means of a
genuine resource adequacy assessment (See Problem Area II, Option 2) there will be no
overcapacities. This is both important to ensure that CMs do not incite lower than economically
optimal wholesale prices, which would inhibit investments, and prevent delays upon the
transition path by preventing exit of non-essential resources. Moreover, the measures under
Problem Area I and Problem Area II, option I, will ensure that prices better reflect the real value
of electricity, affecting specifically the remuneration of electricity generation units that operate
less often but provide security and flexibility to the system. For the same reason, it is important
that TSOs (as responsible entities for overall operation of the system) define and remunerate
ancillary services appropriately, remunerating generators for the full range of services they
provide. These market improvements affect exit in the sense that they ensure that only those
resources will exit that genuinely have no value for the system as a whole.
203
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0204.png
It is true that overall price developments in the electricity sector will also depend on cost factors
beyond the present initiative, such as the carbon prices, prices for primary fuels or technological
costs.
These external factors would mainly impact the level of wholesale prices
380
, possibly affecting
to a certain extent the overall level of benefits to be expected from the present initiative or their
distribution among individual options (in manners which are not easily predictable in view of
the many interactions that take place). However, such changes are not expected to affect the
order of preferred options. Indeed, the proposed measures in essence derive their benefits from
the removal of current market distortions and imperfections, while at the same time having
comparably small implementation costs. These are benefits that are inherent to the measures
themselves and do not depend on the precise context in which they are implemented. Moreover,
strong synergies exist between the sets of options within the package (See Section 7.5.1),
meaning that the overall benefits of a given option are more affected by the coherence of the
package as a whole, than by its interactions with factors outside the present initiative.
Low wholesale prices though would affect investments in electricity resources such as demand
response, RES E and peaking plant investments. Concerning demand response, the aim of the
initiative is to offer to the consumers the opportunity to participate in the market if they wish
to, either directly (e.g. industrial consumers) or indirectly (e.g. via aggregators). The initiative
is not aiming to affect the level and variability of wholesale prices, but to make the functioning
of the markets more efficient so that it can deliver price signals reflecting the value of electricity
at each moment of time and the need for future investments (and in what type). Although
persistent low electricity wholesale prices could lead to low investments, this is a normal
outcome if it is a result of market dynamics and not distortions. For example a system
characterized by overcapacity should have low prices to signal that investments are not needed.
It is equally noteworthy that the modelling work (as presented in section 6.2.6.4) indicates that
in the mid-long term, even in the presence of larger shares of variable RES E, conventional
generators will set the marginal price in a sufficient number of hours to produce meaningful
price signals to guide overall market operations. Increasing RES E penetration therefore does
not necessarily give rise to low(er) average wholesale market prices.
The assessment of the benefits also depends to a certain degree on the progress made in the
implementation of measures proposed by parallel initiatives, considered as part of the baseline
for the present initiative, most notably the REDII. In this context, it is important to note that the
assessment of the present initiative assumes the full phase-out of non-market based support
mechanisms by 2030 for RES E, i.e. feed-in-tariffs would be phased-out and replaced by
schemes that expose RES E to price signals, as for instance premium based schemes. Such
investments would be further triggered by setting support-levels through auctioning as RES E
investments projects would then be incentivised to develop business models that optimise
380
For example the prices projected by PRIMES/OM tend to be quite higher even in 2020 compared to the
currently observed market prices. Several reasons contribute to this: (a) fuel costs are projected to increase by
25% for gas and coal, (b) demand increases, (c) few new investments take place (mainly RES to reach the
2020 target); this point combined with demand increase described above , make it the first step in reducing
the currently observed overcapacity, (d) a well-functioning EoM without distortions is assumed, (e) scarcity
bidding is assumed, in the sense that there is a mark-up on the bids so that generators can recover their full
costs only from the market in the long-run.
204
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0205.png
market based returns. These are reasonable assumptions in view of the rules that are expected
to be in place well before 2030 (see in particular Annex IV).
The success or failure to implement such measures for RES E in time would have a direct
impact on the effectiveness of the present initiative. A partial or delayed implementation of the
closely associated policies, as proposed in the revised Renewable Energy Directive, especially
if combined with the prolongation of existing distortions, would reduce the efficiency of the
market design initiative in the medium term and postpone its expected benefits further into the
future. On the contrary, an expedient implementation would achieve the establishment of
efficient markets and the delivery of the associated benefits sooner.
6.5.
Social impacts
European social partner's joint position
381
:
"Citizens and especially low-income households should be able to pay their bills"
The new market design should be:
"ensuring that the provision of electricity is secure, safe,
reliable and reasonably priced"
It was also underlines that:
"workers in and outside of the electricity sector are relying on a
stable electricity market for their jobs. There is currently a precarious situation for many
workers in the electricity sector, especially among power plant workers. Many plants are not
adequately remunerated for the services they provide (e.g. flexibility, security of supply) and
therefore several companies foresee closure. Workers could lose their jobs".
A shown above, more efficiently organised cross-border electricity markets can avoid
significant costs for energy customers. Given the importance of energy costs for many
companies and for individual households, realising the possible cost savings can be expected to
improve competitiveness of commercial players (with positive impact on jobs and growth) and
on private customers (especially relevant for low-income households).
The electricity industry (i.e. production, transmission, distribution and trade of electricity) is a
key economic sector with a turnover amounting to not less than EUR
1.182 billion
in 2014
382
.
EU households spent
EUR 148.2 billion
on electricity bills (EUR 97.4 billion on gas), which
means that every household had to pay
EUR 686,- per year for electricity
(EUR 451,- for gas)
on average, with important variations between single Member States
383
. Especially for low-
income households, costs for electricity can eat up large parts of the available income
384
. Also
382
383
384
Eurostat Data for 2014.
Eurostat Data for 2014.
In 2014, EU households in the lowest income quintile spent an average of 9% of their household income on
electricity and gas, whereas middle income households spent 6% on electricity and gas. Source: DG ENER
Data.
205
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0206.png
for many industries, especially those in competition at a world-wide scale, energy costs are an
important factor for competitiveness. EU wholesale electricity prices are still higher than in
other regions in the world (e.g. around 30% compared to the U.S.
385
). Avoiding unnecessary
prices increases by an intelligent organisation of electricity markets (e.g. market-based
solutions and using advantages of aggregation across borders) can therefore save jobs and create
growth in the EU.
The possible measures analysed to better adapt the current market rules to decarbonised
electricity markets through revised legislation (See options in
'Problem Area I'
e.g. re-
establishing the level playing field, improving short-term markets and removing barriers for
demand response and distributed resources) would allow to integrate electricity generated from
RES E at lower costs. They would also increase the potential for cross-border trade, leading to
more competition and better possibilities to level out production and demand differences across
larger areas.
Grid fees and other system costs have increased in recent years due to the suboptimal
organisation of markets, but also through the need to adapt the infrastructure to decentralised
generation. Better organised electricity markets would therefore not only save costs for
electricity, but also keep grid costs in check (e.g. by limiting the necessary costs for TSO-
interventions to keep the grid stable, so-called 're-dispatching'
386
). Measures to keep the further
expansion of grid fees in check can therefore bring tangible benefits to industry and private
(low-income) customers
387
.
The analysed measures to improve investors' certainty and limit state interventions ('Problem
Area II',
e.g. better co-ordinating capacity mechanisms between countries) can also be
expected to have a positive impact on competitiveness and on energy bills to of households. As
shown above, fragmented adequacy planning and capacity mechanisms leads to higher energy
costs and network charges. If each Member State builds its backup generation in its own country
without taking into account generation from neighbours, this will necessarily lead to
inefficiencies through unnecessary duplication of investments
388
. Notably Options 2 (regional
adequacy assessment) and Option 3 (cross-border openness of capacity mechanisms) would
help to keep the prices for state interventions concerning capacity mechanism in check.
389
385
386
387
388
389
See e.g. Communication on
"A Framework Strategy for a Resilient Energy Union with a Forward-Looking
Climate Change Policy"
of 25.2.2015 COM (2015), p.3.
See e.g. the estimations for Germany, where grid tariff component already exceeds the energy costs and where
re-dispatching costs are estimated to grow to EUR 4 billion/year in the next years, see e.g.
http://www.zfk.de/artikel/bis-zu-vier-milliarden-fuer-engpassmanagement-2023.html
.
According to the Commission's modelling, the assessed options under Problem Area I reduce the average cost
of total demand, i.e. the cost of each MWh generated, apart from Option 1(a) (level playing field). More
specifically and compared to the baseline, Option 1(a) (level playing field) increases it by 6%, while Options
1(b) (strengthening short-term markets), 1(c) (demand response/distributed resources) and Option 2 decrease
it by 6%, 9% and 11%, respectively.
See for further evidence on the disadvantages of fragmented CMs above, Problem Area II (investment
uncertainty/fragmented CMs), discussion of Option 3.
Option 4 (EU wide capacity market) is not considered here as it was already discarded above. However, it is
useful to note that it would also be more costly (about 5% pursuant to the Commission's model) than the other
options.
206
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0207.png
In a similar manner, the analysed measures to improve risk preparedness ('Problem
Area III',
e.g. better co-ordinated planning and rules to better coordinate possible load shedding in case
of crises) options are likely to have a positive impact for EU citizens and businesses. Previous
blackouts have shown that even in the "traditional" electricity market with low shares of RES
E so-called "cascade blackouts" resulting from problems in other Member States can seriously
harm businesses and customers, in particular those depending on electrical heating (see on the
system blackouts in 2003 and 2006 above, section 6.3.2.1). Amounts of variable RES E have
increased ever since, and so has the importance of a reliable electricity grid for citizens and
customers (e.g. increased risks of blackouts for internet-driven businesses and private
communication). Minimising blackout risks through better regional coordination will therefore
contribute to avoid negative impacts on businesses and households.
Finally, the analysed measures to enhance performance of retail markets (Problem
Area IV,
e.g. measures facilitating to change suppliers, more targeted support for "energy-poor")
customers in the transition to market-based prices, etc.) will also have a positive impact on
businesses and households. In addition, the proposals relative to the phasing out of regulated
prices, should incentivise Member States which currently use blanket price regulation to
provide targeted support for vulnerable and energy poor consumers instead of providing an
indirect support to all consumers regardless of their circumstances as is currently often the case.
Improvements to the health
390
and well-being of energy poor consumers, savings to the health
sector
391
, and economy-wide productivity gains
392
can be expected from the packages of energy
poverty measures evaluated above. Due to the indirect nature of the way these measures would
address energy poverty, and a lack of specific data on their impact, these benefits are impossible
to quantify.
Health impacts most commonly associated with energy poverty and under-heated dwellings can
be fatal, resulting in higher mortality during winter period. Benefits of effective action to reduce
excess winter mortality could be substantial given the scale of the issue. In fact independent
research shows that over 200,000 excess winter deaths have occurred across 11 Western
European countries alone
393
during the winter of 2014/2015. In addition to the physical impacts,
cold homes are directly related to mental health problems.
The energy transition and decarbonisation policies play a key role in developing Europe’s
competitive edge internationally as growth and jobs increasingly will have to come from
innovative products and services which are closely linked to sustainable and smart solutions.
"Fuel
Poor & Health. Evidence work and evidence gaps. DECC. Presented at Health, cold homes and fuel
poverty
Seminar
at
the
University
of
Ulster".
2015.
Cole,
E.
Available
at:
http://nhfshare.heartforum.org.uk/HealthyPlaces/ESRCFuelPoverty/Cole.pdf;
"Towards an identification of
European indoor environments’ impact on health and performance
- homes and schools.
2014. Grün &
Urlaub,
Excess winter mortality: a cross-country analysis identifying key risk factors. Journal of
Epidemiology & Community Health"
2003. Healy.
391
"2009
Annual Report of the Chief Medical Officer (London: Department of Health", 2010. Donaldson, L.
392
"Indoor
cold and mortality. In Environmental Burden of Disease Associated with Inadequate Housing",
(Bonn: World Health Organisation (Regional office for Europe)).
2011. Rudge, J.
393
Excess mortality in Europe in the winter season 2014/15, EuroMOMO, source:
http://www.euromomo.eu/methods/pdf/winter_season_summary_2015.pdf
390
207
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0208.png
Recent studies on the impact of EU’s energy and climate targets suggest a net increase in job
demand in the power generation market as a result of the transition of the energy system. One
factor behind this is the higher labour intensity in power generation from renewable sources
compared to gas or nuclear. There will also be a change in the employment structure as many
of the jobs associated with the energy transition require higher skills and increased supply of
workers that outweigh job losses in somewhat less qualified jobs in conventional energy
generation. The total number of jobs in the power sector (operation, maintenance, construction,
installation, and manufacturing) is forecast to increase by around a half by 2030
394
. Further
positive impacts are expected in the indirect and substitution effects.
395
Whereas these effects
are related to the energy transition as such and cannot be attributed solely to the measures
assessed here, by ensuring a cost effective transition in more smoothly functioning markets,
these beneficial social effects stand a much increased chance of being realised and retained.
7.
C
OMPARISON OF THE OPTIONS
Taking into account the impacts of the options and the assessment presented in Section 6, the
following section compares the different options against each other using, the baseline scenario
as the reference and applying the following criteria:
-
-
Effectiveness: the options proposed should first and foremost be effective and thus
be suitable to addressing the specified problem;
Efficiency: this criterion assesses the extent to which objectives can be achieved at
the least cost (benefits versus the costs).
The tables provide a summary of the assessment of the policy options against these criteria. The
options are measures against the criteria applied for the assessment of the impacts specified for
options developed to address each Problem Area (See Sections 6.1, 6.2, 6.3 and 6.4
respectively) and the comparison of the options below. Each policy option is rated between "--
-" (very negative), 0 (neutral) and "+++" (very positive).
The options are not compared here on the basis of their coherence with parallel initiatives. The
design of the baseline already assures that all option are compatible with parallel initiatives. In
particular, the baseline in the present impact assessment ensures that under all investigated
options, the RES E targets (as well as other policy targets) are met. Consequently, comparing
options on the basis of their compatibility with the RED II initiative is meaningless.
7.1.
Comparison of options for adapting market design for the cost-effective operation
of variable and often decentralised generation, taking into account technological
developments
All options, except for Option 0 (baseline scenario) can contribute to achieving to a degree the
objective of adapting the market design to make it suitable for the cost-effective operation of
variable, often decentralised generation of electricity and capture some of the potential social
welfare and environmental opportunities (e.g. lower wholesale electricity prices; incentivise the
394
395
Between 2 and 2.5 million in 2030, depending on the decarbonisation scenario (source Neujobs/CEPS)
Neujobs/CEPS report “Impact
on Decarbonisation of the Energy System on Employment in Europe”
2015 ,
The methodology is based on applying “employment factors” (i.e. labour intensities) of different energy
technologies to changing energy mixes as projected by the EU decarbonisation scenarios.
208
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0209.png
increase of low carbon electricity generation). However, the effectiveness and efficiency of the
different options, as well as their impact, vary significantly.
Table 25: Summary of assessment of policy options
Impacts
Criteria
---------
Options
Policy Option 0
(Baseline)
Policy Option
1(a)
(level
playing field)
Policy Option
1(b)
(strengthening
short-term
markets)
Policy Option
1(c)
(demand
response/
distributed
resources )
Policy Option 2
(fully integrated
markets)
Source: DG ENER
Effectiveness
Efficiency
Economic
impact
0
+
Impact on
stakeholders
0
-
Impact on business
and public
authorities
0
-
0
+
0
+
++
++
++
--
--
+++
++
+++
--
--
+++
+++
++
---
---
In summary:
Option 0 (baseline scenario): will fall short in providing for the adaptation of the market design
to the new realities of the interconnected electricity system and will not allow the internal
electricity market to reach its full potential.
Options 1(a) (level playing field), 1(b) (strengthening short-term markets) and 1(c) (demand
response/distributed resources) reflect an increasing degree of ambition regarding the
integration of the national electricity markets, with Option 1(c) building on the packages of
measures covered under Options 1(a) and 1(b) and including additional measures. All these
options present a compromise between bottom-up initiatives and top-down steering of the
market development, without substituting the role of national governments, regulators and
TSOs by a centralised and fully harmonised system. Option 1(a) and Option 1(b) are
significantly more efficient than Option 0 but cannot be expected to fully meet the specific
objectives, given that these options do not cover measures for including additional resources
(i.e., demand response, distributed RES E and storage) in the electricity markets to further
increase the flexibility of the electricity system and the resources for the TSOs to manage it.
The value of these additional resources for the efficient operation of decarbonised electricity
markets and hence for the energy transition should not be underestimated. Option 1(c) provides
a more holistic, effective and efficient package of solutions and has the added value that it will
not lead to significant additional impacts on stakeholders or on businesses and public
authorities. Indeed, while Option 1(c) may lead to additional administrative impacts for
Member States and competent authorities regarding the implementation and monitoring of the
measures, these impacts will be offset by lower barriers to entry to start-ups and SMEs, by the
benefits to market parties from more stable regulatory frameworks and new business
209
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0210.png
opportunities as well as by the benefits to consumers from more competition and access to
wider choice.
As regards Option 2 (fully integrated market), while having advantages in terms of lower
coordination requirements (i.e., a fully integrated EU-market can be operated more efficiently),
the results of the assessment indicate that the move towards a more integrated European
approach has less significant economic added value since most of the benefits will have already
been reaped under the regional, more decentralised approach under Option 1(c) (demand
response/distributed resources). Moreover, Option 2 (fully integrated market) has the
disadvantage of requiring significant changes to established practices, systems and processes
and hence a significant impact on stakeholders, businesses, Member States and competent
authorities. Such profound changes of national competences in favour of centralised powers
"across the board" would also raise serious questions concerning the subsidiarity of the
measure. Therefore, in view that for Option 2 (fully integrated market) the efficiency gains are
not significantly higher compared to Option 1(c) (demand response/distributed resources) but
the impacts and required changes to national competences much greater, it appears
disproportionate and not the most appropriate option at the current stage of development of the
internal electricity market.
In the light of the previous assessment, the preferred option would be Option 1(c) (pulling
demand response and distributed resources in the market) (which encompasses Options
1(a) (level playing field) and 1(b) (strengthening short-term markets). This option is the
best in terms of effectiveness and, given its impacts, has been demonstrated to be the most
efficient as well as consistent with other policy areas.
This preferred Option has large support among stakeholders. No support exists for retaining the
status quo (i.e. Option 0 or 0+) whereas Option 2 (fully integrated market) was generally
deemed a step too far. It is noted that hesitations by stakeholders on aspects of the preferred
option, such as the removal of priority dispatch provisions under Option 1(a) (level playing
field), are based on the notion that this should go hand in hand with a reform rendering the
market more adapted to RES E resources, which is what is foreseen under Option 1(b)
(strengthening short-term markets) and Option 1(c) (demand response/distributed resources)
396
.
7.2.
Comparison of Options for facilitating investments in the right amount and in the
right type of resources for the EU
All options, except for Option 0 (baseline scenario), can improve the overall cost-efficiency of
the electricity sector and contribute towards achieving the objective of facilitating investments
in the right amount and in the right type of resources for the EU. However, the effectiveness
and efficiency of the different options, as well as their viability and impact, vary significantly.
396
Reference is made to Section 5.1.1 through to 5.1.5 and Sections 7 of Annexes 1.1 through 3.4 for more
detailed representations of stakeholders' opinions.
210
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0211.png
Table 26: Summary of assessment of policy options
Impacts
Criteria
---------
Options
Policy Option 0
(Baseline
scenario)
Policy Option 1
(Reinforced
energy-only
market without
CMs)
Policy Option 2
(reinforced
energy-only
market + EU
adequacy
assessment for
CMs)
Policy Option 3
(reinforced
energy-only
market + EU
adequacy
assessment for
CMs + EU
framework on
cross-border
participation
CMs)
Source: DG ENER
Effectiveness
Efficiency
Economic
impact
0
Impact on
stakeholders
0
Impact on business
and public
authorities
0
0
0
+
+
+
+/-
-
+
+
+
+
+
++
++
++
++
++
In summary:
Option 0
(baseline scenario), which would assume the existence of national capacity
mechanisms without coordination at EU-level will fall short of achieving the specific objectives
of improving market functioning to reduce the need to have recourse to state intervention and
of ensuring that state-interventions, where needed, are more coordinated, efficient and
compatible with the EU's internal energy market.
Option 1
(reinforced energy-only market without CMs) can improve the overall cost-efficiency
of the electricity sector significantly. The analysis shows that undistorted energy-only markets
increase overall system efficiency as make sure that resources are better utilized across the
borders, demand can better participate in markets, and renewables can be better integrated into
the system without additional need for subsidies. This will in turn decrease the need for capacity
mechanisms (which are often introduced as a reaction to markets which do not produce correct
price signals due to state interventions).
The analysis also shows that reinforced energy-only markets can in principle provide the right
signals for market operation and ensure resource adequacy. Option 1 also has slightly more
positive environmental impacts than any of the other options.
However, markets are still characterised by manifold regulatory distortions today, and
removing the distortive effects will not be possible with immediate effects in many Member
211
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0212.png
States. The observation that undistorted markets can provide the necessary investment signals
has therefore to be weighed against the observation that a significant transition time to phase
out the existing distortions will be necessary. Furthermore, some national distortions (e.g.
resulting from differences in taxation) cannot be addressed by a reform of energy law and are
therefore likely to continue.
Investors also do not have perfect foresight of market conditions, and confidence that they will
not be distorted for the economic lifetime of their investments. Such certainty is increasingly
difficult to find, often due to uncertainty as to the regulatory measures that could be taken in
the future that may supress prices and reduce the load factors of plants compared to the
assumptions made when the investment decision is taken. In a market that requires more and
more varied sources of funding that in many cases are competing with other, non-electricity,
projects for capital, relying solely on the energy price as a basis for investment is not always
easy. Uncertainty about future policy developments or the perception thereof can create
'missing money' that may require addressing
397
.
The legislator should also take into account that the level of interconnection is markedly
different among Member States. This militates for a more nuanced approach than a
straightforward EU-wide prohibition of CMs.
In this perspective, not allowing Member States to introduce any type of CMs would mean that
Member States would be prevented from addressing adequacy concerns with CMs. As those
concerns might be legitimate, this option is not considered to be appropriate.
But, as developed in Chapter 2.2.1 undistorted energy price signals are fundamental irrespective
of whether generators are solely relying on energy market incomes or also receive capacity
payments. Therefore the measures aimed at removing distortions from energy-only markets
discussed under Option 1 (e.g. scarcity pricing or reinforced locational signals) are 'no-regrets'
and assumed as being integral parts of Options 2 (CMs + EU adequacy assessment
)
and 3 (CMs
+ EU framework on cross-border participation)..
When compared with the baseline,
Option 2
(CMs + EU adequacy assessment) can improve
the overall cost-efficiency of the electricity sector as significant savings can be achieved
through establishing an EU-wide approach to resource adequacy assessments as opposed to
national-based adequacy assessments. At the same time Option 2 does not allow reaping the
full benefits of cross-border participation in CMs.
Option 3
(CMs + EU framework on cross-border participation) (which includes the market
reforms under Option 1 and the regional assessment under Option 2) goes beyond Option 2 as
it proposes additional measures to avoid fragmentation of CMs. This would achieve significant
additional net benefits when compared with Option 2. This is because it makes sure that foreign
resource providers can effectively participate in national capacity mechanisms and avoids
competition and market distortions resulting from capacity payments which are reserved to
domestic participants. By remunerating foreign resources for their services this option reduces
397
It must however also be recognised that CMs by themselves are not a panacea as they can equally be a source
of regulatory uncertainty. Indeed, in practise CM designs are regularly found imperfect and consequently
adjusted on a regular basis.
212
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0213.png
investment distortions that might be present in Option 2 as a result from uncoordinated
approaches to cross-border participation.
In view of the assessment above,
Option 3
(CMs + EU framework on cross-border
participation)
(encompassing options 1 and 2) is the preferred option.
This preferred Option has large support among stakeholders. There is almost a consensus
amongst stakeholders on the need for a more aligned method for generation adequacy
assessment. A majority of stakeholders support the idea that any legitimate claim to introduce
CMs should be based on a common methodology. When it comes to the geographical scope of
the harmonised assessment, a vast majority of stakeholders call for regional or EU-wide
adequacy assessments, while only a minority favour a national approach. There is also support
for the idea to align adequacy standards across Member States. Stakeholders clearly support a
common EU framework for cross-border participation in CMs
398
.
Most stakeholders including Member States agree that a regional/ European framework for
CMs is preferable. Member States, however, might want to keep a large degree of freedom
when proposing a CM. They might claim that beyond a revamped regional/ EU generation
adequacy assessment, there is legitimacy for a national assessment based on which they can
claim the necessity of their CM. Similarly Member States might instinctively want to rely more
on national assets and favour them over cross-border assets.
7.3.
Comparison of options for improving Member States' reliance on each other in
times of system stress and reinforcing coordination between Member States for
preventing and managing crisis situations
All options, except for Option 0 (baseline scenario), can contribute to achieve the objective of
improving Member State's reliance on each other in times of system stress and reinforcing their
coordination and cooperation at times of crisis situation. However, the effectiveness and
efficiency of the different options, as well as their viability and impact, vary significantly.
398
Reference is made to Section 5.2.1 through to 5.2.9 and Sections 7 of Annexes 4.1 through 5.2 for more
detailed representations of stakeholders' opinions.
213
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0214.png
Table 27: Summary of assessment of policy options
Criteria
---------
Options
Policy Option 0
(Baseline
scenario)
Policy Option 1
(Common
minimum EU
rules)
Policy Option 2
(EU rules +
regional
cooperation)
Policy Option 3
(Full
harmonisation)
Impacts
Effectiveness
Efficiency
Economic
impact
0
Impact on
stakeholders
0
Impact on
business and
public authorities
0
0
0
++
++
+
+
0/-
+++
+++
++
++
0/-
+++
--
+
+
0/--
From the point of view of impacts, particularly costs and administrative impact, Option 1
(Common minimum EU rules) could in principle appear as preferred option. However, the
performance in terms of effectiveness and efficiency is limited compared to Option 2 (EU rules
+ regional cooperation) and Option 3 (Full harmonisation). Additionally, impacts associated
with Option 3 (Full harmonisation) are neither proportionate nor fully justified by the
effectiveness of the solutions, which makes Option 3 (Full harmonisation) perform poorly in
terms of efficiency compared to Option 2 (EU rules + regional cooperation).
Overall, the more harmonized approach to security of supply through minimum rules pursued
by Option 1 (Common minimum EU rules) would not solve all the problems identified, in
particular, the uncoordinated planning and preparation ahead of a crisis. As regards Option 1
(Common minimum EU rules), the main drawback of this approach is that each Member State
would be drafting and adoption the national risk preparedness plans under its own
responsibility. While the regionally coordinated plans with crisis scenarios identified at regional
level and the agreement of some aspects of the plan (e.g. load shedding plan) in a regional
context, aim at ensuring that all regional specificities are fully considered. Given the urgency
to enhance the level of protection against cyber threats and vulnerabilities, it must be concluded
that Option 1 (Common minimum EU rules) regarding cybersecurity is not recommended,
because it is not viable for reaching the policy objectives, given that the effectiveness would
depend on whether the voluntary approach would actually deliver a sufficient level of security.
Option 2 (EU rules + regional cooperation) addresses many of the shortcomings of Option 1
(Common minimum EU rules) providing a more effective package of solutions. In particular,
the regionally coordinated plans ensure the regional identification of risks and the consistency
of the measures for prevention and managing crisis situations. For cybersecurity this option
creates a harmonised level of preparedness in the energy sector and ensures that all players have
the same understanding of risks and that all operators of essential services follow the same
selection criteria for the energy sector throughout Europe.
Overall, Option 3 (Full harmonisation) represents a highly intrusive approach that tries to
address possible risks by resorting to a full harmonisation of principles and the prescription of
concrete solutions. For example, the preparation of risk preparedness plans at regional level
214
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0215.png
ensures full coherence of actions ahead and during a crisis. However, the major limitation is
that national specificities could not be addressed through regional plans. The detailed
"emergency
rulebook"
with an exhaustive list of measures would also reduce the room of
manoeuvre of Member States to tackle local problems. The creation of a dedicated agency on
cybersecurity at EU level would be also a costly solution. The assessment of impacts in Option
3 (Full harmonisation) shows that the estimated impact on cost is likely to be high and looking
at the performance in terms of effectiveness, it makes Option 3 (Full harmonisation) a
disproportionate and not very efficient option.
In the light of the previous assessment, the preferred option would be Option 2 (EU rules
+ regional cooperation). This option is the best in terms of effectiveness and, given its
economic impacts, has been demonstrated to be the most efficient as well as consistent
with other policy areas.
This preferred Option has large support among stakeholders. The majority of stakeholders are
in favour of regional coordination of risk preparedness plans and ex-ante cross-border
agreements to ensure that markets function as long as possible in crisis situations. No support
exists for retaining the status quo (i.e. Option 0 or 0+), as stakeholders agree that the current
framework does not offer sufficient guarantees that electricity crisis situations are properly
prepared for and handled in Europe. Option 3 (Full harmonisation) was deemed a step too far;
stakeholders did not support a fully harmonised approached based on rulebooks
399
.
7.4.
Comparison of options for addressing the causes and symptoms of weak
competition in the energy retail market
Although there is a significant level of uncertainty in quantifying the benefits of the options in
this Problem Area, all options, except for Option 0 (baseline scenario), are expected to improve
retail competition. However, the anticipated effectiveness and efficiency of the different options
vary markedly.
399
Reference is made to Section 5.3.1 through to 5.3.6 and Section 6 of Annexes (6.1.4 presentation of options
and 6.1.8 for more detailed representations of stakeholders' opinions).
215
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0216.png
Table 28: Summary of assessment of policy options
Criteria
---------
Options
Policy Option 0
(Baseline
scenario)
Policy Option
0+ (Non-
regulatory
approach)
Policy Option 1
(Flexible
legislation)
Policy Option 2
(Harmonization
and extensive
consumer
safeguards)
Impacts
Effectiveness
Efficiency
Economic
impact
0
Impact on
stakeholders
0
Implementation
costs
0
0
0
+
+++
+
+/0
-
+++
++
+++
+++/--
--
+++ / ++
-
+++ / ++
++/---
---
Option 0+
(Non-regulatory approach) can be expected to lead to
modest, albeit tangible,
economic benefits
primarily as a result of the voluntary phase-out of regulated prices in some
Member States and the drive to tackle illegal switching costs. Given its
low implementation
costs,
it is a
highly efficient
option. And the few stakeholders that will be affected will be
affected positively. However, the
effectiveness of Option 0+ is significantly limited
by the
fact that non-regulatory measures are not suitable for tackling the poor data flow between retail
market actors that constitutes both a barrier to entry and a barrier to higher levels of service to
consumers. In addition, shortcomings in the existing legislation make it impossible to
significantly improve consumer engagement and energy poverty. They also introduce great
uncertainty around the drive to phase out price regulation.
Option 1
(Flexible legislation) would probably lead to
substantial economic benefits.
Retail
competition would be improved as a result of the definitive phase-out of blanket price
regulation, non-discriminatory access to consumer data, and increased consumer engagement.
In addition, consumers would see direct benefits through improved switching. And the energy
poor would be better protected, leading to knock-on benefits to the broader economy. Given
that Option 1 would entail
moderate implementation costs
(these stem primarily from
ensuring a standardised format for consumer data, and the various burdens associated with
improving consumer engagement) it is
an efficient option
as these costs are considerably
outweighed by the benefits. Many stakeholder groupings are likely to be positively and
negatively affected by the collection of policy measures in Option 1. But none would bear a
disproportionate burden that would not be offset by commensurate benefits. Likewise, the
proposed measures in Option 1 respect the principle and limits of subsidiarity.
Option 2
(Harmonization and extensive consumer safeguards) would also lead to
substantial
economic benefits,
albeit with a
greater degree of uncertainty
over the size of these benefits.
This uncertainty stems from the tension some of the measures in Option 2 may have with
competition (stronger disconnection safeguards, an outright ban on all switching-related
charges), and from the difficulty of prescribing EU-level solutions in certain areas (defining
exceptions to price deregulation, implementing a standard EU bill design). Whilst a single EU
data management model would be just as effective and easier to enforce, and whilst the energy
poor would be even better protected by the stronger safeguards proposed, the
high
216
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0217.png
implementation cost
of these measures would
reduce the efficiency
of Option 2 compared
with Option 1. Disconnection safeguards may be better designed by Member States to ensure
synergies between national social services. As social policy is a primary competence of Member
States, Option 2 may go beyond the boundaries of subsidiarity. Finally, many stakeholders will
be affected by the collection of policy measures in Option 1, both positively and negatively.
Suppliers and DSOs in particular would face significant burdens that they would at least
partially pass on to consumers i.e. socialise.
In the light of the analysis, the preferred option is Option 1 (Flexible legislation). This
option is most likely to be the most effective, is efficient, and is consistent with other policy
areas.
Most stakeholders would support (or at least be indifferent to) the measures in preferred Option
1 (Flexible legislation). This is due to the fact that a flexible legislative approach allows the
problems identified to be largely addressed while accommodating: 1) the broad range of
national differences that still exist in retail markets for energy; and 2) the specific concerns
aired in the stakeholder outreach. Nevertheless, some Member States practising blanket price
regulation will likely oppose a phase out of this, and industry associations representing energy
suppliers have stated that they would not welcome any EU legislation addressing the content of
bills.
Almost no support exists for retaining the status quo (i.e. Option 0) or for tackling the issues in
the Problem Area through soft law (Option 0+), except for isolated instances already mentioned.
Several measures in Option 2 (Harmonization and extensive consumer safeguards) were
generally deemed a step too far by a number of stakeholders, including stakeholders such as
ACER, or NRAs who represent the interest of the public.
400
7.5.
Synergies, trade-offs between Problem Areas and sequencing
The measures considered in this impact assessment are highly complementary. Most of the
different Options considered in each Problem Area would reinforce the effect of options in other
Problem Areas, with little trade-offs between the different areas.
Synergies
The measures to make intraday and balancing markets more flexible such as pursued under
Problem Area I, in particular Option 1(b) (strenghening short-term markets) and Problem Area
II , Option 1 (reinforced energy-only market) will foster a price signal that better reflects the
value of electricity, notably when it is scarce. It will hence provide a price signal benefical for
flexible resources, in particular demand response and storage and improve the business case for
innovative assets and service models to enter the market as assessed under Problem Area I
Option 1(c) (demand response/distributed resources). It will also reinforce liquidity and
competition in the electricity wholesale electricity markets. As choice on the wholesale market
is a pre-condition for more competition on retail markets, more liquid wholesale markets will
also contribute to improving competition in retail markets (Problem Area VI).
400
See Section 5.4.2 through to 5.4.5, and Sections 7 of Annexes 7.1 through 7.6 for more detailed representations
of stakeholders' opinions.
217
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
Helping RES E resources to be remunerated through the market as fostered with the measures
under Problem Area I will ultimately reduce the high level of taxes and levies currently
necessary to drive RES E deployment, decreasing overall system costs and making energy more
affordable compared with a scenario where markets remain poorly adapted to RES E.
The measures proposed to improve the functioning of the electricity markets as discussed under
Problem Areas I and II, in particular Option 1 (reinforced energy market/No CMs), will also
lead to a more robust formation of price signals. Robust price signals will reduce the need for
assets to be remunerated by alternative revenue streams to be a credible investment opportunity
or avoid its decommissioning and hence reduce the need for government intervention in the
form of CMs or otherwise to ensure resource adequacy such as discussed under Problem Area
II, Option 3. Moreover, the measures assessed Problem area II, in particular the preferred
Option 3 will reduce market distorition caused by genuinly justifed CMs and improve the ability
of the market to operate optimally. In other words, improving the energy markets will reduce
the need for governement intervention to ensure investments in electricity resources.
Measures to improve retail competition, consumer engagement and data handling as fostered
with the measures under Problem Area IV (Retail markets) will increase system flexibility as
targeted by the measures under Problem Area I, in particuler Option 1(c) (pulling demand
response and distributed resources into the market). This is because the majority of untapped
demand response potential originates from smaller consumers and because retail price
regulation can have a detrimental effect on the deployment of innovative consumer products
such as dynamic price supply contracts.
Improving the market in its ability to renumerate (in particular, flexible) resources and
removing the distortions that prevent resources to reacte to proper price signals (such as those
aimed at in Problem I area I and Option 1 of Problem Area II) will overall improve the
robustness of the system to satisfy demand at all times and, hence, the freqeuncy and overall
number of hours that recourse has to be taken to out-of-market measures to operate the system,
such as the demand curtailment, as discussed under Problem Area III (Crisis situations).
Phasing out price regulation as fostered with the measures under Problem Area IV (particularly
in Member States with very low retail margins) will help address the high levels of electricity
and gas consumption caused by artificially low prices and provide an accurate price signal for
energy efficiency investments that would ultimately mitigate the effects of security of supply
events as targeted by the measures under Problem Area III (Crisis situations). Removing price
regulation will also allow for a more flexible organisation of the market and increase the
incentives to participate in the market through demand response as fostered by the measures
assessed un Problem Area I. Option 1(c) (pulling demand response and distributed resources
into the market)
Measures to improve retail competition as discussed under Problems Area IV, will ensure that
all benefits, including those expected under Problem Areas I, II and III are transferred to end-
consumers, ultimately increasing the beneficial effects on social welfare and competiveness.
218
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0219.png
Overall, market improvement measures will address increasing energy poverty as discussed in
Problem Area IV. Indeed, one of the three main drivers
401
of energy poverty has been the
gradual increase in retail prices.
Measures to ensure a common approach to crisis prevention and management as is the objective
under Problem Area III avoid unduly interventions in market functioning. Better preparedness,
transparency and clear rules on crisis management will build trust between Member States to
rely on the internal electicity market for resource adequacy, helping the achievement of the
objectives under Problem Area II. By imposing obligations to cooperate and lend assistance,
Member States are also less likely to "over-protect" themselves againt possible crisis situations.
Trade-offs
The mesures selected as the preferred option under Problem Area I and II are mutually
reinforcing in that they collectively aim at improving market functioning, thereby reducing the
need for market gouvernment intervention through CMs, and reducing their distortive effects if
nonetheless required. However, scarcity pricing and CMs to a certain degree can be seen as
alternative measures to foster investments. Even if CM deployment rules and design principles
are ringfenced, the mere fact that resources are also renumerated by CMs means that the
effectiveness of scarcity prices to drive investment may be reduced as the number of hours that
scarcity occurs and thus the profits that more flexible resources can earn from selling energy in
the market is reduced. It needs also to be noted that scarcity prices and CMs (at least in its
market-wide version) act differently on investment decision in a crucial manner. Whereas such
CMs rewards any capacity, removing barriers for scarcity pricing will improve remuneration of
flexible capacity in particular.
The measures assessed under various options in the impact assessment seek to improve the
overall flexibilty of the electricity system. However, they do this by employing different means.
It can therefore be expected that some trade-offs exist between these options. Improvements in
the usage of interconnection capacity (as assessed under Problem Area I, Option 1(b)
(strenghening short-term markets)) allow a given plant to exploit variations in production and
demand over a larger geographcial area allowing for a more stable intertemporal production
pattern of the plant. Improving the usage of interconnection capacity will hence favour the
usage of less flexible resources over flexible ones. Similarly, pulling demand response into the
market will reduce the profits of generation capacity and, in particular, flexible generation
capacity which may amplify the amount of capacity that needs to exit the market into the
transition towards 2030. Ultimately, efficient markets should select the most cost-efficient
solutions.
Energy poverty safeguards whose costs directly accrue to suppliers
particularly, the costly
disconnection safeguards considered in Option 2 (Harmonization and extensive consumer
safeguards) of Problem Area IV (Retail markets)
may act as a barrier to retail-level
competition, and diminish the associated benefits to consumers, including lower prices, new
and innovative products, and higher levels of service. Although the implementation costs of
these safeguards will be passed on to consumers, and therefore socialized, different energy
suppliers may have different abilities to do this, and to deal with the additional consumer
401
The other two drivers being wage growth and the energy efficiency of housing stock
219
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0220.png
engagement costs. Some may therefore choose not to enter markets with such safeguards in
place. A uniform level of such safeguards throughout the market would help create a level
playing field and address such competition impacts.
Sequencing of measures
Over all, the synergies between the measures are large and the temporal dependency low, the
overall beneficial effects will be achieved only if all measures are implemented as a package.
A sequencing of measures is not necessarily appropriate to establish at EU level. The judgement
of moving to a next stage of market development much depends on the development stage of
the electricity market at hand. The reality is that Member States are at different, sometimes even
very different stages, in the development of their market arrangements. As an example only, as
a result of the individual characteristics of national markets, the timing of the phase out of price
regulation may differ on a case-by-case basis. This is to enable national authorities to ensure
that the necessary prerequisites of a smooth transition are in place before all regulatory
interventions in price setting are discontinued. Such prerequisites may include, for example, the
number of suppliers in the market, the market share of the largest suppliers, or retail price levels.
The same is true for other measures proposed.
The EU legislation ultimately adopted should therefore need to find the appropriate balance
between setting out a well-defined endpoint whilst allowing sufficient space for Member States
to manage their transition thereon.
8.
8.1.
M
ONITORING AND EVALUATION
Future monitoring and evaluation plan
The Commission will systematically monitor the transposition and compliance of the Member
States and other actors with the finally adopted measures and take enforcement measures if and
when required and report on the progress made in this regard on a regular basis. For this
purpose, the Commission will be supported by ACER as described below.
In addition, as it has already done in the context of the implementation of the Third Package,
the Commission will provide guidance documents providing assistance on the implementation
of the adopted measures.
Parallel to the proposed initiatives, the Commission will bring forward an initiative concerning
the governance of the Energy Union that will streamline the monitoring and reporting
requirements. Based on the initiative of the governance of the Energy Union, the current
monitoring and reporting requirements of Commission and Member States' reporting
obligations in the Third Energy Package will be integrated in a horizontal monitoring report.
More information on the streamlining of the monitoring and reporting requirements can be
found in the impact assessment for the governance of the European Union.
The annual reporting by ACER and the evaluation by the Commission, together with the
reporting from the Electricity Coordination Group are part of the proposed initiatives and
described in the sections below.
220
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0221.png
8.2.
Annual reporting by ACER and evaluation by the Commission
The monitoring of the proposed initiatives will be carried out following a two tier approach:
annual reporting by ACER and an evaluation by the Commission.
Annual reporting by ACER
ACER's duties
402
under the Third Package include the monitoring of and reporting on the
internal electricity market. ACER prepares and publishes an annual market monitoring report
that tracks the progress of the integration process and the performance of electricity markets
and identifies any barriers to the completion of the internal electricity retail and wholesale
markets.
The sources of data on which ACER relies to compile its annual market monitoring report are:
the Commission, NRAs, ENTSO-E, the Bureau Européen des Unions de Consommateurs
(BEUC) and other relevant organisations. ACER's annual report is based on publicly available
information and the information provided by these entities.
Based on the present proposals, ACER will continue to monitor and report on the internal
electricity market on an annual basis after the adoption of the proposals. ACER's annual
reporting will replace the Commission's reporting obligations that are currently still existing
under the Electricity Directive. The present proposals also foresee extending ACER's
monitoring mandate to include matters related to security of supply.
Evaluation by the Commission
The Commission will carry out a fully-fleged evaluation of the impact of the proposed
initiatives, including the effectiveness, efficiency, continuing coherence and relevance of the
proposals, within a given timeline after the entry into force of the adopted measures
(indicatively, 5 years).
In the context of this evaluation, the Commission will pay particular attention as to whether the
assumptions underlying its analyses in the present impact assessment were valid.
The evaluation report will be developed by the Commission with the assistance of external
experts, on the basis of terms of reference developed by the Commission services. Stakeholders
will be informed of and consulted on the evaluation report, and they will also be regularly
informed of the progress of the evaluation and its findings. The evaluation report will be made
public.
8.3.
Monitoring by the Electricity Coordination Group
The Electricity Coordination Group will be also a tool to monitor developments in the internal
electricity market and in particular as regards security of supply more closely. To this end a
402
The
legal basis for the Agency’s market monitoring duties is in Article 11 of Regulation (EC) No. 713/2009.
ACER equally monitors and reports on many more detailed aspects of the regulatory framework.
(http://www.acer.europa.eu/Official_documents/Publications/Pages/Publication.aspx)
221
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0222.png
concrete mandate will be given to the Electricity Coordination Group, in particular to monitor
the security of supply in the EU on the basis of a set of indicators (e.g. EENS, LoLE) and regular
outlooks and reports produced by ENTSO-E
403
.
8.4.
Operational objectives
The key objective of the present initiative is to make electricity markets more secure, efficient
and competitive whilst ensuring that electricity is generated in a sustainable way and remains
affordable to all. The operational objectives for the preferred options are listed as follows:
Problem Area I (market design not fit for an increasing share of variable decentralised
generation and technological developments):
-
-
-
-
Adoption of measures directed at removing market distortions deriving from the
different treatment to generation from different sources;
Adoption of measures aiming at providing for liquid and better integrated short-term
markets;
Adoption of measures directed at removing barriers preventing demand response from
participating in energy and reserve markets;
Adoption of measures aiming at strengthening the role of ACER, clarifying the role of
NRAs at regional level, criteria for enhancing ENTSO-E's transparency and monitoring
obligations, rules for formalising the role of DSOs at European level.
Problem Area II (uncertainty about sufficient future generation investments and uncoordinated
capacity markets):
-
-
Adoption of measures aiming at improving the price signals of the electricity markets;
Specific requirements to align national CMs by requiring ENTSO-E to propose a
methodology for an EU-wide resource adequacy assessment and requiring Member
States to rely on the assessment.
Adoption of rules aiming at enhancing the compatibility between CMs.
-
Problem Area III (reinforce coordination between Member States for preventing and managing
crisis situations):
-
-
-
Adoption of measures aiming at improving risk assessment and preparedness;
Adoption of rules aiming at improving coordination in emergency;
Adoption of measures aiming at improving transparency and information sharing.
Problem Area IV (retail markets):
-
-
-
Adoption of measures aiming at reducing regulatory intervention in retail price setting;
Adoption of measures aiming at protecting energy poor and vulnerable consumers;
Adoption of measures directed at removing barriers to market entry for new supply and
service companies;
403
See Preferred Option (Option 2 (EU rules + regional cooperation)) to address problem Area III (When
preparing or managing crisis situations, Member States tend to disregard the situation across their borders).
222
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
-
8.5.
Adoption of measures aimed at increasing consumer engagement and choice.
Monitoring indicators and benchmarks
As of 2021, ACER will be invited to review its current monitoring indicators with a view to
ensure their continuing relevance for monitoring progress towards the objectives underlying the
present proposals. ACER will continue relying on the same sources of data used for the
preparation of the market monitoring report. It will be tasked to cover in that report the security
of supply dimension as well. Monitoring indicators could include:
Problem Area I (market design not fit for an increasing share of variable decentralised
generation and technological developments):
-
Indicators relating to market and regulatory barriers that affect the level playing field
between market participant and types of resources, such as the degree of capacity
dispatched - fully, partially or not at all - on the basis of price signals only, and the
usage of market and non-market based curtailment;
Indicators related to the degree of flexibility available within the electricity system and
the development of intraday and balancing markets, such the level of market liquidity
in intraday and balancing markets and the allocation and use of cross-border capacity
for these time-frames, and related efficiency gains;
Indicators related to the participation of distributed resources and demand in the market
(including use from system operators), energy service operators such as aggregators and
barriers to market participation. Such for example, the capacity and production by
distributed RES E and storage, the capacity of demand response available and its
activation, the number of facilities and their capacity operated by aggregators;
Indicators related to consumer access to smart metring systems, their functionalities and
availability/uptake of dynamic electricity pricing contracts;
Indicators related to the evaluation of the performance by ACER, ENTSO-E and NRAs
of their duties.
-
-
-
-
Problem Area II (uncertainty about sufficient future generation investments and
uncoordinated capacity markets):
-
Indicators pointing to the effectiveness of market arrangements in providing locational
signals and reflecting the value of electricity, also in times of scarcity, such as the extent
to which market prices have been contrained by any implicit or explict limits on prices,
levels of investment and correlation with price in different bidding zones.
State interventions to support resource adequacy and their interaction with the EU's
electricity markets, such as their incidence, design features and degree of participation
of cross-border capacity;
-
Problem Area III (reinforce coordination between Member States for preventing and
managing crisis situations):
-
-
Indicators for monitoring security of supply, such as expected energy non-served
(EENS) and loss of load expectation (LoLE);
In the case that electricity crisis situations occur, the lessons learnt from these stress
situations should also feed in the analysis of security of supply.
Problem Area IV (retail markets):
223
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
-
-
-
The incidence of regulated prices and the progress towards their phase-out;
Market developments regarding consumer switching, switching facilitation such as
switching rates, costs and incidence of price and non-price barriers to switching.
Key performance indicators measuring the economic and technical effectiveness of
DSOs and impact on system users (level of distribution charges).
224
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
9.
ACER
G
LOSSARY AND
A
CRONYMS
The Agency for the Cooperation of Energy Regulators, a European
Union Agency that was created by the Third Energy Package to
further progress the completion of the internal energy market both
for electricity and natural gas.
Regulation (EC) No 713/2009 of the European Parliament and of the
Council of 13 July 2009 establishing an Agency for the Cooperation
of Energy Regulators, OJ L 211, 14.8.2009, p. 1–14.
(Resource) adequacy can be defined as the ability of the system to
meet the aggregate power and energy requirements of all consumers
at virtually all times. In this impact assessment the term resource
adequacy is favoured over other terms often used in this context,
such as generation or system adequacy
See FFR
A service provider that combines multiple consumer loads
(flexibility or energy) and/or supplied energy units for sale or auction
in organised energy markets.
Services necessary to support the transmission of capacity and
energy from resources to loads while maintaining reliable operation
of the transmission service provider. They refer to a range of
functions which TSOs contract so that they can guarantee system
security. These include services like the provision of mFFR and
aFFR or reactive power.
The situation after markets have closed (gate closure) in which a
TSO acts to ensure that demand is equal to supply, in and near real
time.
Commission Regulation establishing a Guideline on Electricity
Balancing, one of the legal acts to be adopted under Article 18 of the
Electricity Regulation.
All resources, if procured
ex ante
or in real time, or according to
legal obligations, which are available to the TSO for balancing
purposes.
Business As Usual, i.e. the state of the world if no additional action
is taken.
A bidding Zone means a geographical area within which electricity
market wholesale prices are uniform and market participants not
have to take into account grid constraints. Market participants who
wish to buy or sell electricity in another bidding zone have to take
into account grid constraints and related congestion rent payments.
ACER Regulation:
Adequacy
aFFR
Aggregator
Ancillary Services:
Balancing
Balancing Guideline
Balancing reserves
BAU
Bidding zone
225
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
BRPs
BSPs
Balance responsible parties, such as producers and suppliers, keep
their individual supply and demand in balance in commerical terms.
Balancing Service Providers, such as generators or demand facilities,
balance-out unforeseen fluctuations on the electricity grid by rapidly
increasing or reducing their power output.
Guideline on Capacity Allocation and Congestion Management, one
of the legal acts adopted under Article 6 of the Electricity
Regulation.
Combined Cycle Gas Turbine, a common type of gas-fired
generation plant
Central Eastern European Electricity Forum, a platform for
cooperation between certain EU Member States.
Computer Emergency Response Team.
Combined Heat and Power units produce heat and electricity
simultaneously. Their production of electricity is not necesarrily
deterined only by prices for electricity.
Capacity Mechanism, a regulatory intervention that remunerates the
availability of electricity resources instead of the production of
electricity (or the avoidance of electricity consumption).
Means a situation in which an interconnection linking national
transmission networks cannot accommodate all physical flows
resulting from international trade requested by market participants,
because of a lack of capacity of the interconnectors and / or the
national transmission systems concerned.
CACM Guideline
CCGT
CEEE
CERT
CHP
CM
Congestion
Conventional generation The non-low carbon technologies, based on fossil fuels (lignite, hard
coal, natural gas, oil). They usually constitute the mid-range and
peaking plants.
Cross-zonal transmission capacity: The capability of the interconnected system to
accommodate energy transfers between bidding zones.
CSIRT
CT
Curtailment
Day-ahead market
Computer Security Incident Response Team.
Comparison Tools, websites that help consumers to compare
different offers in the market.
Curtailment means a reduction in the scheduled capacity or energy
delivery.
The market timeframe where commercial electricity transactions are
executed the day prior to the day of delivery of traded products.
226
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
DER
Distributed Energy Resources, a generic term referring electricity
assets such as small-scale RES E, storage connected to distribution
grids or by end-consumers on their premises.
EU policy strategy aimed at: (i) helping to make the EU's digital
world a seamless and level marketplace to buy and sell; (ii) designing
rules which match the pace of technology and support infrastructure
development; and (iii) ensuring that Europe's economy, industry and
employment take full advantage of what digitalisation offers.
Demand (side) response, the ability of consumers of electricity to
actively adapt their consumption to market conditions.
Distribution System Operator, the entity that operates, maintains and
develops the low voltage networks in a given area to which most
consumers are connected.
The Electricity Coordination Group was created in 2012 by
Commission Decision of 15 November 2012. The Group is a
platform for the exchange of information and coordination of
electricity policy measures having a cross-border impact. It also aims
to facilitate the exchange of information and cooperation on security
of electricity supply, including the coordination of action in case of
an emergency within the Union.
Energy Efficiency Directive. Directive 2012/27/EU of the European
Parliament and of the Council of 25 October 2012 on energy
efficiency, amending Directives 2009/125/EC and 2010/30/EU and
repealing Directives 2004/8/EC and 2006/32/EC. This directive
establishes a set of binding measures to help the EU reach its 20%
energy efficiency target by 2020.
Communication from the Commission - Guidelines on State aid for
environmental protection and energy 2014-2020, OJ C 200,
28.6.2014, p. 1–55. The Guidelines aim to help Member States
design state aid measures that contribute to reaching their 2020
climate targets. The guidelines will be in force until the end of 2020.
Expected Energy Non Served, a metric to measure security of supply
and to set a reliability standard.
The European Economic and Social Committee.
Directive 2009/72 of the European Parliament and of the Council of
13 July 2009 concerning common rules for the internal market in
electricity and repealing Directive 2003/54/EC, OJ L 211,
14.8.2009, p. 55–93. Together with the Electricity Regulation, the
Electricity Directive sets the main parts of the legal framework for
the EU's electricity markets.
Digital Single Market
DR
DSO
ECG
EE
EEAG
EENS
EESC
Electricity Directive
227
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
Electricity Regulation
Regulation (EC) No 714/2009 of the European Parliament and of the
Council of 13 July 2009 on conditions for access to the network for
cross-border exchanges in electricity repealing Regulation (EC) No
1228/2003, OJ L 211, 14.8.2009, p. 15–35. Together with the
Electricity Directive, the Electricity Regulation sets the main parts
of the legal framework for the EU's electricity markets.
End-customers procure electricity for their own use.
European Network of Transmission System Operators for
Electricity. ENTSO-E was established and given legal mandates by
Third Package.
European Network of Transmission System Operators for Gas.
ENTSOG was established and given legal mandates by Third
Package.
Energy Performance of Buildings Directive or Directive
2010/31/EU of the European Parliament and of the Council of 19
May 2010 on the energy performance of buildings. OJ L 153,
18.6.2010, p. 13–35, concerning energy efficiency of building.
Modifications are being proposed to the EPBD.
Emmission Trading System, works on the 'cap and trade' principle.
A 'cap', or limit, is set on the total amount of certain greenhouse
gases that can be emitted by the factories, power plants and other
installations in the system. The cap is reduced over time so that total
emissions fall. This policy instrument equally fosters penetration of
RES E as it renders production of electricity from non- or less-
emitting generation capacity more economical.
Term refering to the current design of the EU's electricity markets.
The EU target model is based on two broad principles: (i) the
development of integrated regional wholesale markets, preferably
established on a zonal basis, in which prices provide important
signals for generators' operational and investment decisions; and (ii)
market coupling based on the so-called "flow-based" capacity
calculation, a method that takes into account that electricity can flow
via different paths and optimises the representation of available
capacities in meshed electricity grids.
The central policy scenario modelled by PRIMES, reflecting the
agreed 2030 climate and energy targets (and the 2050 EU's
decarbonisation objectives).
Frequency Containment Reserve are reserves from reserve providers
(generators, storage, demand response) used by TSOs to maintain
frequency stable in the whole synchronous area (e.g. continental
Europe). This category typically includes automatically activated
reserves with the activation time up to 30 seconds.
End-customer
ENTSO-E
ENTSO-G
EPBD
ETS
EU Target Model:
EUCO27
FCR
228
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
1730752_0229.png
Florence Forum
The Florence Forum was set up to discuss the creation of a true
internal electricity market in Europe. The participants are national
regulatory authorities, Member States, the European Commission,
international organisations in the area of energy and European-wide
associations representing transmission and distribution system
operators, electricity traders, consumers, network users and power
exchanges.
Frequency Restoration Reserve are reserves from reserve providers
(generators, storage, demand response) used by TSOs to restore
system frequency and power balance after sudden system imbalance
occurrence (e.g. the outage of a power plant). Those reserves replace
FCR if the frequency deviation lasts longer than 30 seconds. This
category includes operating reserves with an activation time
typically between 30 seconds up to 15 minutes. FRR can be
distinguished between reserves with automatic activation (aFRR)
and reserves with manual activation (mFRR).
Directive 2009/73 of the European Parliament and of the Council of
13 July 2009 concerning common rules for the internal market in gas
and repealing Directive 2003/55/EC, OJ L 211, 14.8.2009, p. 94–
136. Together with the Gas Regulation, the Gas Directive sets the
main parts of the legal framework for the EU's gas markets.
Regulation (EC) No 715/2009 of the European Parliament and of the
Council of 13 July 2009 on conditions for access to the natural gas
transmission networks and repealing Regulation (EC) No
1775/2005, OJ L 211, 14.8.2009, p. 36-54. Together with the Gas
Directive, the Gas Regulation sets the main parts of the legal
framework for the EU's gas markets.
The moment when contracts are frozen. After gate closure, no
trading is allowed anymore. At this point, parties are expected to
adhere to the physical data submitted to the System Operator and to
the contracted volumes submitted before Gate Closure.
Charges for network usage imposed on generators
A generator produces electricity and sells this to suppliers or end-
customers
Aggregator that is not affiliated to a supplier or any other market
participant.
Commission Regulation (EU) No 838/2010 of 23 September 2010
on laying down guidelines relating to the inter-transmission system
operator compensation mechanism and a common regulatory
approach to transmission charging
FRR
Gas Directive:
Gas Regulation:
Gate closure
G-charges
Generator
Independent aggregator
ITC Regulation
229
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
LFC block
Load-Frequency Control block or balancing zone, defines the size of
the network area for which the balancing reserves are being
procured.
The total electricity demand
Load Payments correspond to the amount of money retail
companies/consumers need to pay to generators for the electricity
bought from the wholesale market. For each hour, it corresponds to
the product of served demand with the electricity price.
Loss of load expectation, a metric to measure security of supply and
to set a reliability standard
Long-term contract.
A modelling tool used by the Commission, described in more detail
in Annex IV.
See FFR
Network Code on Emergency and Restoration
Nominated Electricity Market Operator; an entity designated by
competent authroities to perform tasks related to single day-ahead
and intraday coupling as defined in the Guideline on Capacity
Allocation and Congestion Management, one of the legal acts
adopted under Article 6 of the Electricity Regulation.
Load
Load Payments
LoLE
LTC
METIS
mFFR
NC ER
NEMO
Electricity network codes and guidelines: a legal act adopted under Articles 6, 8 and 18 of the
Electricity Regulation. Examples of such codes and guidelines are
the NC ER, the CACM guideline, the RfG, the System Operation
Guideline or the Balancing guideline. For a full overview of these
network codes and guidelines, reference is made to Annex VII.
NIS Directive
Directive (EU) 2016/1148 of the European Parliament and of the
Council of 6 July 2016 concerning measures for a high common
level of security of network and information systems across the
Union, OJ L 194, 19.07.2016, p. 1-30.
National Regulatory Authorities, are national authorties set up and
empowered by the Third Package to over see national electricity (and
gas) markets.
Net Transfer Capacity, a metric to measure the capacity available on
interconnectors to transfer electricity.
Risk Preparedness Plans, a measure proposed under Problem Area
III
Pentalateral Energy Forum, a platform for collaboration consisting
of the Ministries, NRAs and TSOs of the BENELUX, DE, FR, AT,
NRAs
NTC
Plan
PLEF
230
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
CH as well as a market parties platform and the European
Commission.
Power exchange
Power exchanges facilitate the trading of electricity at wholesale
level, often for delivery the next day or at even shorter intervals
(intraday). They cooperate with TSOs in optimising interconnection
capacity in the contex of market coupling.
A modelling tool used by the Commission, described in more detail
in Annex IV.
Photovoltaic
The Renewable Energy Package comprising the new Renewable
Energy Directive and bioenergy sustainability policy for 2030
A measure activated by one or several system operators by altering
the generation and/or load pattern in order to change physical flows
in the transmission system and relieve a physical network
congestion.
A platform or regionally coordinated platforms for the attribution of
Long Term Cross Zonal Capacity for a single border or set of
borders.
Renewable sources of electricity
Network code on Requirements for Grid Connection of Generators
Regional Operational Centre
Replacement Reserve are reserves from reserve providers
(generators, storage, demand response) used by TSOs to restore the
required level of FCR and FRR due to their earlier usage. Contrary
to FCR and FRR, not all TSOs in the EU maintain RR. This category
includes operating reserves with activation time from several
minutes up to hours.
Regional Security Coordinators, an entity foreseen under the System
Operation Guidelines to assist TSOs in maintaining the operational
security of the electricity system.
The sector inquiry into capacity mechanisms as conducted by DG
Competition of the European Commission
An electronic device that records consumption of electric energy in
intervals of an hour or less and communicates that information at
least daily back to the utility for monitoring and billing. Smart meters
enable two-way communication between the meter and the central
system.
PRIMES
PV
RED II
Redispatching
Regional platform
RES E
RfG
ROC
RR
RSC
Sector Inquiry
Smart meter
231
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
SME
Small and Medium-sized Enterprises as defined in the Commission
Recommendation of 6 May 2003 concerning the definition of micro,
small and medium-sized enterprises (notified under document
number C(2003) 1422), OJ L 124, 20.05.2003, p. 36-41.
Security of Electricity Supply Directive or Directive 2005/89/EC of
the European Parliament and of the Council of 18 January 2006
concerning measures to safeguard security of electricity supply and
infrastructure investment, OJ L 33, 4.2.2006, p. 22–27
Suppliers are active in the retail segment of the market and supply
electricity to end-consumers
The percentage of consumers changing suppliers in any given year.
SoS Directive
Supplier
Switching rate
System Operation Guideline: Draft Commission Regulation which will set down rules relating
to the maintenance of the secure operation of the interconnected
transmission system in real time.
TFEU
Third Package:
Treaty of the Functioning of the European Union
A package of legislation adopted in 2009 comprising the Electricity
Directive, the Electricity Regulation, the ACER Regulation as well
as similar legislation concerning the gas markets.
Time-of-Use tariffs: Time-based pricing is a pricing strategy where
the provider of a service or supplier of a commodity, may vary the
price depending on the time-of-day when the service is provided or
the commodity is delivered.
The transmission capacity, also called TTC (Total Transfer
Capacity), is the maximum transmission of active power in
accordance with the system security criteria which is permitted in
transmission cross-sections between the subsystems/areas or
individual installations.
Transmission Reliability Margin, a metric to capture the amount of
transmission transfer capability necessary to provide reasonable
assurance that the interconnected transmission system will be secure
during changing system conditions
Transmission System Operator, the entity that operates, maintains
and develops the high voltage networks in a given area.
Ten-Year Network Development Plan
The Vulnerable Consumer Working Group provides advice to the
European Commission on the topics of consumer vulnerability and
energy poverty, its membership comprising industry, consumer
associations, regulators and Member States representatives.
ToU tariffs
Transmission capacity
TRM
TSO
TYNDP
VCWG
232
Fejl! Brug fanen Hjem til at anvende Heading 1,Livello 1 på teksten, der skal vises her.
kom (2016) 0863 - Ingen titel
VoLL
Value of Lost Load is a projected value reflecting the maximum
price consumers are willing to pay to be supplied with electricity.
VoLL is typically quite high (e.g. several thousands of EUR/MWh)
and not necessarily the same for each (group of) consumer, thus
enabling DR activation by consumers before the VoLL is reached.
233