COMMISSION STAFF WORKING DOCUMENT
European Overview - River Basin Management Plans
Accompanying the document
REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND
THE COUNCIL
implementation of the Water Framework Directive (2000/60/EC) and the Floods
Directive (2007/60/EC)
Second River Basin Management Plans
First Flood Risk Management Plans
{COM(2019) 95 final} - {SWD(2019) 31 final} - {SWD(2019) 32 final} -
{SWD(2019) 33 final} - {SWD(2019) 34 final} - {SWD(2019) 35 final} -
{SWD(2019) 36 final} - {SWD(2019) 37 final} - {SWD(2019) 38 final} -
{SWD(2019) 39 final} - {SWD(2019) 40 final} - {SWD(2019) 41 final} -
{SWD(2019) 42 final} - {SWD(2019) 43 final} - {SWD(2019) 44 final} -
{SWD(2019) 45 final} - {SWD(2019) 46 final} - {SWD(2019) 47 final} -
{SWD(2019) 48 final} - {SWD(2019) 49 final} - {SWD(2019) 50 final} -
{SWD(2019) 51 final} - {SWD(2019) 52 final} - {SWD(2019) 53 final} -
{SWD(2019) 54 final} - {SWD(2019) 55 final} - {SWD(2019) 56 final} -
{SWD(2019) 57 final} - {SWD(2019) 58 final} - {SWD(2019) 59 final} -
{SWD(2019) 60 final} - {SWD(2019) 61 final} - {SWD(2019) 62 final} -
{SWD(2019) 63 final} - {SWD(2019) 64 final} - {SWD(2019) 65 final} -
{SWD(2019) 66 final} - {SWD(2019) 67 final} - {SWD(2019) 68 final} -
{SWD(2019) 69 final} - {SWD(2019) 70 final} - {SWD(2019) 71 final} -
{SWD(2019) 72 final} - {SWD(2019) 73 final} - {SWD(2019) 74 final} -
{SWD(2019) 75 final} - {SWD(2019) 76 final} - {SWD(2019) 77 final} -
{SWD(2019) 78 final} - {SWD(2019) 79 final} - {SWD(2019) 80 final} -
{SWD(2019) 81 final} - {SWD(2019) 82 final} - {SWD(2019) 83 final} -
{SWD(2019) 84 final}
EN
EN
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Table of Contents
Acronyms ................................................................................................................................... 4
Executive summary .................................................................................................................... 5
1. Introduction ......................................................................................................................... 20
2. Main elements of the WFD ................................................................................................. 20
3. Approach to the assessment of the River Basin Management Plans ................................... 22
4. Overview Of Activities To Ensure Better Implementation ................................................. 24
4.1.
4.2.
4.3.
4.4.
Legal action ................................................................................................................ 24
Court rulings related to the WFD ............................................................................... 27
Better national implementation: working with Member States and stakeholders...... 29
Legal implementation of related Directives adopted in accordance with Article 16
(EQSs) and 17 (Groundwater) of the WFD ............................................................... 32
Governance ................................................................................................................ 33
Introduction ................................................................................................................ 33
Conclusions ................................................................................................................ 46
Recommendations ...................................................................................................... 47
Characterisation of the River Basin District .............................................................. 48
Introduction ................................................................................................................ 48
Conclusions ................................................................................................................ 64
Recommendations ...................................................................................................... 65
Monitoring, assessment and classification of ecological status in surface waters ..... 66
Introduction ................................................................................................................ 66
Conclusions ................................................................................................................ 99
Recommendations .................................................................................................... 102
Monitoring, assessment and classification of chemical status in surface waters ..... 103
Introduction .............................................................................................................. 103
Conclusions .............................................................................................................. 117
Recommendations .................................................................................................... 120
Monitoring, assessment and classification of quantitative status in groundwater ... 121
Introduction .............................................................................................................. 121
Conclusions .............................................................................................................. 129
Recommendations .................................................................................................... 130
Monitoring, assessment and classification of chemical status in groundwater ........ 131
Introduction .............................................................................................................. 131
Conclusions .............................................................................................................. 141
5. Results of the assessment at EU level and recommendations ............................................. 33
5.1.
5.1.1.
5.1.2.
5.1.3.
5.2.
5.2.1.
5.2.2.
5.2.3.
5.3.
5.3.1.
5.3.2.
5.3.3.
5.4.
5.4.1.
5.4.2.
5.4.3.
5.5.
5.5.1.
5.5.2.
5.5.3.
5.6.
5.6.1.
5.6.2.
1
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
5.6.3.
5.7.
5.7.1.
5.7.2.
5.7.3.
5.8.
5.8.1.
5.8.2.
5.8.3.
5.9.
5.9.1.
5.9.2.
5.9.3.
5.10.
Recommendations .................................................................................................... 142
Designation of HMWBs and AWBs and definition of GEP .................................... 143
Introduction .............................................................................................................. 143
Conclusions .............................................................................................................. 157
Recommendations .................................................................................................... 158
Environmental Objectives and Exemptions ............................................................. 159
Introduction .............................................................................................................. 159
Conclusions .............................................................................................................. 177
Recommendations .................................................................................................... 178
Programme of measures
general & measures related to other significant pressures180
Introduction .............................................................................................................. 180
Conclusions .............................................................................................................. 220
Recommendations .................................................................................................... 220
Measures related to abstractions and water scarcity ................................................ 221
5.10.1. Introduction .............................................................................................................. 221
5.10.2. Conclusions .............................................................................................................. 225
5.10.3. Recommendations .................................................................................................... 225
5.11.
Measures related to pollution from agriculture ........................................................ 226
5.11.1. Introduction .............................................................................................................. 226
5.11.2. Conclusions .............................................................................................................. 232
5.11.3. Recommendations .................................................................................................... 233
5.12.
Measures related to pollution (including nutrients, organic matter and chemicals)
from sectors other than agriculture .......................................................................... 233
5.12.1. Introduction .............................................................................................................. 233
5.12.2. Conclusions .............................................................................................................. 237
5.12.3. Recommendations .................................................................................................... 238
5.13.
Measures related to hydro-morphological alterations .............................................. 239
5.13.1. Introduction .............................................................................................................. 239
5.13.2. Conclusions .............................................................................................................. 244
5.13.3. Recommendations .................................................................................................... 245
5.14.
Economic analysis and water pricing policies ......................................................... 246
5.14.1. Introduction .............................................................................................................. 246
5.14.2. Conclusions .............................................................................................................. 251
5.14.3. Recommendations .................................................................................................... 252
5.15.
Protected Areas ........................................................................................................ 253
5.15.1. Introduction .............................................................................................................. 253
5.15.3. Conclusions .............................................................................................................. 270
2
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
5.15.3. Recommendations .................................................................................................... 270
5.16.
Adaptation to climate change and drought............................................................... 271
Introduction ............................................................................................................................ 271
5.16.2. Conclusions .............................................................................................................. 277
5.16.3. Recommendations .................................................................................................... 277
6. International cooperation under the EU Directive 2000/60/EC establishing a framework for
the Community action in the field of water policy ............................................................ 279
6.1.
6.1.1.
6.2.
6.2.1.
6.2.2.
6.2.3.
6.2.4.
6.2.5.
6.3.
Introduction .............................................................................................................. 279
International river basin districts and their coordination mechanisms..................... 279
Overview of International Cooperation ................................................................... 282
International coordination mechanisms ................................................................... 282
International coordination on characterisation, monitoring and status assessment . 284
International coordination on exemptions and economic analysis .......................... 290
International coordination on Programme of Measures ........................................... 291
International coordination on Climate change and droughts ................................... 293
Recommendations for international cooperation under the WFD ........................... 294
6.1.2. Selection of iRBDs for the assessment ........................................................................ 281
3
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Acronyms
AWB
CIS
EU
EQS
FRMP
GEP
GES
HMWB
ICPDR
iRBMP
iRBD
km
km
2
KTM
MSFD
PoM
QA/QC Directive
RBD
RBMP
RBSP
WFD
WISE
Artificial water body
Common Implementation Strategy
European Union
Environmental Quality Standard
Flood Risk Management Plan
Good Ecological Potential
Good Ecological Status
Heavily Modified Water Body
International Commission for the Protection of the Danube
River
International River Basin Management Plan
International River Basin District
Kilometre
Kilometre squared
Key Type of Measure
Marine Strategy Framework Directive
Programme of Measures
Quality Assurance/Quality Control Directive
River Basin District
River Basin Management Plan
River Basin Specific Pollutants
Water Framework Directive
Water Information System for Europe
4
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0006.png
Executive summary
EU water policy has delivered significant improvements to water quality over the past four
decades. Thanks to EU water law and the implementation efforts of Member States, supported
by EU funding, it is increasingly possible to reconcile life in a densely populated continent,
and a growing economy, with a progressive improvement of water quality. There are still
significant pressures on water quality and quantity, but an effective approach to mitigate or
eliminate these pressures has been chosen. Vigilance in intensification and implementation of
efforts will however be needed throughout the EU to achieve the objectives of the Water
Framework Directive (WFD).
EU Member States reported their second River Basin Management Plans (RBMPs) for the
period 2015-2021 to the European Commission under the WFD as of March 2016; in some
cases with significant delays. The Commission's analysis has therefore not covered the most
delayed RBMPs, which were not adopted and reported on time to be part of this assessment,
i.e. Greece, Ireland and Lithuania
1
.
This assessment of all RBMPs covers more than 111 000 surface water bodies and more than
13 000 groundwater bodies. The Commission focused on developments compared to its
analysis of the first RBMPs (covering the period 2009-2015) in the main areas of integrated
water management. The Commission’s analysis highlights progress and identifies remaining
challenges. This assessment includes the international river basins.
Governance
Appropriate governance of water quality management at the river basin level is an essential
precondition for achieving the WFD objectives. For the second RBMPs, many Member States
have strengthened coordination among the responsible authorities. They have also made
considerable efforts to improve public consultation and strengthen the active involvement of
stakeholders. Information and views provided by stakeholders have led to changes to the draft
RBMPs across the whole EU. The majority of Member States have carried out joint
consultations of the second RBMPs with the Flood Risk Management Plans (FRMPs) but
fewer have carried out joint consultations with the Marine Strategy Framework Directive
(MSFD), or incorporated MSFD objectives in their RBMPs. International cooperation has
overall further improved in the second cycle.
1
The Canary Islands in Spain and Gibraltar in the UK have not been part of this assessment either.
5
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0007.png
Characterisation of river basin districts
Article 5 of the WFD requires Member States to undertake an analysis of the characteristics of
each RBD or portion of an international RBD falling within their territory. This analysis had
to be reviewed by the end of 2013 as the basis for the second RBMPs. Member States had to
review the general description of the characteristics of their RBDs within the RBMPs, the
definition of all relevant categories and types of water bodies (delineation) and the
identification of the pressures and impacts on water status. For the EU overall, the delineation
of about 90% of the surface water bodies (by number of water bodies) and around 70% of the
groundwater bodies (by area) was unchanged from the first to the second RBMPs. Progress
has been made since the first RBMPs in the establishment of reference conditions, however
gaps still remain, as in most Member States, reference conditions have not been established
for all water body types (rivers, lakes, transitional and costal) and for all quality elements and
for all quality elements. A few Member States have established all reference conditions,
including Austria, Hungary and Poland. The quality elements whose type-specific reference
conditions showed the most significant gaps for surface water body types were found to be
the hydro-morphological ones, as most Member States established reference conditions only
for some water categories, and 8 Member States did not establish reference conditions for any
water category (including Denmark, Finland, France, Croatia, Italy, Latvia and Malta).
Even if there is better knowledge on the significant pressures which may put water bodies at
risk of failing the objectives, significant gaps remain, which will need to be addressed in the
current cycle, particularly in defining thresholds and criteria for significance and impact.
Further work is also required by Member States on apportioning pressures to sectors and
activities to design more targeted measures.
For the second RBMPs, almost all River Basin Districts (RBDs) have reported inventories for
at least some Priority Substances
2
. Some Members States have included all Priority
Substances, including Austria, Cyprus, Luxembourg, Latvia and Slovenia. In many cases,
justification was provided for not including the missing Substances in the inventories. In some
Member States, less than 10 substances have been included in the inventories, this is the case
for Bulgaria, Croatia, Malta, Sweden and Slovakia. Few Member States have complete
inventories for discharges, emissions and losses of such harmful substances. Furthermore, the
inventories are mainly based on point sources while diffuse source inputs are insufficiently
addressed.
Monitoring and assessment of ecological status of surface water bodies
The WFD requires Member States to establish monitoring programmes for the assessment of
the status of surface and groundwater to provide a coherent and comprehensive overview of
2
Under the Environmental Quality Standards Directive (Directive 2008/105/EC), Member States are required to
establish an inventory of emissions, discharges and losses of the substances in Annex I of the Directive.
6
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0008.png
water status within each RBD. Member States have to establish a surveillance monitoring
programme and an operational monitoring programme. They may also need in some cases to
establish programmes of investigative monitoring.
In the second RBMPs, for almost all water bodies it has been possible to establish their status,
reducing much of the uncertainty found in the previous cycle. This is the case even if there
have been some significant changes, both increases and decreases, in the number of
monitoring sites and in the proportion of surface water bodies included in monitoring used for
the second RBMPs compared to the first. These changes partially relate to the revised
characterisation of water bodies between the first and second plans.
There are still significant gaps in the biological and hydro-morphological quality elements
required to be monitored in each water category. This is particularly so for the hydro-
morphological quality elements, which are not monitored at all in the Czech Republic and
Croatia, only to a limited extent in Bulgaria, Portugal and France, and show significant gaps
in practically all Member States. Significant gaps also persist in the monitoring of biological
quality elements.
Environmental Quality Standards (EQSs) for RBSPs have not always been derived in
accordance with the Technical Guidance
3
developed under the Common Implementation
Strategy
4
. This is the case for the Czech Republic, Finland, Croatia, Italy, Luxembourg,
Latvia, Malta and Poland, and, to a large extent, Spain. Furthermore, the analytical methods
used for some RBSPs did not correspond to the requirements of the relevant Commission
Directive
5
. This is particularly the case of Malta, for which none of the analytical methods
were in line with the requirements.
Annex V of the WFD establishes the classification for ecological status (and ecological
potential, for heavily modified water bodies and artificial water bodies), which is an
expression of the quality of the structure and functioning of aquatic ecosystems associated
with surface waters. The overall ecological status/potential has not improved since the first
RBMPs. Overall, there is a much better understanding of the situation of water bodies and the
proportion of water bodies with unknown ecological status/potential has decreased
significantly since the first cycle. The overall confidence in the classification has improved in
the second RBMPs compared to the first, mainly due to better designed monitoring networks
and improved availability and quality of the information for the status assessment methods.
There has been progress in the development of biological assessment methods since the first
RBMPs. However some Member States, such as Austria, The Netherlands and Romania, have
not reported methods sensitive to chemical pollution, although chemical pollution had already
3
4
Technical Guidance For Deriving Environmental Quality Standards
https://circabc.europa.eu/w/browse/3eaafe7c-0857-47d4-a896-8022df48d3ba
5
Directive laying down technical specifications for chemical analysis and monitoring of water status
(2009/90/EC) for the strictest standards applied
7
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0009.png
been reported in the first cycle as having a significant impact in those Member States. Hydro-
morphological quality elements are not assessed in the Czech Republic, Denmark and The
Netherlands, while in many other cases this concerns some hydro-morphological quality
elements for some water types, particularly for coastal waters.
The ‘one-out
all-out’
principle is a key principle that reflects the integrated approach on
which the WFD is based. The overall status is only ‘good’ if all the elements comprised
are at
least considered ‘good’. This ensures that all pressures capable of degrading the water status
are addressed. All 147 RBDs with reported information except Madeira, in Portugal, indicated
that the one-out-all-out principle had been applied in the second RBMPs.
Monitoring and assessment of chemical status of surface water bodies
The WFD objective of achieving good surface water chemical status means that
concentrations of pollutants cannot exceed the environmental quality standards established in
the Environmental Quality Standards Directive
6
.
Overall, the percentage of water bodies that are of unknown chemical status has decreased
significantly since the first RBMPs from 39 % of all surface water bodies to only 16 %. This
indicates that the monitoring (spatially, substances and frequency) and status assessment
methods have improved overall. A limited number of Member states have more than 60% of
their water bodies in unknown status (Bulgaria, Denmark, Estonia, Latvia, Portugal).
Against a background of little change overall in the proportion of water bodies achieving
good status and an increase in the proportion failing to achieve good status (most likely due to
an increase in knowledge), several cases of improvements between the first and second
RBMPs were reported for particular Priority Substances.
Grouping techniques and expert judgement have been widely used to classify water bodies.
Some RBMPs provide information on the approaches used. The use of these may also be at
least partly linked to the reduced confidence in the assessment of status. The range of
confidence levels varies widely between Member States. This may result from various factors,
including differences in the methodologies to assess the level of confidence.
Although it is not expected that all water bodies be monitored, the monitoring undertaken
should be sufficient to obtain a reliable and robust assessment of the chemical status of all
water bodies in the RBD, and should allow Member States to assess the effectiveness of the
measures implemented to reach good status. The WFD also requires Member States to
monitor all discharged priority substances.
6
Directive 2008/105/EC
8
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0010.png
Overall the extent of monitoring of Priority Substances across the EU has been very diverse,
which tends to reflect differences in population density and intensity of pressures between
Member States but also different strategies for monitoring.
Generally, the spatial extent of monitoring in water was limited in terms of the proportion of
water bodies monitored with some variation between water categories. Some Member States
(Slovenia, Malta and Belgium) however monitored at least some priority substances in more
than 80% of their surface water bodies. The majority of Member States monitor all of their
water bodies failing to achieve good status as part of their operational monitoring programmes
in at least some of their RBDs and most commonly in coastal and transitional waters.
For status assessment, all Member States monitored Priority Substances in water. Nearly three
quarters of Member States monitored mercury, hexachlorobenzene and/or
hexachlorobutadiene in biota in at least some RBDs for status assessment, even if they
generally (also) monitored in water in the same and other RBDs.
Relatively few chemical pollutants have individually a large impact on status. These include
certain metals (cadmium, nickel, lead) and several ubiquitous, persistent, bioaccumulative and
toxic substances, such as mercury
7
, which is involved in by far the largest number of failures
to meet good chemical status. As regards measures against mercury pollution, a new Mercury
Regulation
8
, applicable since 1 January 2018, seeks to limit further mercury use and
emissions by,
inter alia,
regulating trade in mercury and mercury compounds and improving
the management of mercury waste. The atmospheric deposition onto EU surface waters of
mercury from non-EU sources
a significant source of pollution - is expected to decrease in
the decades to come, following the entry into force, since August 2017, of the Minamata
Convention on Mercury
9
, already ratified by over 100 countries, including major global
players.
The majority of Member States monitored all of the Priority Substances identified as
discharged into their RBDs with the exception of a few Priority Substances and with some
variation among RBDs within Member States. Although significant efforts have been made to
establish inventories of emissions, few Member States reported complete inventories for all
their RBDs, and it is therefore unclear whether all discharged substances have been identified.
In some cases (eg Cyprus, Slovenia), all substances were included in the inventories, and all
discharged substances were monitored.
For trend assessment, around two-thirds of Member States reported that arrangements were in
place for long-term trend analysis in most, but not all, RBDs. All but two of these monitored
7
Other ubiquitous, persistent, bioaccumulative and toxic substances causing failure to meet good chemical status
are pBDEs, tributyltin and certain polycyclic aromatic hydrocarbons (Benzo(a)pyrene, benzo(g,h,i)perylene,
indeno(1,2,3-cd)pyrene, benzo(b)fluoranthene and benzo(k)fluoranthene).
8
(EU)2017/852
9
http://www.mercuryconvention.org/
9
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
sediment and/or biota for this reason. Most Member States monitored the majority of the 14
substances though not in all RBDs and not in all water categories. Some Member States
(including Hungary, Bulgaria, Czech Republic) did not report any trend monitoring in any of
their RBDs.
According to Article 4 of the Directive 2008/105/EC Member States may designate mixing
zones adjacent to points of discharge. Concentrations of one or more substances may exceed
the relevant EQS within such mixing zones if they do not affect the compliance of the rest of
the surface water body with those standards. Just over a quarter of Member States designated
mixing zones in at least some RBDs, in a small portion of water bodies overall.
The EQSD allows Member States to take into account the natural background concentrations
and bioavailability for metals and their compounds when assessing the monitoring results
against the EQS. Most Member States have used this possibility (sometimes only in some
RBDs within a Member State).
Monitoring and assessment of groundwater quantitative status
The groundwater quantitative monitoring network has to include sufficient representative
monitoring points to estimate groundwater level in each groundwater body or group of bodies
taking into account short and long-term variations in recharge. Overall, groundwater
quantitative monitoring improved since the first RBMPs with increasing coverage of
groundwater bodies. Most Member States increased the coverage of groundwater bodies by
quantitative monitoring or at least kept the coverage at high level (decreases were observed in
Bulgaria, Estonia, Finland, Romania). Nevertheless, a significant number of groundwater
bodies (around 65%) are still without quantitative monitoring sites in specific Member States
and the partially reported grouping of groundwater bodies for monitoring purposes does not
fully explain the absence of monitoring.
The definition of quantitative status is set out in WFD Annex V (2.1.2). Good groundwater
quantitative status is achieved when the level of groundwater in the groundwater body is such
that the available groundwater resource is not exceeded by the long term annual average rate
of abstraction. The groundwater quantitative status situation improved with 92% of the
groundwater bodies representing 89% of the total groundwater body area being at good status.
Most of the changes in status are due to the significant re-delineations of groundwater bodies
better targeting the groundwater bodies at risk and improved status assessment
methodologies. Next to the improvement of status, also knowledge improved, which is
expressed in the decreased share of groundwater bodies at unknown status (3% of
groundwater bodies representing 1% of the area) and the increased confidence in the status
results which is high or medium for about 48% respectively 22% of the groundwater bodies.
The WFD requires for the characterisation of RBDs that Member States estimate and identify
the impact of significant water flow regulation, including water transfer and diversion, on
10
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0012.png
overall flow characteristics and water balances. Water balance is almost fully considered in
status assessment. Also associated surface water bodies and groundwater dependent terrestrial
ecosystems are fully considered in almost all Member States where such ecosystems exist and
where they are related to groundwater quantitative risk. This is a significant improvement
since the previous RBMPs.
Monitoring and assessment of groundwater chemical status
The surveillance monitoring of chemical status of groundwater needs to be carried out to
supplement and validate the impact assessment procedure and provide information for use in
the assessment of long-term trends, both as a result of changes in natural conditions and
through anthropogenic activity. Sufficient monitoring sites should be selected for bodies
identified as being at risk and for bodies which cross a Member State border.
The definition of chemical status is set out in WFD Annex V (2.3.2). Good groundwater
chemical status is achieved when there is no saline intrusion, monitoring data do not show
exceedance of relevant standards and groundwater concentrations do not result in status
failure of associated surface waters, nor in any significant diminution of their ecological or
chemical quality, nor in any significant damage to terrestrial ecosystems which directly
depend on the groundwater body.
Most groundwater bodies have been assessed, and for only very few the chemical status is
unknown. Overall, the confidence in the status results is relatively high. As explained above,
some of the changes in the chemical status of groundwaters are also due to the reported
re-delineation of a significant number of groundwater bodies, improvements of the status
assessment methods and changed threshold values. Therefore, comparison between both
reporting cycles need to be done with caution.
About 84% of groundwater bodies (representing 74% of the total groundwater body area) in
good groundwater chemical status. The overall chemical status of groundwater bodies
improved only very little since the first cycle
10
. Also the reported expected achievement of
good status for most of the groundwater bodies by 2027 or beyond 2027 demonstrates the
long time-lag between the implementation of measures and their effectiveness in
groundwater.
The consideration of groundwater associated aquatic and groundwater dependent terrestrial
ecosystems improved significantly. In almost all Member States such ecosystems were
identified and commonly considered in status assessment if risk was related to them.
Overall, groundwater chemical monitoring did not improve since the first RBMPs. Six
Member States (Slovenia, Luxembourg, Malta, the Netherlands, Estonia and Croatia) have
10
About 80% of groundwater bodies, representing 72% in terms of area, were reported to be of good chemical
status in 2009
11
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
now full coverage of groundwater bodies by surveillance monitoring. On the contrary a few
Member States (e.g. Spain, the United Kingdom)reduced the coverage of groundwater bodies
by surveillance monitoring while some others have still limited coverage of groundwater
bodies (e.g. Finland, Sweden, Denmark). A significant number of groundwater bodies is still
without chemical monitoring sites and the partially reported grouping of groundwater bodies
for monitoring purposes does not fully justify the absence of monitoring. Not all groundwater
bodies which were identified at risk of failing good chemical status are subject to operational
monitoring and also not all substances causing risk are fully covered. As with surveillance
monitoring the partially reported grouping of groundwater bodies cannot completely justify
the absence of operational monitoring.
Designation of Heavily Modified Water Bodies and definition of Good Ecological
Potential
According to the WFD Article 4(3)(a) and (b), Member States may designate a water body as
heavily modified if the changes to the hydro-morphological characteristics of that body which
would be necessary for achieving GES would have significant adverse effects on the use, and
the beneficial objectives served by modified characteristics of the water body cannot, for
reasons of technical feasibility or disproportionate costs, reasonably be achieved by other
means, which are a significantly better environmental option.
At EU level, the extent of designated Heavily Modified Water Bodies (HMWBs) and
Artificial Water Bodies (AWBs) has remained similar to the first RBMPs: approximately 13%
of European surface water bodies are designated as HMWB and 4% as AWB. The extent of
designation varies across Member States, with some States designating more than 30% of
their water bodies as heavily modified (Hungary, Malta, Germany and the Netherlands), while
other States designate less than 5% of their water bodies as heavily modified (Finland and
Sweden).
A methodology for designating HMWB is described for the RBMPs of all Member States,
with few exceptions such as Croatia, where a consistent description of the method is missing.
In some countries (e.g. in Denmark, Sweden, Slovakia), assessments to complete the
designation of HMWB and AWB are still ongoing and further changes to the extent of
designation may take place during the second cycle.
Most Member State methodologies
address the definition of “substantial changes in
character” in order to consider a water body for designation as HMWB and report relevant
criteria. Descriptions of how to assess significant adverse effects of restoration measures on
the use or wider environment and how to assess other means which are better environmental
options were assessed in detail in about two thirds of the Member States, but not done in
particular for the Czech Republic, Germany and Croatia. Only few Member States provide
information on specific criteria used to assess significant adverse effects of restoration
12
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0014.png
measures, such as Austria, and the criteria reported are mainly of qualitative nature, similar to
the first RBMPs.
The status of HMWB and AWB needs to be assessed in terms of achieving at least Good
Ecological Potential (GEP) as this is defined in Annex V of the Directive. This refers to the
best approximation to the best status which could be achieved, given the hydro-morphological
characteristics that cannot be changed without significant adverse effects on the specified use
or the wider environment. As regards the definition of Good Ecological Potential (GEP) some
improvements have been noted in relation to the methodology, which will allow for easier
tracking of progress. In the second RBMPs, GEP is reported as defined (or partly defined) in
the majority of Member States. Methodological improvements for the establishment of GEP
are reported by a number of countries, while in some, new national methods have been
developed since the first cycle. One of the key improvements since the first RBMPs is the
inclusion of more biological quality elements in the definition of GEP. In most Member
States, the establishment of values of biological quality elements for GEP is based on
assessment methods similar to those used for good ecological status (GES) of natural water
bodies, but often using lower thresholds to distinguish between classes of “good” and
“moderate”. Mitigation measures for defining GEP are reported in most Member States.
However, the level of information provided on the ecological changes that the measures are
designed to achieve remains very limited, indicating little progress in this respect since the
first RBMPs.
Environmental objectives and exemptions
The exemptions foreseen in Article 4
11
of the Directive are still used extensively, with around
half of Europe’s water bodies currently under an exemption, to a greater extent for surface
waters than for groundwaters. Exemptions under Article 4(4) are still used to a significant
extent in all Member States. For surface waters, technical feasibility, natural conditions and
disproportionate costs are used as justifications. For groundwater bodies, mainly natural
conditions and technical feasibility are used to justify these exemptions, with technical
feasibility used more often than natural conditions. Article 4(5) exemptions have been applied
more often in the second cycle than in the first in several Member States.
The justifications provided in the second RBMPs for exemptions under Article 4(4) and 4(5)
are more detailed and more consistently reported on water body level compared to the first
11
Article 4(1) defines the WFD general objective to be achieved in all surface and groundwater bodies, i.e. good
status or potential (for HMWBs) by 2015, and introduces the principle of preventing any further deterioration
of status. A number of exemptions to the general objectives are possible under certain conditions. Article 4(4)
allows for an extension of the deadline beyond 2015, Article 4(5) allows for the achievement of less stringent
objectives, Article 4(6) allows a temporary deterioration in the status of water bodies and Article 4(7) sets out
conditions in which deterioration of status or failure to achieve certain of the WFD objectives may be
permitted for new modifications to the physical characteristics of surface water bodies, and deterioration
from high to good status may be possible as a result of new sustainable human development activities.
13
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
cycle, when in many cases justifications were very general and it was often unclear when the
environmental objectives were expected to be reached (under Article 4(4)). However,
justifications are in many cases still very generic. Technical feasibility under Article 4(4) and
technical ‘infeasibility’ in relation to Article 4(5) needs to be substantially improved and
made more transparent in most of the RBMPs. Also, the justifications for disproportionate
costs under Article 4(4) and Article 4(5) should be better distinguished. A few Member States
have applied Article 4(6) exemptions due to prolonged droughts, such as Spain and in the
Netherlands. In Portugal a potential use of this exemption is referred to in the RBMPs.
The application of Article 4(7) has increased in the second RBMPs. It can be concluded that
more projects are in the pipeline and more cases of Article 4(7) application may occur in the
future. Some progress has been made in terms of methodologies to assess impacts on the
status of water bodies. The assessment of cumulative effects, though, remains a challenge.
Information on how to determine overriding public interest is limited and it is not clear to
which extent public consultations have taken place. The newly developed CIS guidance
document on Article 4(7) of December 2017 provides important clarifications and is expected
to further improve Article 4(7) related assessments and reporting for the next RBMPs.
The fact that exemptions are so widely used is an indicator of the significant efforts needed
from Member States to achieve good status or good potential by 2027. However, and in line
with what is required by that same Article, Member States need to better ensure that the
exemptions applied for one water body do not permanently exclude or compromise the
achievement of the environmental objectives in other water bodies (Article 4(8)), and
guarantee at least the level of protection provided for in other EU environmental law (Article
4(9)).
PROGRAMMES OF MEASURES (PoMs)
General
Whilst progress has been made in implementing the first programmes of measures (PoMs),
these PoMs have not been fully implemented. A lack of adequate finance is likely to continue
to present an obstacle also to implementing the second PoMs as no less than 64 % of RBDs
have yet to secure finance for all relevant sectors.
Most Member States have made some progress in identifying the gap to good status for each
significant pressure, and the level of implementation of measures required to achieve good
status. This is a significant improvement that will allow for better identification and
prioritisation of the measures. However, more work is needed to refine this for the third
PoMs.
14
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0016.png
Not all Member States have reported other significant pressures. It is not clear whether this is
because they are not relevant or because they have not assessed them. For those Member
States that have identified other pressures, measures are in place to address them, the gap to
good status has generally been identified, and indicators developed to identify the level of
implementation required to achieve good status.
Measures to tackle main pressures on water bodies
A. Abstractions and water scarcity
More than 7 600 (7%) of Europe’s surface water bodies are affected by significant water
abstraction pressures and 16% of the area of groundwater bodies is affected by over-
abstraction. Basic and supplementary measures are in place in most of the RBDs concerned
with water scarcity. However, progress in reducing pressures is slow.
Some Member States still need progress in fulfilling previous recommendations to improve
water scarcity management (Spain, Portugal, Italy, Malta, Sweden, Slovenia). However,
relevant action in extending metering, water abstraction controls and reviewing licenses has
been found in some Member States (Cyprus, Hungary, Malta, Portugal, Slovenia, United
Kingdom), while in others water abstraction datasets have improved. In most Member States,
small abstractions are exempted from controls and/or registering, despite the fact that water
bodies suffering from significant abstraction pressures are not achieving good status.
B. Pollution from agriculture
Agriculture is a major driver of failure of good chemical status to EU groundwater and
surface waters, mainly due to diffuse pollution by nutrients (nitrogen and phosphorus) and
pesticides. Water abstraction for agriculture is the main significant pressure, among others,
causing failure of good quantitative status of groundwater bodies. The biggest challenges in
addressing the poor quality of water related to agricultural activities were found in Bulgaria,
the Czech Republic, Germany, Spain, Croatia, Hungary, Poland and the United Kingdom.
About half of the Member States, which reported on their RBMPs, have carried out a gap
assessment in relation to agricultural pressures in order to identify the efforts needed to reach
the WFD targets.
Basic measures under Article 11(3)(h)
12
, to tackle diffuse pollution, are reported for all
assessed Member States, but not for all RBDs and not for all diffuse pollutants. Furthermore,
12
Article 11(3) WFD on basic measures, which are the minimum requirements to be complied with, include in
Article11(3)(h) the measures for diffuse sources liable to cause pollution, measures to prevent or control the
input of pollutants. Controls may take the form of a requirement for prior regulation, such as a prohibition on
the entry of pollutants into water, prior authorisation or registration based on general binding rules where
such a requirement is not otherwise provided for under Community legislation. These controls shall be
periodically reviewed and, where necessary, updated.
15
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
many of the supplementary measures in the second cycle programmes of measures are
voluntary. The voluntary nature of measures could be a limiting factor if their uptake by
farmers remains low. Most Member States have defined, or are in the process of defining,
specific zones including specific water protection measures to avoid pollution to drinking
water from agriculture.
Engagement with farmers seems to have increased, as most Member States report having
consulted with farmers or farmers associations when setting up the programmes of measures.
However, few Member States report the provision of advisory support services for farmers
on measures implementation.
C. Pollution from other sectors (including nutrients, organic matter and chemicals)
Basic measures to reduce pollution from non-agricultural sources, such as an authorisation
and/or permitting regime to control wastewater point source discharges, the operation of
registers of wastewater discharges, and the prohibition or limitation of all direct discharges to
groundwater, and/or other measures to eliminate / reduce pollution from priority substances
and other substances, are in place in most of the Member States.
The number of Member States identifying substance-specific measures in their second
RBMPs is significantly higher than the number which did so in their first RBMPs, although
even where Member States have identified such measures, the coverage of substances causing
failure is not always complete.
Measures have generally been reported in relation to failure of good status, but not in relation
to phasing out the emissions of priority hazardous substances in RBDs where failure has not
been observed.
D. Hydro-morphological alterations
The majority of Member States, with few exceptions (Croatia, Malta, Romania, French
overseas RBDs), have reported operational Key Types of Measures (KTMs) to address
significant hydro-morphological pressures (fish ladders, removal of structures, etc.). In the
second RBMPs, information on the links between measures, hydro-morphological pressures
and water uses/sectors has substantially improved. In some Member States, such as in Austria
and Sweden, there will be small to medium progress in terms of closing the gap for hydro-
morphological pressures by 2021, and the main progress is expected between 2021 and 2027.
In other Member States, the information reported indicates that no or very little progress is
expected in closing the gap for significant hydro-morphological pressures between 2015 and
2021, or this information has not been reported, such as in Bulgaria, Czech Republic,
Denmark, Spain, Finland, Luxembourg, Latvia.
Establishing ecologically based flow regimes is an important hydro-morphological measure
since to have a sufficient ecological flow regime is a prerequisite to reach good ecological
16
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0018.png
status in rivers and it is crucial to maintain a flow throughout the river continuum. In most
Member States, the work on defining and implementing ecological flows is still ongoing in
the second cycle. The ecological flow has been reported as fully defined and implemented in
Hungary and the Netherlands.
E. Cross-cutting measures requiring improved implementation
Economic analysis and water pricing policies
The WFD promotes the application of sound economic principles
13
, methods and instruments
for supporting the achievement of its objectives in the EU, including incentive pricing, cost
recovery and the application of the polluter pays principle.
The ex-ante conditionality for water under the Common Provisions Regulation for the
European Structural and Investment Funds for the period 2014-2020 has facilitated the
preparation, timely adoption and reporting of several of the RBMPs. It also incited a number
of Member States to address shortcomings in the implementation of the WFD, including by
upgrading their water pricing policies, thereby improving the quality and legality of relevant
investments
14
.
Despite these efforts, still more progress is needed in implementing the changes to water
pricing policies. In particular, the incomplete implementation of the principle of cost recovery
and the limited use of economic instruments put a strain on the potential of promoting
efficient water management through this instrument. In many cases methodologies to
calculate costs are insufficiently documented and essential information is missing. A
significant number of Member States has widened the definition of water services to include
water use activities that have a significant impact on water bodies, such as for example
hydropower generation, navigation and flood protection, or self-abstraction for irrigation and
industrial purposes. In Latvia, for example, a broad definition of water services has been used,
and cost recovery rates are presented for all these services.
In Hungary and Slovakia, for example, pricing policies have been modified to increase cost
recovery in agriculture. At the same time the application of Article 9.4
15
, which provides the
possibility not to apply the principle of cost recovery to certain water services, varies across
Member States, and also across RBDs in the same Member State.
13
14
Article 9 WFD
SWD(2017) 127 final
15
Article 9(4) WFD: Member States shall not be in breach of this Directive if they decide in accordance with
established practices not to apply the provisions of paragraph 1, second sentence, and for that purpose the
relevant provisions of paragraph 2, for a given water-use activity, where this does not compromise the
purposes and the achievement of the objectives of this Directive. Member States shall report the reasons for
not fully applying paragraph 1, second sentence, in the river basin management plans.
17
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0019.png
Considerable work is reported by all Member States calculating financial costs of water
services; nevertheless; the transparency of the calculation methods could be further improved.
Environmental and resource costs are treated more specifically in this second cycle. There are
evident efforts to calculate these costs and more information is available on methodologies
and approaches, next to more transparency on whether these costs have been internalized or
not. Nevertheless significant gaps remain and there is room to improve the transparency on
how these costs have been dealt with. Overall, limited changes in the water-pricing policies
have taken place in order to implement the Article 9 provisions.
Protected areas
The 'additional measures in protected areas' refer to those measures needed to achieve more
stringent objectives than good status required by Article 4 of the WFD. More stringent
objectives are those that have been set out in in relevant EU law under which the individual
protected areas have been established.
Reporting of monitoring specifically targeted towards protected areas, including for shellfish,
is very limited
in certain countries even missing. Especially regarding groundwater (both for
drinking water, but also for groundwater dependent habitats and species), the gap between the
actual level of reported and needed monitoring is large. Specific objectives have only been set
for a limited number of protected areas and for a considerable part of water bodies with a
specific objective, the more stringent objectives are already met, meaning that no further
effort is needed.
The evaluation of the Drinking Water Directive (DWD)
16
assessed the coherence with the
WFD and identified a missing link in the DWD as regards protecting drinking water
resources. Therefore, the 2018 proposal for a recast of the DWD is introducing a risk based
approach from abstraction
to tap, and improving communication between Member States’
authorities and water suppliers to ensure there is a full governance cycle for water. The
proposal aims to improve coherence between the two Directives and ensure that the polluter
pays principle and the precautionary principles both apply.
For nearly half the protected areas related to the Habitats and Birds Directives, no objectives
have been set, because the additional needs for improvement are not yet known. Furthermore,
for a significant part of the water bodies related to protected areas, GES is reported as
sufficient also to reach the more stringent objectives according to other Directives. Therefore,
the need for additional measures in protected areas can be described only for a very small
number of water bodies. The second RBMPs will not bring significant progress in the status
of protected areas, as the additional needs for setting specific water objectives for most of
them are not yet known. This leaves a significant task for the third cycle for most Member
States to live up to the requirements.
16
Council Directive 98/83/EC of 3 November 1998 on the quality of water intended for human consumption
18
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Adaptation to droughts and climate change
Only in about half of the Member States droughts were considered as a relevant feature for
water management (e.g. Cyprus, Spain, the Netherlands, Portugal).
The key management measure to mitigate drought impact although not explicitly mentioned
in the Water Framework Directive, is a Drought Management Plan. However, the Drought
Management Plan has not been adopted in all relevant RBDs. A few Member States have,
however, progressed in their drought management since the first cycle by developing drought
indicators and extending the number of RBDs with Drought Management Plans (Slovenia,
United Kingdom). The adoption of elements within the RBMPs that address clearly the key
elements for drought mitigation (indicators, measures, organisational set-up) can provide a
step-wise approach.
Most Member States (e.g. Bulgaria, Germany, France, Italy, Slovakia) have reported that they
have used the Common Implementation
Guidance number 24 (“River Basin Management in a
changing climate”), have done a climate proofing of the POMs and have a national Climate
Change Strategy or Plan. However, the effectiveness of the climate proofing methodologies is
unclear, and in general, green infrastructures and water retention measures are underused.
Thus, it remains important that technical measures and planned infrastructures duly take into
account climate change predictions, especially for the occurrence of extreme phenomena and
changes in river flows.
International co-operation
Member States are obliged to coordinate their work under the WFD for each river basin that
crosses national borders of EU countries. With non-EU countries they need to make
reasonable efforts to coordinate. A large number of river basins is indeed international in the
EU, including some very large ones like the basin of the Rhine and the Danube. The degree of
cooperation differs from basin to basin. Usually, there is an international agreement in place,
often also an international coordinating body and, in a more limited number of cases, a joint
RBMP. Only a few international basins in the EU have none of these arrangements.
Overall, good progress has been made in the international coordination for shared river basins.
Governance structures have been improved and further formalised, RBMPs have increasingly
been developed and improved and comparability of findings improved as did compatibility of
approaches developed in response to pressures. Generally, the stronger the governance of the
basin and the more developed the RBMP, the better the results in terms of achieving WFD
objectives.
19
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0021.png
1.
I
NTRODUCTION
EU water policy has delivered significant improvements to water quality over the past four
decades. Thanks to EU water legislation and the implementation efforts of Member States, we
are increasingly able to reconcile life in a densily populated continent, with growing
economies, with an improvement of water quality. There are still significant pressures on
water quality and quantity, but an effective approach to mitigate or even eliminate these
pressures has unmistakebly been chosen.
Vigilance in implementation, and even
intensification of efforts will however been needed throughout the EU to achieve the
objectives of the WFD.
This Commission Staff Working Document is part of the Commission’s fifth implementation
report
17
as required by Article 18 of the WFD and is based on the assessment of the RBMPs
for the period 2015-2021 reported by Member States. The report describes the results of the
assessment based on the information reported by Member States. The report also covers the
requirements of Article 11 of the Groundwater Directive and Article 5 of the EQSs Directive.
This document is accompanied by Staff Working Documents describing the results of the
assessment by the Commission of the RBMPs relating to each Member State that reported on
time and provided its information through the Water Information System for Europe (WISE),
as well as the international RBMPs. The report on of the European Environment Agency on
the State of Water 2018 provides a detailed overview and analysis of actual progress in
quality
of Europe’s 80,000 water bodies.
This document covers 25 EU Member States
18
. Lithuania, Ireland and Greece are not covered
due to late reporting to WISE. Spain and the UK are included except for the RBMPs of the
Canary Islands
19
and Gibratar respectively.
2.
M
AIN ELEMENTS OF THE
WFD
The WFD introduced new and ambitious objectives to protect aquatic ecosystems in a more
holistic way, considering all uses and users of water, and managing water on the scale of river
basins. It introduced a number of key principles into the management and protection of
aquatic resources:
(1) The integrated planning process at the scale of river basins, from characterisation to
the definition of measures to reach the environmental objectives.
(2) A comprehensive assessment of pressures, impacts and status of the aquatic
environment, including from the ecological perspective.
17
Earlier WFD implementation reports are available at :
http://ec.europa.eu/environment/water/water-framework/impl_reports.htm
18
By judgment of 26 December 2018, the Paris Administrative Court annulled the RBMP (SDAGE) of the
Seine-Normandy basin for the period 2016-2021.
19
Spain notified the Commission that the RBMP for La Gomera was endorsed on 17 September 2018, Tenerife,
La Palma on 26 November 2018, Fuerteventura, Lanzarote, El Hierro on 26 December 2018, and Gran
Canaria on 21 January 2019.
20
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0022.png
(3) The economic analysis of the measures proposed/taken and the use of economic
instruments.
(4) The integrated water resources management principle encompassing targeting
environmental objectives with water management and related policies objectives.
(5) Public participation and active involvement in water management.
The key objective of the WFD is to achieve good status for all water bodies by 2015. This
comprises the objectives of good ecological and good chemical status for surface waters and
good quantitative and good chemical status for groundwater.
The key tool for the implementation of the WFD is the RBMP and the accompanying POMs.
The planning process is a step-by-step procedure in which each step builds on the previous
one. Each step is important, starting from the transposition and the administrative
arrangements, followed by the characterisation of the RBD, the monitoring and the
assessment of status, the setting of objectives, the establishment of an appropriate POMs and
its implementation including the monitoring and evaluation of the effectiveness of the
measures supporting the following RBMP cycle.
The PoM is the tool designed to enable the Member States to respond appropriately to the
relevant pressures identified at RBD level during the pressures and impacts analysis, with the
objective of enabling the river basin/water body to reach good status. For example, if a
significant pressure is overlooked during the pressures and impacts analysis, the monitoring
programme may not be designed to assess the pressure, and the POMs may not envisage
action to address it.
The RBMP is a comprehensive document describing the implementation of water
management and identifying all actions to be taken in the RBD.
The first RBMPs started in 2009 and ended in 2015. The plans were expected to deliver the
objectives of the WFD including non-deterioration of water status and the achievement of
good status by 2015. The preparatory process for the plans has already been subject to two
Commission implementation reports
20
, in 2007 and 2009. The Commission adopted its
assessment of the first RMBPs in 2012, in the third implementation report while a fourth
report, in 2015, covered the implementation of the planned Programmes of Measures that
were due in 2012
21
.
Implementation of the WFD continues to be supported by an informal network of Member
States, EEA/EFTA countries and stakeholders under the banner of the Common
Implementation Strategy (CIS), led by Water Directors of Member States and the
Commission. The CIS has successfully delivered a large number of guidance documents and
is now increasingly turning to promoting better implementation through exchange of best
practice and discussion of policy developments.
20
21
http://ec.europa.eu/environment/archives/water/implrep2007/index_en.htm#first
http://ec.europa.eu/environment/water/water-framework/impl_reports.htm#third
21
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0023.png
3.
A
PPROACH TO THE ASSESSMENT OF THE
R
IVER
B
ASIN
M
ANAGEMENT
P
LANS
The RBMPs are comprehensive documents that cover many aspects of water management,
consisting of hundreds to thousands of pages of information, published in national languages.
The assessment of the RBMPs has been a very challenging and complex task that has
involved dealing with extensive information in more than 20 languages. While the RMBPs
are used as a basis for the Commission’s assessment, and the
EEA State of Water report, they
are primarily key management instruments for Member States.
In the frame of the CIS of the WFD Member States agreed that besides submitting their
RBMPs to the Commission they would report pre-defined key information of their RBMPs
electronically through the WISE;
http://water.europa.eu).
22
WISE is a web-portal entry to
water related information ranging from inland waters to marine that helps streamlining
reporting under different water related EU legislation and allows the different European
bodies to more easily collect and share information as well as public access to water data and
information reported by Member States. WISE has been improved over the last years and
further investments are planned to create an even more user-friendly, shared environmental
system, with amongst others better visualisation capacities.
The quality of the Commission assessments relies on the quality of the Member States'
reports. Incomplete or deficient reporting can lead to wrong and/or incomplete assessments. It
is recognised that reporting is a big effort for Member States, in particular the electronic
reporting to WISE. There are examples of very good, high quality reporting. However, there
are also cases where reporting contains gaps or contradictions.
In the context of the preparation of its assessment, the Commission maintained regular
informal contact with the Member States to validate its findings and to ensure that the
assessment reflects reality.
According to the WFD, the deadline for reporting was March 2016. Figure 4.1 presents the
state of play regarding the adoption of the RBMPs
23
. 25 Member States have adopted and
reported the RBMPs for their national parts of the RBDs.
Lithuania, Ireland, Greece and Gibraltar (UK) as well as Norway
24
have adopted their RBMPs
but have not finished the reporting in WISE yet. In Spain, the seven plans for the Canary
22
23
http://cdr.eionet.europa.eu/help/WFD/WFD_521_2016/Guidance/WFD_ReportingGuidance.pdf
Updated overview at http://ec.europa.eu/environment/water/participation/map_mc/map.htm
24
Norway is implementing the WFD under a specific timetable agreed pursuant to the Agreement on the
European Economic Area (EEA). The RBMPs prepared in 2015 represent the first planning cycle following
the formal entry into force of the Directive in Norway. The RBMPs were adopted by County Councils before
the end of 2015, and approved by the Central Government on 1 July 2016, and are being implemented for the
period 2016-2021.
22
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0024.png
Islands have been adopted just before the publication of this document
25
. The reporting for
Ireland was completed only some weeks before the adoption of this report.
Figure 4.1: State of adoption of the RBMPs. GREEN - RBMPs adopted. RED - Consultation
has not started or is on-going. YELLOW - Consultation closed, adoption pending.
Overall geographical scope of the RBMPs
There are 177 RBDs designated in the EU, of which 94 are international. The number of
RBMPs adopted is 174. The geographical scope of the RBMPs does not correspond exactly to
the number of RBDs, and a number of different models can be identified:
-
Most Member States have prepared one RBMP for each RBD exclusively within their
territory.
Most Member States who have part of an international RBD within their territory have
produced one RBMP for the national part of the international RBD. In some cases they
-
25
Spain notified the Commission that the RBMP for La Gomera was endorsed on 17 September 2018, Tenerife,
La Palma on 26 November 2018, Fuerteventura, Lanzarote, El Hierro on 26 December 2018, and Gran
Canaria on 21 January 2019.
23
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0025.png
have also reported international RBMPs produced for the whole international RBD.
Where such international RBMPs are available, this can be seen as being a successful
result of the implementation of the WFD.
-
One Member State has prepared one plan covering all of their territory (but which
includes sections on each of the relevant RBDs. In these cases, they have been counted
as having prepared one RBMP per RBD.
-
Some Member States have prepared several RBMPs for each RBD and for sub-basins.
For instance, in Romania all of the territory falls within the Danube RBD and is
covered by the Danube International RBMP (A-level), as well as by the national
Romanian Danube RBMP (B-level). In addition, and fully in accordance with the
Directive (Article 13.5 WFD), more detailed sub-RBMPs have been prepared for each
of the 11 sub-basins. For the purpose of this assessment, the Romanian Danube RBMP
has however been considered as one RBMP.
4.
O
VERVIEW
O
F
A
CTIVITIES
T
O
E
NSURE
B
ETTER
I
MPLEMENTATION
The Commission's recent Communication on "EU law: Better results through better
implementation"
26
("the EU law Communication") foresees that the Commission employs a
wide variety of tools at its disposal to ensure better compliance with Union legislation. In the
frame of the WFD such tools range from informal compliance promotion activities and a
focus on working together with Member States on shared implementation challenges (notably
in the context of the CIS) to more formal legal action (pilots, infringements, court cases).
1.1. Legal action
The Commission has pursued targeted legal action to enforce the WFD since the transposition
deadline of 2003.
a) Brief history and priorities
Legal action initially focused on two main priorities
27
:
Enforcement of the deadlines:
whenever a reporting deadline lapsed, the necessary legal
steps were taken against those Member States which failed to respect those deadlines. For the
WFD itself this concerned the following deadlines:
-
2003: transposition
-
2004: RBD delineation, competent authorities and administrative arrangements
-
2007: adoption of the monitoring programmes
26
27
https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52017XC0119(01)&from=EN.
A more detailed picture of enforcement during the initial stages can be found in the Commission's 3rd
Implementation report, Staff Working Document (2012) 379 final, Chapter 6. See:
http://ec.europa.eu/environment/water/water-framework/pdf/3rd_report/CWD-2012-379_EN-Vol1.pdf.
24
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
-
2009: adoption of RBMPs (reporting deadline 22.3.2010)
-
2015: adoption of updated RBMPs (reporting deadline 22.3.2016)
The Commission has prioritised these actions as they represent key milestones for the
implementation of the Directive. For example, without the adoption of RBMPs, there is no
plan for the effective implementation of the Directive on the ground, as well as the inclusion
of a POMs to achieve environmental objectives. This has necessitated the Commission going
to Court in the past (see below section on Court Cases).
Correct transposition:
The Commission also pursued actions to address issues of
non-
conformity
of the national legislation transposing the provisions related to the RBMPs with a
view to ensuring that the national legal framework correctly reflects the different EU
requirements for the WFD. Correct transposition has been highlighted as one of the key
priorities for enforcement under the Commission's recent Communication referred to above.
Infringement proceedings for the most part have been closed with the Member States.This is
not surprising given the fairly advanced stage of the WFD implementation process (update of
RBMPs). However, a number of non-conformity cases concerning the WFD are pending.
The Commission, in view of the fact that correct transposition is considered a key priority for
enforcement, will continue to stay alert for such issues as they affect the achievement of the
objectives of the Directive. It is, therefore, important that Member States systematically
communicate to the Commission changes to their national laws in the field governed by this
Directive (Article 24(2) WFD).
Non-conformity cases are also taken up in relation to the related Directives adopted in
accordance with Article 16 (EQSs) and 17 (Groundwater) of the WFD.
b) Bad application cases
A rather extensive number of so called 'bad application' infringement cases have been opened
since 2003 in relation to the implementation of the WFD. Such cases have increased as time
has progressed in the implementation of the Directive.
Bad application refers to the Commission's assessment that an infringement of EU law is not
due to deficiencies in the legislative framework but due to non-respect by the authorities of
that framework.
In general terms, bad application cases can be classed into three main categories:
i.
failure to meet reporting requirements
In the past, reporting requirement cases have concerned the failure to report administrative
arrangements (Article 3) or to submit the report on the characterisation of the RBDs (Article
5) as explained in the first implementation report. It concerns cases for failure to report
25
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0027.png
monitoring networks (Article 8) as explained in the second implementation report.. Details in
relation to these cases can be found in the 3rd implementation report of the Directive.
28
The Commission has continued to follow its strict line in relation to the timely adoption and
reporting of the updated RBMPs (reporting date: 22.3.2016). Numerous enquiries with
Member State authorities and, when necessary, infringements were initiated. This has resulted
in a far quicker uptake than in the previous cycle. Finally, the Commission will ensure timely
reporting of the progress of delivering POMs under Art 15(3) WFD (by 22.12.2018). This is
to ensure that Member States continue to deliver on their proposed measures to achieve
environmental objectives.
ii.
Targeted follow-up to the assessment of RBMPs
In relation to its first RBMP assessment, the Commission has strived to identify important
gaps in implementation and to highlight them to the Member State concerned, notably by
recommendations. Such recommendations pertain normally to important issues highlighted in
a given Member State (lack of measures to address important pressures such as diffuse
pollution, issues concerning exemptions, monitoring, HMWB issues, governance).
These can be followed up with the Member State through bilateral dialogue. If action is not
forthcoming then more formal legal action may be warranted. This can involve the opening of
an investigation against the Member State or, if necessary, recourse to an infringement
procedure.
On the basis of the first RBMP, 10 investigation procedures were initiated against different
Member States of which 5 remain open. In one case, the matter was taken forward to
infringement.
The second RBMP assessment will provide an opportunity to take stock of the steps taken by
the Member States concerned and indeed whether there are other important issues that have
arisen in the meantime and require follow-up.
iii.
Cases arising from complaints
There are also bad application cases arising pursuant to complaints. Citizens, non-
governmental organisations, parliamentary questions and petitions can be a reliable source of
information in relation to implementation challenges that can arise under complex
environmental legislation such as the WFD.
The approach taken to complaints follows the Commission's recent communication on "Better
Results through Better Application".
29
In general terms, the Commission aims to prioritise
28
A more detailed picture of enforcement during the initial stages can be found in the Commission's 3rd
Implementation report, Staff Working Document (2012) 379 final, Chapter 6. See:
http://ec.europa.eu/environment/water/water-framework/pdf/3rd_report/CWD-2012-379_EN-Vol1.pdfv
26
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0028.png
cases, taking due account of the Framework nature of the Directive and that in many instances
national authorities are best placed to address the bulk of individual cases which often involve
technical in nature. It is therefore necessary to focus on important issues that can make a
difference to overall practice within that Member State.
Key complaints concern inter alia existing or future projects which may impact on water
status (such as the construction of new hydropower facilities and works related to navigation
which allegedly fail to give proper attention to the impact on the ecological and chemical
status of the water) and existing or future activities which impact water (such as discharges of
salt resulting from mining activities into fresh water negatively affecting water quality or the
over-abstraction concerning water dependent protected areas which could have an impact on
groundwater quantitative status, interpretation of key concepts such as "water services").
These complaints are all assessed individually and, where needed, the Commission enquires
with the Member State authorities as a preliminary step towards formal enforcement action. In
this context, it should be highlighted that the overall objective is to ensure better compliance
with the Directive to maintain its levels of ambition which also reflects the high levels of
ambition for the environment set in the Treaty on the Functioning of the EU.
Complaints sometimes invoke particular deficiencies in the RBMPs, such as that the measures
proposed are not sufficient or that certain exemptions under Article 4 of the WFD are
unlawfully invoked by the authorities. Where possible, complaints related to the RBMPs as
such are pursued under the on-going assessment of the RBMPs by the Commission. Further
information on infringements
The Commission publishes all
infringement decisions
undertaken. It also has produced
press
releases
about the infringements and
statistics
for infringements in the entire environment
policy domain.
1.2. Court rulings related to the WFD
The Court of Justice of the European Union (ECJ) has issued several rulings on the basis of
the WFD. Initially, these cases dealt with provisions of the WFD which may be seen as
straightforward (such as non-communication of the transposing measures, late reporting, late
adoption of monitoring programmes and RBMPs). However, in recent years there have been
numerous preliminary rulings on key concepts of the WFD as well as its interaction with
horizontal environmental measures such as the Environmental Liability Directive and access
to justice. There have also been a few enforcement cases under the WFD.
Relevant case law by the ECJ:
Commission vs. Luxembourg (Case C 32/05, The Court ruled that Luxembourg had
29
https://ec.europa.eu/info/publications/communication-commission-eu-law-better-results-through-better-
application_en
27
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0029.png
ruling of 30.11.2006)
Non Communication Transposition
Commission vs. Germany (Ref. Case C
67/05, ruling of 15.12.2005)
Non
Communication Transposition
Commission vs. Italy (Case C85/07, ruling of
18.12.2007) and vs. Greece (Case C264/07,
ruling of 31.1.2008)
Bad application - Non-
reporting
Commission vs. Spain (Case C-516/07,
ruling of 7.5.2009)
Administrative
arrangements
Commission vs. Malta (Case C-351/09,
ruling of 22.12.2010)
Bad application -
Monitoring networks
Commission vs. Greece (Case C -297/11,
ruling 19.4.2012.), vs. Belgium (Case C-
366/11, ruling 24.5.2012), vs. Portugal (Case
C-223/11, ruling 21.6.2012), and vs. Spain
(case C-403/11, ruling 4.10.2012)
Non
reporting
Case C-41/10 on the Acheloos in Greece - On
30
31
failed to transpose, or to notify
transposition, of the Directive to the
Commission. Luxembourg argued that
their existing legal framework was
sufficient; the Court found that this was not
the case. Luxembourg has since complied
and the case is closed.
30
The Court ruled that Germany had failed to
transpose, or to notify such transposition of
the Directive to the Commission within the
deadline, since the law had not been
transposed into the legislation of all
Bundesländer. Germany has since complied
and the case is closed.
31
For failing to submit the reports required
under Article 5 of the Directive, on
Characterisation of the RBDs, review of the
environmental impacts of human activity
and economic analysis of water use. Italy
and Greece have since complied and the
cases are closed.
32
Spain had failed to notify all competent
authorities in accordance with Article 3. In
this case the Court also emphasised the
importance of designating the RBDs in
accordance
with
the
hydrological
boundaries rather than administrative
boundaries. Spain has since complied and
the case is closed.
33
For not having established a network for
monitoring of inland waters, and for failure
to submit a summary report to the
Commission. In this ruling, the court found
that even if the Maltese inland surface
water bodies are small, there is a need to
ensure monitoring.
34
On the failure to adopt and report RBMPs
for all of their respective RBDs.
35
the
interpretation
of
the
WFD
http://curia.europa.eu/juris/liste.jsf?language=en&num=C-32/05.
http://curia.europa.eu/juris/liste.jsf?language=en&num=C-67/05
..
32
http://curia.europa.eu/juris/liste.jsf?language=en&num=c-85/07
..
33
http://curia.europa.eu/juris/liste.jsf?language=en&jur=C,T,F&num=c-516/07&td=ALL
34
http://curia.europa.eu/juris/liste.jsf?language=en&num=C-351/09
35
(C-297/11)
http://curia.europa.eu/juris/liste.jsf?num=C-297/11&language=EN;
(C-366/11)
http://curia.europa.eu/juris/liste.jsf?num=C-366/11&language=EN;
(C-223/11)
http://curia.europa.eu/juris/liste.jsf?num=C-223/11&language=EN;
(C-403/11)
http://curia.europa.eu/juris/liste.jsf?language=en&num=C-403/11
.
28
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0030.png
preliminary ruling was issued on 11.09.2012
Commission vs. Germany (C-525/12,
judgment of 11 September 2014)
bad
application
Case C-461/13 Bund für Umwelt und
Naturschutz
Deutschland
e.V.
v
Bundesrepublik Deutschland (the Weser
case)
Preliminary ruling of 1 July 2015.
Case C-529/15 Folk
The ruling concerned the interaction
Preliminary ruling of 15 July 2015
between the Environmental Liability
Directive and the WFD.
39
Commission vs. Poland (Case C-648/13, The judgment held that Poland had
judgment of 30 June 2016).
incorrectly transposed numerous provisions
of the WFD.
40
Case C-686/15
Vodoopskrba i odvodnja
The ruling concerned the recovery of the
d.o.o. v
�½eljka Klafurić.
costs of services connected with water use
Preliminary ruling of 7 December 2016
which included a variable component
related to actual consumption and fixed
component
independent
of
that
41
consumption.
Case C-664/15 Protect Natur-, Arten- und The ruling concerned the relationship
Landschaftsschutz Umweltorganisation v between the WFD and the access to justice
Bezirkshauptmannschaft
Gmünd. provisions under the Aarhus Convention.
42
Preliminary ruling of 20 December 2017.
2000/60/EC,
of
Council
Directive
85/337/EEC on the assessment of the
effects of certain public and private projects
on the environment, of Directive
2001/42/EC on the assessment of the
effects of certain plans and programmes on
the environment and of Council Directive
92/43/EEC on the conservation of natural
habitats and of wild fauna and flora.
36
The judgment held that Germany, in the
circumstances of the case and complaints
made, had not failed to fulfil its obligations
under Articles 2(38) and 9 of Directive
2000/60.
37
The ruling concerned the environmental
objectives relating to surface waters and the
concept of deterioration of the status of a
body of surface water.
38
1.3. Better national implementation: working with Member States and
stakeholders
Member States have primary responsibility for ensuring the correct implementation and
application of this Framework Directive. The Commission employs a number of tools to
facilitate in this regard.
a) The Common Implementation Strategy
36
37
http://curia.europa.eu/juris/liste.jsf?num=C-43/10&language=EN
http://curia.europa.eu/juris/liste.jsf?language=en&num=C-525/12.
38
http://curia.europa.eu/juris/liste.jsf?language=en&jur=C,T,F&num=C-461/13&td=ALL.
39
http://curia.europa.eu/juris/liste.jsf?num=C-529/15
40
http://curia.europa.eu/juris/liste.jsf?language=en&num=C-648/13
41
http://curia.europa.eu/juris/liste.jsf?language=en&num=C-686/15.
42
http://curia.europa.eu/juris/liste.jsf?num=C-664/15.
29
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0031.png
In this context, it should be noted that the Commission working jointly with the Member
States and relevant stakeholders has developed a CIS
43
in order to facilitate a common
understanding and approach which is crucial to the successful and effective implementation of
the Directive.
This has played an important role with regard to best practice and thus better implementation
on the ground. Apart from being a good forum on diverse subjects of WFD and related
Directives' implementation, the CIS strategy has produced a substantial amount of best
practice guidance (approximately 50) which should improve application by Member State
authorities.
44
This assists with a strategy which is focused on prevention, rather than cure.
A recent noteworthy example was the substantial guidance produced in relation to Article 4(7)
which should assist with ensuring better practice in relation to the permitting of projects, thus
leading to improved compliance on the ground by national authorities.
45
The CIS also acts a forum for informed debate on various issues arising under the WFD
umbrella and carries out a dedicated work-programme every few years. Further details
concerning its work programme, key events and related documentation can be found
online.
b) Integration
sectoral efforts
Effective implementation of water legislation cannot possibly be undertaken without the
effective cooperation of key sectors which have major impacts on water bodies throughout the
Union. This need to integrate water considerations into sectoral policy areas at all levels
(including Commission, Member State authorities and relevant stakeholders) is a major
challenge. Examples of sectors which do impact on water include agriculture, energy
(hydropower), navigation and chemicals/pollution. The Commission also factors in water
considerations into cohesion policy funding. For the 2014-2020 funding period, ex-ante
conditionality was introduced to ensure a proper transposition and implementation of EU
water legislation for investments in the water sector. This has proved to be a very useful tool
in closing the relevant implementation gaps identified in the first River Basin Management
Plans. It has been a driver for many Member States to implement improvements in areas such
as pricing policies and to adopt the second generation of River Basin Management Plans.
46
c) Promoting networks
The Commission has also facilitated the development of networks composed of key
stakeholders in order to increase public awareness of water issues and thus lead to better
43
44
http://ec.europa.eu/environment/water/water-framework/objectives/implementation_en.htm.
http://ec.europa.eu/environment/water/water-framework/facts_figures/guidance_docs_en.htm
45
https://circabc.europa.eu/sd/a/e0352ec3-9f3b-4d91-bdbb-
939185be3e89/CIS_Guidance_Article_4_7_FINAL.PDF
46
SWD (2017)127
30
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0032.png
implementation on the ground. Two such examples are the European Innovation Partnership
(EIP)
47
and the Urban Water Agenda
48
.
d) Implementation of horizontal legislation
EU environmental law also has developed numerous horizontal policies to improve uptake of
environmental matters within Member States.
Environmental Liability
49
- the Environmental Liability Directive establishes a
framework based on the polluter pays principle to prevent and remedy environmental
damage.
Access to Justice
50
- notably the Aarhus Regulation which concerns the uptake of
the Aarhus Convention in the Union and Member States. The Aarhus Regulation
addresses the "three pillars" of the Aarhus Convention - access to information, public
participation and access to justice in environmental matters - where those are of
relevance to EU institutions and bodies and lays down related requirements. Such
rules complement the existing public participation and consultation rules under the
WFD. The Commission has also developed a recent Notice on Access to Justice in
Environmental Matters
51
.
The implementation of such policies also benefits the implementation of the WFD. This has
also been reflected in recent case law involving these respective policy areas in the context of
the WFD. Reference is made to the preliminary rulings in the cases of
Folk
(Environmental
Liability) and
Protect Natur
(access to justice) - see above section on relevant ECJ case-law.
e) Environmental Implementation Review (EIR)
The Commission has developed the Environmental Implementation Review (EIR) which can
serve as a useful poltical forum to support the delivery of the objectives of existing EU
environmental policies and legislation.
52
In the water area, the CIS and the EIR complement
each other.
f) Compliance assurance
The Commission has recently placed greater emphasis upon the notion of compliance
assurance.
53
In essence this covers three notions:
47
48
http://ec.europa.eu/environment/water/innovationpartnership/
https://ec.europa.eu/futurium/en/urban-agenda-eu/urban-water-agenda-2030
49
http://ec.europa.eu/environment/legal/liability/index.htm.
50
http://ec.europa.eu/environment/aarhus/legislation.htm
51
The WFD is explicitly cited in Annex II
https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=OJ:C:2017:275:FULL&from=EN
52
http://ec.europa.eu/environment/eir/index_en.htm
53
http://ec.europa.eu/environment/legal/compliance_en.htm.
31
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0033.png
Promote means helping businesses and others to comply;
Monitor means using inspections and other checks to collect information about levels
of compliance and provide solid evidence for enforcement;
Enforce means stopping those who disregard the rules, sanctioning them and
obliging them to rectify the damage.
The foregoing notions can well complement the CIS to achieve better implementation by
Member State authorities themselves within the field of the WFD. For example, in the
Commission Action Plan on environmental compliance and governance
54
, targeted action is
foreseen to produce guidance on how to better ensure compliance in rural areas. This includes
guidance for farmers and Member State authorities can ensure better practice in relation to EU
water law in rural areas. This is of importance given the impact of agriculture as a pressure on
water bodies within the EU.
1.4. Legal implementation of related Directives adopted in accordance with
Article 16 (EQSs) and 17 (Groundwater) of the WFD
Two closely related Directives have been adopted since 2000, one further specifying the legal
requirements in relation to groundwater status (Directive 2006/118/EC, also known as the
Groundwater Directive) the second regarding the chemical status of surface waters (Directive
2008/105/EC, also known as the EQSs or Priority Substances Directive).
The Commission has continued with the process of conformity checks for both Directives. On
the Groundwater Directive the first steps were taken (requests for clarification sent through
investigations); there are two open infringement cases and one pilot on non-conformity.
Both Directives have been amended (Commission Directive 2014/80 amending Annex II of
the Groundwater Directive 2006/118 and Directive 2013/39/EU which amends the EQS
Directive 2008/105). Therefore, the Commission is in the process of checking the conformity
of this amending legislation. There are presently a number of non-communication cases
concerning Commission Directive 2014/80.
As implementation of these Directives goes hand in hand with that of the WFD, the variety of
tools listed for that Directive is equally applied here. To note, that there are dedicated
working groups under the CIS for both Chemicals and Groundwater.
54
http://ec.europa.eu/environment/legal/pdf/COM_2018_10_F1_COMMUNICATION_FROM_COMMISSION_
TO_INST_EN_V8_P1_959219.pdf
32
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
5.
R
ESULTS OF THE ASSESSMENT AT
EU
LEVEL AND RECOMMENDATIONS
This chapter includes the results of the assessment of the second RBMPs adopted and
reported by Member States.
1.5. Governance
1.5.1. Introduction
The WFD creates a framework for the integrated management of all aspects of water policy.
A robust framework and appropriate and effective multi-level governance structures are
essential pre-requisites for successful integrated river basin management. Some of the key
aspects of water governance in the context of the implementation of the WFD are to ensure an
adequate territorial approach, the clear identification of responsibilities, coordination and
cooperation across sectors, interests and borders as well as ensuring adequate human and
financial resource are allocated.
Transparency on this whole process within a clear governance structure will encourage public
participation in both the development and delivery of necessary measures to deliver
sustainable water management.
Assessment of implementation and compliance with the WFD requirements in the 2nd cycle
Administrative arrangements
river basin districts
The criteria for successful water governance structures are inter alia clear and effective
alignment of objectives and adequate territorial approaches which take the whole catchment
as the basis for the integrated water management. The Directive defines the RBD as the main
unit for management of river basins, for which competent authorities that apply the rules of
the Directive need to be identified. There is a requirement to co-ordinate the actions
(nationally and internationally) to achieve the environmental objectives established by the
Directive through the planned Programmes of Measures.
The designation of RBDs is thus one of the core aspects of the integrated river basin
management approach setting out the geographical extent for the co-ordination of water
resources. In most cases, the RBDs have been established respecting the hydrological
boundaries of the river basins.
33
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0035.png
Administrative arrangements
competent authorities
The clear identification of responsibilities and roles of authorities is a pre-requisite for
successful water management. The WFD therefore requires the designation of competent
authorities for its implementation within each river basin district.
Member States have designated a range of competent authorities for the implementation of the
WFD
55
. Figure 1 below provides an overview of the authorities that were identified. About
one-fourth of Member States have a single authority responsible for all WFD roles. In some
cases, only a single type of authority is responsible, for example the Federal States in
Germany, but, for most Member States a range of authorities are responsible for different
tasks.
Figure 1
RBMPs
Competent authorities for the development and implementation of the
Source: WISE electronic reports 2016
Notes: * Ministry of Environment or Ministry responsible for environmental protection. **
Regions include other sub-national administrative levels (e.g. provinces)
In some Member States, specific RBD Authorities have been established for the purpose of
the WFD: Bulgaria and Italy are examples. A few Member States have a national body
responsible for water management: in Romania, for example, the National Administration for
55
Please note that in their RBMP reporting, Member States indicated the names of their competent authorities:
the categories and the categorisation were created for the purpose of the assessment for this report. It should
also be noted that the Member States have indicated authorities responsible for key aspects of the
development and implementation of their RBMPs: these may include authorities additional to those reported
under Article 3 of the WFD.
34
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Romanian Waters is responsible for almost all WFD roles. Other Member States have adapted
existing water administrations to ensure better implementation of the WFD.
Environment agencies and other national bodies are competent authorities in about half of the
Member States. In some cases, these bodies play a leading role: in Portugal, for example, the
Environment Agency holds all the main roles related to RBMP and WFD implementation in
the mainland RBDs. In other cases, national bodies have specific roles, as is the case in
Poland, where the Chief Inspector of Environmental Protection (head of the national
Environmental Inspectorate) has roles for monitoring and assessment of water status,
enforcement of regulations and implementation of measures.
Regional authorities play a role in about half of Member States. This category includes the
Federal States in Germany and the provinces in the Netherlands. In France, department-level
authorities are responsible for two RBDs, Corsica and Mayotte.
In a few Member States, municipalities also play a role: in both Bulgaria and Sweden, for
example, these are among the bodies responsible for the implementation of measures.
As noted, the great majority of Member States have more than one competent authority. This
division between different authorities necessitates that co-ordination is clear and adequate to
ensure integrated water management. The WFD indeed requires coordination: Member States
should ensure that all requirements of the Directive are co-ordinated in order to achieve the
environmental objectives at the level of the RBD.
Several Member States strengthened coordination in the second cycle. In Germany, for
example, LAWA
the Working group on water issues, which brings together the Federal
States and the Federal Government, represented by the Ministry of Environment
prepared
updated guidance in several areas such as surface water monitoring as well as a catalogue of
measures for the WFD, Floods Directive and MSFD. In Italy, there was a stronger
coordination among regions within RBDs, supported by national legislation, including further
national methodologies to ensure common approaches across the RBDs.
RBMPs
structure (subplans)
RBMPs are the main tool for water management of all water bodies within RBDs. Clear plans
are important in order to ensure overview and accountability, including policy integration
with relevant areas affecting water resources and water management such as energy
production, agriculture, transport and industry.
Most Member States have prepared RBMPs for each RBD within their territory and in some
cases there are several river basins in each RBD. The WFD leaves the decision on the use of
sub-plans to Member States. Sub-plans may offer Member States the opportunity to provide
35
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0037.png
more details on the issues and actions impacting at different levels within the RBD. In the
second cycle, more than one-third of Member States had sub-plans for their RBMPs.
Coordination is needed to ensure that the implementation of RBMPs and sub-plans is
coherent.
The WFD includes key requirements on how the RBMPs shall be the framework for
integrating different policies and sectors. The consideration of all types of significant
anthropogenic pressures is at the core of the WFD with one of the main building blocks being
'the review of impacts of human activity on the status of water' (Article 5). All potential
policy sectors shall therefore be addressed by the RBMPs, including those not part of
traditional water management, for instance the agriculture sector, energy production and the
transport sector.
All discharges into surface waters shall be controlled in accordance with the 'combined
approach' in the WFD. This reinforces policy integration which goes beyond the
implementation of point source control measures such as the IPPC/Industrial Emissions
Directive, Urban Wastewater Treatment Directive, or policies related to diffuse pollution like
the Nitrates Directive. The combined approach is often necessary in order to reach good status
and more stringent measures therefore have to be put in place for sources controlled by those
Directives and any other relevant legislation.
The assessment has shown improved co-ordination and policy coherence in Member States
due to the implementation of the WFD.
Member States can learn from each other’s
experience as well as further enhance the inclusion of other sectors in the water management.
Strategic Environmental Assessment
The Directive on Strategic Environmental Assessment
56
integrates environmental
considerations into plans and programmes, with the goal of promoting sustainable
development. The Directive identifies, among the types of plans and programmes to be
assessed, those related to water management (Article 3).
The assessment shows that the great majority of Member States carried out a Strategic
Environmental Assessment (SEA) procedure for the RBMPs in all their RBDs. In a few
Member States, the SEA screening step did not identify a need for a full update to the SEA
carried out in the first cycle.
56
Directive 2001/42/EC of the European Parliament and of the Council of 27 June 2001 on the assessment of the
effects of certain plans and programmes on the environment,
https://eur-lex.europa.eu/legal-
content/EN/TXT/?uri=CELEX:32001L0042
36
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Public consultation and the active involvement of stakeholders
A key mechanism for sectoral and territorial integration is stakeholder involvement in the
development of RBMPs. Member States have to ensure consultation and access to
background information used for the development of RBMPs and to encourage active
involvement of all interested parties. Drafts of the RBMPs, as well as of other key documents,
such as the timetable, work programme and overview of significant water management issues
shall be published and made available for public consultation for at least six months.
Providing information on the consultation and provision of documents
RBMPs can communicate to interested parties, including the public, how water management
will be carried out. Interested parties shall be provided access to sufficient information to
enable them to express their views in a meaningful way. This is not the case if only
incomplete drafts of RBMPs are made available or background documents which are a part of
the plan are not made available.
The requirement to conduct a consultation on draft RBMPs lasting six months was respected
in almost all Member States. Moreover, the Member States have undertaken considerable
efforts in consulting stakeholders and the public and they have used a variety of different
outreach methods (see
37
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Figure 2
below). On average, Member States used five of the ten information methods listed
in the WFD Reporting Guidance. All listed more than one method, and one-fourth of the
Member States used either eight or nine methods in at least some of their RBDs.
38
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0040.png
Figure 2
Methods used by Member States to inform the public and stakeholders of the
RBMP consultation
Source: WISE electronic reports 2016
The most common outreach methods were the Internet and direct invitations to stakeholders:
both were used in almost all Member States. Some Member States have set up dedicated web
portals on water issues that provided information on the consultation: Austria, notablyhas
developed three
one to provide technical information for the interested public (WISA),
another to provide general information to support public involvement in the WFD
(Wasseraktiv), and the third to engage with young people (Generation Blue). Via a LIFE+
project called WATLIFE, Slovakia developed a web site called
voda je život
(water is life),
providing information to the public on water issues. A small group of Member States used
social networking among the information methods in at least some of their RBDs.
With regard to the provision of documents, about two-thirds of the Member States made
drafts for consultation available for download in all their RBDs (see Figure 3). In terms of
other methods to provide the draft RBMPs, many Member States made paper copies available
in municipal buildings, exhibitions, direct mailing via email and some by post.
Some Member States also provided relevant supporting documents during the consultation. In
the Netherlands, for example, related plans (for example at provincial level) were provided as
well as fact sheets on the conditions of each water body.
39
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0041.png
Figure 3
Methods used by Member States to provide draft RBMP documents for
consultation
Source: WISE electronic reports 2016
Active involvement of stakeholders
The WFD
states that ‘Member States shall encourage the active involvement of all interested
parties in the implementation of this Directive’
57
which goes beyond consultation and implies
that stakeholders are invited to contribute actively to the process and thus play a role in
advising the competent authorities
58
. Active involvement can be fulfilled in various ways, for
example through advisory councils or ad-hoc meetings.
Stakeholder groups were actively involved in the preparation of the RBMPs in all Member
States assessed. On average, more than seven types of stakeholder groups listed in the WFD
Reporting Guidance were actively involved (including the category of other) in all or some of
their RBDs.
Water supply and sanitation, agriculture, local and regional authorities, non-governmental
organisations and nature protection groups were actively involved in all or some of the RBDs
(see Figure 4)
in most of the Member States. A few Member States indicated ‘other’
stakeholders, including: universities and research centres; associations of municipalities;
landowners and forest owners; health authorities; and small and medium-sized enterprises.
57
58
Water Framework Directive Article 14
European Commission, Public Participation in Relation to the Water Framework Directive, Guidance
Document No 8 (of the Common Implementation Strategy for the Water Framework Directive), 2003.
Available at:
https://circabc.europa.eu/sd/a/0fc804ff-5fe6-4874-8e0d-de3e47637a63/Guidance%20No%208%20-
%20Public%20participation%20%28WG%202.9%29.pdf
40
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0042.png
Figure 4
Types of stakeholder groups actively involved the preparation of RBMPs
Source: WISE electronic reports 2016
Concerning the mechanisms for active involvement, the majority of Member States
established advisory groups and involved stakeholders in the drafting (see Figure 5
).
Over one-third
of Member States identified ‘other’ mechanisms. These include, for example:
web-based tools, as well as social media, meetings or conferences and River Basin
Committees.
Figure 5
RBMPs
Mechanisms for the active involvement of stakeholders in the preparation of
Source: WISE electronic reports 2016
Several Member States strengthened the active involvement of stakeholders for the second
cycle of RBMPs, for example by ensuring the participation of stakeholders in advisory
groups.
41
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0043.png
Impact of the consultation
The purpose of stakeholder involvement is to ensure that the best and most cost-effective
measures are identified and selected, and that acceptance of the measures are built in to the
process. It should therefore be highlighted that in all 25 Member States assessed, the
consultation of the draft RBMPs has had an impact on the final RBMPs (see Figure 6
below).
In almost all Member States consultation led to the addition of new information in the
RBMPs for all or some of their RBDs and to the adjustment of measures, while changes to the
selection of measures were made in the majority of Member States. In a high share of
Member States, commitments to further work were made as a result of consultation (which
possibly would not be reflected in changes to the second RBMPs), both in terms of action in
the next cycle and in terms of further research. Finally, about one-third of Member States
made changes to the methodology as a result of consultation and a few made other types of
changes, for instance addition of new river water bodies, greater coordination of policies and
finance, integration of RBMPs into territorial contracts, and improved linkages with FRMP.
Figure 6
Impacts of the consultation on the final RBMPs
Source: WISE electronic reports 2016
Overall, extensive consultation has been one of the major achievements of the WFD and has
in general increased public awareness and provided valuable information for the further
process. The Commission has however received information which indicates that some
stakeholders still do not have the opportunity to contribute actively to the process and thus
play a role in advising the competent authorities in a sufficiently inclusive way.
42
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0044.png
Integration with the Floods Directive and the MSFD
The framework established by the WFD in order to protect inland surface waters, transitional
waters, coastal waters and groundwater contributes inter alia to the protection of territorial
and marine waters (WFD Article 1) and Member States shall take the necessary measures
including preventing and reducing pollution to the marine environment, in accordance with
the MSFD (MSFD). The first step is for Member States to ensure that the necessary actions
are taken to coordinate RBMPs with the MSFD objectives. About half of the Member States
have started to do so by undertaking joint consultation of the RBMPs with the MSFD in all or
some of their RBDs (see Figure 7
). However, there is still a lack of coordination,
especially regarding coordination of the objectives
59
.
Member States shall also take appropriate steps to coordinate actions under the Floods
Directive and the WFD, focusing on opportunities for improving efficiency, information
exchange and for achieving common synergies and benefits, including coordination of active
involvement of interested parties, as appropriate.
The great majority of Member States has carried out a joint consultation of their RBMPs and
the FRMPs, and a few Member States have also integrated the two plans into a joint plan.
Figure 7
Integration of the RBMPs with FRMPs and with the MSFD
Source: WISE electronic reports 2016
59
The adoption of the new GES Decision (2017/848/EU) brings closer the marine and freshwater policy
frameworks together with the identification of the same elements to be assessed and used the same
methodological standards (equivalent threshold values).
43
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
International coordination and co-operation
One of the main elements introduced by the WFD was the legal requirement for
transboundary co-operation. Indeed, 60% of EU territory is covered by international river
basins, and all Member States except Cyprus and Malta share international river basins.
A river basin covering the territory of more than one Member State shall in accordance with
the WFD be designated as an international river basin district (IRBD), and Member States
concerned shall together ensure coordination with a view of producing a single RBMP.
In some international river basins there was extensive co-operation even before the WFD,
such as the Rhine where there was important progress on pollution reduction. Most existing
international river conventions were amended to fulfil the role of co-ordination of the
implementation of the WFD.
International cooperation is taking place in the frame of international agreements, permanent
co‐ operation bodies and international RBMPs and PoMs. In six international RBDs that
cover multiple Member States, all these elements are seen (designated as category 1
cooperation
see chapter 7 on international cooperation for further information). In total, half
of the Member States participate in at least one international river basin with category 1
coordination. The Danube iRBD, for example, brings together nine Member States as well as
five third countries (Figure 8 below provides an overview of Member States and international
RBDs by level of coordination).
In other international RBDs, cooperation includes international agreements combined with
permanent co‐ operation mechanisms, though not the preparation of common RBMPs and
Programmes of Measures; close to half of the Member States share river basins at this level of
coordination (designated as category 2). An example are the RBDs shared between Portugal
and Spain, where cooperation takes place under the Albufeira Agreement, which created a
conference of the Parties and a commission, under which a series of working groups are
organised.
A few Member States have international agreements on water management without
permanent co-operation mechanisms (category 3). In some of these cases, co-operation has
been quite active: for example Estonia, Latvia and Lithuania have exchanged information on
monitoring and on measures (moreover, after the preparation of their national RBMPs,
Estonia and Latvia produced international “roof reports” summarising common challenges
and actions in a shared RBD).
44
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0046.png
Figure 8
Member State participation in international RBDs, by level of coordination
Source: WISE electronic reports 2016
Note: Some Member States participate in several iRBDs at different levels of coordination.
The figure only shows data for the Member States assessed.
Overall, international cooperation has significantly improved with the introduction of the
WFD, and the co-ordination between Member States has continued to improve in the second
RBMPs. There is still a need though for further strengthening international cooperation both
within the EU and with neighbouring countries. Strengthening can for example be done
through increased active exchange, coordination of monitoring, harmonisation of river basin
specific pollutants and coordination on all aspects of WFD implementation for RBDs in
general
especially within category 3 and 4 cooperation (more information provided in
chapter 7).
Main changes in implementation and compliance since 1st cycle
This assessment has in general shown progress in the Member States’ implementation of the
governance requirements of the WFD since the first RBMPs. The assessment though carried
out has focused on a few key reported indicators and the approach is not directly comparable
to the assessment of the first RBMPs.
The assessment has shown improved co-ordination and policy coherence within many
Member States due to the implementation of the WFD, as seen in the example of Italy, where
coordination within RBDs was strengthened.
The assessment has also shown that most Member States undertook a range of actions to
engage the public and stakeholders in the consultation process, in many cases going further
than in the first cycle. In the second cycle, the most common methods reported were Internet
45
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
and direct contacts with stakeholders, while a few Member States used web sites and social
media to reach the public. In almost all Member States, a broad range of stakeholder groups
were actively involved, in particular non-governmental organisation/nature protection groups,
agriculture and local and regional authorities, followed by industry and water supply and
sanitation. The consultation process has had an impact on water management in all Member
States, for example via the addition of new information in the RBMPs and the selection of
measures.
The implementation of the WFD has strengthened cooperation among Member States and
with third countries on water management in shared river basins, and this process continued in
the second cycle. Examples include strengthened coordination between Bulgaria and Greece
and also among Estonia, Latvia and Lithuania.
1.5.2. Conclusions
In many Member States, several authorities are responsible for implementing different aspects
of the WFD. This underlines the importance of coordination between government bodies and
across administrative levels. Member States are becoming more aware of the necessity of
clarity regarding both cooperation and responsibilities; while many have made progress, there
is a need to enhance coordination in order to reach the objectives of the Directive.
Member States have undertaken considerable efforts in consulting stakeholders and the public
and have used a variety of different outreach methods. Moreover, Member States used a range
of mechanisms for the active involvement of stakeholders in the development of the RBMPs:
in the great majority, advisory groups were established
The extensive consultation undertaken has been one of the major achievements of the WFD
and has in general increased public awareness and provided valuable information for the
further process. In all 25 Member States assessed, consultation on the draft RBMPs had an
impact, such as the addition of new information and the adjustment of measures.
International cooperation has significantly improved with the introduction of the WFD, and
co-ordination between Member States has continued to strengthen in the second cycle of
RBMP. Specific recommendations for international cooperation under the WFD are provided
in chapter 7.
Although the assessments conducted on the first and second RBMPs are not directly
comparable due to different approaches used for the assessment, the general conclusion is that
the patterns of governance appear to be largely similar with adjustments in responsible
authorities, enhanced involvement from stakeholders, improved transparency, improved
coordination and improved international coordination.
46
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.5.3. Recommendations
Member States should continue to focus on improving stakeholder involvement in
order to provide them with the opportunity to contribute actively to the process.
Clarity regarding responsibilities between government bodies and across
administrative levels as well as enhanced coordination should be ensured in order to
reach the objectives of the WFD.
Institutional arrangements for international cooperation should be further
strengthened regarding relevant aspects of the WFD in the iRBDs, in particular in
those iRBDs where international coordination bodies are not in place.
International cooperation should be further strengthened in iRBDs shared with
countries which are not members of the EU, including candidate and potential
candidate countries [in support of the alignment to the EU environmental
requirements in their process to join the EU].
[more
specific recommendations for international cooperation under the WFD are
provided in chapter 7].
47
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.6. Characterisation of the River Basin District
1.6.1.
Introduction
Article 5 of the WFD requires Member States to undertake an analysis of the characteristics of
each RBD or portion of an international RBD falling within their territory. The first
characterisation of suface water and groundwater bodies was reported in March 2005. This
included a general description of the characteristics of their RBDs (Annex VII, A.1). Under
Article 5(2) the characterisation is required to be reviewed, and updated if necessary by 2013
and every 6 years after that. Therefore meaning the characterisation should have been
reviewed by each Member State between the first and the second RBMPs.
Characterisation should identify all relevant categories and types of water bodies within the
RBD. For surface waters, specific typologies and reference conditions have to be established.
This step is an essential foundation for a robust classification systems and ecological status
assessment.
Characterisation also involves correctly identifying water bodies at risk of failing objectives.
The results of the risk assessment inform the monitoring of water bodies and the subsequent
classification of status. These water bodies are then the subsequent focus for implementation
of necessary measures for the achievement of objectives. It is crucial that risk assessment
methodologies are fit for purpose, as objectives may be missed or measures not correctly
targeted.
For operational purposes, the
WFD defines a water body as a ‘discrete and significant’
element of water, which is the scale at which status is assessed. The size thresholds given in
Annex II for System A typology (catchments larger than 10 km
2
and lakes larger than 50 Ha)
have been used as a possibility for differentiating water bodies. However this approach should
not exclude smaller water bodies from the protection of the Directive. Member States have
flexibility to decide not to designate very small water bodies and can aggregate these small
water bodies into groups or include them as part of a larger contiguous water body of the
same surface water category and of the same type. The optimum size of a water body is the
size that allows the objectivies of the Directive to be most efficiently achieved.
Assessment of implementation and compliance with WFD requirements in second RBMPs
Delineation of surface water bodies
The following table presents an overview of the water categories available in each Member
State. Throughout the EU, more than 111 000 surface water bodies have been defined in the
second RBMPs (compared to around 127 000 in the first RBMPs and 70 000 reported for the
initial characterisation completed in 2004). Approximately 80% are rivers, 16% lakes, and the
remaining 4% coastal and transitional waters which is similar to results from the first RBMPs.
48
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
The average size of water bodies in Member States is variable with average river water body
lengths varying from 2.4 km in Denmark to close to the EU average (13 km) in Portugal,
Croatia, and the UK, and up to an average of 54 km in Bulgaria. Sweden and Finland have the
highest number of lake water bodies, 7 422 and 4 617, respectively. The EU average area of
water bodies increases (as might be expected) from 4.5 km2 for lakes, to 19 km2 for
transitional waters and to 102 km2 for coastal waters. This is similar to the first RBMPs with
the exception of coastal waters for which the previous EU average area was 644 km2. The
largest average coastal water body size in the second RBMPs was reported by Estonia equal
to 907 km2 (in the first RBMPs, the largest average coastal water body size was reported by
Spain with 8 700 km2).
49
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0051.png
Table 1: Number of water bodies under each water category in the Member States
Member State
River
water
bodies
8065
527
873
174
1044
8998
7776
645
4390
1913
10706
1484
Lakes water bodies
Transitional water bodies
Coastal
water
bodies
Not
relevant
2
17
22
Not
relevant
75
119
16
220
276
179
26
14
2
1
Territorial
water bodies
Groundwater
bodies
138
80
169
21
174
1177
402
39
729
3733
645
33
Austria (AT)
Belgium (BE)
Bulgaria (BG)
Cyprus (CY)
Czech Rep (CZ)
Germany (DE)
Denmark (DK)
Estonia (EE)
Spain (ES)
Finland (FI)
France (FR)
Croatia (HR)
62
18
37
8
77
730
856
89
326
4617
435
37
Not relevant
6
28
None
Not relevant
5
None
None
186
None
94
25
50
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0052.png
Hungary (HU)
Italy (IT)
Luxembourg (LU)
Latvia (LV)
Malta (MT)
The Netherlands (NL)
Poland (PL)
Portugal (PT)
Romania (RO)
Sweden (SE)
Slovenia (SI)
Slovakia (SK)
United Kingdom (UK)
963
7493
110
203
3
246
4586
1899
2891
15092
137
1510
7506
115
347
None
259
2
451
1044
23
130
7422
12
None
1068
Not relevant
172
Not relevant
3
5
5
9
52
2
None
None
Not relevant
190
Not
relevant
561
Not
relevant
5
9
9
10
66
4
653
5
Not
relevant
561
1
19
1
8
185
1052
6
22 (16)
15
23
178 (172)
151
143
3311
21
102
788
Source: WISE reporting 2016. Values in brackets were subsequently provided by Member States and differ from those reported in WISE.
51
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0053.png
There are five landlocked Member States (Austria, Czech Republic, Hungary, Luxembourg and
Slovakia) for which transitional and coastal waters are not relevant. Six other Member States
(Cyprus, Denmark, Estonia, Finland, Sweden and Slovenia) with a coastline have not
designated any transitional waters though coastal water bodies have been identified. Some
justifications for this were provided in the RBMPs. Sweden had defined transitional water
bodies in the first RBMPs, but these were redefined as coastal water bodies because it was not
possible to distinguish them from the nearby coastal waters. Malta had not included any rivers,
lakes or transitional water bodies in its first RBMP but has done so for the second RBMP.
Some Member States have re-delineated surface water bodies for the second RBMPs. Overall,
about 90% of surface water bodies are unchanged from the first to the second RBMPs. About
10% were reported to be deleted, markedly modified (split or aggregated) or newly created
60
.
At a Member State level, the vast majority of surface water bodies in Denmark and Croatia
were deleted and created from the first to the second RBMPs. There was also a significant
amount of splitting of surface water bodies in Bulgaria, Cyprus and Luxemburg. Very little
explanation of the consequences of these changes for the comparability of status between
cycles was found in the RBMPs. Poland was the only Member State to report no changes to
surface water bodies.
61
Generally Member States have included information on size thresholds that they have used to
delineate river and lake water bodies. The following table presents the minimum size criteria
used by Member States to delineate river and lake water bodies. A large majority have used the
size thresholds in typology System A of WFD Annex II (catchments larger than 10 km2 and
lakes larger than 50 Ha). Some Member States have explicitly included smaller water bodies if
they are protected under other legislation or if they are ecologically important in the basin. In
Finland and Latvia, the minimum catchment size for rivers was 100km2 which was
significantly higher than the other Member States. However, both countries reported that
smaller rivers have also been considered if they were particularly relevant for water
management or if delineation was needed to achieve specific environmental quality objectives
in protected areas.
EEA (2018). European Waters
Assessment of status and pressures 2018,EEA Report No 7/2018, ISSN 1977-
8449.
61
Further information available for the different Member States at:
https://tableau.discomap.eea.europa.eu/t/Wateronline/views/WISE_SOW_Evolution_Compare/SWB_Evolutio
n_Country?:embed=y&:showAppBanner=false&:showShareOptions=true&:display_count=no&:showVizHom
e=no
60
52
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0054.png
Table 2: Minimum size criteria used by Member States to delineate river and lake water
bodies
Member
State
Austria
(AT)
Belgium
(BE)
Bulgaria
(BG)
Cyprus
(CY)
Czech Rep
(CZ)
Germany
(DE)
Denmark
(DK)
Estonia (EE)
Spain (ES)
Rivers
Catchment > 10 km2
Lakes
Area > 50 Ha
Catchment > 10 km2 (Meuse and Scheldt) Area > 50 Ha (Meuse and
BEMEUSE_RW is <10 km2
Scheldt) BEMEUSE_RW is
<50 Ha
Catchment > 10 km2
Area > 50 Ha
Catchment > 10 km2
Catchment > 10 km2
Catchment > 10 km2
No information
No information
Area > 50 Ha
Area > 50 Ha
Area < 5 Ha
Finland (FI)
France (FR)
Croatia
(HR)
Hungary
(HU)
Italy (IT)
Luxembourg
(LU)
Latvia (LV)
Malta (MT)
The
Netherlands
(NL)
Poland (PL)
Portugal
(PT)
Romania
(RO)
Sweden
(SE)
Slovenia
(SI)
Slovakia
(SK)
United
Catchment > 10 km2
Area > 50 Ha
Catchment > 10 km2 (Balearic Islands are Area > 5 Ha (Western
> 5 km2)
Cantabrian, Guadiana, Segura
all > 50 Ha)
Catchment > 100 km2
Area > 50 Ha
Catchment > 10 km2
Area > 50 Ha
Catchment > 10 km2
Area > 50 Ha
Catchment > 10 km2
Catchment > 10 km2
No information
Catchment > 100 km2
No information
Catchment > 10 km2
Area > 50 Ha
Area > 50 Ha
Area > 50 Ha
Area > 50 Ha
No information
Area > 50 Ha
Catchment > 10 km2
Catchment > 10 km2
Catchment > 10 km2
Catchment > 10 km2
No information
Catchment > 10 km2
Catchment > 10 km2
Area > 50 Ha
Area >5 Ha
Area > 50 Ha
Area > 100 Ha
Area > 50 Ha
No information
Area > 50 Ha
53
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0055.png
Kingdom
(UK)
Source: WISE reporting 2016; Note: The reported minimum size criteria were reported at the
RBD level and have been summarised at Member State level in this table.
Typology for surface water bodies
As part of the characterisation, Member States have defined surface water body types
(typology) for each surface water category (i.e. rivers, lakes, transitional waters or coastal
waters) in each RBD, and have delineated surface and groundwater bodies in accordance with
the methodology specified in Annex II of the WFD. This also includes the identification of
HMWBs and AWBs, which is addressed in chapter 6.7. For each surface water body type,
type-specific reference conditions should have been established representing the values for that
surface water body type at high ecological status.
The division of a surface water category into types is based on abiotic descriptors such as
altitude, geology, size, etc. using System A or B (Annex II of WFD). The ecological relevance
of the different theoretical types has to be demonstrated by cross-checking against biological
data such as benthic invertebrates groups and/or species composition. Not all water categories
occur in every RBD. Many Member States have still not validated their water body typology
against biological data, or it is unclear if biological validation has taken place based on the
information in the RBMPs.
The following table presents an overview of the number of types reported per water category
and Member State. All water categories have types that have been developed in each Member
State. The typologies between the first and the second RBMPs remained largely the same,
however some individual Member States did have significant changes and these can be
examined in the respective Member State reports.
Table 3: Overview of the number of types reported per water category and Member State
Member State
River water bodies Lakes
water
bodies
49
14
41
20 (15)
4
35
39
5
7
6
10 (6)
3
16
16
12 (11)
8
54
Transitional water bodies Coastal
water
bodies
Not relevant
Not
relevant
3
2
5
9
None
4
Not relevant
Not
relevant
2
10
None
19
None
6
Austria (AT)
Belgium (BE)
Bulgaria (BG)
Cyprus (CY)
Czech Rep (CZ)
Germany (DE)
Denmark (DK)
Estonia (EE)
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0056.png
Member State
Transitional water bodies Coastal
water
bodies
Spain (ES)
18
29
Finland (FI)
None
14
France (FR)
16
48
Croatia (HR)
4
5
Hungary (HU)
Not relevant
Not
relevant
Italy (IT)
364
29
40
39
Luxembourg (LU)
6
Not relevant
Not
relevant
Latvia (LV)
6
9
1
4
Malta (MT)
1
1
1
4
The Netherlands (NL) 12
18
1
3
Poland (PL)
25
13
4
3
Portugal (PT)
23
2
5
10
Romania (RO)
56 (19)
14 (9)
2
4 (2)
Sweden (SE)
52
77
None
27
Slovenia (SI)
52
9
None
3
Slovakia (SK)
42
Not
Not relevant
Not
relevant
relevant
United Kingdom (UK) 57
36
10
19
Source: WISE reporting 2016. Note: Not relevant means there are no water bodies in this
category. Values in brackets were subsequently provided by Member States and differ from
those reported in WISE.
Member States were asked to report if there is no corresponding EU intercalibration common
type for their national types. At EU level, the majority of national types for natural surface
water bodies have been intercalibrated.. However, there were often several national types that
had not been intercalibrated.
Reference conditions
Member States are required to identify the ecological status of water bodies by comparing
current status with near natural or reference conditions. The establishment of reference
conditions is a basic pre-requisite so as to allow a relative comparison of the ecological status at
one certain moment. Reference conditions have to be established for each of the surface water
types. They represent the values for that surface water body type at high ecological status.
According to WFD Annex II reference conditions can be established using different methods
(without specific ranking):
River water bodies Lakes
water
bodies
48
36
19
15
145
34
28
15 (6)
15
8
Spatially based reference conditions using data from monitoring sites if sufficiently
undisturbed or minimally disturbed sites are available.
When adequate numbers of representative reference sites are not available in a
region/type, predictive modelling, using the data available within a region/type or
55
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
borrowing data from other similar regions/types, can be used in model construction
and calibration.
A combination of the above approaches.
Where it is not possible to use these methods, reference conditions can be established
using expert judgement.
Establishing reference conditions for many quality elements may involve using more than one
of the methods described.
The establishment of reference conditions and the establishment of ecological class boundaries
(i.e. boundary between high and good) are closely interconnected. Considerations assumed and
methodologies for the establishment of reference conditions are crucial for the judgement of the
risk that individual water bodies will fail to reach the overall objective of good water status.
The figure below shows by water category for all Member states whether type-specific
reference conditions have been developed for all, some and none of the biological,
physicochemical and hydro-morphological quality elements for all surface water body type.
The proportion of Member States who established reference conditions for all types and for all
quality elements (i.e. biological, hydro-morphological or physicochemical) is, for the different
water categories, 16% for rivers and lakes, 4% for transitional water bodies and 8% for coastal
water bodies. A few Member States have established all reference conditions for all water
categories, including Austria, Hungary and Poland. Only a small proportion of Member States
have no type specific reference conditions at all for rivers (8%) and for transitional waters
(4%), and 16% of Member States have no reference conditions for lakes. A large proportion of
Member states have partly established reference conditions, which means they established them
for all types of a water category but not for each quality element (partly - all types), or only for
some types (partly - some types). It is the case for 76% of rivers, 64% of lakes, 48% of
transitional waters and 72% of coastal water bodies.
Table 4 shows the percentage of surface water body types in the EU with reference conditions
established for all, some and none of the biological, hydro-morphological and physicochemical
quality elements. It clearly highlights that the quality elements with the least type specific
reference conditions established are hydro-morphological quality elements, with 68% of types
having none established. In most of the cases, Member States established reference conditions
for some water types, but 8 Member States didn’t establish reference conditions for hydro-
morphological quality elements for any type (including Denmark, Finland, France, Croatia,
Italy, Latvia, Malta and Slovakia). Regarding the other quality elements, 77% and 76% of
biological quality elements and physicochemical quality elements (respectively) have type-
specific reference conditions established for all or some types.
56
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0058.png
Overall the situation is similar to the first RBMPs with little improvement shown at the EU
level. Some Member States have shown improvements and this information can be obtained in
the individual Member State reports.
Figure 2 Type-specific reference conditions for each surface water type by water category
Source: WISE reporting 2016;
Notes: Yes = when reference conditions have been established for all types for each
quality element (i.e. biological, hydro-morphological or physicochemical)
Partly (all types) = when reference conditions have been established for all types but
not for each quality element (i.e. biological, hydro-morphological or physicochemical)
Partly (some types) = when reference conditions have been established for some types
but not for each quality element (i.e. biological, hydro-morphological or
physicochemical)
No = when reference conditions have not been established
Not relevant = water category not delineated
The situation may be different between RBDs but the data is summarised at a national level.
Table 4: Percentage of surface water body types in the EU with reference conditions
established for all, some and none of the biological, hydro-morphological and
physicochemical quality elements.
Water
types
All
Some
None
Biological
elements
37%
40%
23%
quality Hydro-morphological
quality elements
12%
22%
68%
Source: WISE reporting 2016.
Physicochemical quality
elements
33%
41%
26%
57
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0059.png
Delineation and further characterisation of groundwater bodies
Approximately 13 380 groundwater bodies have been delineated in the EU with the highest
number being reported by Finland (3 773) and the lowest by Luxembourg (6). The average size
of groundwater bodies in the EU is around 320 km
2
with the smallest by far on average being in
Finland (2.6 km
2
), and the largest in Latvia (3 460 km
2
). Around 70% of the groundwater
bodies (by area) have not changed from the first to the second RBMPs, while 29% of those
from the first RBMPs have been deleted and replaced by new ones
62
.
In the assessment of the first RBMPs, it was recommended that the delineation of groundwater
bodies should be better harmonised and that related guidance documents should be improved.
The CIS Guidance Document no.
26 on the “Risk Assessment and the Use of Conceptual
Models for Groundwater” provided more guidance on the refinement of water body
delineation. Since the first RBMPs, most Member States have further characterised their
groundwater bodies by providing information on their geological formation and whether they
are layered or not. In addition, the majority of Member States have provided an inventory of
associated surface systems, including terrestrial ecosystems and bodies of surface water with
which the groundwater body is dynamically linked.
Pressures and impacts on surface and groundwater bodies
The WFD requires identification of significant pressures from point sources of pollution,
diffuse sources of pollution, modifications of flow regimes through abstractions or regulation
and morphological alterations, as well as any other pressures. ‘Significant’ is interpreted as
meaning that the pressure contributes to an impact that may result in the failing of
environmental objectives.
For the second RBMPs, Member States have reported on significance of pressures at a
disaggregated level, i.e. for different types of pressure-driver combinations, which helped to
better identify the link between pressures, sectoral drivers and measures. The identification of
significant pressures can involve different approaches: numerical tools (e.g. modelling); expert
judgement or a combination of both tools. The magnitude of the pressure is compared with
thresholds or criteria, relevant to the water body type to assess its significance. Figure 3 shows
the types of tools reported to be used to assess the significance of the main types of pressures.
For most pressure types, most Member States use a combination of numerical tools and expert
judgement (see Figure 3).
In addition, the criteria used to define significance of pressures have been further developed by
some Member States. The significance of pressures has been defined using thresholds for 61%
of surface water bodies and 68% of groundwater bodies. The significance of pressures has also
been linked to the failure of environmental objectives for 82% of surface water bodies and 80%
62
EEA (2018). European Waters
Assessment of status and pressures 2018,EEA Report No 7/2018, ISSN 1977-
8449.
58
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0060.png
of groundwater bodies. Whilst there have been advancements since the first RBMPs, there is
room for improvement and the criteria could be made more explicit in the RBMPs and
supporting documents.
Member States also reported which significant pressures were not assessed, however it was
often unclear from the RBMPs and supporting documents what the rationale for excluding
these pressures were. Moreover, no justification has been provided to discard certain pressures
that had been reported in the first RBMPs.
The EEA State of Water Report 2018 provides a wide overview of the identification of
significant pressures and impacts at EU level. As shown in Figure 4, the main significant
pressures affecting surface water bodies are hydro-morphological pressures (40% of surface
water bodies affected), diffuse source pollution (38%) and point source pollution (18%)
63
. Most
countries report diffuse sources of pollution as being a pressure for groundwater (24 out of 25
Member States), while 20 Member states report point sources as a pressure. The main pressures
affecting groundwater bodies are : diffuse pollution from agriculture which is identified as the
major pressure causing failure of good chemical status affecting 20% of groundwater bodies
(by area), and water abstraction and change in groundwater level with over-abstraction
affecting 16% of the total groundwater area. In particular, water abstraction for public water
supply, agriculture and industry is the main significant pressures causing failure of good
quantitative status.
Pressures and impacts should be apportioned to the responsible drivers, sectors and activities to
give a clear picture of the most important sources for a given impact so that specific measures
can be set within their POMs to address particular pressures. The main drivers for point source
pollution pressures were urban wastewater, followed by industrial plants and storm overflows.
For diffuse source pollution, the main driver was agriculture, followed by atmospheric
deposition and discharges not connected to sewerage plants
64
.
63
64
EEA (2018). European Waters
Assessment of status and pressures 2018,EEA Report No 7/2018, ISSN 1977-
8449.
EEA (2018). European Waters
Assessment of status and pressures 2018,EEA Report No 7/2018, ISSN 1977-
8449.
59
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0061.png
Figure 3 The types of tools reported to be used to assess the significance of the main types
of pressures in surface water and groundwater
Source: WISE reporting 2016
The main impacts on surface water bodies are nutrient enrichment, chemical pollution and
altered habitats due to morphological changes, reflecting the key pressures
65
. It is highlighted
that a higher proportion of transitional and coastal water bodies are affected by pollution
pressures compared with rivers and lakes.
Unknown impacts of anthropogenic origin were also reported for a large proportion of water
bodies in several Member States, which would indicate that the pressures and impacts have not
65
EEA (2018). European Waters
Assessment of status and pressures 2018,EEA Report No 7/2018, ISSN 1977-
8449.
60
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0062.png
been fully apportioned to activities or sectors. Also in the case of hydro-morphological
pressures, many Member States have not clearly apportioned these to specific sectors,
according to the WISE reporting (see further information in chapter 6.13).
Figure 4 Proportion of surface water bodies affected by main pressures and sources of
pressures
Notes: Proportion of water bodies with specific pressures; for example, point sources affect 18
% of water bodies, and the main point source pressure is discharges from urban waste water
treatment plants, which affect 12 % of all surface water bodies. A water body may be affected
by more than one pressure; therefore, the sum of percentages is greater than 100 %. IED plants
are industrial emissions covered by the Industrial Emissions Directive (EC, 2018e).
Source: EEA (2018). European Waters
Assessment of status and pressures 2018, EEA Report
No 7/2018, ISSN 1977-8449.
61
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0063.png
Establishment and use of inventories of discharges, emissions and losses of chemical
substances
Article 5 of the EQSD (2008/105/EC) requires Member States to establish, on the basis of the
information collected in accordance with Articles 5 and 8 of the WFD and other available data
such as that collected under Regulation (EC) No 166/2006, an inventory of emissions,
discharges and losses of all Priority Substances and the 8 other pollutants listed in Part A of
Annex I EQSD for each RBD, or part thereof, lying within their territory. These inventories
should allow Member States to further target measures to tackle pollution from priority
substances. It should also inform the review of the monitoring networks, and allow the
assessment of progress made in reducing (resp. suppressing) emissions, discharges and losses
for priority substances (resp. priority hazardous substances).
The transposition deadline for the EQSD was July 2010, after the adoption of the first RBMPs.
This meant an inventory precisely according to Article 5 of the EQSD did not have to be
established by the time of submission of the first RBMPs. However, the obligations for
gathering data under Articles 5 and 8 of the WFD were effectively in place by the end of 2006,
as the list of substances was already known and emissions data on some substances have been
gathered. In 35% of the RBMPs assessed for the first cycle, no clear information was found
relating to inventories.
The CIS Guidance Document No. 28 “Technical Guidance on the Preparation of an Inventory
of Emissions, Discharges and Losses of Priority and Priority Hazardous Substances”
66
published in 2012 addresses the preparation of the inventories at national RBD scale.
For the second RBMPs, each Member State reported for the first time which Priority
Substances had been included in an inventory of discharges, emissions and losses and all RBDs
reported an inventory for at least some Priority Substances. Only a few countries have complete
inventories, including Austria, Cyprus, Luxembourg, Latvia and Slovenia. For the remaining
Member States, the inventories are not complete. In some cases, justification for not including
the missing Substances in the inventory was provided but not always. Some Member States
included less than 10 substances in their inventories, it is particularly the case for Bulgaria,
Croatia, Malta, Sweden and Slovakia.
The CIS Guidance Document no. 28 recommends a two-step approach for compiling
inventories. In the first step, substances considered to be less important are subject to only a
basic estimation of significant inputs, whereas for the remaining substances, a more in-depth
analysis should be performed. Two-thirds of the Member States reported that the two-step
approach was applied, very few reported that it was not used and the remaining Member States
66
http://ec.europa.eu/environment/water/water-framework/facts_figures/guidance_docs_en.htm
62
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
used this approach for some, but not all Priority Substances. Analysis of inputs of Priority
Substances was almost entirely based on assessment of point sources with diffuse source inputs
not being given due consideration.
As required by Article 5 of the EQS Directive, the Commission will assess progress in reducing
(respectively suppressing) emissions, discharges and losses of priority substances (respectively
priority hazardous substances). This will be done after Member States have reported their
second inventories as part of their third RBMPs.
Main changes in implementation and compliance since first RBMPs
Overall at an EU level about 90% of surface water bodies remained unchanged in terms of
delineation since the first RBMPs. However, in certain Member States, it can be seen that a
large proportion of surface water bodies did change (splitting, creation and deletion) since the
first RBMPs. Around 70% of the groundwater bodies (by area) had not changed. Since the first
RBMPs most Member States have further characterised their groundwater bodies by providing
information on their geological formation and whether they are layered or not. In addition, the
majority of Member States have provided an inventory of associated surface systems, including
terrestrial ecosystems and bodies of surface water with which the groundwater body is
dynamically linked.
Overall since the first RBMPs there have been no significant improvements in the development
of typologies and reference conditions for surface waters. In particular many gaps in terms of
type-specific reference conditions still remain.
For most pressure types, most Member States use a combination of numerical tools and expert
judgement to identify significant pressures. This is similar to the first RBMPs, although many
Member States have shown improvements in the methodologies for individual pressure types.
In addition, the criteria used to define significance of pressures have been further developed by
some Member States. The significance of pressures has been defined using thresholds for 61%
of surface waters and 68% of groundwaters. The significance of pressures has also been linked
to the failure of environmental objectives for 82% of surface water bodies and 80% of
groundwater bodies.
As to changes in reporting of inventories, the transposition deadline was July 2010, meaning an
inventory precisely according to Article 5 of the EQSD did not have to be established by the
time of submission of the first RBMPs. Therefore, 35% of the first RBMPs assessed had no
clear information relating to inventories. For the second RBMPs, each Member State reported
which Priority Substances had been included in an inventory of discharges, emissions and
losses for each RBD, however only a few countries have complete inventories.
63
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.6.2.
Conclusions
Overall at an EU level about 90% of surface water bodies have remained unchanged in terms of
delineation since the first RBMPs although in certain Member States, a large proportion of
surface water bodies did change since the first RBMPs. Around 70% of the groundwater bodies
(by area) have not changed. Nevertheless, little explanation of the consequences of these
changes for the comparability of status between cycles was found in the RBMPs.
Reference conditions have not been established for all water body types in a number of
Member States for all water categories. The situation is similar to the first RBMPs with little
improvement shown at the EU level. Hydro-morphological quality elements were found to be
the quality elements whose type-specific reference conditions show the most significant gaps
for surface water body types.
The identification of significant pressures by Member States involves different approaches such
as numerical tools (e.g. modelling), expert judgment or a combination of both. For most
pressure types, most Member States use a combination of numerical tools and expert
judgement. The criteria used to define significance of pressures have been further developed by
some Member States since the first RBMPs. However, there remain significant gaps that will
need to be addressed in the current cycle, particularly in defining thresholds; in addition, the
criteria used could be made more explicit in the RBMPs or in supportive documents. Member
States reported which significant pressures were not assessed, however it was often unclear
from the RBMPs and supporting documents what the rationale for excluding these pressures
were. Further work is required by Member States on the apportionment of pressures to sectors
and activites to better inform the targeting of measures. For the second RBMPs, Member States
have reported on significance of pressures at a disaggregated level, i.e. for different types of
pressure-driver combinations, which helped to better identify the link between pressures,
sectoral drivers and measures. However, unknown impacts of anthropogenic origin and
pressures of unknown drivers (especially hydro-morphological pressures) were reported for a
large proportion of water bodies in some Member States, which would indicate that the
pressures and impacts have not been fully apportioned to activities or sectors.
For the second RBMPs, each Member State reported which Priority Substances had been
included in an inventory of discharges, emissions and losses, however only a few countries
have complete inventories, with the reasons for incomplete inventories generally not being
reported. Two-thirds of the Member States reported that the two-step approach for compiling
inventories, as recommended in the CIS Guidance Document no. 28, was applied although
analysis of inputs of Priority Substances. However, it was almost entirely based on assessment
of point sources with diffuse source inputs not being given due consideration.
64
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.6.3. Recommendations
Member States should address the existing gaps in the definition of reference conditions
for surface waters. Reference conditions should be established for all water body types
and for all relevant quality elements, in order to improve the reliability of status
assessment. A particular effort has to be done for hydro-morphological quality
elements.
Improvements are further needed in the evaluation of significance of pressures and in
the apportionment of those pressures to sectors and activities, in order to better inform
the targeting of measures. In particular, all pressures should be assessed with
methodologies that enable a reliable quantitative assessment.
Member States should complete their inventories of discharges, emissions and losses of
Priority Substances from point and diffuse sources, in order to cover all Priority
Substances, and provide clear information on the reasons for not including certain
substances when that is the case.
65
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.7. Monitoring, assessment and classification of ecological status in surface
waters
1.7.1.
Introduction
The main objectives of the WFD include the achievement of GES/potential by 2015. Member
States had to establish surface water monitoring networks to provide a coherent and
comprehensive overview of ecological (and chemical) status within each river basin that allows
for the classification of water bodies into five classes consistent with the normative definitions
given in Annex V of the WFD. The quality elements used for the classification of ecological
status comprise biological elements, hydro-morphological elements supporting the biological
elements; general physicochemical elements and RBSPs supporting the biological elements.
The WFD specifies the types and objectives of monitoring to be undertaken, including
surveillance monitoring which should be carried out in sufficient surface water bodies to
provide an assessment of the overall ecological status/potential within each catchment or
subcatchments within the river basin district. Surveillance monitoring should be able to detect
the impact of all potential anthropogenic pressures and natural long-term changes. This requires
a range of different quality elements to be monitored. Operational monitoring should. establish
the status of those bodies identified as being at risk of failing to meet their environmental
objectives, and. assess any changes in the status of such bodies resulting from the programmes
of measures. Operational monitoring generally focuses on the quality elements most sensitive
to the specific pressures and impacts on water bodies.
Annex V of the WFD provides guideline monitoring frequencies for the different quality
elements. In any case, frequencies should be chosen so as to achieve an acceptable level of
confidence and precision in the results of monitoring, and in the subsequent assessment and
classification of ecological status/potential of water bodies. Estimates of the confidence and
precision attained by the monitoring system used should be stated in the RBMPs. The level of
confidence and precision achieved in the classification of water bodies should enable the
measures needed to achieve WFD objectives to be effectively targeted.
Before the implementation of the WFD many Member States had developed their own systems
for monitoring and assessing the quality of water bodies. However, these were generally
developed for specific stressors or types of impact, such as organic pollution and acidification.
Considerable efforts have subsequently been made by Member States to develop assessment
methods for the biological quality elements, and the supporting hydro-morphological and
physicochemical quality elements that meet the requirements of the WFD. This includes the
establishment of type‐ specific reference conditions for all water body types for all relevant
quality elements: this aspect has been assessed in this document in the chapter on
characterisation.
66
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0068.png
The WFD provides for a process to ensure the comparability between the biological monitoring
results of Member States and their monitoring system classifications. These are compared
through an intercalibration network comprised of monitoring sites in each Member State and in
each ecoregion of the Union. Member States should apply the results of the intercalibration
exercise to their national classification systems, in order to set the boundaries between high and
good status and between good and moderate status for all their national types. There have been
three phases of the intercalibration exercise, each resulting in a Commission Decision. It is
expected that the results of the first two exercises would have been used in the development of
the second RBMPs, while the results of the third exercise should be used in the next river basin
planning cycle.
According to the one-out-all-out principle, that the status of a water body should be classified
according to the biological quality element with the lowest status class and the status class
should be downgraded to moderate if the worst biological quality element is good and one or
more of the supporting quality elements are less than good. When combining with the
supporting quality elements, an aggregated level can be used for the supporting quality
elements belonging to the same impact (e.g. phosphorus, nitrogen, Secchi depth), based on
averaging the class for single quality elements within each impact category, before applying the
one-out-all-out principle.
Monitoring of ecological status/potential in surface waters
Monitoring programmes
Table 3.1 gives the number of monitoring programmes reported by Member States for each of
their relevant water categories. Monitoring programmes may include more than one water
category and hence the numbers in the surface water column are not necessarily the sum of the
programmes for each water category. Territorial waters are not a water body category under the
WFD. However, it should be noted that under Article 2(1) of the WFD, territorial waters are
included for the assessment and reporting of chemical status.
Table 3.1: Number of surface water monitoring programmes reported by Member States.
Note: NR = water category not relevant to land-locked Member State.
Number of monitoring programmes
Surface
Coastal
Lakes
waters
waters
8
NR
2
26
2
3
36
4
11
6
2
2
2
NR
2
10
7
10
Member
State
AT
BE
BG
CY
CZ
DE
Rivers
6
19
18
2
2
10
Transitional
waters
NR
2
3
NR
4
Territorial
waters
NR
2
NR
67
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0069.png
Member
State
DK
EE
ES
FI
FR
HR
HU
IT
LU
LV
MT
NL
PL
PT
RO
SE
SI
SK
UK
EU 25
Number of monitoring programmes
Surface
Coastal
Lakes
Rivers
waters
waters
4
1
3
5
3
4
4
5
185
33
56
159
21
6
8
7
51
20
20
26
1
1
1
1
11
NR
4
7
85
30
31
48
13
NR
13
1
2
2
2
2
1
1
1
1
1
1
1
11
5
11
11
18
8
14
17
4
1
3
4
15
12
15
14
4
2
4
4
6
NR
6
27
10
8
12
551
152
216
400
Source: WISE electronic reports.
Transitional Territorial
waters
waters
2
41
16
1
NR
19
NR
2
1
1
6
9
1
NR
NR
NR
9
115
1
5
2
NR
12
In total 551 monitoring programmes were reported by EU Member States including 12 for
territorial waters reported by 5 Member States. There are many differences in how Member
States have designed and reported their monitoring programmes. There are examples where
there are separate programmes for surveillance and operational purposes and/or separate
programmes for each relevant water category. Several Member State-specific gaps have been
identified in the reported programmes, especially the lack of operational or surveillance
monitoring programmes for lakes, transitional or coastal waters in some Member States.
Some Member States also reported monitoring programmes that are not explicitly related to the
WFD (e.g. Bathing Water Directive and Nitrates Directive programmes for surface waters).
Some programmes were also time limited and in one Member State it appears that no
monitoring programmes are planned for the duration of the second cycle.
68
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0070.png
Monitoring sites
a)
Second RBMPs
Tables 3.2 and 3.3 present the number of surveillance and operational monitoring sites reported
by Member States in the second RBMPs. It is apparent that Member States have interpreted
differently what is meant in the reporting guidance by ecological monitoring and chemical
monitoring: i.e. are river basin specific pollutants included in chemical monitoring and/or in
ecological monitoring. Also no explicit differentiation had been made between chemical and
ecological monitoring in the data reported for the first RBMPs. For these reasons the data in the
tables below make no allowance for whether sites are used for chemical or ecological
monitoring.
Table 3.2: Number of sites used for surveillance monitoring for the second RBMPs.
Memb
er
State
AT
BE
BG
CY
CZ
DE
DK
EE
ES
FI
FR
HR
HU
IT
LU
LV
MT
NL
PL
PT
RO
SE
SI
SK
UK
EU
(25)
CW
LW
RW
TeW
TW
NR
6
14
20
NR
75
781
128
543
93
133
49
NR
304
NR
5
10
118
1144
2
NR
677
32
1
5
6
8
162
818
360
156
1126
201
6
27
166
25
80
322
116
22
3379
4
463
76
122
492
52
85
306
790
315
2 355
481
1 699
40
118
1 647
5
33
69
338
334
1234
5 512
25
875
2 634
NR
1
NR
3
28
NR
43
NR
10
299
79
81
NR
40
NR
NR
NR
11
114
16
1
NR
NR
513
1 211
4 102
7 485
19 637
28
Source: WISE electronic reports.
69
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0071.png
Notes for table: CW: coastal waters; LW: lakes; RW: rivers; TeW: territorial waters; TW:
transitional waters. NR = water category not relevant to land-locked Member States. No
allowance has been made as to whether the sites are for ecological or chemical monitoring.
This is because this makes the data more comparable with the data from the first RBMPs.
Table 3.3
RBMPs.
Table: Number of sites used for operational monitoring for the second
Memb
er
State
AT
BE
BG
CY
CZ
DE
DK
EE
ES
FI
FR
HR
HU
IT
LU
LV
MT
NL
PL
PT
RO
SE
SI
SK
UK
EU
(25)
CW
LW
RW
2 025
664
285
34
997
13 106
12 464
72
2 312
591
3 085
135
1 078
1 494
218
186
344
1 813
495
422
4 030
248
277
21 316
TeW
TW
NR
6
6
4
NR
98
781
34
293
227
47
29
NR
439
NR
20
5
10
10
28
714
6
NR
325
89
14
62
716
262
7
71
627
222
14
102
170
218
465
373
32
72
1524
14
448
NR
2
NR
10
15
NR
15
NR
77
51
23
NR
428
NR
8
14
9
3
8
NR
NR
3
7
1
NR
NR
462
1 123
3 082
5 502
67 691
13
Source: WISE electronic reports.
Note for table: CW: coastal waters; LW: lakes; RW: rivers; TeW: territorial waters; TW:
transitional waters. NR = water category not relevant to land-locked Member States. No
allowance has been made as to whether the sites are for ecological or chemical monitoring.
This is because this makes the data more comparable with the data from the first RBMPs.
70
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0072.png
At the EU level (25 Member States assessed for this report), more sites were used for the
monitoring of rivers than for the other water categories with more being used for operational
purposes (67 691) than for surveillance (19 637). The reverse was the case for lakes (7 485 for
surveillance monitoring and 5 502 for operational), while similar numbers were used for both
purposes in transitional and coastal waters.
b) Changes since the first RBMPs
Table 3.4 summarises the changes in the numbers of surveillance and operational monitoring
sites between the first and second RBMPs. The assessment is made at the Member State level
and summarises the changes in terms of small, medium and large differences in numbers.
Table 3.4
Number of Member States with changes in the numbers of surveillance and
operational monitoring sites between the first and second RBMPs.
Surveillance
CW
Large increase (>50%)
Medium increase (10% to
50%)
Small increase (up to 10%)
No change
Small decrease (up to 10%)
2
1
0
0
2
2
1
1
2
4
0
4
1
0
0
0
2
0
0
2
0
2
0
2
5
4
0
0
0
0
0
0
8
LW
6
RW
5
TW
4
Operational
CW
6
LW
6
RW
8
TW
2
Medium decrease (10% to
50%)
4
Large decrease (>50%)
4
5
5
8
1
3
5
5
2
7
6
6
1
6
4
Source: WISE electronic reports.
Note to Table: CW: coastal waters; LW: lakes; RW: rivers; TW: transitional waters. No
allowance has been made as to whether the sites are for ecological or chemical monitoring.
The cells show the number of Member States where there have been increases, decreases or no
changes between the first and second RBMPs. Only the RBDs with reported information for
both cycles were used in the analysis.
Only for one Member State was there no change between the first and second RBMPs, in the
case of surveillance monitoring of lakes. In many Member States there were large increases or
71
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
decreases in the numbers of sites used for either purpose in all water categories. For example,
for six Member States there was at least a 50 % increase in lake surveillance sites and in five
others at least a 50 % decrease.
Member State’s RBMPs were examined to look for the reasons behind these changes. For
instance, in one Member State, the reasons for the changes included the abolishment of a
number of measuring stations that were deemed to be not necessary (e.g. stations used to
determine reference conditions), some stations have been changed for reasons of safety (safe
access) or for a more rational planning of the network. In general, it would have been expected
there would be changes because of filling of methodological and monitoring gaps identified in
the first RBMPs. For example, some Member States have adopted a series of national
methodological and guidance documents on different topics of water management since the
first RBMPs, to ensure a common approach across the RBDs. In other Member States, changes
to the monitoring programme were due to the experience gained during the first planning cycle
and also reflect the Commission’s recommendations on the first RBMPs. For instance,
in one
Member State, the river network was expanded to cover rivers with non-permanent flow and to
ensure the monitoring in water bodies that were identified as not being in good status in the
first RBMP.
The number of monitoring sites may also have changed because of the new delineation of water
bodies (e.g. by merging old water bodies or creating new water bodies). In some cases, there
was an extension of the monitoring network in order to increase representativeness or a
reduction of the network due to a risk-based approach determining the extent of the monitoring.
Further details on changes to the monitoring programmes are given in the Member State-
specific reports. Monitoring of quality elements excluding RBSPs
The WFD requires that parameters indicative of all biological quality elements, all hydro-
morphological quality elements, all general physicochemical quality elements, those priority
list pollutants (described in Chapter 6.4) which are discharged into the river basin or sub-basin
and those other pollutants discharged in significant quantities in the river basin or sub-basin
(described here as river basin specific pollutants) are monitored in water bodies included in
surveillance monitoring.
For operational monitoring, Member States are required to monitor for those biological and
hydro-morphological quality elements which are most sensitive to the pressures to which the
water bodies are subjected (Annex V, 1.3.2 Selection of quality elements).
Annex V of the WFD provides guidance on the frequency of monitoring of the different quality
elements. Surveillance monitoring should be carried out for each monitoring site for a period of
one year during the six-year period covered by a RBMP. For phytoplankton this should be done
twice during the monitoring year and for the other biological quality elements once during the
year. As a guideline, operational monitoring should take place at intervals not exceeding once
72
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0074.png
every six months for phytoplankton and once every three years during the six-year cycle for the
other biological quality elements. Greater intervals may be used if they are justified on the basis
of technical knowledge and expert judgement.
Figure 3.1 shows, at the EU level, the average proportion of sites used for the operational and
surveillance monitoring of biological quality elements in each water category where at least the
minimum recommended frequency is applied. There are only two cases where biological
quality elements are monitored at least at the minimum recommended frequency at all
monitoring sites at which they are monitored: these are for macroalgae and angiosperms in
transitional waters for surveillance purposes. The monitoring of fish in rivers and lakes for
operational purposes had the smallest proportion on sites that were sampled with at least the
minimum recommended frequency: 38 % and 41 % of sites, respectively.
Figure 3.1
Average proportions of sites meeting the minimum recommended
frequency for the monitoring of biological quality elements in different water categories.
Source: WISE electronic reports.
73
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0075.png
Note: Average calculated from the proportion of sites meeting the recommended frequencies in
each Member State that reported the element. The numbers in parenthesis are the number of
Member States reporting the quality element to be monitored for surveillance and operational
purposes, respectively.
Annex V of the WFD indicates which quality elements are expected to be monitored in each
water category: a full range of quality elements is required so that the effects of all pressures
and impacts can be detected.
There are still significant gaps in the quality elements monitored in each water category. This is
particularly so for the hydro-morphological quality elements but there are still significant gaps
also in the monitoring of biological quality elements. For example, more than half of the
Member States with coastal waters that have reported do not monitor morphological conditions,
and half of the Member States with coastal waters do not monitor tidal regime. In terms of
biological quality elements, approximately a quarter of the the Member States with coastal
waters do not monitor angiosperms and macroalgae in coastal waters.
Table 3.5 summarises at the aggregated level the percentage of water bodies included in
surveillance monitoring where all required quality elements are monitored.
Table 3.5: Number of water bodies included in surveillance monitoring and percentages
where all required quality elements are monitored.
Water bodies included in surveillance monitoring
Numb %
with all %
with
all %
with
all
er
required
required hydro- general
biological
morphological
physicochemical
quality elements quality elements quality elements
C
W
L
W
R
W
T
W
EU
(17)
EU
(20)
EU
(23)
EU
(11)
1081
4991
12739
337
23%
7%
33%
8%
2%
10%
35%
33%
34%
53%
10%
11%
Source: WISE electronic reports.
Note: The number in brackets next to EU is the number of Member States with reported
information. The analysis includes water bodies where ecological monitoring is reported to be
undertaken for surveillance purposes.
74
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0076.png
It is clear from Table 3.5 that nowhere near all water bodies included in surveillance
monitoring are monitored for all required quality elements. The hydro-morphological quality
elements have the lowest proportion (2 % to 11 %) of water bodies where all required elements
are included, followed by the biological quality elements (7 % to 33 %) and general
physicochemical quality elements (33 % to 53 %).
Table 3.6 further summarises this issue by presenting the number of Member States where all
and none of the required biological, hydro-morphological and physiochemical quality elements
are monitored in water bodies included in surveillance monitoring. Very few Member States
monitor all required hydro-morphological quality elements in all water bodies, and a significant
number monitor none.
Table 3.6:
Number of Member States where all or no water bodies included in
surveillance monitoring are monitored for all required biological, hydro-morphological
and general physicochemical quality elements.
Category Biological
quality elements
Hydro-
morphological
quality elements
All
2
1
1
0
None
11
11
13
8
General
physicochemical
quality elements
All
2
4
5
0
None
6
9
6
4
17
20
23
11
Number
of
Member States
included in the
analysis
All
CW
LW
RW
TW
3
1
1
0
None
6
9
2
6
Source: WISE electronic reports.
Note: The analysis includes water bodies where ecological monitoring is reported to be
undertaken for surveillance purposes.
Monitoring of RBSPs
Member States were asked to report the chemical substances monitored at each site. The
reporting did
not explicitly differentiate between Priority Substances, RBSPs and “other”
substances. According to the reporting guidance, chemical substances monitored in surface
water that were not Priority Substances should be RBSPs. It is clear that some Member States
may have misreported which chemical substances should be considered as RBSPs. Substances
reported as “other chemical substances” were not included in this analysis because their
inclusion would make the assessment unreliable for some Member States as many
“other
chemical substances” are, on close examination, the same substance with slightly different
reporting formats (e.g. use of underscore or hyphen) or were inappropriate (e.g.
phytoplankton).
75
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0077.png
All of the 25 Member States assessed reported that RBSPs were monitored in water in at least
one water category. At the EU level 402 different RBSPs were reported to be monitored in
water, 173 in sediment and 81 in biota.
The RBSPs monitored by most Member States in water, sediment and biota are shown in
Figure 3.2. Metals such as chromium, copper and zinc are monitored by most Member States in
all three matrices. Water is monitored by most Member States followed by sediment and biota.
Figure 3.2:
biota.
The RBSPs monitored by most Member States in water, sediment and
Data from 25 Member States for water, 13
Member States for sediment and 12 Member
States for biota. Sediment equates to
sediment (unspecified), suspended sediment
or settled sediment. Biota equates to biota
(unspecified), fish or biota other than fish.
Substances reported as “other chemical
substances” were excluded from the
analysis. Source: WISE electronic reports.
Annex V, section 1.3.4 of the WFD provides guidance on the frequency of monitoring of the
different quality elements: once every
three months is recommended for “other pollutants” in
water, which are taken here to equate to RBSPs. Surveillance monitoring should be carried out
for each monitoring site for a period of one year during the six-year period covered by a
RBMP. For RBSPs this should be done four times for the year when surveillance monitoring
was undertaken, and for operational monitoring four times a year for each year of the cycle.
Figure 3.3 shows that a significant proportion of the substances monitored in water at the EU
level are not monitored at least at the minimum recommended frequency at all the sites where
they are monitored. For around 20 % and 35 % of the substances monitored for surveillance
76
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0078.png
and operational monitoring, respectively, there are no sites where they are sampled at least at
the minimum frequency.
Annex V, section 1.3.4 of the WFD does not explicitly define the matrices to which the
minimum recommended frequency of monitoring of RBSPs (“Other Pollutants”) applies.
Required monitoring frequencies are specified for Priority Substances in biota and sediment in
Article 3(2)(c) of the EQS Directive
67
: this is once per year for operational and surveillance
monitoring purposes. For consistency, this required frequency of once per year has been
applied to the monitoring of RBSPs in biota/sediment.
Of the 173 different chemical substances (assumed to be RBSPs) monitored at the EU (13
Member States) level in sediment, 13 % were sampled at least at the required frequency at all
of the sites where they were monitored and 34 % at none of the sites. Of the 81 different
chemical substances (assumed to be RBSPs) monitored in biota, 29 % (in 12 Member States)
were sampled at least at the required frequency at all of the sites where they were monitored
and 4 % at none of the sites.
Figure 3.3:
Proportion of RBSPs where different proportions of sites are sampled at
least at the WFD recommended minimum monitoring frequency for surveillance and
operational purposes.
Source: WISE electronic reports.
Note: Numbers in brackets are the sums of the number of river basin specific pollutants
monitored in the 25 Member States that reported information. Substances reported as other
chemical substances were not included in the analysis because their inclusion would skew the
results as many are the same substance with slightly different reporting formats (e.g.
underscore or hyphen) or were inappropriate (e.g. phytoplankton).
67 Directive 2008/105/EC of the European Parliament and of the Council of 16 December 2008 on EQSs in the
field of water policy, amending and subsequently repealing Council Directives 82/176/EEC, 83/513/EEC,
84/156/EEC, 84/491/EEC, 86/280/EEC and amending Directive 2000/60/EC of the European Parliament and
of the Council
77
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0079.png
Surveillance and operational monitoring of surface water bodies
Annex V.1.3.1 of the WFD
indicates that ‘surveillance monitoring shall be carried out of
sufficient surface water bodies to provide an assessment of the overall surface water status
within each catchment or sub-catchments
within the river basin district’. To that end, it might
be expected that surveillance monitoring includes water bodies covering the range of statuses
within the RBD and Member State. It is not expected that all water bodies will be included in
surveillance monitoring. Representative monitoring sites should be selected to provide an
overall picture of the status of water bodies in the basin.
Table 3.7
Comparison of proportion of water bodies included in surveillance and
operational monitoring between the first and second RBMPs.
Surveillance
CW LW RW TW
Large increase (>50%)
0
2
0
1
Operational
CW LW RW TW
1
2
1
1
Medium increase (10% to
50%)
5
Small increase (up to 10%)
No change
Small decrease (up to 10%)
Medium decrease (10% to
50%)
Large decrease (>50%)
3
2
2
3
4
4
6
0
4
3
9
0
12
4
2
2
1
7
5
2
2
4
3
2
5
9
7
0
7
4
1
4
1
3
3
0
0
2
2
2
0
6
0
0
0
3
0
Source: WISE electronic reports.
Note: CW: coastal waters; LW: lakes; RW: rivers; TW: transitional waters. No allowance has
been made as to whether the sites are for ecological or chemical monitoring. The cells show
the number of Member States where there have been increases, decreases or no changes
between the first and second RBMPs. Only the RBDs with reported information for both cycles
were used in the analysis.
In the EU (24 Member States reporting information) a larger proportion of surface water bodies
were included in operational monitoring than in surveillance monitoring for the first and second
RBMPs. There was an increase in the proportion included in both surveillance and operational
between the first and second RBMPs.
78
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0080.png
Some Member States reported an increase in the proportion of water bodies used for
surveillance monitoring in all their water categories, while some reported a decrease also in all
water categories.
Only very few Member States showed a decrease in the proportion of water bodies used for
operational monitoring in all four water categories. In contrast, in several Member States, there
were increases in the proportion of water bodies included in operational monitoring.
Assessment and classification of ecological status for surface waters
Ecological status or potential of surface water bodies
Overall, around 40 % of the surface water bodies are in good or better ecological status, while
60 % did not achieve good status (EEA 2018
68
) (Figure 3.4). Lakes and coastal waters are in
better status than rivers and transitional waters. The ecological status of natural water bodies is
generally better than the ecological potential of heavily modified and AWBs.
68
European Environment Agency (2018) European waters
assessment of status and pressures 2018.
EEA Report
No 7/2018
-
https://www.eea.europa.eu/publications/state-of-water
79
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0081.png
Figure 3.4: Ecological status/potential of rivers, lakes, transitional and coastal waters
for the second RBMPs
Change in ecological status/potential between the first and second RBMPs
The overall ecological status/potential has not improved since the first RBMPs (Figure 3.5). In
fact, the results show a slight reduction in the proportion of water bodies in good or better
ecological status or potential for all the water body categories. Nonetheless, around 20 % (16
000 surface water bodies) have improved in ecological status/potential class since the first
RBMPs, generally by one class but sometimes by 2-3 classes (EEA 2018)
69
.
69
European Environment Agency (2018) European waters
assessment of status and pressures 2018.
EEA Report
No 7/2018
-
https://www.eea.europa.eu/publications/state-of-water
80
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0082.png
Figure 3.5: Ecological Status or potential of all surface waters, rivers, lakes,
transitional and coastal waters in the two RBMPs
Confidence in ecological status assessment
Member States were asked to report the confidence on their ecological status or potential
classification. The criteria used by Member States to assess confidence vary considerably, but
in general low confidence may equate to no monitoring data; medium confidence to supporting
quality element data and/or limited data on one biological quality element; and high confidence
to good data for at least one biological quality element and the most relevant supporting quality
element.
81
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0083.png
Overall, the proportion of water bodies with unknown ecological status has decreased from 16
% to 4 %, and the confidence in the classification has improved from one third of water bodies
with high or medium confidence in the first RBMPs to 58 % of the water bodies in the second
RBMPs (EEA 2018
70
).
Classification of ecological status at the quality element level
a) Second RBMPs
Although a large proportion of water bodies is not classified for each single quality element
(grey bars in Figure 3.6), more than two-thirds of all water bodies are classified with at least
one biological quality element (EEA 2018
71
). The most frequently classified biological quality
elements are: for rivers, benthic invertebrates, phytobenthos/other aquatic flora/macrophytes
and fish; for lakes, phytoplankton; and for transitional and coastal waters, phytoplankton and
benthic invertebrates.
The ecological status for individual quality elements is much better than the overall ecological
status classification. For rivers, for example, 50-70 % of the classified water bodies have high
or good status for several biological quality elements, while the overall ecological status is only
high or good for less than 40 % of the river water bodies. For the general physicochemical and
hydro-morphological quality elements, more than two-thirds of the water bodies have at least
GES.
European Environment Agency (2018) European waters
assessment of status and pressures 2018.
EEA Report
No 7/2018
-
https://www.eea.europa.eu/publications/state-of-water.
71
European Environment Agency (2018) European waters
assessment of status and pressures 2018.
EEA Report
No 7/2018
-
https://www.eea.europa.eu/publications/state-of-water.
70
82
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0084.png
Figure 3.6
Ecological status/potential of biological quality and supporting elements in
rivers, lakes, transitional and coastal waters
83
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0085.png
b) Changes since the first RBMPs
It is difficult to make general comparisons of the ecological status/potential of surface waters
between the first and second RBMPs because of, for example, re-delineation of water bodies
and changes in monitoring programmes and assessment methods between the cycles.
Recognising this difficulty, Member States were asked to report information on changes in
ecological status/potential between the cycles for each water body and quality element, if the
information was available.
Figure 3.7 summarises the information reported by Member States at an aggregated level for
biological quality elements for each water category. For 81 % of surface water bodies there was
no available information, or status or potential was unknown for the first RBMPs. Information
was reported on changed status or no change in status for 31 % of coastal water, 8 % of lake, 20
% of river and 16 % of transitional water bodies.
84
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0086.png
Figure 3.7
Aggregated information of the changes between the first and second
RBMPs reported for each relevant biological quality elements in each water category.
Coastal waters
Changed status
Lakes
No change in status
Rivers
No information available
Status or potential was
unknown in 2010
0%
20% 40% 60% 80% 100%
% of water bodies
Transiional waters
Source: WISE electronic reports.
Note: The biological quality elements relevant to each water category (as described in the
WFD) were selected. As Member States had to report all quality elements irrespective of their
relevance to a category, the non-relevant quality elements were removed before analysis: e.g.
macroalgae in rivers. These were reported as "no information". In terms of “other aquatic
flora”, it was included for a Member State where changes in status had also been reported, as
more Member States classified the component
elements rather than using the generic “other
aquatic flora”. % of water bodies equates to the sum of water bodies that had been reported for
each water category. For example if four biological quality elements had been reported for 100
water bodies, there were 400 water bodies summed in the calculation.
A total of 7 % of surface water bodies were reported to have a change in status/potential in
terms of the biological quality elements between the first and second RBMPs. Member States
were also asked to report the comparability and consistency of any changes in status between
the two cycles, again at the quality element and water body level. Figure 3.8 summarises the
reported information at the EU level. According to this information, 37 % of the improvements
and 34 % of the deterioration in the status/potential of the biological quality elements in surface
water bodies were reported to be consistent (as percentages of the water bodies for which there
was information on changed status/potential, which was 7 % of the total). Improvements and
deteriorations of status/potential that were reported to be inconsistent are due to changes to
assessment methods, changes to monitoring, or both.
85
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0087.png
Figure 3.8: Consistency of changes in ecological status/potential of the biological
quality elements since the first RBMP in each water category.
Coastal waters
Deterioration (464)
Improvement (437)
Lakes
Deterioration (1537)
Improvement (1348)
Rivers
Deterioration (11930)
Improvement(16257)
Transitional waters
Deterioration (112)
Improvement (105)
0% 20% 40% 60% 80% 100%
% of changes in BQEs
Consistent change
Inconsistent due to
changes to assessment
methods
Inconsistent due to
changes to monitoring
Inconsistent due to
changes to monitoring
and assessment methods
No information or
unknown
Note: The biological quality elements analysed were those relevant to each water category.
Source: WISE electronic reports.
Assessment methods for the biological quality elements
Each Member State is required to develop methods to assess ecological status for all biological
quality elements. Assessment methods for the supporting quality elements must be linked to the
biological quality elements, according to the normative definitions given in Annex V of the
WFD. Methods should be developed for the full range of quality elements to allow detection of
all pressures on surface water bodies and together provide a holistic picture of the ecological
status of the aquatic environment.
In most Member States, WFD-consistent assessment methods for the classification of
ecological status were not fully developed for all biological quality elements in time for the
first RBMPs. The most common biological methods developed were phytoplankton
(chlorophyll a) in lakes and benthic fauna in rivers. The biological quality elements that were
least developed in rivers were phytoplankton and macrophytes, and in lakes phytobenthos,
benthic invertebrates and fish. Assessment methods showed the most gaps for transitional
waters (all biological quality elements) and for coastal waters, where particularly assessment
methods for macroalgae and angiosperms were fully developed only in a few Member States.
86
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0088.png
In the second RBMPs, all Member States reported methods for nutrient pollution, organic
pollution and altered habitats due to morphological changes. However, almost half of the
Member States that reported chemical pollution as a significant impact do not have a biological
assessment method that is sensitive to chemical pollution.
Table 3.8 summarises which biological quality elements are used to assess significant impacts.
It is clear that a range of elements is used to assess the various impacts. Fish and benthic
invertebrates are the most commonly used to assess hydro-morphological changes and
phytoplankton, macrophytes and phytobenthos for nutrient pollution.
Table 3.8
Number of Member States that reported biological assessment methods in
relation to significant impacts.
Significant impact type
Biological
Element
Phytoplankton
Other aquatic flora
Macroalgae
Angiosperms
Macrophytes
Phytobenthos
Benthic invertebrates
Fish
Other species
Key:
Nutrient
pollution
Organic
pollution
Chemical
pollution
Saline pollution
Quality
1
25
5
13
11
23
23
18
18
1
2
10
2
7
4
9
17
25
12
5
2
7
6
12
10
3
7
4
8
1
4
3
7
7
7
7
5
7
1
4
2
9
11
12
8
5
3
8
5
11
13
6
8
7
10
1
6
5
14
7
18
20
8
3
1
7
9
14
8
24
23
1
2
3
4
5
6
7
8
Acidification
Elevated temperature
Altered habitats due to hydrological
changes
Altered habitats due to morphological
change
Source: WISE electronic reports.
Intercalibration of biological quality element methods
To ensure comparable definitions of GES across Europe, Member States are also required to
intercalibrate the GES class boundaries of their methods, for each biological quality element in
87
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0089.png
each water category, with other Member States having common types of water bodies.
Intercalibration is a distinct obligation at EU level in addition to the obligation to develop
national ecological status methods, i.e. the lack of success of intercalibration does not exempt
Member States from the obligation of developing assessment methods for all biological quality
elements.
After completion of the intercalibration exercise, it is the obligation of Member States to
translate the results of the intercalibration exercise into their national classification systems, in
order to set the boundaries between high and good status and between good and moderate
status for their national types. Ideally, the class boundaries for the national types that differ
from the intercalibrated types should be set in a way that ensures a level of anthropogenic
disturbance comparable to that used for the same biological quality element for the
intercalibrated types. For some types that are either very specific (e.g. volcanic lakes), very rare
(e.g. some large lake type that occurs only once within some Member States), or even unique in
Europe, it may not be possible to translate the intercalibration results to that type. In such cases,
an explanation should be given for each type about why this is not possible.
Table 3.9
Percentage of surface water bodies that were reported to have no
equivalent intercalibration type.
CW
AT
BE
BG
CY
CZ
DE
DK
EE
ES
FI
FR
HR
HU
57% 52%
70% 51%
56% 37%
35% 90%
37% 45%
51% 89%
46%
LW
39%
50% 22%
41% 97%
RW
1%
8%
65% 100%
54%
39%
4%
16%
47% 69%
20%
30% 21%
5%
Source: WISE electronic reports.
Notes for table: CW: coastal waters; LW: lakes; RW: rivers; TW: transitional waters.
In most Member States and for most water categories, there are significant proportions of
national water bodies that are of types that do not have a common intercalibration type (Table
3.9). It is, therefore, very important that the results of the intercalibration exercise are correctly
TW
IT
LU
LV
MT
NL
PL
PT
RO
SE
SI
SK
UK
44% 67%
75% 59%
9%
7%
40% 75%
4%
17%
37%
58% 100% 33%
50%
67%
22%
13%
19%
14%
67%
67%
100%
CW
3%
LW
74%
RW
16%
3%
100%
100% 100% 100%
TW
38%
100% 6%
100% 53%
88
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0090.png
translated to national types without an equivalent intercalibration type if a comparable
assessment of ecological status/potential within Member States and across the EU is to be
obtained. However, there was little relevant information on this issue in the examined RBMPs.
In several RBMPs there was no information on specific methods, but a general statement that
the results of the intercalibration must be translated so that the national types obtain the same
level of protection as the intercalibrated types.
Assessment of hydro-morphological quality elements
The values of the hydro-morphological quality elements must be taken into account when
assigning water bodies to the high ecological status class and the maximum ecological potential
class (i.e. when deciding between high ecological status or maximum ecological potential and
GES/potential). For the other status/potential classes, the hydro-morphological elements are
required to have “conditions consistent with the achievement
of the values specified
72
for the
biological quality elements.”
The ranges and levels (standards) established for the hydro-morphological quality elements
must support the achievement of the values required for the biological quality elements at high
status or maximum potential, as relevant. Since the values for the biological quality elements at
high status will be type-specific, it is reasonable to assume that the ranges and levels
established for the hydro-morphological quality elements should also be type-specific. Several
types may share the same ranges or levels for some or all of the hydro-morphological quality
elements.
The assessment of the second RBMPs showed that standards have been set for some supporting
hydro-morphological quality elements in some Member States and also that hydro-
morphological standards were less well developed than those for general physico-chemical
quality elements such as nutrients.
Hydrological/tidal regime was not assessed in terms of ecological status/potential in all of the
RBDs where the water category is relevant (Figure 3.9). This was also the case for
morphological conditions and river continuity. The water category where they were assessed in
the smallest proportion of relevant RBDs was coastal waters. Also the classification boundaries
of these elements were related to the class boundaries for the sensitive biological quality
elements in only 36 % of RBDs for hydrological/tidal regime, 42 % for river continuity and 47
% for morphological conditions.
72
WFD, Annex V Tables 1.2.1 - 1.2.5
89
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0091.png
Figure 3.9: Proportion of RBDs where hydro-morphological quality elements are
assessed in terms of ecological status/potential and where their classification boundaries
are related to the class boundaries for the sensitive biological quality elements
Source: WISE electronic reports.
Note: The numbers of RBDs where the water category is relevant are given in parentheses next
to the water category. The relevance of the classification to the sensitive biological quality
elements is reported only once for each QE and is therefore not water category specific.
Assessment of general physicochemical quality elements
The ranges and levels established for the general physicochemical quality elements must
support the achievement of the values required for the biological quality elements at good
status or good potential, as relevant. Since the values for the biological quality elements at good
status will be type-specific, it is reasonable to assume that the ranges and levels established for
the general physicochemical quality elements should also be type-specific.
Several types may share the same ranges or levels for some or all of the general
physicochemical quality elements. If the monitoring results for the biological quality elements,
the general physicochemical quality elements and RBSPs in a water body meet the conditions
required for GES/potential, the overall ecological status/potential of the water body will be
good. However, if one or more of the general physicochemical quality elements or river basin
specific pollutants do not meet the conditions required for GES/potential but the biological
quality elements do, the overall ecological status/potential will be moderate.
The assessment of the second RBMPs showed that standards have been set by some Member
States for some supporting general physicochemical quality elements. However, most of the
general physicochemical standards related to nutrients and organic matter are, in most cases,
90
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0092.png
not clearly linked to the good/moderate class boundaries for the sensitive biological quality
elements.
Figure 3.10 shows the proportion of RBDs where the general physicochemical quality elements
are reported to be assessed in terms of ecological status/potential. Also shown is the proportion
of RBDs where the classification boundaries of these elements are related to the class
boundaries for the sensitive biological quality elements.
Figure 3.10: Proportion of RBDs where general physicochemical quality elements are
assessed in terms of ecological status/potential and where their classification boundaries
are related to the class boundaries for the sensitive biological quality elements
Source: WISE electronic reports.
Note: The numbers of RBDs where the water category is relevant are given in parentheses next
to the water category. The relevance of the classification to the sensitive biological quality
elements is reported only once for each quality element and is therefore not water category
specific.
Oxygenation and nutrient conditions are assessed in terms of ecological status/potential in most
RBDs in most water categories. The classification boundaries of these elements are also
reported to be related to the classification of sensitive biological quality elements in the most
RBDs. However, there are gaps for the other general physicochemical quality elements, as they
are not assessed in relation to ecological status/potential in over half of the RBDs (e.g. thermal
conditions in all water categories).
91
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0093.png
Overall, 20 Member States (112 RBDs) reported standards for acidification, 23 Member States
(137 RBDs) for nutrient conditions, 22 Member States (129 RBDs) for oxygenation conditions,
17 Member States (77 RBDs) for salinity conditions, 14 Member States (60 RBDs) for thermal
conditions and 17 Member States (84 RBDs) for transparency conditions. Most standards at the
RBD level (1599) were reported for nutrient conditions. Figure 3.11 shows the percentage of
these that are consistent with the good-moderate status boundary of the relevant sensitive
biological quality element. A large proportion (~80%) of the standards in each type of general
physicochemical quality elements are consistent with the good-moderate status boundary of the
relevant sensitive biological quality elements.
Figure 3.11 Percentage of reported general physicochemical standards that are
consistent with the good-moderate status boundary of the relevant sensitive biological
quality elements.
Source: WISE electronic reports.
Note: The numbers in the brackets are the number of standards reported at the RBD level. Note
that where the same standard is reported for more than one RBD in a Member State it is
counted more than once.
Selection of RBSPs and use of EQSs
Information on how RBSPs were selected is available in the RBMPs of two-thirds of the 25
Member States assessed. Several Member States reported that this selection was based on some
or all of the following: the inventories of emissions, information on the use of substances, the
results of monitoring, or an analysis of pressures and impacts. In some cases, the Member
92
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0094.png
States mentioned the RBSP selection took into account the list from Annex VIII of the WFD or
other EU legislation such as the repealed Dangerous Substances Directive (76/464/EC).
The obligation to identify RBSPs and set EQSs for them was not equally observed in the
second RBMPs, with some Member States identifying many more than others, and some
standards being much less stringent than others for the same substances. This has implications
for the comparability of conclusions drawn regarding ecological status/potential.
The WFD (Annex V, section 1.2.6) establishes the principles to be applied by the Member
States to develop EQSs for Specific Pollutants that are
‘discharged in significant quantities into
the body of water’. These are also known as RBSPs. Compliance with EQSs for RBSPs forms
part of the assessment of ecological status/potential. EQSs are, therefore, key tools in assessing
and classifying ecological status and can therefore affect the overall ecological status/potential
classification of a water body. In addition, EQSs will be used to set discharge permits to water
bodies, so that chemical emissions do not lead to EQSs exceedances within the receiving water.
Technical Guidance (the 2011 Technical Guidance Document n. 27
73
) has been developed to
support the derivation of EQSs for priority substances and for RBSPs that need to be regulated
by Member States according to the provisions of the WFD. The guidance focuses on the steps
required to derive EQSs that comply with the requirements of Annex V of the WFD.
Tables 3.10 to 3.12 show the standards reported by Member States for RBSPs in water, biota
and sediment. Standards were reported for 229 different RBSPs in water at the EU level.
Standards for metals (zinc, chromium and arsenic) in water are reported by 20 of the 24
Member States that have reported information on this issue. Standards for organic substances
such as toluene and xylene are reported by several Member States.
73
https://circabc.europa.eu/sd/a/0cc3581b-5f65-4b6f-91c6-433a1e947838/TGD-EQS%20CIS-
WFD%2027%20EC%202011.pdf
93
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0095.png
Table 3.10 Top-ten substances for which most Member States have reported EQSs for
RBSPs in water
River Basin Specific Pollutant code
CAS_7440-66-6 - Zinc and its compounds
CAS_7440-47-3 - Chromium and its compounds
CAS_7440-38-2 - Arsenic and its compounds
CAS_7440-50-8 - Copper and its compounds
CAS_108-88-3 - Toluene
CAS_1330-20-7 - Xylene
CAS_25057-89-0 - Bentazone
CAS_7782-49-2 - Selenium and its compounds
CAS_100-41-4 - Ethylbenzene
CAS_94-74-6 - MCPA
Number
of
Member States
20
20
20
19
13
10
10
9
9
9
Source: WISE electronic reports.
Note: 24 Member States reported information on standards in water. Substances reported as
“Other chemical parameter" were excluded from the analysis.
EQSs were reported by three Member States for nine RBSPs in biota (Table 3.11).
Table 3.11
RBSPs for which Member States have reported EQSs in biota
Matrix
Biota -
fish
Biota -
fish
River Basin Specific Pollutant code
CAS_1333-82-0 - Cr(VI)O3
CAS_143-50-0 - Chlordecone (Kepone)
CAS_1763-23-1 - Perfluorooctane sulfonic acid (PFOS)
and its derivatives
Biota
Biota
CAS_7440-38-2 - Arsenic and its compounds
fish
Biota
CAS_7440-47-3 - Chromium and its compounds
fish
Biota
CAS_7440-50-8 - Copper and its compounds
fish
Biota
CAS_7440-66-6 - Zinc and its compounds
fish
Biota
CAS_7782-49-2 - Selenium and its compounds
fish
EEA_33-58-9 - Dioxins and dioxin-like compounds (7
Biota
PCDDs + 10 PCDFs + 12 PCB-DLs)
Source: WISE electronic reports.
-
-
-
-
-
Note: Substances reported as “Other chemical parameter" were excluded from the analysis.
94
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0096.png
EQSs were reported by six Member States for 36 RBSPs in sediment (Table 3.11). Standards
for zinc, copper and chromium in sediment were reported by four Member States. Standards
were also reported for different polychlorinated biphenyl congeners by several Member States.
Table 3.12
RBSPs for which most Member States have reported EQSs for sediment
Number
4
4
4
3
3
3
3
PCB
-
PCB
180
(2,2’,3,4,4’,5,5’-
3
118
(2,3’,4,4’,5-
3
PCB
101
(2,2’,4,5,5’-
of
River Basin Specific Pollutant code
CAS_7440-66-6 - Zinc and its compounds
CAS_7440-50-8 - Copper and its compounds
CAS_7440-47-3 - Chromium and its compounds
CAS_7012-37-5 -
PCB 28 (2,4,4’-trichlorobiphenyl)
CAS_35693-99-3
tetrachlorobiphenyl)
CAS_7440-38-2 - Arsenic and its compounds
CAS_37680-73-2
-
pentachlorobiphenyl)
CAS_35065-29-3 -
heptachlorobiphenyl)
CAS_31508-00-6
pentachlorobiphenyl)
-
PCB
52
(2,2’,5,5’-
Member States
EEA_33-56-7 - Total PAHs (Benzo(a)pyrene,
Benzo(b)fluoranthene,
Benzo(k)fluoranthene,
Benzo(g,h,i)perylene, Indeno(1,2,3-cd)pyrene)
2
CAS_1333-82-0 - Cr(VI)O3
CAS_35065-28-2 -
hexachlorobiphenyl)
CAS_35065-27-1 -
hexachlorobiphenyl)
PCB
PCB
138
153
(2,2’,3,4,4’,5’-
2
(2,2’,4,4’,5,5’-
2
2
Source: WISE electronic reports.
Note: Sediment (unspecified), settled sediment and/or suspended sediment are included. The
table shows the RBSPs reported by two or more Member States. Substances reported as “Other
chemical parameter" were excluded from the analysis.
A total of 64 % of the EQSs at the EU level were derived in accordance with Technical
Guidance Document n. 27 (Table 3.13).
95
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0097.png
Up to 73 % of the derived standards for RBSPs in water, biota and sediment at the EU level had
analytical methods that meet the minimum performance criteria laid down in Article 4(1) of the
Commission Directive laying down technical specifications for chemical analysis and
monitoring of water status (2009/90/EC)
74
for the strictest standard applied (Table 3.13). Of the
remaining 167 EQSs 89 % have analytical methods which are in line with Article 4(2) of the
same Directive (Table 3.14).
Table 3.13: Number of standards for RBSPs for which the analytical method used
meets the minimum performance criteria laid down in Article 4(1) of the Commission
Directive laying down technical specifications for chemical analysis and monitoring of
water status (2009/90/EC) for the strictest standard applied.
Member Matrix
State
AT
BE
BE
BG
CY
CZ
DE
Water
Sediment
Water
Water
Water
Water
Sediment
-
suspended
sediment
Water
Biota
Water
Water
Biota
-
fish
Sediment
- settled
sediment
Water
Sediment
Water
Yes No
Not
reported
Member Matrix
State
FR
FR
HR
HU
IT
IT
LU
Biota -
fish
Water
Water
Water
Sediment
Water
Water
Yes No
Not
reported
21
9
114
24
6
57
1
10
6
1
27
83
24
9
1
3
3
40
13
5
24
13
11
DE
DK
DK
EE
ES
ES
76
2
9
14
6
12
LV
MT
NL
PL
PT
RO
Water
Sediment
Water
Water
Water
Water
2
5
107
25
29
10
1
ES
FI
FI
100
1
11
SE
Water
SI
Water
2
SK
Water
UK
Water
Source: WISE electronic reports.
30
23
29
31
29
5
1
17
Note: Substances reported as “Other chemical parameter" were excluded from the analysis.
74
http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2009:201:0036:0038:EN:PDF
96
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0098.png
Table 3.14: Number of standards for RBSPs where the analytical method corresponds
to the requirements laid down in Article 4(2) of the Commission Directive laying down
technical specifications for chemical analysis and monitoring of water status (2009/90/EC)
for the strictest standard applied.
Member
State
BE
BG
CZ
ES
Matrix
Water
Water
Water
- settled
sediment
ES
FI
FR
HR
HU
Water
Water
Water
Water
Water
52
2
9
1
3
RO
SE
SI
SK
UK
Water
Water
Water
Water
Water
17
1
3
1
31
2
Yes No
2
26
13
3
Member
State
IT
IT
LU
MT
Matrix
Water
Water
Sediment
Yes No
40
13
5
Sediment 3
Sediment 6
Source: WISE electronic reports.
Note: Substances reported as “Other chemical parameter" were excluded from the analysis.
The
European Environment Agency’s 2018
75
assessment of status and pressures of European
waters indicates that 5 % of surface water bodies did not achieve GES/potential owing to
RBSPs. Another 40 % were reported as in good or high ecological status/potential for RBSPs,
while the status of RBSPs was unknown in a significant proportion of surface water bodies (55
%). About 150 RBSPs were reported as causing failure to achieve GES/potential in at least one
water body. Those most frequently reported as causing failure
were the metals zinc, with 1 503
waterbodies failing to achieve GES, and copper (845). As individual substances, most RBSPs
caused fewer than 100 waterbodies to fail GES.
Use of monitoring results for classification
Member States were asked to report the classification results in terms of each of the biological
quality elements monitored in each water body. Status in terms of a particular biological quality
element in a monitored water body might also be extrapolated to non-monitored water bodies in
the same group. Not all biological quality elements are appropriate or will be monitored for all
water categories and some are considered to be not applicable in some water body types.
75
European Environment Agency (2018) European waters
assessment of status and pressures 2018.
EEA Report
No 7/2018
-
https://www.eea.europa.eu/publications/state-of-water.
97
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0099.png
In cases where the number of monitored water bodies is greater than the number of classified
water bodies for any particular quality element there may be a lack of confidence in the
monitoring results, and only the monitoring results/assessments with high and perhaps medium
confidence are used in classification. Where the number of monitored water bodies is the same
as the number of classified water bodies for any particular quality element the classification is
based on monitored water bodies. There may also be examples of where the number of
monitored water bodies is less than the number of classified water bodies for any particular
quality element. This indicates that there has been extrapolation of status from monitored water
bodies to non-monitored water bodies, through grouping or expert judgment.
Figure 3.12 summarises the means of classification of the different types of quality elements
and river basin specific pollutants in the different water categories. The results of monitoring
are predominantly used for the classification of the biological and general physicochemical
quality elements. Expert judgement plays a significant role in the classification of the hydro-
morphological quality elements and river basin specific pollutants in some Member States and
water categories. Grouping is not used to a great extent, except for the biological and general
physicochemical quality elements in rivers, for which around a fifth of water bodies are
classified by this means.
Figure 3.12: Means of classification of biological, hydro-morphological and general
physicochemical quality elements, and of river basin specific pollutants in the four water
categories.
Source: WISE electronic reports
98
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Note: “>50% MS”: at least 50% of water bodies classified by this means in the Member State.
“All Member States”: all water bodies classified by this means in the Member State.
In many cases, Member States have reported more water bodies to be classified at the quality
element level using the results of monitoring than are directly monitored for the quality
element. This was the case for the biological quality elements in surface water bodies
(approximately two-thirds of the 24 Member States which reported on this issue), for the
hydro-morphological quality elements (one third of 21 Member States) and for the general
physicochemical quality elements (approximately half of 23 Member States). This may be due
to reporting errors, in that the monitoring data have not been completely reported or there has
been an under-reporting or misreporting of the water bodies classified by grouping.
Overall classification of ecological status
According to the one-out-all-out principle, that the status of a water body should be classified
according to the biological quality element with the lowest status class and the status class
should be downgraded to moderate if the worst biological quality element is good and one or
more of the supporting quality elements are less than good. When combining with the
supporting quality elements, an aggregated level can be used for the supporting quality
elements related to the same impact (e.g. phosphorus, nitrogen, Secchi depth), based on
averaging the class for single quality elements within each impact category, before applying the
one-out-all-out principle.
The one-out-all-out principle is at the heart of an integrated river basin management that
addresses all pressures and impacts on aquatic environment. It ensures that the negative impact
of the most dominant pressure on the most sensitive quality element is not averaged out and
obscured by minor impacts of less severe pressures or by less sensitive quality elements
responding to the same pressure.
Only the Madeira RBD, in Portugal (out of 147), reported that the one-out-all-out principle had
not been applied.
1.7.2.
Conclusions
In spite of the progress done since the first RBMPs, there are several gaps in the reported
monitoring programmes in terms of some water categories in a few Member States not being
monitored for surveillance and/or operational purposes.
There is no clear pattern in terms of increases and decreases in the numbers of sites used for
surveillance and operational monitoring for the second RBMPs compared to the first. There
are examples where there have been over 50% increases in numbers, and others where there
have been over 50 % decreases. This is also the case in terms of increases and decreases in
99
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
the proportion of surface water bodies included in surveillance and operational monitoring
between the first and second RBMPs.
The changes in monitoring sites and monitored water bodies are partially related to the re-
delineation of water bodies for the second RBMPs. Monitoring programmes may have also
been revised using the experience from the first RBMPs, taking into account national
legislation related to the implementation of the WFD, or in response to Commission
recommendations based on the first RBMPs.
Almost all the biological quality elements are not monitored at the WFD minimum
recommended frequency at all of the sites at which they are monitored.
There are still significant gaps in the quality elements required to be monitored in each water
category. This is particularly so for the hydro-morphological quality elements, which are not
monitored at all in the Czech Republic and Croatia, only to a limited extent in Bulgaria,
Portugal and France, and show significant gaps in practically all Member States, but there
are also still significant gaps in the monitoring of biological quality elements. Only 8 %, 25
% and 34 % of surface water bodies included in surveillance monitoring are monitored for
all required hydro-morphological, biological and general physicochemical quality elements,
respectively.
A total of 402 different RBSPs were reported to be monitored in water; 173 in sediment and
81 in biota. A significant proportion of the substances are not monitored at least at the
minimum recommended frequency at all the sites where they are monitored.
EQSs were reported for 229 different RBSPs in water, 9 in biota and 36 in sediment. Of these
standards, 64 % were derived in accordance with Technical Guidance n. 27. This is not the case
for the Czech Republic, Finland, Croatia, Italy, Luxembourg, Latvia, Malta and Poland, and to
a large extent also Spain. Concerning the analytical methods, 73% of the standards had
analytical methods that consistent with Article 4(1) and 24 % with Article 4(2) of the
Commission Directive laying down technical specifications for chemical analysis and
monitoring of water status (2009/90/EC) for the strictest standards applied. About 5 % of
surface water bodies did not achieve GES/potential due to RBSPs. For Malta, however, none of
the analytical methods were in line with the requirements.
Overall, around 40 % of the surface water bodies are in good or better ecological status.
Lakes and coastal waters are in better status than rivers and transitional waters. The
ecological status of natural water bodies is generally better than the ecological potential of
heavily modified and AWBs.
The overall ecological status/potential has not improved since the first RBMPs. In fact, the
results show a slight reduction in the proportion of water bodies in good or better ecological
100
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
status or potential for all the water body categories. Nonetheless, around 20 % of surface
water bodies have improved in ecological status/potential class since the first RBMPs,
generally by one class but sometimes by 2-3 classes.
Overall, the proportion of water bodies with unknown ecological status has decreased from
16 % to 4 %, and the confidence in the classification has improved from one third of water
bodies with high or medium confidence in the first RBMPs to 58 % in the second.
A total of 7 % of surface water bodies were reported to have a change in status/potential in
terms of the biological quality elements between the first and second RBMPs. About a third
of those changes were reported to be consistent, while the others were reported to be due to
changes to assessment methods, changes to monitoring or both.
All Member States reported biological assessment methods for nutrient pollution, organic
pollution and altered habitats due to morphological changes. However, Austria, The
Netherlands and Romania reported chemical pollution as a significant impact but do not
have a biological assessment method that is sensitive to chemical pollution.
In most Member States and for most water categories, there are significant proportions of
national water bodies that are of types that do not have an equivalent common
intercalibration type. It is, therefore, very important that the results of the intercalibration
exercise are correctly translated to national types without an equivalent intercalibration type.
If not, a comparable assessment of ecological status/potential within a Member State and
across the EU may not be obtained.
The hydro-morphological quality elements are not assessed in terms of ecological
status/potential in many RBDs in the Czech Republic, Denmark and The Netherlands, while
in many other cases this concerns some hydro-morphological quality elements for some
water types, particularly for coastal waters. Furthermore, in more than half of RBDs the
classification boundaries of these elements were not related to the class boundaries for the
sensitive biological quality elements.
Oxygenation and nutrient conditions are assessed in terms of ecological status/potential in
most RBDs in most water categories. The classification boundaries of these quality elements
are also reported to be related to the classification of sensitive biological quality elements in
most RBDs. However, there are gaps for the other general physicochemical quality
elements, as they are not assessed in relation to ecological status/potential in over half of the
RBDs (e.g. thermal conditions in all water categories). A large proportion (~80 %) of the
standards for the general physicochemical quality elements are consistent with the good-
moderate status boundary of the relevant sensitive biological quality elements.
101
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
The results of monitoring are predominantly used for the classification of the biological and
general physicochemical quality elements. Expert judgement plays a significant role in the
classification of the hydro-morphological quality elements and RBSPs in some Member
States and water categories. Grouping is not used to a great extent, except for the biological
and general physicochemical quality elements in rivers, for which around a fifth of water
bodies are classified by this means.
146 of the 147 RBDs reported that the one-out-all-out principle had been applied in the
second RBMPs.
1.7.3.
Recommendations
Members States should continue to strengthen the monitoring of surface waters by
covering all relevant quality elements in all water categories in adequate frequencies, in
order to increase the level of confidence in the assessment of water body status.
Member States should complete the development of assessment methods for ecological
status for all relevant quality elements in all water body categories, and ensure that the
methods correspond to WFD requirements and are intercalibrated.
Member States should have clear and transparent methods for the selection of RBSPs,
and ensure that the corresponding EQSs meet the minimum requirements for the
protection of freshwater and marine ecosystems from possible adverse effects, as well
as for human health.
102
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.8. Monitoring, assessment and classification of chemical status in surface
waters
1.8.1. Introduction
Good chemical status of surface waters means the chemical status required to meet the
environmental objectives for surface waters established in Article 4(1)(a) of the WFD. It is the
chemical status achieved by a body of surface water in which concentrations of priority
substances do not exceed the EQSs established in Annex I of Directive 2008/105/EC (as
amended). Action to achieve compliance with the EQSs may reduce the costs of treating
surface waters used for drinking water production, and should reduce the risks to organisms
living in these waters and other animals and humans that eat them.
Decision 2455/2001/EC of the European Parliament and of the Council of 20 November 2001
established the initial list of 33 priority substances, selected among those identified as posing a
significant risk to or via the aquatic environment at EU-level. Directive 2008/105/EC (also
called the EQSs Directive) then set quality standards for these substances and eight other
pollutants previously regulated by Directive 76/464/EEC. In addition to reaching good
chemical status for all priority substances and the eight other pollutants, Member States are also
required to assess long-term trends for some of these substances and to establish an inventory
of emissions, discharges and losses of all substances identified in the Directive, for each
national river basin district.
Directive 2013/39/EU (amending the EQSs Directive) identified a further twelve priority
substances, set EQSs for them, and updated the EQSs for seven of the existing priority
substances in line with the latest scientific and technical knowledge concerning the properties
of the substances. Good status should be reached by 2021 for the seven substances with
updated standards, and by 2027 for the twelve new substances.
Quality Assurance/ Quality Control Directive 2009/90/EC (QA/QC Directive) on the quality
and comparability of chemical monitoring provides the minimum performance criteria to
ensure the quality of the analytical results and specifies the approach to dealing with
measurements lower than the level of quantification. The requirements of this Directive should
be fully reflected in the second RBMPs.
103
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Assessment of implementation and compliance with WFD requirements in 2nd cycle
Chemical monitoring sites and water bodies monitored for Priority Substances
Article 8.1 of the WFD requires Member States to establish monitoring programmes for the
assessment of the status of surface water in order to provide a coherent and comprehensive
overview of water status within each RBD. The results of monitoring play a key role in
determining whether water bodies are in good chemical status or at risk of failing to meet their
environmental objectives, what measures need to be included in the RBMP in order to reach
good status, and whether the implemented measures are leading to the expected outcome.
Precise and reliable monitoring results are therefore a prerequisite for sound planning of
investments in the POMs.
The amount of monitoring undertaken in terms of priority substances, frequency and numbers
of sites should be sufficient to obtain a reliable and robust assessment of the chemical status of
all water bodies in the RBD. Insufficient monitoring leads to a low confidence in the
classification of water bodies, and as a result the sometimes expensive measures required to
achieve objectives may be incorrectly targeted, and objectives such as restoration of water
bodies to good status may not be achieved.
Annex V of the WFD presents the objectives of the surveillance and operational monitoring
programmes and the modalities for monitoring (selection of sites, substances and frequencies).
Surveillance monitoring aims at validating the pressure and impact assessment, at improving
the design of future monitoring programmes and at assessing long term changes in natural
conditions including those resulting from widespread anthropogenic activity. Member States
are also required to undertake operational monitoring to assess the status of water bodies at risk
of not reaching good status, and to assess the changes in the status of such water bodies
resulting from the implementation of measures. In addition, investigative monitoring can be
undertaken where the reason for any exceedances is unknown or to establish the causes of
water bodies failing to achieve the environmental objectives in the absence of operational
monitoring. Figures 1 and 2 show the proportion of sites and the proportion of water bodies
where priority substances are monitored. Both surveillance and operational monitoring are
covered, and no distinction is made in these figures between sites used for trend assessment,
status assessment or both. Monitoring of protected areas in not included in the numbers given
below. Direct comparisons cannot be reliably made with the first RBMPs because of changes to
the reporting requirements to WISE. A wide variety of changes to monitoring programmes for
chemical status were reported by Member States including both increases and decreases in the
numbers of monitoring sites used and water bodies monitored and a redistribution of sites
between surveillance and operational monitoring programmes and between water categories.
Several Member States reported extensions of monitoring programmes into previously
unmonitored water categories.
104
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Overall the extent of monitoring of Priority Substances across the EU has been very diverse,
ranging from 1 to 98 % of surface water bodies being monitored for Priority Substances, with
an average of about one-third. Only few Member States monitor more than 50 % of their
surface water bodies for Priority Substances (Figure 1). Just under half of the Member States
have chemical monitoring sites which account for greater than 50 % of their total monitoring
sites with proportions ranging from 10 to 80 % of the total monitoring sites (Figure 2).
The majority of Member States monitor all of their water bodies failing to achieve good status
as part of their operational monitoring programmes in at least some of their RBDs and most
commonly in coastal and transitional waters.
105
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0107.png
Figure 1: Proportion of the total surface water bodies that
are monitored for Priority Substances
Figure 2: Proportion of the total monitoring sites that are
chemical monitoring sites
Source: WISE electronic reports
106
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Monitoring of Priority Substances discharged
Annex V of the WFD states, in Section 1.3.1 (Design of surveillance monitoring), that
“Surveillance monitoring shall be carried out for each monitoring
site for a period of one year
during the period covered by a RBMP for [inter alia]: priority list pollutants which are
discharged into the river basin or sub-basin.”
Section 1.3.2 (Design of operational monitoring)
of the Directive states that “In order to
assess the magnitude of the pressure to which bodies of
surface water are subject Member States shall monitor for those quality elements which are
indicative of the pressures to which the body or bodies are subject. In order to assess the impact
of these pressures, Member States shall monitor as relevant [inter alia]: all priority substances
discharged, and other pollutants discharged in significant quantities.”
Member States are therefore required to monitor all Priority Substances which are discharged
into the river basin or sub-basin.
The completeness of inventories of emissions of Priority Substances is discussed in Chapter 5.2
of this report, according to which only very few Member States completed their inventories of
emissions of all Priority Substances. The majority of Member States monitored all of the
Priority Substances identified as discharged into their RBDs with the exception of a few
Priority Substances and with some variation among RBDs within Member States. As
mentioned above, it is however unclear whether all substances discharged in the RBDs have
been properly identified in all cases.
Monitoring of chemical substances in water, sediment and biota, for status assessment
and trend assessment.
Status assessment
EQSs for each Priority Substance in water, and biota where appropriate, are set in the EQSs
Directive. According to the Directive (version in force in 2009), mercury, hexachlorobenzene
and hexachlorobutadiene have to be monitored in biota for status assessment, unless Member
States derived a standard for another matrix which is at least as protective as the biota standard.
All Member States monitored Priority Substances in water for status assessment. In almost all
Member States, the majority of Priority Substances were monitored but with some variation
among RBDs within Member States and among water categories. Some RBDs within Member
States were monitored for significantly fewer Priority Substances and in some of those cases
Member States indicated intentions to enhance monitoring in the second cycle for reporting in
the third RBMPs. Most Member States monitored less than 30% of their water bodies with
some variation between water categories. This sometimes led to some water bodies not being
classified, or being classified with a low confidence in the assessment. Territorial waters were
monitored in a few Member States with a coastline. Coastal and transitional water bodies
tended to be monitored in a greater proportion than lakes and rivers; though many more water
bodies were delineated in these latter categories.
107
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Nearly three quarters of Member States monitored mercury, hexachlorobenzene and/or
hexachlorobutadiene in biota in at least some RBDs for status assessment, even if they
generally (also) monitored in water in the same and other RBDs. In a few cases, these
substances were assessed in water against alternative standards rather than the “direct toxicity”
water standards in the Directive. In general, the spatial extent of biota monitoring in terms of
the proportion of monitoring sites was very limited, and it did not always cover all water
categories.
The WFD indicates that, for the surveillance and operational monitoring of Priority Substances
in water, the frequency of monitoring should be at least monthly for one year during the RBMP
cycle and at least monthly every year, respectively. Monitoring in biota for status assessment
should take place at least once every year according to the EQSs Directive. Member States can
choose to monitor less frequently for any matrix, provided they can justify greater intervals on
the basis of technical knowledge and expert judgement.
Monitoring frequencies in water at the site level varied widely within RBDs in most member
States with some sites meeting the recommended minimum frequencies in the Directive and
some not. The recommended minimum frequencies for surveillance monitoring were met more
often than those for operational monitoring. In some cases, the reasons for reduced frequencies
were justified in the RBMP. In some Member States, less frequent monitoring occurred in
individual RBDs and in some of these cases Member States indicated intentions to enhance
monitoring in the second cycle. Monitoring frequencies in biota were consistent with the
recommended minimum frequency in the Directive for just over three quarters of Member
States though not in all RBDs. In some cases, reduced frequencies were justified in the RBMP.
Trend assessment
Article 3.3 of the EQSs Directive (version in force in 2009) requires Member States to monitor
14 that tend to accumulate in sediment and/or biota, for the purpose of long-term trend
assessment. Monitoring should take place at least once every three years, unless technical
knowledge and expert judgment justify another interval.
Around two-thirds of Member States reported monitoring in sediment and/or biota for trend
assessment. A few Member States reported trend assessment in alternative matrices -
suspended sediment or water. In most cases, the majority of the fourteen substances were
monitored though not in all RBDs and not in all water categories. Generally the proportion of
sites monitored appeared to be very limited. The recommended minimum frequency of
monitoring was met in almost all Member States that monitored for trends. Where reduced
frequencies were reported, these were justified in very few cases.
108
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0110.png
Performance of analytical methods used
For the majority of Priority Substances, the analytical methods meet the minimum performance
criteria laid down in Article 4(1) of Directive 2009/90/EC, in the majority of Member States
and RBDs. For the remaining substances, the analytical methods complied with the
requirements laid down in Article 4(2) of Directive 2009/90/EC in all Member States and
RBDs with very few exceptions.
Assessment and classification of chemical status for surface waters
Chemical status of surface water bodies by category
Figure 3 shows the comparison of chemical status of surface water bodies between the first and
second RBMPs by water category.
76
At the European level, the proportion of surface water
bodies at good status has remained largely the same since the first cycle. There were slight
improvements in chemical status for rivers, transitional and coastal water bodies, but not for
lake water bodies. These apparent changes need to be treated with some caution due to the fact
that some Member States have re-delineated some of their water bodies for the second RBMPs,
including splitting, aggregation, creation and deletion of surface water bodies (see further
details in Chapter 5.2 on Characterisation).
The proportion of water bodies of unknown chemical status has decreased significantly from
39% to 16 % which indicates that there have been improvements in monitoring and assessment
methodologies. The reduction of water bodies with unknown status was seen for all water body
categories, but in particular transitional water bodies. The proportion of water bodies classified
as failing to achieve good chemical status has increased however from 25 % to 46 % overall;
this occurred for all water categories and it seems to result mainly from the increased
knowledge gained during the first cycle.
Territorial waters are not a water body category under WFD. However, Article 2.1 of the WFD
indicates that chemical status applies to territorial waters as well. For the second RBMP,
Member States were able to report any relevant information for the part of territorial waters
which extend beyond coastal waters. Territorial waters are therefore relevant to this question
for all twenty Member States with a coastline (of which seven only reported to monitor and
classify territorial waters). The unknown chemical status of territorial waters has decreased
from 86 % to 39 %.
76
Changes by Member State are available in the WISE WFD Database:
https://www.eea.europa.eu/themes/water/water-assessments/chemical-status-of-surface-water-bodies
109
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0111.png
Figure 3: Comparison of chemical status of surface water bodies between the first and
second RBMPs by water body category
Source: WISE electronic reports; figure available online at:
https://tableau.discomap.eea.europa.eu/t/Wateronline/views/WISE_SOW_SWB_Status_Compa
re/SWB_ChemicalStatus_Category?:embed=y&:showAppBanner=false&:showShareOptions=t
rue&:display_count=no&:showVizHome=no
Note: The term (*) means all Member States and surface water categories. Under Article 2(1)
of the WFD, territorial waters are included for the assessment and reporting of chemical
status.
At the Member State level there have been some more significant changes in the chemical
status between RBMPs. A few Member States have changed from having most of their surface
water bodies at good chemical status to failing to achieve good status. Once again, this seemed
to reflect changes in the monitoring programmes and assessment methodologies. Some other
Member States have actually increased the numbers of surface water bodies with unknown
status since the first cycle.
As highlighted by the EEA (2018), some variation in the chemical status among Member States
is to be expected due to differences in population densities, present and past industrial activities
and geography. However, such large differences are better explained by the methods used to
assess chemical status. While some extrapolated failure of a standard in monitored water bodies
(most commonly for mercury in biota) to all water bodies, others only reported failure where it
was confirmed. A few Member States applied the revised, stricter 2013 EQSs while most
110
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0112.png
countries used the 2008 standards. More details on the approaches adopted by Member States
are provided in Table 3.1 of the EEA report (2018).
Priority Substances causing failure of good chemical status
Member States were expected to report exceedances for individual substances on the basis of
the more stringent 2013 EQSs when they existed The most frequently reported “top 15” priority
substances found in surface water bodies are shown in Table 1. Mercury and brominated
diphenylethers are responsible for failure to achieve good chemical status in the highest number
of water bodies.
Table 1: Priority substances where failure to achieve good chemical status occurs in over
100 water bodies (out of a total of 111062 surface water bodies)
Type / use of Number of Number of
%
Priority substance
chemical
water
Member
contributed
bodies not States with
by one
achieving water bodies Member
good
not achieving State if that
chemical
good
dominates
status
chemical
(% of WBs
status for the not
listed
achieving
substance
good
chemical
status)
Mercury *
Metal
45973
24
50%
Brominated diphenylethers *
+
Flame
23331
8
99%
retardant
Benzo(g,h,i)perylene +
PAH
3091
15
47%
+
Indeno(1,2,3-cd)pyrene *
Benzo(a)pyrene *
+
PAH
1630
12
65%
Fluoranthene
+
PAH
1390
14
40%
Cadmium
Metal
1014
20
--
Tributyltin *
Biocide
663
15
--
+
Nickel
Metal
654
20
--
Lead
+
Metal
462
19
--
Benzo(b)fluor-anthene+
PAH
460
10
41%
+
Benzo(k)fluor-anthene *
Isoproturon
Pesticide
199
8
45%
4-nonylphenol
Surfactant
188
10
52%
+
Anthracene
PAH
123
11
59%
Hexachlorocyclohexane
Pesticide
120
11
--
DEHP
Plasticiser
102
11
--
Note * shows where substance is an ubiquitous persistent, bioaccumulative and toxic Priority
Substances (uPBT) and
+
denotes a more stringent 2013 Environmental Quality Standard.
Source: EEA (2018).
111
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0113.png
The impact of ubiquitous persistent, bioaccumulative and toxic Priority Substances on the
classification of chemical status
According to Article 8(a) of the EQSs Directive, eight priority substances and groups of
priority substances are behaving like ubiquitous, persistent, bioaccumulative and toxic
substances. These substances are generally expected to cause widespread exceedances, and
their emissions can be challenging to tackle (e.g. due to long-range atmospheric transport and
deposition). In order to show the progress made in tackling other priority substances, Member
States have the possibility to present the information related to chemical status separately for
these substances.
The ubiquitous persistent, bioaccumulative and toxic Priority Substances (uPBTs) are also
shown in Table 3 and it can be seen that all of them are in the top 10. Figure 4 displays the
chemical status of surface water bodies, with and without uPBTs. There is a significant
difference with only 3 % of surface water bodies failing to achieve good chemical status when
uPBTs are excluded. This indicates a very significant impact of uPBTs. Some Member States
are more affected by the uPBTs than others
77
. However, the true extent of the impact of uPBTs
is more than likely masked by the different approaches Member States have taken to
accounting for the pressures leading to impacts from these substances and to the use of
extrapolation of monitoring results from monitored to unmonitored water bodies. This is
commonly the case for mercury where exceedance of the environmental quality standard in
biota extrapolated to similar water bodies leads to widespread occurrence of failure to meet
good status.
Figure 4: Chemical status of surface water bodies, with and without and uPBTs
77
For details see WISE WFD Database:
https://tableau.discomap.eea.europa.eu/t/Wateronline/views/WISE_SOW_SWB_SWPrioritySubstanceWithout
UPBT/Country?:embed=y&:showAppBanner=false&:showShareOptions=true&:display_count=no&:showViz
Home=no
112
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0114.png
Progress made in tackling individual substances
The EEA report (2018)
78
provides a more detailed overview of which Priority Substances are
being tackled at the Member State level. Against a background of little change overall in the
proportion of water bodies achieving good status and an increase in the proportion failing to
achieve good status, several cases of improvements between the first and second RBMPs were
reported for particular Priority Substances. For example, 943 water bodies improved in status
during the first RBMP cycle due to cadmium, nickel and lead meeting their EQSs. For
pesticides (isoproturon, endosulfan, chlorpyrifos, diuron, DDT, total DDT, cyclodiene,
trifluralin, atrazine, alachlor), 571 water bodies improved from failing to achieve good
chemical status in the first RBMP as a result of these substances meeting the relevant standards.
A further 621 water bodies are still failing to achieve good chemical status in the second
RBMPs due to these substances failing their standards.
Dealing with measurements lower than the limit of quantification
Article 5 of Directive 2009/90/EC on QA/QC specifies a method for dealing with
measurements lower than the limit of quantification. Almost all Member States reported the use
of methods consistent with these requirements.
Expected date for achievement of good chemical status
For surface water bodies failing to achieve good chemical status by 2015, Member States were
requested to report the date by which good chemical status would be achieved. Member States
were also asked to report water bodies achieving good status in 2015 and those where less
stringent objectives (exemption under Article 4(5)) have already been achieved.
As previously mentioned, good status should be reached by 2021 for substances with revised,
more stringent 2013 standards, and by 2027 for the new priority substances. Member States
may also apply exemptions under WFD article 4(4) to explain the extension of deadlines,
provided they can prove that the necessary conditions are fulfilled.
51% of surface water bodies have already achieved good chemical status in 2015 and 20% have
achieved the less stringent objectives set by Member States under article 4(5) of the WFD.
About 2 % of water bodies are expected to achieve good status by 2021 and 23 % by 2027
(Figure 5). For only less than 1 % the target will be achieved beyond 2027. For about 4 % of
surface water bodies the date of achievement is unknown.
78
EEA (2018). European Waters
Assessment of status and pressures 2018,EEA Report No 7/2018, ISSN 1977-
8449.
113
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0115.png
Figure 5: Expected date for achievement of good chemical status of surface water bodies
by water category.
Source: WISE electronic reports
Methodologies to assess the status of non-monitored water bodies
Figure 6 shows the number of Member States where monitoring, grouping and expert
judgement is used either predominantly or entirely as the means of classification for each water
category relevant for surface water chemical status. 'Monitoring' indicates that there is
monitoring data available for the water body and this is used as the basis for classification.
‘Grouping’ indicates that there is no monitoring data available from the water body and
therefore monitoring from other similar water bodies was used as a basis for classification.
Assessing water bodies by grouping without any monitoring data can increase the uncertainty
but it may be justified in areas where several water bodies are of the same type and are subject
to the same level of pressures and hence can be assumed to present the same chemical status.
'Expert judgement' means there is some, none or insufficiently reliable monitoring data
available in this surface water body, no other similar water bodies were used and the status is
mainly based on expert judgement.
Monitoring is used as the basis of classification most commonly in transitional, coastal and
territorial waters (Figure 9). There are generally fewer water bodies in these water categories
than in surface freshwaters. Expert judgement is used more commonly in lakes and rivers (in
approximately one-third of Member States). Member States appear to have generally reported
as expert judgment the extrapolation of exceedances found for mercury in monitored water
bodies to all unmonitored water bodies within a Member State. This extrapolation was carried
out in a few Member States. The use of grouping as the means of classification occurs least
frequently but is more common in surface fresh waters than in transitional, coastal and
territorial waters.
114
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0116.png
Figure 6: Means of classification of surface water chemical status in the relevant water
categories
Source: WISE electronic reports
Notes to Figure: “>50% MS”: Predominantly used: at least 50% of water bodies classified by
this means in the Member States. “All Member States”: Exclusively
used: all water bodies
classified by this means in the Member State.
Overall, grouping techniques and expert judgement are widely used for the classification. Some
RBMPs provide information on the approaches used but in some cases greater transparency
would be beneficial. The grouping techniques and expert judgement also need to utilise sound
monitoring results.
Confidence in classification of chemical status
The WFD stipulates that estimates of the confidence and precision attained by the monitoring
system used shall be stated in the RBMP. Member States were requested to report the level of
confidence according to 4 categories (low, medium, high and no information). In the first
RBMPs, confidence in the chemical status assessment was not explicitly reported.
Figure 7 shows the surface water chemical status assessment confidence for the second
RBMPs. At EU level, only 15 % of the chemical status classifications were assigned high
confidence, 25 % of medium, 41 % of low confidence and 19 % had no information on the
level of confidence. (No information on the level of confidence was generally associated with
water bodies with unknown chemical status.) The range of confidence levels varies widely
between the Member States. High confidence was generally associated with classifications
based on reliable monitoring results and low confidence with those based on few or no
monitoring results but on, for example, the extrapolation of results from monitored water
bodies or expert judgment.
115
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0117.png
Figure 7: Confidence in the assessment of surface water chemical status
Source: WISE electronic reports
Use of mixing zones
Directive 2008/105/EC also allows Member States to establish mixing zones, where the EQSs
Directive may be exceeded provided that the rest of the surface water body complies with those
standards. These areas must be clearly identified in the RBMPs. Mixing zones were not
commonly defined in the second RBMPs with only just over a quarter of Member States
defining them in at least some RBDs, representing a small portion of water bodies overall.
Use of background concentrations and bioavailability for metals
Directive 2008/105/EU stipulates that Member States may, when assessing the monitoring
results against the EQS, take into account the natural background concentrations for metals and
their compounds and the bioavailability of metals.
In the second RBMPs, most Member States have considered natural background concentrations
when assessing monitoring results against the EQS, however this was not the case in all RBDs
in these Member States.
Most Member States have considered bioavailability when assessing monitoring results against
the EQS, however this was not the case in all RBDs in these Member States.
Main changes in implementation and compliance since 1st cycle
Changes in surveillance and operational monitoring
A wide variety of changes to monitoring programmes for chemical status were reported by
Member States including both increases and decreases in the numbers of monitoring sites used
and water bodies monitored and a redistribution of sites between surveillance and operational
116
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0118.png
monitoring programmes and between water categories. Several Member States reported
extensions of monitoring programmes into previously unmonitored water categories.
Changes in monitoring of Priority Substances
Monitoring of Priority Substances in the first RBMPs was very diverse with few Member Sates
monitoring all substances.
79
In the second RBMPs, all Member States monitored Priority
Substances in water for status assessment. In almost all Member States, the majority of Priority
Substances were monitored but with some variation among RBDs within Member States and
among water categories.
Since the first RBMPs, biota standards have been used in the assessment of chemical status and
trend monitoring was performed in sediment and biota to a greater extent. For status
assessment, nearly three quarters of Member States monitored mercury, hexachlorobenzene and
hexachlorobutadiene in biota compared to just a few Member States in the first RBMPs. For
trend assessment, a similar proportion of Member States reported monitoring of at least some
of the 14 Priority Substances in sediment and/or biota which is a considerable improvement
from the proportion using these matrices in the first RBMPs.
Changes in status
At the European level, the proportion of surface water bodies at good status has remained
largely the same since the first cycle; though small increases were observed in rivers,
transitional, coastal and territorial water categories. However, as a result of significant efforts
invested by Member States in improving the understanding of pressures and monitoring and
assessment methodologies, the number of water bodies of unknown status has decreased from
39 % to 16 %. The number of water bodies classified as failing to achieve good chemical status
has increased from 25 % to 46 % overall, which seems to be largely due to the increase in
knowledge.
Confidence in the classification of chemical status was reported explicitly for the first time in
the second RBMP; 15 % of classified water bodies were assigned high and 25 % medium
confidence. This is related to the extent to which monitoring, grouping and expert judgement
(and extrapolation) is used as the basis for classification. While the classifications of chemical
status reported in the first RBMPs were based largely on limited monitoring programmes, those
reported in the second RBMPs are based on improved monitoring programmes and more
systematic use of grouping and expert judgement.
1.8.2. Conclusions
Overall, the percentage of water bodies that are of unknown chemical status has decreased
significantly since the first RBMPs from 39 % of all surface water bodies to only 16 %. This
79
See 2012 Commission Staff Working Document
framework/pdf/3rd_report/CWD-2012-379_EN-Vol2.pdf
:
http://ec.europa.eu/environment/water/water-
117
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
indicates that the monitoring (spatially, substances and frequency) and status assessment
methods have improved overall. A limited number of Member states have more than 60% of
their water bodies in unknown status (Bulgaria, Denmark, Estonia, Latvia, Portugal).
Against a background of little change overall in the proportion of water bodies achieving good
status and an increase in the proportion failing to achieve good status (most likely due to an
increase in knowledge), several cases of improvements between the first and second RBMPs
were reported for particular Priority Substances.
Only 3 % of surface water bodies are failing to achieve good chemical status when ubiquitous
persistent, bioaccumulative and toxic Priority Substances (uPBTs) are excluded from the
assessment of chemical status (compared to 46% when all substances are considered). This
indicates a significant impact of uPBTs. In particular, mercury and brominated diphenylethers
are responsible for failure to achieve good chemical status in the highest number of water
bodies.
A relatively high proportion of surface water bodies were reported to be failing to achieve good
status for the second RBMPs
46 % overall. However, looking at the target for the expected
date of achieving good status, less than 1 % extends beyond 2027 and most water bodies are
expected to achieve good chemical status by 2027, though more stringent standards and
additional substances are required to be monitored for the third RBMP. For about 4 % of
surface water bodies, the date of achievement is unknown.
Grouping techniques and expert judgement have been widely used to classify water bodies.
Some RBMPs provide information on the approaches used but in some cases greater
transparency would be beneficial. The use of these may also be at least partly linked to the
reduced confidence in the assessment of status : at EU level, only 15 % of the chemical status
classifications were assigned high confidence, 25 % medium, 41 % low confidence and 19 %
had no information on the level of confidence. The range of confidence levels varies widely
between Member States.
Although it is not expected that all water bodies be monitored, overall the extent of monitoring
of Priority Substances across the EU has been very diverse, ranging from 1 to 98 % of surface
water bodies being monitored for Priority Substances and an average of about one third. The
majority of Member States monitor all of their water bodies failing to achieve good status as
part of their operational monitoring programmes in at least some of their RBDs and most
commonly in coastal and transitional waters.
For efficient monitoring programmes the information on pressures and emissions is very
important. Significant efforts have been made to establish inventories of emissions (see Chapter
5.2), although few Member States reported complete inventories for all their RBDs, and it is
therefore unclear whether all discharged substances have been identified. The majority of
118
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Member States monitored all of the Priority Substances identified as discharged into their
RBDs with the exception of a few Priority Substances and with some variation among RBDs
within Member States. For status assessment, all Member States monitored Priority Substances
in water. In almost all Member States, the majority of Priority Substances were monitored but
with some variation among RBDs within Member States and among water categories.
Generally the spatial extent of monitoring in water was limited in terms of the proportion of
water bodies monitored with some variation between water categories. Territorial waters were
monitored in a few Member States with a coastline. Monitoring frequencies in water at the site
level varied widely within RBDs in most member States with some sites meeting the
recommended minimum frequencies in the Directive and some not.
Nearly three quarters of Member States monitored mercury, hexachlorobenzene and
hexachlorobutadiene in biota for status assessment. In general, the spatial extent of monitoring
in terms of the proportion of monitoring sites was very limited. Monitoring frequencies in biota
were consistent with the recommended minimum frequencies in the Directive for just over
three quarters of Member States though not in all RBDs. Explanations for the reduced
frequencies were sometimes provided in the RBMPs.
For trend assessment, around two-thirds of Member States reported to WISE that arrangements
were in place for long-term trend analysis in most, but not all, RBDs. All but two of these
monitored sediment and/or biota for this reason. Most Member States monitored the majority of
the 14 substances though not in all RBDs and not in all water categories. In almost all cases the
spatial extent of monitoring was very limited in terms of the proportion of sites monitored. The
recommended minimum frequency of monitoring was met in almost all Member States. Where
reduced frequencies were reported, these were justified in very few cases.
For the majority of Priority Substances, the analytical methods meet the minimum performance
criteria laid down in Article 4(1) of the QA/QC Directive, in the majority of Member States and
RBDs. For the remaining substances, the analytical methods complied with the requirements
laid down in Article 4(2) in all Member States and RBDs with very few exceptions.
Article 5 of the QA/QC Directive specifies a method for dealing with measurements lower than
the limit of quantification. Almost all Member States reported the use of methods consistent
with these requirements.
Member States did not often use the option of deriving mixing zones in the second RBMPs
with only just over a quarter of Member States defining them in at least some RBDs, in a small
portion of water bodies overall.
Most Member States have used the possibility offered by the Directive to consider natural
background concentrations and bioavailability when assessing monitoring results against the
119
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
EQS. However this was not the case in all RBDs in these Member States (in some RBDs
because metals were not causing exceedances).
1.8.3. Recommendations
Member States should continue improving the confidence in the assessment of status for
all water categories (including territorial waters), and further reduce the proportion in
unknown status. In particular, monitoring should be performed in a way that provides
sufficient temporal resolution and spatial coverage to classify all water bodies (in
combination if necessary with robust grouping /extrapolation methods). All discharged
Priority Substances should be monitored, and all Priority Substances should be
considered in the assessment of status, in the relevant matrix. If reduced frequencies or
a different matrix/EQS are used, they should be explained, as required by the
Directives.
Trend monitoring in sediment and/or biota should be performed or further improved to
ensure that all the relevant substances specified in Directive 2008/105/EC are monitored
in a way that provides sufficient temporal resolution and spatial coverage and fully
reflects the concern that these substances may be accumulating in the environment.
120
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.9.
Monitoring, assessment and classification of quantitative status in
groundwater
1.9.1. Introduction
Monitoring
Article 8 of the WFD requires the establishment of programmes for the monitoring of
groundwater quantitative status. The directive sets out the requirements for these programmes
in Annex V 2.2 and Annex II 2.3.
WFD groundwater monitoring is primarily focussed on the groundwater body as a management
unit, but it also supports the overall management of the RBD. The principal purpose of WFD
quantitative monitoring is to facilitate quantitative status assessment to determine whether the
relevant Article 4 environmental objectives for groundwater bodies are met. Moreover, the
monitoring results must be used:
-
to supplement and validate the Article 5 characterisation and risk assessment procedure
with respect to risks of failing to achieve good groundwater quantitative status,
to demonstrate compliance with the objectives for drinking water protected area and other
protected area objectives,
to assist in designing the programmes of measures necessary to achieve the environmental
objectives and in evaluating their effectiveness, and
to estimate the direction and rate of flow in groundwater bodies that cross Member State
boundaries.
-
-
-
The groundwater quantitative monitoring network shall include sufficient representative
monitoring points and monitoring shall be carried out with a sufficient frequency of
observations. Such monitoring design is particularly necessary to estimate the balance between
groundwater abstraction and recharge in each groundwater body or group of bodies, taking into
account short and long-term variations in recharge. It is also necessary so that the impacts of
anthropogenically induced level changes or of alterations of groundwater flow on groundwater
associated aquatic and dependent terrestrial ecosystems as well as on saline or other intrusion
can be assessed.
Although the WFD identifies groundwater level as the metric for determining quantitative
status, in practice the requirements of status assessment and the specific characteristics of
groundwater bodies mean that additional supporting information will be required to assess
quantitative status. Common Implementation Strategy Guidance document No. 15 recommends
considering spring flows, flow characteristics and/or stage levels of surface water courses
during drought periods or stage levels in significant groundwater dependent wetlands and lakes
for the purposes of quantitative groundwater status assessment, too. Moreover, to adequately
121
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0123.png
assess the quantitative status also information on abstractions, recharge, ecological flow needs
of ecosystems and changes of intrusion parameters would be needed.
Classification
The definition of groundwater quantitative status is set out in Annex V 2.1 of the WFD and
discussed in Common Implementation Strategy Guidance document No. 18. Good quantitative
status is met when the available groundwater resource is not exceeded by the long term annual
average rate of abstraction, when the groundwater levels are not subject to such anthropogenic
alterations which would result in failure to achieve the environmental objectives for associated
surface waters or any significant diminution of their status or any significant damage to
groundwater dependent terrestrial ecosystems. Moreover, in good quantitative status
anthropogenic flow alterations or level changes do not cause any saline or other intrusion.
Assessment of implementation and compliance with WFD requirements in 2
nd
cycle
Monitoring of quantitative status in groundwater
The coverage of groundwater bodies by quantitative monitoring is in most of the Member
States generally high, but with a significant number of groundwater bodies without quantitative
monitoring in specific Member States (see figure 1). In total 4 600 of the 13 376 groundwater
bodies are subject to quantitative monitoring. Eleven Member States (Austria, Belgium,
Cyprus, Czech Republic, Germany, Spain, Hungary, Luxembourg, Latvia, Netherlands,
Poland) monitor more than 80% of their groundwater bodies, and of these, two monitor all their
groundwater bodies (Cyprus, the Netherlands).
Figure 1: Percentage of groundwater bodies with quantitative monitoring (bars) and average
number of monitoring sites per monitored groundwater.
Source: WISE reporting 2016
Note: * grouping has been applied, at least partially, in Austria, Croatia, Denmark, Germany,
Finland, Malta, Spain and Sweden. Austria confirmed that there is surveillance monitoring for
groundwater, but the reported information is shown in this figure.
122
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0124.png
Consistency with the quantitative monitoring requirement of the WFD needs to be assessed in a
differentiated way because the WFD allows grouping groundwater bodies - inter alia for the
purpose of monitoring - and therefore not each groundwater body which is subject to such
grouping is in need of a separate monitoring network. Some Member States reported that
groundwater bodies had been grouped for the purpose of monitoring (see figure 1) (Austria,
Croatia, Denmark, Germany, Finland, Malta, Spain and Sweden) but for the majority of
Member States with unmonitored groundwater bodies there is no such information about
grouping and hence there is a clear gap and inconsistency with the monitoring requirements of
the WFD. Even in cases where grouping has been reported, this often does not allow
determining whether grouping covers all groundwater bodies without monitoring or only a
subset.
In average on the EU level, each monitored groundwater body is monitored in 2.7 monitoring
sites. Figure 1 shows the number of monitoring sites per monitored groundwater body in each
Member State. The number of sites varies between 1.1 sites in Finland up to 40.7 sites in the
Netherlands. Of course, the number of monitoring sites per groundwater body is highly
influenced by its size and is not an adequate measure of comparison. In addition to that, the
density of sites is influenced by the variability of characteristics and pressures within
groundwater bodies and the intensity and type of groundwater use, leading to significant
variations even within Member States. Furthermore, as mentioned previously, it should be
considered that some Member States group their groundwater bodies for monitoring purposes
and therefore did not establish monitoring sites in each groundwater body.
Assessment and classification of quantitative status for groundwater
About 92% of groundwater bodies in the EU (12 299 of the 13 367 groundwater bodies) are in
good quantitative status. Around 5% (693 groundwater bodies) are failing good status and 3%
(385 groundwater bodies) have unknown status. Considering the area of groundwater bodies,
about 89% (3.9 million km²) of the total area of groundwater bodies (4.3 million km²) is in
good quantitative status, around 9 % of the total area has failed to achieve good quantitative
status, while around 1 % of the groundwater body area (about 59 000 km²) has unknown
status.
80
Member States that have reported all groundwater bodies in good quantitative stauts are
Asutria, Luxembourg, Latvia, The Netherlands, Romania and Slovenia. The main reason for
failing good quantitative status is attributed to the ‘water balance / lowering of water table’.
Around 61% of the groundwater body area failing good quantitative status (544 groundwater
80
The total area of GWBs in Europe is 4.34 million km². While this figure might seem extremely large (the
whole EU surface is about 4,3 km²), it is correct as the different layers of delineated and reported groundwater
bodies have been considered for calculating the total.
123
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0125.png
bodies in the other 19 Member States) is affected by this reason. Further reasons for failing
good status are the diminution of associated surface water bodies (22% of the failing
groundwater body area; 217 groundwater bodies in Germany, Spain, Finland, France, Italy,
UK), damage to groundwater dependent terrestrial ecosystems (17% of the groundwater body
area in poor status; 100 groundwater bodies in Bulgaria, Germany, France, Hungary, Poland,
UK) and saline or other intrusions (8% of the groundwater body area in poor status; 104
groundwater bodies in Belgium, Bulgaria, Cyprus, Germany, Spain, Finland, France, Croatia,
Italy, Poland, UK).
The overall confidence in the assessment of groundwater quantitative status is relatively high,
with high confidence being reported for 48% of the groundwater body area and medium
confidence for about 23%. Low confidence in status assessment was reported for 22% of the
area and unknown confidence or no information for about 7% (about 276 000 km²). As it can
be seen in Figure 4, there is quite a difference when comparing the level of confidence for
groundwater bodies or for the related groundwater body area. The range of confidence varies
widely between the Member States.
As stated above, approximately 9% of the total groundwater body area is not achieving good
quantitative status. Looking at the expected date of finally achieving good quantitative status,
only about 40% of the groundwater body area which is currently at poor status is expected to
achieve good status at the end of the second cycle planning period in 2021. About 38% is
expected to achieve good status by 2027. For 8% the target will only be achieved beyond 2027.
For about 7% of the groundwater body area which is currently at poor status, the date of
achievement is either unknown and for 7% less stringent objectives have already been
achieved.
124
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0126.png
Table 1 Outlook on the area of groundwater bodies failing to achieve good quantitative
status in future RBMPs
Groundwater quantitative status
Total groundwater body
Expected achievement of good status area
Groundwater body
area failing good
in
million
in %
status
km²
Good status 2015
3.86
89 %
Less stringent objectives already
0.03
1%
7%
achieved
2016--2021
0.18
4%
40%
2022--2027
0.17
4%
38%
Beyond 2027
Unknown
0.04
1%
8%
0.03
1%
7%
Source: EEA SoW 2016. The table shows preliminary results based on the WISE reporting of
data from 25 Member States (EU28 except Greece, Ireland and Lithuania).
Groundwater bodies at risk:
About 13% of the total groundwater body area is assigned at risk
of failing good quantitative status objectives at the end of the second cycle planning period in
the year 2021. This percentage is slightly higher than the area currently failing good status
(9%). About 87% of the total groundwater body area is not at risk and supposed to achieve
good status at the end of the second cycle planning period.
The main reason for risk is linked with water balance (931 groundwater bodies) followed by
adverse effects to groundwater dependent terrestrial ecosystems (305 groundwater bodies),
associated aquatic ecosystems (236) and saline or other intrusion (154). For 1 011 groundwater
bodies uses or functions of groundwater are affected and for 449 groundwater bodies associated
aquatic and groundwater dependent terrestrial ecosystems.
Brief summary of methodology
The assessment of groundwater quantitative status needs to consider the degree of
direct/indirect groundwater abstractions and of anthropogenically induced alterations of
groundwater levels and flow directions in comparison with the available groundwater resource.
The evaluation of consistency for the ‘water balance’ of a groundwater body as a whole is
based on an assessment of whether the available groundwater resource is not exceeded by the
long-term annual average rate of abstraction. Furthermore, it needs to be checked whether the
environmental objectives of associated surface water bodies and groundwater dependent
terrestrial ecosystems are met and whether there is no saline or other intrusion.
125
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0127.png
Elements considered:
All Member States reported on the considered elements in the
quantitative status assessment. Water balance was considered by all Member States and for
most of the RBDs. Further elements like diminution of the status of associated surface water
bodies and damage to groundwater body dependent terrestrial ecosystems were reported to be
considered by many of the Member States
81
, even if no such ecosystem is related to any
groundwater quantitative risk. The remaining Member States did not consider the ecosystems
in status assessment but there is no risk related. Finally, also saline and other intrusions have
been frequently taken into consideration in status assessment.
The needs of groundwater dependent terrestrial ecosystems have been taken into account in
status assessment by the majority of Member States (but not Czech Republic, Denmark, France,
Latvia, Romania, Sweden and Slovakia), and the majority of the RBDs (e.g. not in all RBDs in
Italy). 16 Member States reported its consideration in 86 RBDs (60% of all 143 RBDs), even in
6 RBDs where no such ecosystems exist. But in 33 RBDs (23%) of 10 Member States the
needs have not been taken into account although such ecosystems exist. In 25 RBDs of 9
Member States, no groundwater dependent terrestrial ecosystems exist and thus, their needs
have not been considered.
For 98 RBDs (69%) in most Member States, the term ‘available groundwater resource’ has
been applied in accordance with the definition laid down in WFD Article 2(27)
82
. For 21 RBDs
of 6 Member States, this was considered partly (Spain, Italy, Latvia, Romania, Sweden,
Slovakia) and for the remaining 24 RBD, this definition was not applied (Czech Republic,
Denmark, France, Luxembourg).
In assessing water balance, 101 (70%) RBDs (7 311 groundwater bodies in the majority of
Member States previously mentioned) reported having compared the annual average
groundwater abstractions against the available groundwater resource for every groundwater
body and in 11 (8%) RBDs (853 groundwater bodies) of 5 Member States the comparison for a
subset of groundwater bodies has been calculated (Spain, Italy, Romania, Sweden, Slovakia).
For 30 (21%) RBDs in 7 Member States (5 123 groundwater bodies),
the failure of achieving
good status was established by considering sustained long-term decline in water levels caused
by long-term groundwater abstraction, based on reliable information on groundwater levels
across the groundwater body.
81
Austria, Belgium, Bulgaria, Cyprus, Germany, Estonia, Spain, Finland, Croatia, Hungary, Italy, Malta,
Netherlands, Poland, Portugal, Slovenia, UK
82
Austria, in some RBDs of Belgium, Bulgaria, Cyprus, Germany, Estonia, Finland, Croatia, UK, Hungary, Malta,
Netherlands, Poland, Portugal, Slovenia and UK
126
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0128.png
Table 2 Assessment of water balance within the assessment of groundwater quantitative
status
Method
Membe
r States
River
Basin
Districts
101
(70%)
Groundwat
er bodies
Comparison of the annual average groundwater
abstractions against the available groundwater
18
resource in the groundwater body
for every
groundwater body
Comparison of the annual average groundwater
abstractions against the available groundwater
5
resource in the groundwater body
for a subset
of
groundwater bodies
Consideration of the sustained long-term decline in
water levels caused by long-term groundwater
abstraction, based on reliable information on 7
groundwater levels across the groundwater body
7311
11 (8%)
853
30 (21%)
5123
No consideration of water balance in status
1
1
90
assessment
Note: Some Member States applied different approaches for different RBDs.
Main changes in implementation and compliance since 1st cycle
In most of the Member States, groundwater quantitative monitoring improved since the first
RBMPs
83
. In many Member States, the coverage of groundwater bodies by quantitative
monitoring increased (including Belgium, Czech Republic, Germany, Denamark, France,
Hungary, Italy, Poland, Portugal, Sweden, Slovenia) and in five Member States the coverage
more or less remained the same, commonly at high level (Austria, Cyprus, Croatia, Malta,
Netherlands). Some Member States reduced the percentage of groundwater bodies with
quantitative monitoring but they did not report reasons for that (Bulgaria, Estonia
–with
reporting data gaps-, Finland, Romania). In two Member States the reduction could be a result
of the re-delineation of groundwater bodies (Bulgaria, Romania).
Overall, the quantitative status of groundwater bodies in the EU improved. The groundwater
body area achieving good quantitative status increased by 5% from 84% to 89% of the total
groundwater body area and the area failing good status decreased from 13% to 9%. Also the
knowledge on groundwater quantitative status has substantially increased as the area at
unknown status decreased from 3% to around 1 % of the total groundwater body area, located
in four Member States. In parallel to the knowledge, also the level of confidence in the status
results increased. Now around 70 % of quantitative status results have been reported of high or
medium confidence.
83
Austria, Belgium, Cyprus, Czech Republic, Germany, Denmark, Spain, France, Hungary, Italy, Luxembourg,
Latvia, Poland, Portugal, Sweden, Slovenia, Slovakia, UK
127
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0129.png
Figure 2: Groundwater quantitative status by area in the first and second RBMPs
Note: The numbers in parenthesis show total area (in million km2) of groundwater bodies.
Source: EEA SoW 2018. Data from 25 Member States (except Greece, Ireland and Lithuania)
Very often, changes in the status results were reported as a result of the re-delineation of
groundwater bodies and the improvement of the status assessment methodologies, which is also
reflected in the increased level of confidence in the status assessment. To a lesser extent,
changes of the pressure situation and the effectiveness of measures were mentioned as reasons
for changes in status results.
128
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Changes in elements considered in status assessment:
The consideration of the water balance in quantitative status assessment increased significantly.
Compared to the first RBMPs, where only half of the Plans reported about this consideration,
now almost 80% of the second RBMPs reported having considered the balance between
recharge and abstraction for every groundwater body (70%) or for a subset of groundwater
bodies (8%). Only 1 of 143 RBMPs did not consider water balance in the status assessment.
Also the consideration of ecosystems in the quantitative status assessment increased
significantly. In the first RBMPs, their consideration was quite limited, but in the 2
nd
cycle,
most Member States reported having considered the ecosystems in status assessment, even if no
such ecosystem is related to any groundwater quantitative risk. The remaining Member States
did not consider ecosystems in quantitative status assessment (Czech Republic, Denmark,
France, Latvia, Romania, Sweden and Slovakia).
1.9.2. Conclusions
Overall, groundwater quantitative monitoring improved since the first cycle RBMPs with
increasing coverage of groundwater bodies. Most Member States increased the coverage of
groundwater bodies by quantitative monitoring or at least kept the coverage at high level
(decreases were observed in Bulgaria, Estonia, Finland, Romania). Nevertheless, a significant
number of groundwater bodies is still without quantitative monitoring sites in specific Member
States and the partially reported grouping of groundwater bodies for monitoring purposes does
not fully explain the absence of monitoring. Therefore, there is still inconsistency with the
WFD requirement on groundwater quantitative monitoring.
The groundwater quantitative status situation improved with 92% of the groundwater bodies
representing 89% of the total groundwater body area being at good status. Most of the changes
in status are owing to the partially significant re-delineations of groundwater bodies and the
improvements of the status assessment methodologies.
In parallel to the improvement of status also knowledge improved which is expressed in the
decreased share of groundwater bodies at unknown status (3% of groundwater bodies
representing 1% of the area) and the increased confidence in the status results which is high or
medium for about 48% respectively 22% of the groundwater bodies.
Water balance is almost fully considered in status assessment and also associated surface water
bodies and groundwater dependent terrestrial ecosystems are fully considered in almost all
Member States where such ecosystems exist and where they are related to groundwater
quantitative risk.This is a significant improvement since the previous RBMP.
129
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.9.3. Recommendations
While there have been important improvements, many Member States need to continue
improving quantitative monitoring programmes, and work toward completing
quantitative status assessment for all groundwater bodies.
In some Member States additional efforts are required for harmonisation of status
assessment methodologies (across regions and RBDs).
Grouping methodologies for monitoring purposes are not always clear and should be
better described in RBMPs.
130
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0132.png
1.10.Monitoring, assessment and classification of chemical status in
groundwater
1.10.1.
Introduction
In this area, the requirements of the WFD are complemented by those of the Groundwater
Directive (GW). The two Directives work in conjunction and, in addition, together with other
EU legislation, such as the Drinking Water Directive and the Nitrates Directive.
84
Monitoring
Article 8 of the WFD requires the establishment of programmes for the monitoring of
groundwater chemical status. The directive sets out the requirements for these programmes in
Annex V 2.4 and Annex II 2.3.
WFD groundwater chemical monitoring is primarily focused on the groundwater body as a
management unit, but it also supports the overall management of the RBD. The principal
purpose of WFD chemical monitoring is to facilitate chemical status assessment to determine
whether the relevant Article 4 environmental objectives for groundwater bodies are met.
Moreover, the monitoring results must be used to supplement and validate the Article 5
characterisation and risk assessment procedure with respect to risks of failing to achieve good
groundwater chemical status, to demonstrate compliance with the objectives for drinking water
protected area (DWPA) and other protected area objectives, to provide information on natural
and anthropogenically induced long-term trends in pollutants concentrations and to assist in
designing the programmes of measures and in evaluating their effectiveness.
Monitoring of groundwater chemical status consists of surveillance and operational monitoring,
as defined in WFD Annex V 2.4. The Directive specifies that surveillance monitoring shall be
carried out for groundwater bodies at risk or which cross a boundary between Member States.
However, to adequately supplement and validate the Annex II risk assessment procedure,
additional surveillance monitoring is also needed for groundwater bodies, or groups of bodies,
not identified as being at risk (see CIS Technical Report 3 on Groundwater monitoring
85
).
Surveillance monitoring must include the core parameters defined in Annex V (oxygen content,
pH value, conductivity, nitrate and ammonium), and the selection of additional parameters to
be monitored should enable the detection of all potential impacts of all pressures on
groundwater bodies, and of all long-term natural and anthropogenically induced changes in
pollutants concentrations (trends). If entire groundwater bodies or certain parameters indicating
impacts of anthropogenic pressures are not included in surveillance monitoring, then this
omission could lead to the non-detection of significant pressures, the incorrect classification of
84
85
The analysis in this chapter also responds to the requirement of Article 11 of the Groundwater Directive.
https://circabc.europa.eu/sd/a/729b38fe-4141-48e8-b808-
04c3ecc91975/Groundwater%20monitoring%20Report.pdf
131
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0133.png
water status and inappropriate targeting of measures. This is particularly important where the
pressures and impacts assessment may not have been adequate enough to identify all potential
pressures and impacts in the RBD, including perhaps because of a lack of information or of
methods or because of unexpected anthropogenic activities within the RBD.
Operational monitoring is to be performed in the periods between surveillance monitoring. In
contrast to surveillance monitoring, operational monitoring is highly focused on assessing the
specific identified risks to the achievement of the directive’s objectives. It is needed to establish
the status for all groundwater bodies identified at risk, and to establish the presence of any
significant long-term anthropogenically induced upward trend in the concentration of any
pollutant.
Classification
The definition of groundwater chemical status is set out in Annex V 2.3 of the WFD. The
procedure of assessing status is further specified in Article 4 and Annex III of the Groundwater
Directive 2006/118/EC (GWD). Good chemical status is met when the chemical composition
of the groundwater body does not indicate saline or other intrusion, does not exceed relevant
standards, does not result in failure to achieve the environmental objectives for associated
surface waters or any significant diminution of their status or any significant damage to
groundwater dependent terrestrial ecosystems and does not impair the ability of a groundwater
body to support human uses such as drinking water abstraction. For groundwater bodies
identified as Drinking Water Protected Areas, the requirements of WFD Article 7 must be met
as well, in order for a groundwater body to be in good chemical status.
Regarding the provision of not exceeding relevant standards, the GWD provides EU-wide
groundwater quality standards for nitrates and pesticides (individual and total) and requests
Member States to establish further national groundwater quality standards (referred to as
‘threshold values’) for all substances
causing risk of failing to meet good chemical status
objectives at the most appropriate level (e.g. Member State, RBD, groundwater body). The
establishment of threshold values shall consider the indicative minimum list of substances
given in Annex II part B of the GWD
86
, the natural occurrence and variability of substances in
groundwater (natural background levels), the needs of the receptors of the groundwater
(including where groundwater is or is planned to be used as drinking water), pollutant pathways
and interactions with different environmental compartments such as associated aquatic
ecosystems or dependent terrestrial ecosystems.
86
Arsenic, Cadmium, Lead, Mercury, Ammonium, Chloride, Sulphate, Nitrites, Phosphorus (total)/Phosphates,
Trichloroethylene, Tetrachloroethylene, Conductivity.
132
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0134.png
Assessment of implementation and compliance with WFD requirements in 2nd cycle
Monitoring of chemical status in groundwater
Surveillance monitoring
The coverage of groundwater bodies by surveillance monitoring is in many Member States
high, but a significant number of groundwater bodies is not covered by such monitoring in
specific Member States (see figure 1). In total
5 050 of the 13 376 groundwater bodies are
subject to surveillance monitoring and 8 326 are not. Fourteen Member States monitor more
than 80% of their groundwater bodies, whereby 6 Member States Croatia, Estonia,
Luxembourg, Malta, the Netherlands and Slovenia) cover all their groundwater bodies.
Coverage is very low in Finland, Sweden and Denmark while two Member States reduced the
coverage (the United Kingdom and Spain). As mentioned, Finland and Sweden host more than
half (7 084) of the in total 13 376
groundwater bodies in the EU.
Figure 1: Percentage of groundwater bodies with surveillance monitoring (bars) and
average number of surveillance monitoring sites per monitored groundwater.
Source: WISE reporting 2016.
Note: * grouping has been applied, at least partially, in Austria, Croatia, Denmark, Finland,
Germany, Spain and Sweden.
As with quantitative monitoring, consistency with the chemical monitoring requirement of the
WFD needs to be assessed in a differentiated way because the WFD allows grouping of
groundwater bodies,
inter alia
for the purpose of monitoring. Therefore, not each groundwater
body which is subject to such grouping is in need of a separate monitoring network. Almost
one third of the Member States reported that groundwater bodies had been grouped for the
purpose of monitoring but for the majority of Member States with unmonitored groundwater
bodies, there is no information reported on grouping and hence there is a clear gap and
potential inconsistency with the requirements of the WFD. Even in cases where grouping has
been reported, this often does not allow determining whether grouping covers all groundwater
bodies without monitoring or only a subset.
133
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0135.png
According to WISE, the surveillance monitoring of the core parameters defined in Annex V of
the WFD (oxygen content, pH value, conductivity, nitrate and ammonium) reported is rather
poor. All parameters are monitored in 17 Member States
87
and, in 42 RBDs, at least 4
parameters were considered. No WFD core parameter was monitored in 21 RBDs located in
eight Member States. The core parameters most often considered were nitrate (115 RBDs) and
electrical conductivity (101 RBDs), while the least considered were ammonium and dissolved
oxygen (71 RBDs)
88
.
Figure 2: Percentage of RBDs where a number of WFD core parameters were monitored.
Source: WISE reporting 2016.
Groundwater bodies at risk of failing environmental objectives
In total 3 222 (24%) groundwater bodies representing about 31% of the total groundwater body
area are assessed as being at risk of failing good chemical status objectives. This is slightly
higher than the area of 25% which is covered by the 2 021 groundwater bodies currently failing
to achieve good chemical status objectives (see Figure 4). For 1 431 groundwater bodies
the
risk is due to nitrate, which is by far the most frequent reason causing risk. The second most
frequent reasons causing risk are pesticides followed by chloride, sulphate, lead, ammonium,
nickel and arsenic. These substances are causing risk in at least 10 Member States.
Operational monitoring
All groundwater bodies at risk should be subject to operational monitoring for those substances
which are causing the risk. Overall, 3 222 groundwater bodies are at risk and 2 922 are covered
by operational monitoring. About half of the Member States implemented operational
monitoring in at least the same number of groundwater bodies at risk, whereas 12 Member
States monitor fewer groundwater bodies than those being at risk. As mentioned for
surveillance monitoring, only seven Member States reported on grouping of groundwater
bodies for monitoring purposes. For the majority of the groundwater bodies without operational
monitoring, there is no such explanation and hence there is a gap and inconsistency with the
requirements of the WFD.
87
88
Austria, Bulgaria, Cyprus, Denmark, Germany, Estonia, Croatia, Hungary, Latvia, Malta, the Netherlands,
Poland, Portugal, Romania, Sweden, Slovenia and Slovakia.
Several Member States consequently clarified that while core parameters are monitored they have not been
reported.
134
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0136.png
Figure 3: Percentage of groundwater bodies with operational monitoring (bars) and
percentage of groundwater bodies at chemical risk.
Source: WISE reporting 2016.
On average, each monitored groundwater body is monitored by 5.3 surveillance monitoring
sites (ranging from 1.1 to 81.6 sites) and by 5.9 operational monitoring sites (ranging from 1.1
to 14.5 sites). The number of monitoring sites per groundwater body is highly influenced by its
size and is not an adequate measure of comparison. In addition to that, the density of sites is
influenced by the variability of characteristics and pressures within groundwater bodies and the
intensity and type of groundwater use. Furthermore, it should be considered that some Member
States group their groundwater bodies for monitoring purposes and therefore did not establish
monitoring networks in each groundwater body. As operational monitoring is to be
implemented for groundwater bodies at risk, comparisons at the Member State or RBD level
are not meaningful.
Confidence and precision of monitoring results
The Member States had to indicate the confidence in the status results which is very much
dependant on the level of monitoring and the availability of sufficient and representative
monitoring data, the applied status assessment methods and whether all environmental
objectives had been considered or only some of them. The overall confidence in the assessment
of groundwater chemical status is relatively high, with high confidence being reported for 59%
of the groundwater body area (3 667 groundwater bodies) and
medium confidence for about
22% (5 292 groundwater bodies). Low confidence in status assessment was reported for 16% of
the area (1 403 groundwater bodies) and unknown confidence or no information for about 4%
(3 014 groundwater bodies). As it can be seen
in Figure 4 there is quite a difference when
comparing the level of confidence for groundwater bodies or for the related groundwater body
area. The range of confidence levels varies widely between Member States.
135
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0137.png
Figure 4: Confidence in the results of the groundwater chemical status assessment.
Source: WISE reporting 2016.
Assessment and classification of chemical status for groundwater
In total 10 867 (81%) groundwater bodies representing 74% (3.2 million km²) of the total
groundwater body area in the EU (total area being about 4.3 million km²) is at good chemical
status; 2 021 (15%) groundwater bodies covering 25% of the total groundwater body area are
failing to reach good chemical status (see Figure 4). For 489 (4%) groundwater bodies
representing
about 1% of the groundwater body area (about 41 000 km²) the chemical status is
unknown. At the Member State level, the proportion varies widely from only 3% of the
groundwater body area reaching good chemical status, up to 100%, where all groundwater
bodies are at good status.
In total, about 160 different synthetic and naturally occurring substances cause poor chemical
status in EU Member States. One third of these substances are pesticides. Indicators like
turbidity, pH, or water temperature were also reported. The main pollutant causing poor
chemical status in 24 Member States is nitrate, which affects 1 179 (9%) groundwater bodies
representing 18% of the total groundwater body area. The group of pesticides is the second
most reported reason but the number of groundwater bodies and the groundwater body area
affected cannot be given precisely, as for some RBDs ‘pesticides’ as such were reported, while
for others each individual active substance was reported. Further frequently reported substances
are ammonium, sulphate and chloride, nickel, arsenic and electrical conductivity which were
reported by at least 10 Member States.
The main reason for failing good status is attributed to ‘general water quality’, which is linked
to an exceedance of groundwater quality standards or threshold values. In 24 Member States in
total 1 400 groundwater bodies representing about 19% of the total groundwater body area
(75% of the area in poor status) are affected by this reason. This requirement considers
significant impairment of human uses and significant environmental risk from pollutants across
the whole groundwater body. The second most frequent reason for failing good status is an
136
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0138.png
impairment of the objectives for drinking water protected areas, reported from 12 Member
States for 375 groundwater bodies representing about 7% of the total groundwater body area.
Diminution of associated surface water bodies (223 groundwater bodies, 3% in terms of area),
damage to groundwater dependent terrestrial ecosystems (92 groundwater bodies, 2% in terms
of area) and saline or other intrusions (128 groundwater bodies, 1% in terms of area) are less
significant.
Expected achievement of good status:
Only about 7% of the groundwater body area which is
at poor status by the year 2015 is expected to achieve good status at the end of the second
planning cycle in 2021. About 67% is expected to achieve good status by 2027. For 15%, the
target will only be achieved after 2027. For about 12% of the groundwater body area which is
currently at poor status the date of achievement is either unknown or less stringent objectives
have already been achieved. This long timeframe needed for the achievement of good status
reflects the specific properties of many groundwater bodies in reacting very slowly to changes
in anthropogenic pressures at the surface. Once measures are implemented it can take many
years or even decades until their effects show in groundwater.
Table 1. Outlook for the groundwater bodies (and the represented area) failing to achieve
good chemical status in future RBMPs
Groundwater
chemical Groundwater
status,
expected bodies
Number in %
achievement date
Good status 2015
Less stringent
already achieved
2016--2021
2022--2027
Beyond 2027
Unknown
objectives
11 239
95
347
1 254
321
121
84 %
1%
3%
9%
2%
1%
Groundwater
area
in million km²
body Groundwater
in %
3.2
0.07
0.11
0.73
0.16
0.06
74 %
2%
3%
17 %
4%
1%
body
failing
status
7%
7%
67 %
15 %
5%
area
good
Source: Preliminary results based on WISE reporting 2016, including data from 25 Member
States (EU28 except Greece, Ireland and Lithuania).
Methodology for status assessment
Groundwater chemical status assessment needs to consider a number of quality objectives,
depending on the identified risk. The evaluation of
consistency for the ‘general water quality’
of a groundwater body as a whole is based on a comparison of monitoring data with quality
standards and threshold values. Member States established different national approaches for the
extent of acceptable exceedance of such values. Below the defined extent of acceptable
137
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
exceedance, the groundwater body is still in good status. Approaches include the number of
monitoring sites (10 Member States) and the affected (weighted) area (12 Member States). No
Member State
calculated the affected groundwater body by volume. Expert judgment or ‘other
methods’ were also reported by 5 Member States without further specifying the underlying
criteria. Some Member States applied different methods in their RBDs and in some RBDs this
calculation was not necessary as no monitoring site exceeded any quality standard or threshold
value.
Associated surface water bodies and groundwater dependent terrestrial ecosystems need to be
considered when posing a risk of not achieving good chemical status in the groundwater body.
In total 3 204 groundwater bodies of 22 Member States are linked with associated aquatic
ecosystems. Diminution of the status of associated surface water bodies was reported to be
considered by 17 Member States, even if no such ecosystem is related to any groundwater
chemical risk. Some Member States did not consider the ecosystems in status assessment but
there is also no risk related and, for a few Member States, where risk is evident, consideration
of surface waters in chemical status assessment is missing.
In total 3 226 groundwater bodies of 22 Member States are linked with groundwater dependent
terrestrial ecosystems. Damage to groundwater body dependent terrestrial ecosystems was
reported to be considered by 15 Member States, even if no such ecosystem is related to any
groundwater chemical risk. Several Member States did not consider these ecosystems in status
assessment but there is also no risk related and, for a few Member States, where risk is evident,
consideration of groundwater dependent terrestrial ecosystems in chemical status assessment is
missing.
Methodology for threshold value establishment
The establishment of groundwater threshold values needs to consider all substances posing risk,
all substances listed in Annex II of the Groundwater Directive, the natural chemical
composition of groundwater (natural background level) and the needs of the relevant receptors
of the groundwater (e.g. human use, ecosystems).
In total, about 170 substances/indicators were reported as posing risk and many of these are
pesticide substances. Up to nine Member States did not establish groundwater threshold values
for all these substances causing risk within their territory. This is often true for pesticide
substances, but for these substances, the Groundwater Directive foresees a general quality
standard of 0.1µg/l. For all other substances where there is neither a EU-wide quality standard
(nitrate and pesticides) nor a nationally set threshold value, then the Member State is not able to
assess the status of a groundwater body at risk in a consistent way.
Most Member States (22) considered natural background levels when establishing threshold
values, while five considered elevated natural substances concentrations at a later stage during
138
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
status assessment. Four Member States considered natural background levels in a different way
or they did not report details about the consideration of background levels in the establishment
of threshold values. In seven Member States, different approaches were applied for their
different RBDs.
Trends assessment
Twenty-two Member States reported that trend assessment has been performed for each RBD
and methodologies are available, the remaining three Member States performed trend
assessment at least partially. Additional trend assessments (required by the Article 5.5 GWD to
assess the impact of existing plumes of pollution) were reported by three Member States for all
of their RBDs and by 5 Member States for a subset. Significant and sustained upward trends
were identified for 58 pollutants. For nitrate, significant upward trends were detected in 19
Member States for 260 groundwater bodies representing about 6% of the total groundwater
body area. Other substances with frequent upward trends are chloride, sulphate and pesticides.
Twenty-one Member States reported that a methodology for trend reversal assessment is
available for at least a subset of their RBDs, four Member States did not report on trend
reversal. Trend reversals were reported for 68 pollutants by 10 Member States, mainly for
nitrates (375 groundwater bodies), ammonium (310), sulphates (291) and chlorides (284).
Main changes in implementation and compliance since 1st cycle
Nineteen Member States reported that they had re-delineated a more or less significant number
of their groundwater bodies. In total about 19% of the groundwater bodies which were reported
in the second RBMPs are new and 81% remained unchanged. Several Member States reported
the improvement of the chemical status assessment methods, the development of trend
assessment methods, changed threshold values and the increased confidence in the assessment
results by the increased availability of monitoring data.
Changes in surveillance and operational monitoring: Overall, efforts in surveillance monitoring
were reduced. Four Member States kept there 100% coverage of groundwater bodies and more
than ten Member States increased the percentage of monitored groundwater bodies but two
Member States reduced their monitoring efforts. Grouping of groundwater bodies is applied in
about one third of the Member States. However, in the majority of Member States with
incomplete coverage of surveillance monitoring, grouping is not applied and consistency with
the WFD requirement on full coverage of groundwater bodies by surveillance monitoring is not
described.
Operational monitoring was reduced in some Member States (e.g. Denmark, Slovakia,
Romania, the United Kingdom), two Member States (Poland, Luxembourg) kept the
monitoring at the same level as in the first cycle, while more than ten Member States increased
their monitoring efforts. Changes in operational monitoring between reporting cycles need to
139
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0141.png
be seen in close relationship with the groundwater bodies being identified at risk of failing
good chemical status. Overall, in half of the Member States, the number of groundwater bodies
at risk is higher than the number of groundwater bodies subject to operational monitoring while
only two Member States (Belgium and Malta) have full coverage of the groundwater bodies.
The improvement of groundwater chemical status is very minor since the first cycle RBMPs.
The number of groundwater bodies achieving good status increased by 1% from 80% to 81%
which corresponds to an increase from 72% to 74% in terms of the represented total
groundwater body area. Half of this increase is due to the fact that the area at unknown status
has more than halved. This slight increase in good status and the reported expected
achievement of good status for most of the groundwater bodies by 2027 points to the long time-
lag between the implementation of measures and their effectiveness in groundwater; hence, the
importance of correctly classifying groundwater bodies status and timely targeting the
appropriate measures.
Figure 5: Groundwater chemical status of groundwater bodies reported in first and
second RBMPs in terms of groundwater area
Note:
Proportion of groundwater area in good and failing to achieve good chemical status.
Total groundwater area (EU25) is 4.3 million km².
Source:
Preliminary results based on WISE reporting 2016, including data from 25 Member
States (EU28 except Greece, Ireland and Lithuania).
Source of figure: EEA SoW report 2018
Note: The total area of GWBs in Europe is 4.34 million km². While this figure might seem
extremely large (the whole EU surface is about 4,3 km²), it is correct as the different layers of
delineated and reported groundwater bodies have been considered for calculating the total.
For many Member States and groundwater bodies the direct comparison between the first and
the second RBMPs might be difficult due to changes in assessment methodologies, increased
consideration of ecosystems (which was quite low in the first plans), changed threshold values
and the re-delineation of groundwater bodies. Overall, the confidence in the status results has
increased.
140
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Compared to the first cycle RBMPs the consideration of groundwater associated aquatic and
groundwater dependent terrestrial ecosystems increased dramatically. Almost all Member
States reported the existence of such ecosystems and only few Member States did not consider
them in status assessment although risk is related to them.
Compared to the first cycle RBMPs, where available time series were often too short, trend
assessment is now commonly applied. In the second RBMPs, even trend reversal assessment is
widely applied, which usually requires longer time series than trend assessment.
1.10.2.
Conclusions
Most groundwater bodies have been assessed, and for only very few the chemical status is
unknown. Overall, the confidence in the status results is relatively high.
Due to the reported re-delineation of a significant number of groundwater bodies,
improvements of the status assessment methods and changed threshold values, comparisons
between both reporting cycles need to be made carefully.
Overall, groundwater chemical monitoring did not improve since the first cycle RBMPs. In
contrary, two Member States reduced the coverage of groundwater bodies by surveillance
monitoring. A significant number of groundwater bodies is still without chemical monitoring
sites and the partially reported grouping of groundwater bodies for monitoring purposes does
not fully justify the absence of monitoring. Therefore, there is still an inconsistency with the
WFD requirement on groundwater chemical monitoring. Following the clarification from the
Member States, the monitoring of the WFD core parameters is partly implemented for the
United Kingdom, Italy, Belgium, France, while it is complete for about seventeen Member
States. One Member State i.e. Finland has very limited monitoring of the WFD core
parameters.
Not all groundwater bodies which were identified at risk of failing good chemical status are
subject to operational monitoring and also not all substances causing risk are fully covered. As
with surveillance monitoring the partially reported grouping of groundwater bodies cannot
completely justify the absence of operational monitoring at in total 669 groundwater bodies at
risk. Therefore, there is evidence of inconsistency with the WFD requirement on groundwater
chemical monitoring.
About 74% of the total groundwater body area is at good groundwater chemical status. The
overall chemical status of groundwater bodies improved only very little since the first cycle.
Also the reported expected achievement of good status for most of the groundwater bodies by
2027 or beyond 2027 demonstrates the long time-lag between the implementation of measures
and their effectiveness in groundwater.
141
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
The consideration of groundwater associated aquatic and groundwater dependent terrestrial
ecosystems improved significantly. In almost all Member States such ecosystems were
identified and commonly considered in status assessment if risk was related to them.
Still, not all Member States (e.g. Spain) have established threshold values for all
substances/indicators posing a risk of failing good status.
Trend assessment is now commonly applied in all Member States, in few cases only covering a
subset of RBDs.
1.10.3. Recommendations
Operational monitoring must be ensured for all groundwater bodies identified at risk.
Monitoring of core parameters must be reported by Member States.
Grouping methodologies for monitoring and status assessment is not always clear, and
thus the absence of monitoring sites cannot be justified.
Member States should set threshold values for all substances/indicators posing a risk of
failing good status, and should clearly describe how natural background levels have
been considered in their establishment.
Some Member States still need to develop and apply trend reversal methodologies.
142
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.11.Designation of HMWBs and AWBs and definition of GEP
1.11.1.
Introduction
Designation of HMWBs and AWBs
The WFD aims to bring all water bodies to GES by 2015. Measures have to be identified and
implemented for impaired water bodies to improve their conditions. Not all water bodies,
however, can be brought to a GES which refers to only slight changes compared to natural
undisturbed conditions, since important water uses would otherwise be significantly affected.
Many water bodies have been heavily modified in their physical structure to serve various uses
including navigation, flood protection, hydropower, or agriculture. In many cases, it is not
viable nor desirable from a socio-economic perspective to abandon such uses and to remove the
physical modifications which affect the water bodies. Member States can, thus, designate such
water bodies as HMWBs or AWBs whose environmental objective is GEP instead of GES,
according to WFD Article 4(3).
Some of the key aspects which should be considered in the designation of HMWB are recalled
below:
HMWB should be water bodies that have undergone significant hydro-morphological
alterations such that the water body is substantially changed in character (WFD Article
2(9)). In general, these hydro-morphological alterations should be long-term and non-
reversible, and impact both morphological and hydrological characteristics.
The designation process needs to include a clear understanding of the expected failure
of good status due to hydro-morphological changes. Therefore, the proper assessment
of ecological status is a prerequisite for HMWB designation. If GES is achievable,
designation as HMWB is not justified.
Restoration measures to achieve GES need to be identified (changes to the hydro-
morphological characteristics of the water body which would be necessary for
achieving GES). For HMWB to be designated, these restoration measures should have
significant adverse effects on: (i) the wider environment, (ii) navigation, including port
facilities, or recreation, (iii) activities for the purpose of which the water is stored, such
as drinking water supply, power generation or irrigation, (iv) water regulation, flood
protection, land drainage, (v) other equally important sustainable human development
activities (WFD Article 4(3)(a)). The reasons and criteria for judgements on
significance should be made clear.
The beneficial objectives served by the modified characteristics of the water body
cannot, for reasons of technical feasibility or disproportionate costs, reasonably be
143
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0145.png
achieved by other means, which are a significantly better environmental option (WFD
Article 4(3)(b)).
HMWB and AWB are a specific water body category with their own classification
scheme and objective, namely GEP. While GES requires the implementation of
restoration measures to reach the environmental objectives, reaching GEP requires the
implementation of mitigation measures so as to improve the overall environmental
condition of the water bodies.
HMWB and AWB are not a type of exemption. Exemptions under WFD Articles 4(4),
4(5), 4(6) and 4(7) may also apply to HMWB and AWB, as they apply to natural water
bodies.
HMWB designation refers to existing modifications. Any new modification with
potential significant effect on the ecological status of the water body needs to be
handled as a possible exemption through WFD Article 4(7) if the conditions are met.
Therefore, designation of HMWB in view of future modifications is not in line with
the WFD.
The methodology and specific criteria for HMWB designation (application of all
relevant steps according to CIS HMWB guidance number 4
89
) should be clearly
explained in the RBMPs.
In addition, according to WFD Article 4(3), the designations of HMWB and AWB and the
reasons for them shall be specifically mentioned in the RBMPs and reviewed every six years
for each new WFD planning cycle.
The WFD takes a very similar approach to AWBs and HMWBs. AWB must have been created
by the same specified uses listed in Article 4(3)(a). The CIS Guidance document no. 4
interprets an AWB "as a surface water body which has been created in a location where no
water body existed before and which has not been created by the direct physical alteration or
movement or realignment of an existing water body". As in the case of HMWB, the
environmental objective of AWB is GEP.
According to the assessment of the first RBMPs, the designation of HMWB is one of the key
elements of the WFD. In the first RBMPs, HMWB were designated to a significant extent in
Member States (approximately 12% of surface water bodies with an additional 4% designated
as AWB), reflecting the amount of modifications that took place historically in Europe.
89
CIS Guidance Document no.4. Identification and Designation of Heavily Modified and Artificial Water Bodies.
Available online:
https://circabc.europa.eu/sd/a/f9b057f4-4a91-46a3-b69a-e23b4cada8ef/Guidance%20No%204%20-
%20heavily%20modified%20water%20bodies%20-%20HMWB%20(WG%202.2).pdf
144
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0146.png
Assessment of implementation and compliance with WFD requirements in 2nd cycle
In the second RBMPs, approximately 13% of European surface water bodies are designated as
HMWB and 4% as AWB. The extent of designation varies across Member States, with some
States designating more than 30% of their water bodies as heavily modified (such as Hungary,
Malta, Germany and the Netherlands), while other States designate less than 5% of their water
bodies as heavily modified (such as Finland and Sweden). The extent of designation of AWB is
high in the Netherlands (more than 50% of surface water bodies), but in most Member States
with some exceptions is relatively low between 0% and 10%.
Figure 1 Designated HMWBs in the EU Member States
Source: WISE reporting 2016
145
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0147.png
Figure 2 Designated AWBs in the EU Member States
Source: WISE reporting 2016
Main activities and physical alterations due to which HMWB are designated
Flood protection, land drainage for agriculture and hydropower are the human activities (water
uses) due to which the highest number of water bodies is designated as HMWB across the EU,
followed by urban development (urban use other than drinking water supply) and storage for
drinking water and irrigation
90
. For a relatively high number of HMWB, the water activity for
which they are designated is either unknown or has been reported as “other” (i.e. not
further
specifying the water use categories in the WISE reporting).
90
The pre-defined list of water uses for HMWB in WISE is: Agriculture - land drainage; Agriculture - irrigation;
Energy - hydropower; Energy
non-hydropower; Storage for fisheries/aquaculture/fish farms; Flood
protection; Industry supply; Tourism and recreation; Transport - navigation / ports; Urban development -
drinking water supply; Urban development - other use; Wider environment - nature protection and other
ecological uses; Other; Unknown.
146
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0148.png
Figure 3 Activities for which water bodies are being designated as HMWBs
Source: WISE reporting 2016
Weirs/dams/reservoirs and channelisation/straightening/bed stabilisation/bank reinforcements
are the main physical alterations affecting the highest number of designated HMWB in the EU.
Dredging/channel maintenance, land drainage and land reclamation/coastal modifications/ports
are physical alterations which affect a substantial number of HMWB in certain countries only.
91
91
The pre-defined list of physical alterations of HMWB in WISE is: Locks; Weirs / dam / reservoir;
Channelisation / straightening / bed stabilisation / bank reinforcement; Dredging / channel maintenance; Land
reclamation / coastal modifications / ports; Land drainage; Other
147
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0149.png
Figure 4 Types of physical modifications considered in the designation of HMWBs
Source: WISE reporting 2016.
Methodologies for designating HMWBs
A methodology for designating HMWB is described for the RBMPs of all Member States, with
few exceptions, where a consistent description of the method is until now missing (such as in
Denmark, Sweden and Slovakia). Nevertheless, the degree to which the reported methodologies
of the Member States cover the main aspects of HMWB designation varies. The RBMPs of
Member States with a relevant recommendation by the European Commission for the first
RBMPs concerning their designation methodologies were assessed in more detail concerning
these aspects.
Most Member State methodologies address the definition of “substantial changes in character”
in order to consider a water body for designation as HMWB and report relevant criteria. Some
approaches refer to simple presence of certain structures, e.g. presence of dams, dykes or ports,
while other approaches are more “quantified‘ and connect criteria to specific thresholds, e.g. %
of river water body impacted, for defining substantial changes in character.
The designation tests concerning the assessment of significant adverse effects of restoration
measures on the use or wider environment (Article 4(3)(a)) and the assessment of other means
to deliver the beneficial objectives of the modifications (Article 4(3)(b)) are less adequately
covered in the reported Member State methodologies. Relevant descriptions of how to do such
assessments were only found in about two thirds of the Member States assessed in detail, while
148
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
for one third, no relevant information is provided in the methodologies for designating HMWB.
Only few Member States provide information on specific criteria used to assess significant
adverse effects of restoration measures, such as Austria, and the criteria reported are mainly of
qualitative nature, similar to the first RBMPs.
Furthermore, for the majority of Member States, no information was found reported in the
second RBMPs on the details of the outcome of the designation tests of significant adverse
effects and “other means” for individual water bodies
(e.g. in Czech Republic, Germany and
Hungary). The information provided is in most cases of general nature, applicable to the
national or regional level. Only few Member States provide information on specific criteria
used to assess significant adverse effects of restoration measures on the use or wider
environment. The criteria reported are mainly of qualitative nature, instead of quantified ones.
This situation is similar to the first RBMPs.
Main changes in implementation and compliance since 1st cycle
The EU average share of surface water bodies designated as HMWB and AWB is similar
between the second and first RBMPs (ca. 12-13% and 4% respectively). Some differences are
noted only in individual Member States, while for the majority of countries, the extent of
designated HMWB and AWB has remained the same. In some countries, the share of
designated HMWB has increased, while in others, the share of designated HMWB decreased
since the first cycle.
Most countries clearly report that they have reviewed the designation of HMWB and AWB for
the second planning cycle; this involves an assessment of whether existing HMWB and AWB
still fulfil the relevant criteria, and whether water bodies formerly not designated should be
designated as HMWB or AWB for the new cycle.
The degree to which the reasons for changes in the extent of designations are explained varies
in the second RBMPs between Member States. In the RBMPs of some Member States, no
explanations of the changes are provided, even though it is stated that designations have been
reviewed. Other Member States provide explanations, even though these may not be detailed at
individual water body level.
The main reasons for changes in the extent of designating HMWB and AWB since the first
RBMPs, as reported by Member States, are:
Improved data available from new investigations and monitoring in hydro-
morphological and biological terms
Updated analysis of hydro-morphological pressures and updated assessment of status
149
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Redelineation of water bodies (for example, changes in the number of HMWB due to
the merging of water bodies)
Further knowledge acquired on the feasibility of restoration actions or other means
which may have become available to provide equivalent benefits to those of the
physical modifications of the HMWB
Finalisation of designations of water bodies that were only provisionally identified as
HMWB or AWB in the first RBMPs
Designations of new HMWB as a result of new developments that have been permitted
since the first RBMPs
De-designations of HMWB into natural water bodies, because of new assessments
indicating that the water bodies may achieve GES
Changes in the methodology for designating HMWB (for example, further uses
considered in the designation may have led to an increase of HMWB)
For several countries, the methodologies for designating HMWB and AWB are the same as
those used for the first RBMPs. However, for certain countries, updates in the methodologies
used are explicitly reported, while in other countries, new methods or guidelines for
designation have been published since the first cycle.
In some countries, assessments to complete the designation of HMWB and AWB are still
ongoing and further changes to the extent of designation may take place during the second
cycle.
Definition of GEP for HMWB and AWB
Within the WFD implementation, the status of HMWB and AWB needs to be assessed in terms
of achieving at least GEP as this is defined in Annex V of the Directive. A water body shows a
GEP when there are slight changes in the values of the relevant biological quality elements as
compared to the values found at Maximum Ecological Potential (MEP). The MEP is considered
as the reference conditions for HMWB and AWB, and is intended to describe the best
approximation to a natural aquatic ecosystem that could be achieved given the hydro-
morphological characteristics that cannot be changed without significant adverse effects on the
specified use or the wider environment.
The definition of ecological potential for HMWB and AWB has been a subject of long
discussions between Member States and the Commission in the context of the CIS. Defining
ecological potential is a challenging and complex subject in the WFD implementation, which
needs to be defined on the basis of a sound methodological approach in order to set appropriate
environmental objectives for the numerous HMWBs and AWBs in Europe.
150
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0152.png
An Appendix to CIS Guidance document number 4 is currently in preparation to provide more
detailed guidelines on the establishment of GEP and MEP for HM and AW bodies.
Until the second RBMPs, the following two approaches had been put forward and discussed on
EU level for the definition of GEP.
Reference-based approach
(based on the CIS Guidance Document number 4): This
approach is based on biological quality elements as illustrated in CIS Guidance number
4
92
. The MEP for HMWB relates to the values of biological quality elements after all
mitigation measures have been implemented that do not have a significant adverse
effect on the use. GEP is defined as only slight changes from those values at MEP. GEP
represents a state in which the ecological potential of a water body is falling only
slightly short of the maximum it could achieve without significant adverse effects on
the wider environment or on the relevant water use or uses. An assessment of
disproportionate costs of the mitigation measures should not be considered (as these are
considered when applying exemptions).
Mitigation measures approach
(alternative Prague approach): The alternative Prague
approach
93
takes a different route and bases the definition of GEP on the identification
of mitigation measures. Starting from all measures that do not have a significant adverse
effect on the water use, those measures are excluded that, in combination, are predicted
to deliver only slight ecological improvement. GEP is then defined as the biological
values that are expected from implementing the remaining identified mitigation
measures. As in the first approach, an assessment of disproportionate costs of the
mitigation measures should not be considered. A key difference to the first approach is
that the GEP is derived directly from the mitigation measures, and not indirectly from
the specification and prediction of biological quality elements at MEP.
Assessment of implementation and compliance with WFD requirements in 2nd cycle
According to the WISE reporting, GEP has been defined in almost all Member States. In some
Member States though, it has only been defined for some but not all RBDs with designated
HMWB or AWB. In a few Member States, GEP is reported as not defined yet in the second
RBMPs. In one case, there are currently projects ongoing to develop a GEP methodology. In
another, a national methodology for GEP has not yet been published.
92
CIS Guidance Document no.4. Identification and Designation of Heavily Modified and Artificial Water Bodies.
Available online:
https://circabc.europa.eu/sd/a/f9b057f4-4a91-46a3-b69a-e23b4cada8ef/Guidance%20No%204%20-
%20heavily%20modified%20water%20bodies%20-%20HMWB%20(WG%202.2).pdf
93
See Annex II of Common Implementation Strategy for the Water Framework Directive 2006: Good Practice in
managing the ecological impacts of hydropower schemes; Flood protection works; and works designed to
facilitate navigation under the Water Framework Directive. 30 November 2006.
151
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
In the second RBMPs, about one third of the Member States define GEP on the basis of the
reference-based approach and one fifth of the Member States on the basis of the mitigation
measures approach. In several Member States, either a hybrid approach combining elements of
the two methods in all their RBDs is used or they use different approaches across the regions or
RBDs on their territory. In one country, the approach used is not specified as one of the
approaches listed in WISE; different criteria to assess ecological potential were used, which do
not correspond to any of these approaches.
Most methodologies of Member States for defining GEP are established at national level. In
terms of the water categories addressed, most reported methodologies describe the definition of
GEP for rivers, less methodologies refer to lakes and coastal waters while the category less
often addressed by the reported methodologies are transitional waters. In a few Member States,
the methods for GEP establishment treat reservoirs separately from lakes and rivers.
With regards to the level at which GEP has been defined, more than half of the Member States
report to have defined GEP at the water body level (a few of these countries have done so for
part of their RBDs). Several Member States have defined GEP for groups of HMWB and AWB
of the same use/physical modification (a few of these countries have used this approach for part
of their RBDs). A few Member States report to have used another approach (for all or some of
their RBDs).
GEP definition in terms of biology
GEP is reported as defined in terms of biology in most Member States, which have defined
GEP in the second RBMPs. In some Member States, GEP is reported as not defined in terms of
biology, but also in the case of a few other countries, no clear information could be found in
their RBMPs on how actual values for biological quality elements (BQEs) are estimated for
GEP.
The BQEs for which biological values have been derived for MEP and GEP in the majority of
RBDs are phytoplankton, benthic invertebrates and fish (respectively in 77%, 76% and 60% of
the RBDs in which GEP is defined in biological terms). Biological values for phytobenthos and
macrophytes for MEP and GEP have been derived in less RBDs (respectively in 52% and 39%
of the RBDs).
Most Member States report that the establishment of values of BQEs for GEP is based on
assessment methods which are similar to those used for GES of natural water bodies, but often
using lower thresholds to distinguish between classes of “good” and “moderate”. A comparison
between GEP and GES has been carried out in half of the Member States, which have defined
GEP. In another few Member States, such a comparison was done in some but not all of their
RBDs where GEP is defined, while no such comparison was done in several Member States.
152
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0154.png
It is also noted that, according to WISE, for the second RBMPs, almost all Member States
(with few exceptions) report to have one or more biological quality element assessment
methods in place, which are sensitive to hydrological and/or morphological changes. Such
methods have been reported for various BQEs in the different water categories (rivers, lakes,
coastal and transitional waters).
Estimations of BQE values can be based on available data and monitoring, combined with
expert judgement. Some countries report that biological values have only been derived in case
monitoring data are available; in cases of lack of biological data, ecological potential is defined
mainly in hydro-morphological terms.
Figure 5 BQEs for which biological values have been derived for MEP and GEP
Source: WISE reporting 2016. Note: The total number of RBDs in which GEP is reported as
defined in biological terms is 93.
Table 1: Key elements of GEP definition in the second RBMPs of the Member States
Approach
definition
for
GEP
GEP reported as
Level at which GEP is
defined in terms
defined
of biology
Yes
At water body level
For
groups
of
HMWB/AWB in four
RBDs in Walloon
At water body level in
Brussels region and
Flanders
Member State
Austria (AT)
Hybrid approach
Mitigation
measures
approach in four RBDs in
Belgium (BE)
Walloon
Reference-based approach Yes
in one RBD (Brussels
region)
Hybrid approach in two
153
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0155.png
Member State
Approach
definition
for
GEP
GEP reported as
Level at which GEP is
defined in terms
defined
of biology
At water body level
At water body level
Another approach
For
groups
of
HMWB/AWB in eight
RBDs
At water body level in
two RBDs
RBDs in Flanders
Bulgaria (BG)
Cyprus (CY)
Czech Rep (CZ)
Reference-based approach Yes
Mitigation
approach
measures
No
Reference-based approach Yes
Reference-based approach
Germany (DE)
in three RBDs
Yes
Hybrid approach in seven
RBDs
Yes
Denmark (DK)
(in three RBDs;
Reference-based approach for one RBD, At water body level
GEP
is
not
defined)
Reference-based approach Yes
For
groups
HMWB/AWB
of
Estonia (EE)
Spain (ES)
At water body level in
Reference-based approach
twelve RBDs, for
in fourteen RBDs
Partially (in 16 of
groups
of
Hybrid approach in four 18 RBDs)
HMWB/AWB in six
RBDs
RBDs
Mitigation
approach
measures
No
At water body level
Finland (FI)
France (FR)
Hybrid approach
Yes
(in 11 RBDs; for
two RBDs with
designated
At water body level
HMWB/AWB,
GEP
is
not
defined)
Croatia (HR)
Hungary (HU)
Italy (IT)
Luxembourg (LU)
GEP not defined
Mitigation
approach
GEP not defined
Reference-based approach Yes
154
At water body level
measures
No
At water body level
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0156.png
Member State
Latvia (LV)
Malta (MT)
Approach
definition
Not specified
Mitigation
approach
for
GEP
GEP reported as
Level at which GEP is
defined in terms
defined
of biology
Yes
Another approach
Yes (only for
coastal
water At water body level
bodies)
Yes
At water body level
For
groups
of
HMWB/AWB in four
RBDs
Another approach in
five RBDs
In practice, depends on
water category (rivers:
for
groups
of
HMWB/AWB; lakes:
at
national
level;
transitional and coastal
waters: at water body
level)
Yes
(in eight RBDs;
Defined for groups of
for two RBDs,
HMWB/AWB
GEP
is
not
defined)
Yes
Another approach
At water body level
At water body level
For
groups
HMWB/AWB
of
measures
The Netherlands (NL) Hybrid approach
Poland (PL)
Reference-based approach Yes
Portugal (PT)
Hybrid approach
Romania (RO)
Sweden (SE)
Slovenia (SI)
Slovakia (SK)
Hybrid approach
Mitigation
approach
measures
No
Reference-based approach Yes
Reference-based approach Yes
Mitigation
measures
approach in England,
United Kingdom (UK) Wales and Scotland
No
Hybrid
approach
in
Northern Ireland
At water body level
Source: WISE reporting 2016 and additional information from the published RBMPs.
155
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0157.png
Mitigation measures for defining GEP
Mitigation measures for defining GEP are reported in almost all Member States, where GEP
has been defined. Measures related to longitudinal continuity and fauna migration, habitat
restoration and setting of ecological flows are the most commonly reported mitigation measures
(Figure 6). No mitigation measures for defining GEP were reported for a few. Mitigation
measures used to define GEP need to be linked to specific ecological improvements in order to
set the environmental objective of HMWB and AWB in a way which is consistent with the
WFD. In the majority of the first RBMPs, there was no explanation of the expected ecological
improvements, while, on some RBMPs, there was some general information on ecological
improvements but the ecological benefits of individual measures remained unclear. This has
not been significantly improved in the second RBMPs, as descriptions of the ecological
changes that the mitigation measures are designed to achieve were found in the plans of only
less than a third of Member States (descriptions being mainly qualitative). In the RBMPs of
more than half of the Member States, no such descriptions have been given, indicating a
significant gap in this respect.
Figure 6 Mitigation measures for defining GEP
Source: WISE reporting 2016; Note: Percentage calculated with reference to the total number
of RBDs (119) which reported mitigation measures for defining GEP and MEP.
Main changes in implementation and compliance since 1st cycle
In the first RBMPs, GEP was not defined at all or only in a very limited way in more than a
third of Member States. Overall, progress is noted in this respect, as in the second RBMPs,
156
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
GEP is reported as defined (or partly defined) in almost all Member States. Although there are
still gaps in the methods of many Member States and specific CIS guidance on the process for
establishing GEP is in development, several methodological improvements have been reported.
Methodological improvements for the establishment of GEP in the second RBMPs are reported
by a number of countries, and in some countries, new national methods have been developed
since the first cycle.
One of the key improvements reported by Member States in the methodological developments
of GEP definition since the first RBMPs is the inclusion of more biological quality elements in
the assessment. In the first RBMPs, due to the lack of data and well-developed assessment
methods, it was possible to only include few BQEs in the assessment of ecological potential.
Since the first cycle, the assessment methods for various BQEs have been reviewed and
improved, therefore, the number of BQEs to assess the classification of ecological status and
potential in different water categories has increased.
Nevertheless, the level of information provided on the ecological changes that the mitigation
measures for defining GEP are designed to achieve remains limited, indicating a lack of
progress in this respect since the first RBMPs.
1.11.2.
Conclusions
For the majority of countries, the extent of designated HMWB and AWB has remained similar
to the first RBMPs, while some differences (increase or decrease of the number of designated
HMWB and AWB) are noted only in individual Member States. In the RBMPs of some
Member States, no explanations of the changes are provided, even though it is stated that
designations have been reviewed. Other Member States provide explanations, even though
these may not be detailed at individual water body level.
A methodology for designating HMWB is described for the RBMPs of all Member States, with
few exceptions. Nevertheless, the degree to which the reported methodologies of the Member
States cover the main aspects of HMWB designation varies. Most Member State methodologies
address the definition of “substantial changes in character” in order to consider a water body
for designation as HMWB and report relevant criteria. However, descriptions of how to assess
significant adverse effects of restoration measures on the use or wider environment and how to
assess other means which are better environmental options were only found in about two thirds
of the Member States assessed in detail.
For the majority of Member States, no information was found reported in the second RBMPs
on the details of the outcome of the
designation tests of significant adverse effects and “other
means” for individual water bodies. The information provided is in most cases of general
nature, applicable to the national or regional level. Only few Member States provide
information on specific criteria used to assess significant adverse effects of restoration
157
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
measures on the use or wider environment and the criteria reported are mainly of qualitative
nature, similar to the first RBMPs.
In the first RBMPs, GEP was not defined at all or only in a very limited way in more than a
third of Member States. In the second RBMPs, GEP is reported as defined (or partly defined)
almost all Member States (reported as undefined only in very few Member States).
Methodological improvements for the establishment of GEP in the second RBMPs are reported
by a number of countries, while in some countries, new national methods have been developed
since the first cycle. One of the key improvements reported by Member States since the first
RBMPs is the inclusion of more biological quality elements in the definition of GEP.
GEP is reported as defined in terms of biology in the majority of Member States, with only on
fifth of countries reporting not to have done so in the second RBMPs. The BQEs for which
biological values have been derived for MEP and GEP in the majority of RBDs are
phytoplankton, benthic invertebrates and fish. Most Member States report that the
establishment of values of BQEs for GEP is based on assessment methods which are similar to
those used for GES of natural water bodies, but often using lower thresholds to distinguish
between classes of “good” and “moderate”.
Mitigation measures for defining GEP are reported in most Member States, where GEP has
been defined. Nevertheless, the level of information provided on the ecological changes that the
mitigation measures for defining GEP are designed to achieve remains very limited, indicating
little progress in this respect since the first RBMPs.
1.11.3.
Recommendations
Member States should continue the efforts to further improve the methodologies for the
designation of HMWBs. Clear criteria of how to assess significant adverse effects of
restoration measures on the use or wider environment and how to assess other means
which are a significantly better environmental option should be developed. Generic and
qualitative descriptions should be improved towards more transparent and traceable
quantitative approaches.
Member States should further improve the definition of GEP by including more
biological quality elements. The objective of GEP needs to be clearly distinguishable
from the application of exemptions.
158
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0160.png
1.12.Environmental Objectives and Exemptions
1.12.1.
Introduction
The WFD defines environmental objectives in Article 4 and sets the aim for long-term
sustainable water management. Article 4(1) defines the WFD general objectives to be achieved
in all surface and groundwater bodies, i.e. good status or potential (for HM and AW bodies) by
2015, and introduces the principle of preventing any further deterioration of status. A number
of exemptions to the general objectives are possible to be applied if specific conditions are met.
Article 4(4) allows for an extension of the deadline for achieving good status beyond 2015,
Article 4(5) allows for the achievement of less stringent objectives, Article 4(6) allows a
temporary deterioration in the status of water bodies as a result of circumstances of natural
cause or
force majeure,
and Article 4(7) sets out conditions in which deterioration of status or
failure to achieve certain of the WFD objectives may be permitted for new modifications to the
physical characteristics of surface water bodies, alterations to the level of groundwater, or
deterioration from high to good status as a result of new sustainable human development
activities. Furthermore, Articles 4(8) and 4(9) introduce two principles applicable to all
exemptions and designation of heavily modified water bodies: the exemptions applied for one
water body must not permanently exclude or compromise the achievement of the
environmental objectives in other water bodies, and when exemptions are applied, at least the
same level of protection provided for by existing EU law must be achieved.
The WFD provides the general and legally binding framework on exemptions. Guidance was
elaborated to facilitate a better common understanding on the practical application. Further
clarifications can be obtained in the CIS Guidance Document No. 20 on exemptions
94
. Since
the publication of the second RBMPs, three further supporting documents have been elaborated
and published, aiming to help and further clarify the application of exemptions. These include
the CIS Guidance Document No. 36 further clarifying aspects of Article 4(7)
95
, the technical
document clarifying the application of WFD Article 4(4) time extensions in the 2021 RBMPs
and practical considerations regarding the 2027 deadline
96
and the technical document on
natural conditions in relation to WFD exemptions
97
.
94
CIS Guidance Document No. 20: Guidance on exemptions to the environmental objectives
https://circabc.europa.eu/sd/a/2a3ec00a-d0e6-405f-bf66-
60e212555db1/Guidance_documentN%C2%B020_Mars09.pdf
95
Guidance Document No. 36: Exemptions to the Environmental Objectives according to Article 4(7)
https://circabc.europa.eu/sd/a/e0352ec3-9f3b-4d91-bdbb-
939185be3e89/CIS_Guidance_Article_4_7_FINAL.PDF
96
Technical document on Clarification on the application of WFD Article 4(4) time extensions in the 2021
RBMPs and practical considerations regarding the 2027 deadline
https://circabc.europa.eu/w/browse/f6393a2a-87ba-4cb1-86e8-ff3178a1ac1f
97
Technical document on Natural Conditions in relation to WFD Exemptions
159
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0161.png
Assessment of implementation and compliance with WFD requirements in the 2
nd
cycle
According to the EEA State of Water Report (2018), in 2015, around 40 % of surface water
bodies were in high or GES/potential and 38 % of surface water bodies were in good chemical
status. Concerning groundwater, 74 % of EU groundwater bodies (by area) achieved good
chemical status by 2015, while around 90 % of groundwater bodies were in good quantitative
status.
A comparison of the first with the second RBMPs shows that for groundwater some
improvement of the status (mainly quantitative) has been achieved between the first and the
second cycle. For surface waters, the assessment of the second RBMPs shows that there has
been progress in the status of single quality elements and single pollutants. For example, the
status of some biological quality elements has improved from the first to the second cycle,
whereas overall status is determined by the quality element(s) in the lowest status class hence
not necessarily leading to an improvement of the overall status
98
.
It should be noted that several changes between the first and the second cycle are outlined in
many RBMPs, such as changes in water body delineation, changes in the methodologies
applied, changes in the quality elements considered in the status assessments as well as changes
in the legal requirements related to priority substances (for priority substances, see chapter 6.4).
Further, new assessment methods for different quality elements have been developed and
intercalibrated since the first RBMPs, allowing a better assessment of the status of waters. This
has resulted in a marked reduction of water bodies with unknown status, a clearly improved
confidence in status assessments in the second RBMPs, as well as a better understanding of the
ecological, chemical and quantitative status, the pressures causing failure to achieve good status
and the needed measures.
Due to these developments
and changes to water body delineation - many Member States
have flagged that a direct comparison of the status between the first and second cycle is not
fully possible. Further details on the assessment of status of surface water and groundwater are
given in chapters 6.3, 6.4, 6.5 and 6.6 .
Expected good status in 2015, 2021, 2027 and beyond
In the second RBMPs, Member States have also indicated whether it is expected that water
bodies will achieve good (or better) status by the end of 2015. This may differ from the most
recently assessed status of the water body, due to the fact that the assessment of status will most
likely be based on monitoring data from the period 2010-2014 and measures implementation
was still ongoing. Therefore, the monitored status communicated in the second RBMPs may
not necessarily reflect the expected status in the year 2015. In addition, for water bodies failing
https://circabc.europa.eu/sd/a/cea9ffbb-2cf0-4c08-b421-b085893352a0/WD2017-2-2%20-
%20Natural%20Conditions%20-%20Main%20document.pdf
98
EEA (2018): European waters - Assessment of status and pressures 2018
160
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0162.png
to achieve good status (in 2015), Member States have indicated in their reporting the year
(2021, 2027 or beyond 2027) by when they are expected to achieve the WFD objectives.
The table below summarises this information on EU level, while separate tables are provided
further below with more detailed information for ecological, chemical and quantitative status at
Member State level.
Table 1: Status (ecological, chemical and quantitative) expected to be good (or better) in
2015 and the proportion expected to be in good status in 2021 and 2027. All surface water
bodies (by count) and groundwater bodies (weighted by area).
Ecological
status/potential
of
surface
water bodies
Expected
to
achieve good (or
better) by end of
2015
Less stringent
objectives
already achieved
Expected
to
achieve good (or
better) by end of
2021
Expected
to
achieve good (or
better) by end of
2027
Expected
to
achieve good (or
better)
by
beyond 2027
Unknown when
objectives will
be achieved
43%
Chemical
status
of
surface water
bodies
51%
Chemical
Quantitative
status
of status
of
groundwater
groundwater
bodies
bodies
74%
90%
1%
21%
2%
1%
21%
2%
3%
4%
31%
24%
17%
4%
1%
1%
4%
1%
2%
1%
1%
1%
Source: WISE electronic reports.
Note: The percentages above have been calculated on the basis of the total number of water
bodies, including water bodies with unknown current status.
Overall, the following observations can be made:
43 % of all surface water bodies were expected to be in high or GES or potential in
2015. The percentage of water bodies in high/good status or potential is expected to
increase to 64 % and 95 % in 2021 and 2027, respectively.
161
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
For chemical status, 51 % of surface water bodies were expected to be in good status in
2015; this is expected to increase to 53 % and 77 % in 2021 and 2027, respectively. For
21 % of surface water bodies (mainly corresponding to one Member State), the less
stringent objectives set have been already achieved.
74 % of the area of groundwater bodies was expected to be in good chemical status in
2015; this is expected to increase to 77% and 94% in 2021 and 2027, respectively.
90 % of the area of groundwater bodies was expected to be in good quantitative status
already in 2015; this is expected to increase to 94% and 98 % in 2021 and 2027,
respectively.
Only a few Member States reported that good status will be achieved after 2027 for a
significant share of their water bodies or it is unknown when objectives will be
achieved.
Although the number of water bodies in unknown status has substantially been reduced
since the first RBMPs, it is noted that in a few Member States, the share of surface
water bodies in unknown ecological status or potential is still significant. In the case of
chemical status of surface water bodies, there is still a high share of water bodies in
unknown status in approximately a quarter of the Member States. In these cases, further
clarification and information may be needed on how it is possible to indicate expected
good status in 2015 for water bodies currently in unknown status.
It should be noted that information is often limited to judge whether the estimations on the
timelines by several Member Status on reaching good status are realistic or not.
162
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0164.png
Table 2: Ecological status/potential of surface water bodies expected to be good (or better) in 2015 and the proportion expected to be in good
status/potential in 2021 and 2027 at Member State level (count of water bodies).
MS
Expected to achieve good (or better) by end
of 2015
47%
27%
59%
59%
21%
8%
51%
63%
58%
81%
46%
46%
8%
45%
3%
21%
63%
0%
36%
53%
68%
38%
62%
70%
38%
Less stringent objectives already
achieved
2016--
2021
2022—
2027
53%
1%
18%
28%
57%
81%
28%
19%
21%
10%
33%
1%
33%
21%
64%
10%
68%
17%
22%
13%
21%
38%
30%
39%
Beyond
2027
Unknown when
objectives will be
achieved
59%
2%
17%
AT
BE
BG
CY
CZ
DE
DK
EE
ES
FI
FR
HR
HU
IT
LU
LV
MT
NL
PL
PT
RO
SE
SI
SK
UK
2%
4%
1%
13%
20%
13%
5%
11%
21%
17%
16%
9%
20%
1%
7%
22%
34%
69%
11%
12%
47%
22%
18%
40%
1%
1%
52%
51%
1%
7%
26%
20%
3%
11%
8%
3%
Source: WISE electronic reports.
N
ote: The percentages above have been calculated on the basis of the total number of water bodies, including water bodies with unknown current status.
163
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0165.png
Table 3: Chemical status of surface water bodies expected to be good (or better) in 2015
and the proportion expected to be in good status in 2021 and 2027 at Member State level
(count of water bodies).
Expected to achieve Less
stringent 2016 2022
good (or better) by end objectives already --
--
MS of 2015
achieved
2021 2027
100
AT
%
BE 2%
1%
BG 95%
1% 3%
CY 97%
1% 2%
CZ 61%
1% 13%
100
DE
%
DK 99%
1%
EE 98%
2%
ES 92%
3% 5%
FI 50%
50%
FR 82%
1% 17%
HR 93%
1% 1%
HU 46%
54%
IT 76%
8% 7%
100
LU
%
LV 95%
5%
MT 53%
NL 39%
9% 18%
PL 96%
1% 3%
PT 26%
52% 16%
RO 98%
1% 1%
SE
98%
1% 1%
SI 1%
99%
SK 98%
2%
UK 97%
1% 2%
Source: WISE electronic reports.
Beyo Unknown
when
nd
objectives will be
2027 achieved
97%
1%
24%
5%
8%
47%
34%
6%
Note: The percentages above have been calculated on the basis of the total number of water
bodies, including water bodies with unknown current status.
164
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0166.png
Table 4: Chemical status of groundwater bodies expected to be good (or better) in 2015 and the proportion expected to be in good status in
2021 and 2027 at Member State level (by area).
MS
Expected to achieve good (or better)
Less stringent objectives
2016--
2022--
Beyond Unknown when objectives
by end of 2015
already achieved
2021
2027
2027
will be achieved
AT
98%
1%
BE
37%
1%
62%
BG
55%
39%
6%
CY
88%
8%
4%
CZ
37%
2%
17%
44%
DE
62%
2%
20%
16%
DK
80%
20%
EE
95%
5%
ES
68%
1%
6%
15%
9%
FI
95%
2%
3%
FR
75%
2%
23%
HR
98%
2%
HU
83%
13%
4%
IT
61%
8%
3%
26%
2%
LU
21%
29%
50%
LV
100%
MT
3%
3%
28%
67%
NL
31%
67%
2%
PL
92%
3%
4%
PT
97%
2%
1%
RO
87%
13%
SE
94%
3%
3%
SI
94%
6%
SK
83%
17%
UK
53%
19%
3%
21%
4%
Source: WISE electronic reports. Note: The percentages above have been calculated on the basis of the total number of water bodies, including water
bodies with unknown current status.
165
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0167.png
Table 5: Quantitative status of groundwater bodies expected to be good (or better) in 2015 and the proportion expected to be in good status in
2021 and 2027 at Member State level (by area).
MS
AT
BE
BG
CY
CZ
DE
DK
EE
ES
FI
FR
HR
HU
IT
LU
LV
MT
NL
PL
PT
RO
Expected to achieve good
(or better) by end of 2015
100%
71%
99%
43%
95%
96%
98%
94%
79%
100%
90%
99%
75%
81%
100%
100%
20%
24%
95%
98%
100%
80%
76%
5%
1%
1%
4%
2%
6%
16%
10%
3%
2%
7%
3%
1%
3%
13%
4%
8%
4%
1%
1%
2%
6%
1%
50%
2%
2%
29%
Less stringent objectives
already achieved
2016--2021 2022--2027 Beyond 2027
Unknown when objectives will be
achieved
166
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0168.png
MS
SE
SI
SK
UK
Expected to achieve good
(or better) by end of 2015
94%
100%
97%
84%
Less stringent objectives
already achieved
2016--2021 2022--2027 Beyond 2027
6%
3%
Unknown when objectives will be
achieved
9%
3%
4%
Source: WISE electronic reports.
Note: The percentages above have been calculated on the basis of the total number of water bodies, including water bodies with unknown current
status.
167
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Application and justification of exemptions
The number of exemptions applied in the different Member States varies. An accountable
factor is
inter alia
the fact that Member States have different starting points for achieving
good status/potential because of the different levels of pressures and impacts as well as
different degrees of progress regarding the implementation of measures.
The following two figures provide an overall picture on the type of exemptions applied at EU
level to surface and groundwater bodies.
The main reported type and justification for exemptions to GES/potential of surface water
bodies are Article 4(4) time-extensions based on technical feasibility. In relation to chemical
status of surface water bodies, the main type of exemptions are Article 4(5) exemptions
justified by technical feasibility and leading to less stringent objectives.
For groundwater, technical feasibility is the main reason for Article 4(4) time-extensions to
the achievement of good quantitative status. Natural conditions and technical feasibility are
the main justifications for Article 4(4) time-extensions to the achievement of good chemical
groundwater status.
The following sections describe the reasons behind the different exemptions applied in more
detail.
168
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0170.png
Figure 9: Type of exemptions applied to surface water bodies in the 2
nd
RBMPs.
Source: WISE electronic reports.
Note: Ecological status exemptions are reported at the water body level. Chemical status
exemptions for surface waters are reported for each Priority Substances that is causing
failure of good chemical status.
169
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0171.png
Figure 10: Type of exemptions applied to groundwater bodies in the second RBMPs.
Source: WISE electronic reports.
Note: Groundwater quantitative status exemptions are reported at the water body level.
Chemical exemptions for groundwater are reported at the level of each pollutant causing
failure of good chemical status.
170
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0172.png
Use of exemptions under Article 4(4)
Time extensions
Exemptions according to WFD Article 4(4) are applied in all Member States in the second
RBMPs. For surface water bodies, technical feasibility, natural conditions and
disproportionate costs are used as justifications for applying this type of exemption. The main
pressures reported causing the application of exemptions under Article 4(4) in surface water
bodies are hydro-morphological pressures, atmospheric deposition, diffuse source pollution,
point source pollution and water abstractions.
The figures below set out the application of Article 4(4) per Member State for ecological and
chemical status of surface water bodies. For more than one third of the Member States,
Article 4(4) exemptions to the achievement of GES/potential are applied for more than 50 %
of their water bodies.
For approximately one-fifth of the Member States, Article 4(4) exemptions to the
achievement of good chemical status are applied for almost 100 % of their surface water
bodies. For most of these Member States, the main reasons that all or almost all surface
waters are exempted from the achievement of good chemical status by 2015 are ubiquitous
substances.
Figure 11: Percentage of surface water bodies with Article 4(4) exemptions per Member
State related to ecological status/potential
Source: WISE electronic reports.
171
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0173.png
Figure 12: Percentage of surface water bodies with Article 4(4) exemptions per Member
State related to chemical status
Source: WISE electronic reports.
For groundwater bodies, mainly natural conditions and technical feasibility are used as
justifications for Article 4(4) exemptions, with technical feasibility reported more frequently
than natural conditions. Disproportionate costs play a less important role. The main pressures
related to exemptions for chemical status are diffuse and point sources of pollution, while for
groundwater quantitative status the main pressures are from water abstractions.
In general, the justification of Article 4(4) exemptions has improved compared to the first
RBMPs. Exemptions are justified at water body level which was not always the case in the
first cycle. In addition, the details provided behind each justification have improved in most
Member States and more detailed relevant studies have been reported.
Use of exemptions under Article 4(5) - Less stringent objectives
In the first RBMPs, exemptions under Article 4(5) were rarely used for surface water bodies,
comprising less than 5% of all exemptions applied.
99
The main pressures behind Article 4(5)
exemptions were diffuse and point pollution.
The figures 5 and 6 below show the application of Article 4(5) exemptions per Member State
in the second RBMPs for ecological and chemical status of surface water bodies. In the
second RBMPs, Article 4(5) exemptions for ecological status of surface waters were applied
99
See European Commission Staff Working Document (2012): European Overview (2/2) Report from the
Commission to the European Parliament and the Council on the implementation of the water Framework
Directive
172
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0174.png
in two-thirds of the Member States, and mainly due to technical feasibility and
disproportionate costs.
Article 4(5) exemptions for chemical status of surface water were applied in one third of the
Member States, but mainly in Sweden and Czech Republic (see Figure 6 below). Sweden has
used Article 4(5) in a general way as in the first cycle and has reported less stringent
objectives under Article 4(5) for about 23.000 water bodies due to pollution by mercury. The
most frequent justification for this type of exemption is technical feasibility which was used
for approximately one fifth of the total surface water bodies. Similar to the first RBMPs,
Sweden has reported less stringent objectives under Article 4(5) for about 23,000 water
bodies due to pollution by mercury.
Figure 5: Percentage of surface water bodies with Article 4(5) exemptions per Member
State related to ecological status/potential
Source: WISE electronic reports.
173
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0175.png
Figure 6: Percentage of surface water bodies with Article 4(5) exemptions per Member
State related to chemical status
Source: WISE electronic reports.
Use of exemptions under Article 4(6)
Article 4(6) provides the possibility for an exemption for temporary deterioration of the status
of water bodies in certain circumstances, which are exceptional or could not reasonably have
been foreseen. Such circumstances include natural causes or force majeure, in particular
extreme floods and prolonged droughts, or the result of circumstances due to accidents which
could not reasonably have been foreseen. The reason for invoking an exemption under Article
4(6) is that an extreme event may affect the status of a water body considerably and during a
significant period of time, so that temporary deterioration may be inevitable (see also chapter
6.16 on droughts and water scarcity).
In the second RBMPs, the application of exemptions under Article 4(6) has been reported in
the Netherlands, Portugal, Hungary and Spain. The reasons for the application of such
exemptions are linked to extreme floods (Netherlands), prolonged droughts (Netherlands,
Portugal, Spain
100
) and accidents (Netherlands, Hungary, Spain).
Use of exemptions under Article 4(7)
Under Article 4(7) exemptions can be applied due to new modifications to the physical
characteristics of surface water bodies or alterations to the level of bodies of groundwater
which might lead to deterioration / non-achievement of good status / potential, or for a new
sustainable human development activity which might lead to deterioration of surface water
bodies from high status to good status. Non-exhaustive examples which may cause such
100
It should be noted that this exemption is only included in a Spanish RBMP but has not been reported in the
WISE reporting system.
174
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0176.png
modifications or alterations include new hydropower plants, flood protection schemes,
navigation projects or groundwater abstractions.
Member States will not be in breach of the Directive if a new modification/alteration/new
sustainable human development activity leads to deterioration or compromising the
achievement of good status/potential at water body level, and the conditions as outlined under
Article 4(7) (a) to (d)
101
are met. The authorisation or licensing process plays a key role in
performing the related assessments and justifying the conditions as outlined under Article
4(7).
Since the first RBMPs, important clarifications have been provided
102
on the way in which
compliance with the Directive's environmental objectives should be interpreted in the
assessment of new developments and lately new guidance
103
has been elaborated in the frame
of the CIS for the WFD.
In accordance with WFD Article 4(7) and Annex VII A.5, A.7 and B1, which refer to Article
4(7) exemptions and the need to report them in the RBMP, more than a third of the Member
States have reported Article 4(7) in the second RBMPs. Article 4(7) has been applied for
specific projects in about one-fifth of the total RBDs (29 out of 147 RBDs).
Exemptions under Article 4(7) have most commonly been applied in RBDs due to
impoundments for drinking water followed by flood protection schemes and hydropower
plants (see Figure 7).
According to the information reported to WISE, Article 4(7) has been applied in the
following Member States: Austria (3 RBDs), Bulgaria (3 RBDs), Germany (2 RBDs), Spain
(9 RBDs), France (2 RBDs), the Netherlands (1 RBDs), Poland (3 RBDs), Portugal
(3 RBDs), Romania (1 RBD) and the UK (2 RBDs).
a) All practicable steps are taken to mitigate the adverse impact on the status of the body of water;
b) The reasons for those modifications or alterations are specifically set out and explained in the river basin
management plan required under Article 13 and the objectives are reviewed every six years;
c) The reasons for those modifications or alterations are of overriding public interest and/or the benefits to
the environment and to society of achieving the objectives set out in paragraph 1 are outweighed by the
benefits of the new modifications or alterations to human health, to the maintenance of human safety or to
sustainable development, and
d) The beneficial objectives served by those modifications or alterations of the water body cannot for reasons
of technical feasibility or disproportionate cost be achieved by other means, which are a significantly better
environmental option.
102
Case C-461/13 Bund für Umwelt und Naturschutz Deutschland e.V. versus Bundesrepublik Deutschland:
http://curia.europa.eu/juris/document/document.jsf;jsessionid=9ea7d0f130d6146e624bf57c46808158f287ace
d950b.e34KaxiLc3eQc40LaxqMbN4Pax8Le0?text=&docid=165446&pageIndex=0&doclang=EN&mode=ls
t&dir=&occ=first&part=1&cid=11661
103
CIS Guidance Document No. 36 - Exemptions to the Environmental Objectives according to Article 4(7):
https://circabc.europa.eu/sd/a/e0352ec3-9f3b-4d91-bdbb-
939185be3e89/CIS_Guidance_Article_4_7_FINAL.PDF
101
175
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0177.png
The RBMPs or background documents provide descriptions on how the steps of the
assessment required under Article 4(7) have been applied. It should be noted that in several
other RBDs, projects that may cause deterioration/non-achievement of good status/potential
and thus require to meet the conditions as outlined in Article 4(7) are being planned.
Figure 7: Number of RBDs (RBDs) with projects causing Article 4(7) exemptions.
Source: WISE electronic reports.
Note: Some projects causing an Article 4(7) exemption may be multi-purpose, e.g. a proposed
hydropower plant may also serve as a flood protection scheme or as impoundment for water
supply. For this reason, the same project causing an Article 4(7) exemption in one RBD may
be captured in more than one bar in the figure above.
An assessment of the methodologies behind the application of Article 4(7) shows that some
progress has been made in the second cycle. Member States have developed more detailed
approaches and improved methodologies to assess a project’s effect on the status of a water
body and justifications are provided in more detail. The assessment of cumulative effects
though remains a challenge. Information on how to determine overriding public interest is
limited, and it is not clear to which extent public consultations have taken place.
Main changes in implementation and compliance since 1st cycle
Since the first RBMPs, there have been improvements in the approaches and methodologies
used for the application of exemptions for surface and groundwater bodies. While in the first
cycle, not all Member States have justified the application of exemptions on water body level,
this has significantly improved providing now more detailed information on the justifications
176
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
for exemptions. Most progress has been made in the justifications related to disproportionate
costs.
Generally, more detailed studies have been elaborated, although the information provided
does not always clearly distinguish between the criteria applied for justifications under
Article 4(4) and Article 4(5). Overall, justifications for exemptions are still often provided in
a generic way.
As in the first cycle, fewer Member States are applying Article 4(5) exemptions compared to
Article 4(4) exemptions, but overall the use of Article 4(5) exemptions has increased. Sweden
is the Member State that applies Article 4(5) most frequently due to mercury pollution.
A comparison of the first and the second RBMPs shows that for groundwater, improvements
in the status (mainly in quantitative status) has been achieved between the first and the
second cycle. For surface waters, the situation is less clear and changes to the application of
exemptions are difficult to track due to changes related to the assessment of status between
the first and second RBMPs. In several Member States, the methodology for status
assessment has improved, for example through increasing the number of quality elements
considered. Although this has improved the understanding of status, the improved knowledge
has in some cases led to a change in water body status despite the implementation of
measures. Changes in the number of delineated water bodies, i.e. an increase or decrease in
the number of water bodies, also makes it difficult to assess whether the use of exemptions
has increased or decreased in an RBD.
In relation to Article 4(6), the number of RBDs applying this type of exemption has increased
from five to fourteen between the first and second RBMPs.
Reported exemptions under Article 4(7), which were applied in the first RBMPs in 12 RBDs,
have increased in the second RBMPs, now being applied in 29 RBDs. Based on the
assessment of the RBMPs, it can be concluded that more projects are in the pipeline and more
cases of Article 4(7) application may occur in the future. From the assessment of the
methodologies behind the application of Article 4(7), it appears that some progress has been
made in terms of methodologies to assess the impacts on the status of a water body.
1.12.2.
Conclusions
In the second RBMPs, the status of groundwater across Europe is generally better than that of
surface waters. In addition, for groundwater, some improvement in the status (mainly in
terms of quantitative status) has been achieved between the first and the second cycle. For
surface waters, the situation is less clear and changes to the application of exemptions are
more difficult to track e.g. due to improvements related to the assessment of status between
the first and second RBMPs. Improvements in monitoring and classification methods have
177
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
led to a better understanding of water boy status, but have also changed the baseline for
comparing status assessments between the first and second cycle.
Exemptions under Article 4(4) are still applied to a significant extent in all Member States. In
general, exemptions under this Article are more often applied to surface water than to
groundwater for which good status is already achieved to a greater extent. For surface waters,
technical feasibility, natural conditions and disproportionate costs are used as justifications
for exemptions under Article 4(4). For groundwater bodies, mainly natural conditions and
technical feasibility are used to justify these exemptions, with technical feasibility used more
often than natural conditions.
Article 4(5) exemptions have been applied more often in the second than in the first RBMPs
in several Member States.
The justification provided in the second RBMPs for exemptions under Article 4(4) and 4(5)
are more detailed and more consistently reported on water body level compared to the first
cycle. However, justifications are still often provided in a generic way and the criteria
applied, distinguishing between Article 4(4) and 4(5), are not always clear.
The application of Article 4(7) has increased in the second RBMPs. Based on the assessment
of the RBMPs, it can be concluded that more projects are in the pipeline and more cases of
Article 4(7) application may occur in the future. The assessment of the methodologies behind
the application of Article 4(7) provided evidence that some progress has been made in terms
of methodologies to assess impacts on the status of water bodies. The assessment of
cumulative effects though remains a challenge. Information on how to determine overriding
public interest is limited and it is not clear to which extent public consultations have taken
place. Further improvements in relation to the application of Article 4(7) may be expected
due to clarifications provided on the way in which compliance with the Directive's
environmental objectives should be interpreted in the assessment of new developments and
new guidance which was elaborated in the frame of the CIS.
1.12.3.
Recommendations
A significant number of exemptions from the WFD objectives is still applied in the
second RBMPs. Member States should raise the level of ambition for the
implementation of the necessary measures to subsequently reduce the amount of
exemptions and to ensure a timely achievement of the WFD objectives.
Transparency in relation to the justifications for the use of exemptions should be
further improved in the RBMPs, including clear criteria for the decision. In case of
extending deadlines or lowering objectives, the necessary remaining measures and
timeline for implementation should be clearly indicated.
178
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Member States should include in the RBMPs an inventory of projects under
development to ensure that the RBMPs present a complete overview of all current and
planned developments, including particularly new hydropower, navigation, flood
protection, drainage and water abstraction projects.
Member States should ensure a thorough assessment of the expected effects of
projects under development on water body status/potential at quality element level
RBMPs. For the application of exemptions Member States are encouraged to
implement the policy recommendations and the best practice guidance that has been
elaborated under the CIS.
179
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.13.Programme of measures
general & measures related to other
significant pressures
1.13.1.
Introduction
The WFD requires that, within each RBD, a POMs is established to address the significant
issues identified and to allow the achievement of the objectives established under Article 4.
The Directive further specifies that the POMs shall include as a minimum 'basic measures'
and where necessary to achieve objectives 'supplementary measures'.
Basic measures as a minimum must comprise:
Measures required in order to implement existent Community water legislation and
other environmental legislation (set out in Article 10 and in Part A of Annex VI
detailed below).
Measures to implement Article 9 (cost recovery).
Measures to promote efficient and sustainable water use.
Measures to protect drinking water quality and reduce level of treatment required.
Measures to control abstraction from surface and groundwater.
Measures to control recharging of groundwater.
Measures to control point source discharges.
Measures to prevent or control inputs of diffuse pollutants.
Measures to address any other significant impacts on status, in particular the hydro-
morphological condition.
Measures to eliminate or reduce pollution by priority substances.
Measures to prevent accidental pollution.
The legislation referred to in Article 10 and listed in Part A of Annex VI are:
(i) The Bathing Water Directive (76/160/EEC).
(ii) The Birds Directive (79/409/EEC).
(iii) The Drinking Water Directive (80/778/EEC) as amended by Directive (98/83/EC).
(iv) The Major Accidents (Seveso) Directive (96/82/EC).
180
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
(v) The Environmental Impact Assessment Directive (85/337/EEC).
(vi) The Sewage Sludge Directive (86/278/EEC).
(vii) The Urban Waste-water Treatment Directive (91/271/EEC).
(viii) The Plant Protection Products Directive (91/414/EEC).
(ix) The Nitrates Directive (91/676/EEC).
(x) The Habitats Directive (92/43/EEC).
(xi) The Integrated Pollution Prevention Control Directive (96/61/EC).
Supplementary measures are those measures designed and implemented in addition to the
basic measures, where it is necessary to achieve the environmental objectives of the WFD as
established in Article 4 and Annex V. Supplementary measures can include additional
legislative powers, fiscal measures, research, educational campaigns that go beyond the basic
measures and are deemed necessary for the achievement of objectives.
According to Article 11(5), additional measures may be necessary when a water body is
unlikely to achieve the objectives under Article 4, after the adoption of the measures under
the first RBMP.
Measures should be targeted in terms of their type and extent to ensure that pressures are
addressed and that this will deliver improvements towards achieving good status or potential
in the individual water bodies. The measures should be designed based on the assessment of
the actual status of the water body, supplemented with the information from the analysis of
pressures and impacts affecting the water body.
Each step of the planning process of the WFD is, therefore, necessary to ensure the correct
measures are implemented in the appropriate location. The planning process started with the
transposition of the Directive into national law and the administrative arrangements, and was
followed by the characterisation of the RBD (including the pressure and impact analysis, the
economic analysis, the delineation of water bodies and the establishment of the typology and
reference conditions for surface water bodies: the basis for the ecological status assessment).
The status assessment based on sufficient (parameters, frequency, etc.) and updated
monitoring results is a fundamental element of the planning process. Finally, the
environmental objectives are set and the POMs to achieve those objectives established. The
first POMs should have become operational by December 2012 at the latest. There is also a
need to monitor the effects and effectiveness of the measures in the improvement of the water
status and (as stated in Article 11.5) where monitoring or other data indicate that the
objectives set are unlikely to be achieved. The cause of the possible failure should be
181
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
investigated, relevant permits and authorisations should be reviewed, monitoring programmes
reviewed and adjusted and amended or additional measures devised to ensure achievement of
objectives. Article 11.8 requires the POMs to be reviewed and updated by 2015, with
measures being made operational three years later.
This chapter covers general issues concerning the POMs such as implementation of the first
POMs, the application of KTMs to achieve objectives, the use of basic and supplementary
measures, targeting of measures including the assessment of the gap to good status, and
finally measures to address other significant pressures. The following chapters in this report
cover specific measures targeted abstractions and water scarcity, to pollution from agriculture
and other sources, to hydro-morphological pressures and water pricing policies.
Reported progress with the implementation of the first POMs
In their second RBMPs, Member States were asked to report on the status of implementation
of the first POMs; a summary of this information is shown in Table 1. It should be noted that
the reporting to WISE was not always consistent with the reporting in the RBMPs. All
planned measures have been completed in only a few RBDs of few Member States, whilst in
the vast majority (84 %) of RBDs, only some measures have been completed. Member States
reported that a lack of finance and unexpected planning delays were the main obstacles to the
implementation of the POMs, with a lack of mechanism for implementing measures (e.g.
national regulations not yet adopted) and governance issues affecting the implementation of
measures in at least 50 % of RBDs. Some Member States reported other obstacles such as a
change of the delineation of water bodies and classification systems, measures that proved to
be irrelevant, lack of membership, difficulties due to land ownership, land availability, staff
resources and an acceptance of the measures, acquisition of real estate, complex approval
procedures and coordination with participants and staff shortages, the need to prioritise
measures under the conditions of limited time and financing and a lack of research on the
effect of the measures, land acquisition and a reduction in the national budget due to the
economic crisis, and the legal regime of the land and tendering process for the award of
contracts (“the contestation of the auctions for works”).
182
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0184.png
Table 1 Status of the implementation of the first POMs
Status of implementation of first Number
PoM
RBDs
All planned measures started
Some planned measures started
Some measures completed
All measures completed
No measures started
10
1
119
11
0
of Percentage
RBDs
7%
1%
84%
8%
0%
of
Source: WISE electronic reports.
Table 2 Number of obstacles to the implementation of measures identified in the first
PoM
Obstacle
Governance
Delays
Lack of finance
Lack of mechanism
Lack of measures
Planned measures not cost effective
Extreme events
Number
RBDs
71
102
112
88
31
26
14
of Percentage
RBDs
50%
72%
79%
62%
22%
18%
10%
of
Source: WISE electronic reports.
About one-quarter of the Member States provided no information on the costs of the first
POMs. At EU level, a total investment of at least € 92350
million was reported for the first
POMs. Ninety two RBDs (65 %) reported having received a contribution from EU funds for
the first POMs, which implies that EU funds were a significant source of funding for
measures in the first cycle for some RBDs.
Assessment of implementation and compliance with WFD requirements in 2nd cycle
Overview of the application of KTMs to achieve WFD objectives
The concept of KTMs was developed in 2012 to simplify reporting. This approach was the
consequence of the large differences in the level of detail reported in 2010. Some Member
States reported 10-20 measures whilst others reported hundreds or even thousands. KTMs are
groups of measures identified by Member States in the PoMs which target the same pressure
183
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0185.png
or purpose. The individual measures included in the PoM (being part of the RBMP) are
grouped into KTMs for the purpose of reporting. The same individual measure can be part of
more than one KTM because it may be multi-purpose, but also because the KTMs are not
completely independent silos. There is certain degree of overlap in the description of KTMs
to ensure that the Member States can more easily find the way to report their PoMs. KTMs
are expected to deliver the bulk of the improvements through reduction in pressures required
to achieve WFD environmental objectives. A KTM may be one national measure, but it
would typically comprise more than one national measure. The KTM should be fully
implemented and made operational within the RBMP planning period to address specific
pressures or chemical substances and to achieve the environmental objectives.
Figures 1 and 2 show the number of RBDs where significant pressures causing groundwater
bodies and surface water bodies to fail to be of good status are addressed by operational
KTMs. 91 RBDs have measures in place to address failures caused by diffuse pollution from
agriculture in groundwater and 123 RBDs have measures in place to address the same
pressure causing failures of surface water bodies. 128 RBDs have operational measures in
place to address point source pollution from urban waste water treatment plants. Only very
few Member States reported operational measures in place to address all the significant
pressures identified as causing failures of objectives. Approximately half of the Member
States reported that the majority of the significant pressures were being addressed by
operational measures in all RBDs with only one or two pressures not reported as being
addressed. Figure 3 shows the number of RBDs which have reported each KTM as
operational to address at least one significant pressure. KTM2 - Reduce nutrient pollution
from agriculture is reported as operational in the most RBDs to address significant pressures
in groundwater, whilst KTM1 - Construction or upgrades of wastewater treatment plants is
reported as operational to address at least one significant pressure in surface water bodies in
the most RBDs.
Member States were asked to report the national basic and supplementary measures mapped
against the KTMs
104
(see
Tables 3 and 4 and Figures 4 and 5 below). A total of 12 800 basic
measures were reported. No single KTM was reported to have been applied in basic measures
by all the 24 Member States that reported information. Following observations can be made
on selected KTM:
-
The majority of Member States reported a total of 5 579 basic measures mapped
against KTM1 - Construction or upgrades of wastewater treatment plants.
-
The majority of Member States have also applied a total of 565 basic measures under
KTM2 - Reduce nutrient pollution from agriculture.
104
For each pre-defined or new KTM, Member States were asked to report the unique code of each national or
RBD specific measure incorporated into the KTM.
184
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
-
The majority of Member States have mapped a total of 285 basic measures against
KTM3 - Reduce pesticides pollution from agriculture.
-
Two thirds of Member States have mapped a total of 442 basic measures against
KTM6 - Improving hydro-morphological conditions of water bodies other than
longitudinal continuity.
Two thirds of Member States have mapped a total of 408 basic measures against
KTM7 - Improvements in flow regime and/or establishment of ecological flows.
Two thirds of Member States mapped a total of 572 basic measures against KTM8 -
Water efficiency, technical measures for irrigation, industry, energy and households.
Two thirds of Member States mapped a total of 243 basic measures against KTM13 -
Drinking water protection measures (e.g. establishment of safeguard zones, buffer
zones etc).
-
-
-
-
The majority of Member States mapped a total of 280 basic measures against KTM15
- Measures for the phasing-out of emissions, discharges and losses of Priority
Hazardous Substances or for the reduction of emissions, discharges and losses of
Priority Substances.
The majority of Member States mapped a total of 706 basic measures against KTM21
- Measures to prevent or control the input of pollution from urban areas, transport and
built infrastructure.
-
-
1 193 basic measures have been mapped against KTM14
- Research, improvement of
knowledge base reducing uncertainty by about half of the Member States.
Two thirds of the Member States (reported at total of 1 251 basic measures under
nationally defined KTMs.
Only a few Member States reported basic measures KTM24 - Adaptation to climate
change and under KTM25 - Measures to counteract acidification.
-
-
Some Member States have reported a large number of basic measures across a wide range of
KTMs, whilst at the other extreme some have reported a small number of measures against a
limited range of KTMs. Neither of these extremes suggests that the programme of measure
will be effective in addressing the significant pressures, either because too many measures to
be implemented have been adopted, or because an insufficient number of measures have been
adopted.
All 24 Member States which reported also provided information on the number of national
supplementary measures mapped against KTM. A total
of 10 157 supplementary measures
185
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
were reported. This is significant progress from the first POMs where little if no information
on supplementary measures was provided:
-
All Member States have mapped a total of 1 442 supplementary measures against
KTM6 - Improving hydro-morphological conditions of water bodies other than
longitudinal continuity and 274 supplementary measures against KTM2 - Reduce
nutrient pollution from agriculture.
-
The majority of Member States have mapped a total of 1 602 supplementary measures
against KTM14 - Research, improvement of knowledge base reducing uncertainty.
-
A few Member States reported a total of 16 supplementary measures against KTM11 -
Water pricing policy measures for the implementation of the recovery of cost of water
services from agriculture and 13 supplementary measures against KTM25 - Measures
to counteract acidification.
As with basic measures, some Member States have reported a large number of supplementary
measures across a wide range of KTMs whilst others have reported a few supplementary
measures against a small range of KTMs.
A comparison of the national measures mapped against KTMs versus the KTMs that
Member States had reported as being operational for the control of significant pressures,
showed that all national measures reported are operational in only a third of the Member
States. For the other Member States, a number of national measures had been mapped against
KTMs which were not reported as operational to address significant pressures causing failure.
186
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0188.png
Figure 1 Main significant pressures on groundwater bodies for which KTMs are
operational
. - Grou d ater - Alteratio of ater le el…
6.1 - Groundwater - Recharges
3.7 - Abstraction or flow diversion - Other
3.3 - Abstraction or flow diversion - Industry
. - A stra tio or flo di ersio - Pu li …
3.1 - Abstraction or flow diversion - Agriculture
2.10 - Diffuse - Other
2.8 - Diffuse - Mining
2.7 - Diffuse - Atmospheric deposition
. - Diffuse - Dis harges ot o e ted to…
. - Diffuse - Co ta i ated sites or…
2.4 - Diffuse - Transport
2.3 - Diffuse - Forestry
2.2 - Diffuse - Agricultural
2.1 - Diffuse - Urban run-off
1.9 - Point - Other
1.7 - Point - Mine waters
1.6 - Point - Waste disposal sites
. - Poi t - Co ta i ated sites or a a do ed…
1.4 - Point - Non IED plants
1.3 - Point - IED plants
1.2 - Point - Storm overflows
1.1 - Point - Urban waste water
0
10 20 30 40 50 60 70 80 90 100
Number of RBDs
Significant Pressures on Groundwater Bodies Addressed by
KTMs
Source: WISE electronic reports.
187
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0189.png
Figure 2 Main significant pressures on surface water bodies for which KTMs are
operational
. - Hydro orphologi al…
. . - Hydrologi al alteratio -…
. . - Hydrologi al alteratio -…
. . - Hydrologi al alteratio -…
. . - Da s, arriers a d lo ks -…
Significant Pressures on Surface Water Bodies Addressed by KTMs
. . - Da s, arriers a d lo ks -…
. . - Da s, arriers a d lo ks -…
. . - Da s, arriers a d lo ks -…
. . - Physi al alteratio of…
. . - Physi al alteratio of…
. . - Physi al alteratio of…
. - A stra tio or flo di ersio …
. - A stra tio or flo di ersio …
. - A stra tio or flo di ersio …
2.10 - Diffuse - Other
2.8 - Diffuse - Mining
. - Diffuse - Dis harges ot…
2.4 - Diffuse - Transport
2.2 - Diffuse - Agricultural
1.9 - Point - Other
1.7 - Point - Mine waters
. - Poi t - Co ta i ated sites or…
1.3 - Point - IED plants
1.1 - Point - Urban waste water
0
20
40
60
80 100 120 140
Number of RBDs
Source: WISE electronic reports.
188
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0190.png
Figure 3: Number of RBDs which have reported each KTM as operational to address at least one significant pressure in surface water and
groundwater
KTM25 - Measures to counteract acidification
KTM23 - Natural water retention measures
KTM
- Measures to pre e t or o trol the i put of…
KTM - Water pri i g poli y
easures for the…
KTM - I pro e e ts i flo regi e a d/or esta lish e t…
KTM - I pro i g lo gitudi al o ti uity (e.g. esta lishi g…
KTM
KTM3 - Reduce pesticides pollution from agriculture.
KTM
- Measures to pre e t or o trol the ad erse i pa ts…
Surface Water
Groundwater
KTM
- Measures to redu e sedi e t fro
KTM
KTM
soil erosio a d…
- Measures for the phasi g-out of e issio s,…
- Dri ki g ater prote tio
- Water pri i g poli y
easures (e.g.…
easures for the…
KTM
KTM - Co stru tio or upgrades of aste ater treat e t…
0
20
40
60
80
100
120
140
Number of RBDs
Source: WISE electronic reports.
189
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0191.png
Table 3 National basic measures mapped against KTMs
Member State
AT BE BG CY
15
0
0
0
9
0
24
12
3
0
0
15
0
3
8
1
0
0
7
2
2
1
1
1
1
4
0
18
3
2
2
1
7
13
7
7
1
1
2
9
2
9
3
0
0
0
0
0
0
0
0
0
0
1
0
13
KTM
KTM
1
KTM
10
KTM
11
KTM
12
KTM
13
KTM
14
KTM
15
KTM
16
KTM
17
KTM
18
KTM
19
KTM
2
KTM
20
KTM
CZ
1,2
09
1
0
0
11
2
3
8
0
0
0
0
0
43
DE DK
6
0
0
2
1
4
2
3
2
0
0
4
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
EE
3
0
0
0
0
0
0
1
0
0
0
1
0
0
ES
FI FR
3,47
9
4 4
2
6
8
33
558
13
19
6
16
0
148
25
117
0
0
0
0
0
1
8
0
0
0
0
0
0
2
1
0
3
5
2
3
1
0
0
2
0
0
HR HU IT
64
7
3
9
12
14
7
19
39
17
2
6
10
2
10
1
39
190
3
3
0
2
0
5
2
2
0
2
2
0
7
27
43
20
58
39
2
11
5
30
48
11
0
78
0
72
LU
13
1
1
0
1
0
0
0
27
0
0
48
0
7
LV
0
0
0
0
9
0
1
0
1
0
6
14
6
25
MT
0
0
0
0
0
9
2
0
0
2
3
2
0
4
NL
2
1
1
0
3
0
3
0
0
0
0
2
1
5
PL
36
10
0
0
61
82
30
0
0
0
10
4
17
0
0
30
PT
10
6
0
8
0
9
75
42
0
0
0
0
35
0
7
RO
3
0
0
0
1
0
1
4
0
0
0
2
2
3
SE
6
0
0
0
4
0
0
5
0
0
0
3
0
10
SI
4
0
0
0
1
0
2
0
0
0
0
2
0
1
SK
9
0
0
0
0
2
1
1
0
0
0
4
0
0
UK
7
3
0
5
4
10
7
3
4
10
1
9
1
15
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0192.png
CZ
KTM
21
KTM
22
0
0
1
0
0
KTM
23
0
9
0
0
0
KTM
24
0
0
6
0
0
KTM
25
0
0
0
0
0
KTM
21 4
4
0
1
3.
KTM
4
6
6
1
0
0
KTM
24 4
3
0
94
5
KTM
6
30 10 2
0
0
KTM
27 5
8
0
12
7
KTM
8
0
6
12 13
1
KTM
0
2
2
0
1
9
KTM
0
10 0
1
2
99
Source: WISE electronic reports.
Member State
AT BE BG CY
DE DK
EE
ES
FI FR
HR HU IT
LU
LV
MT
NL
PL
7
0
0
0
10
80
0
20
26
50
24
10
39
0
PT
RO
SE
SI
SK
UK
0
0
0
2
2
0
0
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4
0
0
18
12
45
57
103
246
12
438
1
0
0
0
0
0
0
0
0
0
0
0
0
1
5
0
1
0
0
0
1
2
1
4
0
0
27
0
7
1
35
55
47
29
20
18
3
0
4
0
0
1
2
0
23
4
4
2
16
0
80
35
0
89
31
43
18
2
90
19
8
28
32
1
0
0
0
25
0
3
12
3
4
1
11
6
1
0
0
8
0
0
7
0
4
0
22
0
0
0
0
1
0
0
4
1
14
0
9
0
0
0
0
2
0
0
1
2
1
0
6
0
0
1
0
8
4
9
15
35
7
10
58
0
0
0
0
1
1
0
0
1
1
0
2
1
0
0
1
3
3
7
2
7
0
0
0
0
0
0
0
1
0
1
5
0
1
0
0
0
0
0
1
3
0
0
1
0
0
6
1
0
5
7
10
3
10
10
5
0
35
32 0
191
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0193.png
Table 4 National supplementary measures mapped against KTMs
Member State
KTM
KTM1
KTM10
KTM11
KTM12 9
KTM13 6
KTM14 3
KTM15
KTM16 6
KTM17 3
KTM18
KTM19
KTM2
KTM20
KTM21
KTM22
KTM23
KTM24
KTM25
2
3
1
2
3
5
5
2
2
4
1
36
1
8
6
7
2
25
1
5
3
1
5
18
4
3
1
2
2
5
3
7
2
1
77
3
2
3
1
16
3
4
4
3
3
2
1
1
5
4
10
10
3
39
6
10
38
65
39
7
3
2
1
2
9
1
1
6
1
1
4
95
7
1,023
3
28
191
130
8
1
2
AT
6
BE BG CY CZ
3
1
2
DE DK EE ES
7
1
1
3
FI FR HR HU IT
10
2
2
1
7
9
4
7
6
1
1
8
1
4
1
19
56
2
1
5
3
2
1
2
2
2
2
1
1
7
3
1
4
2
3
1
58
1
4
11
21
31
3
1
8
2
19
7
10
33
14
204 2
5
10
22
6
3
1
8
8
4
3
1
4
1
5
1
4
3
1
1
2
1
10
5
42
3
44
16
1
17
26
2
3
6
1
4
1
7
3
1
23
2
5
5
2
2
1
2
LU LV MT NL PL PT
5
3
2
2
1
1
26
3
16
1
3
1
1
31
5
20
9
113 59
9
23
10
15
1
2
5
1
1
1
3
1
2
6
1
5
6
27
4
2
4
9
6
10
2
RO SE SI SK UK
2
4
2
1,826 6
160 1
150 1
192
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0194.png
Member State
KTM
KTM3
KTM4
KTM5
KTM6
KTM7
KTM8
KTM9
KTM99
6
12
3
2
6
2
35
23
8
1
1,140 6
AT
BE BG CY CZ
2
2
3
1
2
6
8
4
1
9
4
7
4
DE DK EE ES
2
275 6
3
436 17
5
14
3
3
2
8
2
2
11
25
220
671
55
445
2
7
2
FI FR HR HU IT
1
16
3
4
15
4
10
4
9
4
2
9
1
1
2
7
10
7
38
6
11
86
41
90
13
83
18
LU LV MT NL PL PT
9
2
2
4
3
1
2
2
11
3
8
2
9
10
24
17
14
2
2
5
1
12
4
4
28
4
78
7
3
3
6
23
18
6
84
1
2
5
RO SE SI SK UK
4
2
2
6
2
3
2
5
1
1
1
4
1
10
14
8
4
Source: WISE electronic reports.
193
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0195.png
Figure 4 Number of Member States which have mapped basic measures against each KTM
KTM99 - Other key type measure reported under PoM
KTM - Water pri i g poli y easures for the i ple e tatio of the…
KTM - Water effi ie y, te h i al easures for irrigatio , i dustry, e ergy…
KTM - I pro e e ts i flo regi e a d/or esta lish e t of e ologi al…
KTM - I pro i g hydro orphologi al o ditio s of ater odies other…
KTM - I pro i g lo gitudi al o ti uity (e.g. esta lishi g fish passes,…
KTM - Re ediatio of o ta i ated sites (histori al pollutio i ludi g…
KTM3 - Reduce pesticides pollution from agriculture.
KTM25 - Measures to counteract acidification
KTM24 - Adaptation to climate change
KTM23 - Natural water retention measures
KTM22 - Measures to prevent or control the input of pollution from forestry
KTM - Measures to pre e t or o trol the i put of pollutio fro ur a …
KTM - Measures to pre e t or o trol the ad erse i pa ts of fishi g a d…
KTM2 - Reduce nutrient pollution from agriculture
KTM - Measures to pre e t or o trol the ad erse i pa ts of re reatio …
KTM - Measures to pre e t or o trol the ad erse i pa ts of i asi e…
KTM17 - Measures to reduce sediment from soil erosion and surface run-off
KTM - Upgrades or i pro e e ts of i dustrial aste ater treat e t…
KTM - Measures for the phasi g-out of e issio s, dis harges a d losses…
KTM14 - Research, improvement of knowledge base reducing uncertainty
KTM - Dri ki g ater prote tio
easures (e.g. esta lish e t of…
KTM12 - Advisory services for agriculture
KTM - Water pri i g poli y easures for the i ple e tatio of the…
KTM - Water pri i g poli y easures for the i ple e tatio of the…
KTM1 - Construction or upgrades of wastewater treatment plants
0
5
10
15
20
25
KTM
Number of Member States
Source: WISE electronic reports.
194
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0196.png
Figure 5 Number of Member States which have mapped supplementary measures against each KTM
KTM - Water pri i g poli y
easures for the i ple e tatio of the…
KTM - I pro e e ts i flo regi e a d/or esta lish e t of…
KTM - I pro i g lo gitudi al o ti uity (e.g. esta lishi g fish passes,…
KTM3 - Reduce pesticides pollution from agriculture.
KTM24 - Adaptation to climate change
KTM
KTM
KTM
KTM
KTM
KTM
KTM
- Measures to pre e t or o trol the i put of pollutio fro …
- Measures to pre e t or o trol the ad erse i pa ts of…
soil erosio a d surfa e…
- Measures to pre e t or o trol the ad erse i pa ts of fishi g…
KTM
- Measures to redu e sedi e t fro
- Dri ki g ater prote tio
- Water pri i g poli y
- Measures for the phasi g-out of e issio s, dis harges a d…
easures (e.g. esta lish e t of…
easures for the i ple e tatio of the…
KTM1 - Construction or upgrades of wastewater treatment plants
0
5
10
15
20
25
30
Number of Member States
Source: WISE electronic reports.
195
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Notes: List of KTMs
KTM1 - Construction or upgrades of wastewater treatment plants
KTM10 - Water pricing policy measures for the implementation of the recovery of cost of
water services from industry
KTM11 - Water pricing policy measures for the implementation of the recovery of cost of
water services from agriculture
KTM12 - Advisory services for agriculture
KTM13 - Drinking water protection measures (e.g. establishment of safeguard zones, buffer
zones etc)
KTM14 - Research, improvement of knowledge base reducing uncertainty
KTM15 - Measures for the phasing-out of emissions, discharges and losses of Priority
Hazardous Substances or for the reduction of emissions, discharges and losses of Priority
Substances
KTM16 - Upgrades or improvements of industrial wastewater treatment plants (including
farms).
KTM17 - Measures to reduce sediment from soil erosion and surface run-off
KTM18 - Measures to prevent or control the adverse impacts of invasive alien species and
introduced diseases
KTM19 - Measures to prevent or control the adverse impacts of recreation including angling
KTM2 - Reduce nutrient pollution from agriculture
KTM20 - Measures to prevent or control the adverse impacts of fishing and other
exploitation/removal of animal and plants
KTM21 - Measures to prevent or control the input of pollution from urban areas, transport
and built infrastructure
KTM22 - Measures to prevent or control the input of pollution from forestry
KTM23 - Natural water retention measures
KTM24 - Adaptation to climate change
196
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
KTM25 - Measures to counteract acidification
KTM3 - Reduce pesticides pollution from agriculture.
KTM4 - Remediation of contaminated sites (historical pollution including sediments,
groundwater, soil)
KTM5 - Improving longitudinal continuity (e.g. establishing fish passes, demolishing old
dams)
KTM6 - Improving hydro-morphological conditions of water bodies other than longitudinal
continuity
KTM7 - Improvements in flow regime and/or establishment of ecological flows
KTM8 - Water efficiency, technical measures for irrigation, industry, energy and households
KTM9 - Water pricing policy measures for the implementation of the recovery of cost of
water services from households
KTM99 - Other KTM reported under PoM
197
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0199.png
As specified in the introduction to this chapter, Article 11(3) requires that the POMs include
specified basic measures. Table 5 below shows the types of basic measures that have been
reported mapped against KTMs in each Member State, and the number of RBDs within that
Member State for which the measures have been reported. Only a quarter of the Member
States reported that basic measures are in place to meet all the requirements of Article 11(3)
of the WFD, but not all of these measures apply in all the RBDs. Two Member States have
only 3 types of the basic measures required by Article 11(3) in place.
Of the types of basic measures required, half of the Member States who provided information
have reported that measures are in place for the implementation of the Habitats
105
or Birds
106
Directives, and to meet the requirements of Article 11(3)(f) on controls for the artificial
recharge or augmentation of groundwater and Article 11(3)(b) for the implementation of
Article 9 on the cost recovery of water services.
105
106
Council Directive 92/43/EEC of 21 May 1992 on the conservation of natural habitats and of wild fauna and
flora
Directive 2009/147/EC of the European Parliament and of the Council of 30 November 2009 on the
conservation of wild birds
198
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0200.png
Table 5 Basic measure types mapped against KTMs in the RBDs of each Member State
Basic
Measure
Type
Urban Waste
Water
Treatment
Nitrates
IPPC IED
Habitats or
Birds
Cost
recovery
water
services
Efficient
water use
Protection
water
abstraction
Controls
water
abstraction
Recharge
augmentation
groundwaters
Point source
discharges
Pollutants
diffuse
Hydro-
morphology
Pollutants
direct
groundwater
Surface
Member State
AT
BE
BG
CY
CZ
DE
DK
EE
EL
ES
FI
FR
HR
HU
IE
IT
LT
LU
LV
MT
NL
PL
PT
RO
SE
SI
SK
UK
3/3
3/3
3/3
5/8
5/8
4/4
4/4
3/4
2/4
1/1
1/1
4/10
6/10
1/10
2/3
2/3
18/25
15/25
6/25
6/8
13/14
11/14
2/14
2/2
2/2
2/2
1/1
1/1
1/1
1/1
8/8
7/8
3/8
3/8
2/2
2/2
4/4
4/4
4/4
4/4
1/1
1/1
1/1
1/1
4/4
4/4
4/4
4/4
10/10
10/10
10/10
1/10
9/10
8/10
8/10
8/10
1/1
1/1
1/1
5/5
1/5
2/2
2/2
2/2
2/2
2/2
2/2
2/2
15/15
15/15
10/15
3/15
1/8
1/1
3/8
3/8
4/4
3/4
1/1
1/3
12/25
14/25
12/14
6/14
2/2
2/2
1/1
1/1
7/8
7/8
2/2
2/2
4/4
1/1
4/4
4/4
10/10
10/10
10/10
3/10
1/1
5/5
2/2
2/2
10/15
11/15
3/3
7/8
4/4
3/3
9/25
14/14
2/2
1/1
7/8
2/2
4/4
4/4
10/10
8/10
5/5
2/2
2/2
14/15
3/3
6/8
4/4
1/1
3/3
15/25
12/14
2/2
1/1
7/8
2/2
4/4
4/4
10/10
3/10
1/1
5/5
2/2
12/15
2/4
3/3
3/3
3/3
3/8
7/8
7/8
4/4
4/4
4/4
1/1
1/1
3/3
3/3
3/3
1/10
5/10
3/10
No information
2/3
No data reported
1/25
16/25
12/25
16/25
6/8
6/8
1/14
6/14
2/14
2/2
2/2
2/2
2/2
1/1
1/1
1/1
No data reported
1/1
3/8
7/8
8/8
7/8
No data reported
2/2
2/2
2/2
2/2
4/4
4/4
4/4
1/1
1/1
1/1
1/1
4/4
4/4
4/4
4/4
10/10
10/10
10/10
10/10
10/10
10/10
9/10
1/1
1/1
1/1
5/5
5/5
5/5
2/2
2/2
2/2
2/2
1/2
2/2
11/15
15/15
15/15
12/15
3/3
3/3
3/8
6/8
2/4
3/4
2/10
1/1
3/3
1/25
6/25
10/14
2/2
2/2
1/1
1/1
5/8
8/8
2/2
4/4
4/4
1/1
4/4
4/4
10/10
10/10
9/10
8/10
2/2
1/1
5/5
13/15
15/15
199
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0201.png
Priority
Substances
Accidental
pollution
3/3
3/8
2/4
2/3
5/25
12/14
2/2
1/1
4/8
2/2
4/4
4/4
10/10
9/10
5/5
2/2
11/15
Source: WISE electronic reports.
Note: The first number is the number of RBDs where the measure is in place. The second number shows the total number of RBDs in the Member State
thus
for Austria (AT) 3/3 indicates that measures are in place in all 3 RBDs, whereas for Spain (ES) 18/25 indicates that measures are in place in 18 of the 25
RBDs.
200
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Targeting of measures to address the gaps to achieving WFD objectives
In order for measures to be effectively targeted, an analysis of the gap to good status should
be carried out, ideally, at a water body level. Member States were asked to report indicators
of the expected gap to good status for significant pressures for 2015, 2021 and 2027 together
with indicators of the level of implementation expected in the KTMs to be applied to address
the gaps.
From the information reported by the 25 Member States, it is clear that the implementation of
such an analysis varies considerably between the Member States. Some Member States
provided quantitative indicators for all RBDs showing the level of progress of
implementation of KTMs expected in 2015, 2021 and 2027 and the progress towards good
status that would be achieved for the main significant pressures to groundwater and surface
waters. In some cases it was anticipated that the level of progress that could be achieved in
addressing some significant pressures would be limited. Some Member States provided a
strong analysis for some, but not all of their RBDs. A number of Member States only
provided indicators for 2015 and 2021. In some cases this is because good status is expected
to be achieved in all water bodies by 2021, but this is not the case for all. Some Member
States provided quantitative indicators for the gap to good status for 2015 and 2021, but only
provided qualitative information for the level of progress expected in the implementation of
the measures. Four Member States (Germany, Finland, Malta and UK) provided some
information for some significant pressures for some years for some RBDs.
A few Member States reported that it was not possible to identify quantitative indicators, for
example due to the “complex pressure environment not allowing for the disaggregation of
the
pressure-measure
relationship”. A few other Member States reported that the information was
not available.
It is clear that some Member States have made significant progress in identifying the gap to
good status and the measures that should be implemented to address this, whilst others still
have significant work to do. It is also clear that some Member States have not yet developed
the methodology to achieve this level of analysis and there may be a benefit in ensuring an
effective sharing of knowledge between and within Member States of how this analysis can
be achieved.
201
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Cost-Effectiveness Analysis and Prioritisation of Measures
Cost-effectiveness analysis is an appraisal technique that provides a ranking of alternative
measures on the basis of their costs and effectiveness, where the most cost-effective has the
highest ranking. A quantitative cost effectiveness analysis of measures was reported as
having been carried out in 17 RBDs (in only four Member States). No cost-effectiveness
analysis was reported to have been carried out in 22 RBDs (in five Member States). A
qualitative cost-effectiveness analysis of measure was reported as having been carried out in
35 RBDs (in five Member States). A combination of qualitative and quantitative analysis was
reported as having been carried out in the remaining 67 RBDs for which information was
reported.
For the purpose of this assessment, further information was sought on the methodology used
for the prioritisation of measures for most Member States. In all cases it was not possible to
easily identify from the information provided by the Member States the methods used to
prioritise measures, and how cost effectiveness analysis fits into this. It can therefore be
concluded that little progress appears to have been made on this aspect of implementation
since the first POMs.
Costs of planned measures
For the effective implementation of the second POMs, it is important that the costs of the
planned measures are clearly identified. Member States were therefore asked to report the
costs of measures (both capital investment and annual operation and maintenance costs) to
meet Article 11.3(a) requirements (measures required to implement Community legislation
for the protection of water) and measures to meet the requirements of Articles 11(3)(b-l),
11(4) and 11(5) (all other measures). Information could be reported either at the Member
State level or at the RBD level. Table 6 shows which information was reported by each
Member State and at what level.
A third of Member States reported all the information requested at the Member State level,
whilst one only reported the capital investment costs, another only reported the capital
investment costs for measures under Articles 11.3(b-l), 11.4 and 11.5 (all other measures).
Another Member State also only reported costs for measures under Articles 11.3(b-l), 11.4
and 11.5 (all other measures) but did report both capital investment and annual operation and
maintenance costs. Of these, only one Member State included depreciation in the
calculations.
Of those Member States that reported information at an RBD level, only three provided full
information for all RBDs. Two Member States only provided capital investment costs, no
202
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
operation and maintenance costs were reported. Two Member States provided capital
investment and operation and maintenance costs for both types of measures for most, but not
all, RBDs. Two other Member States only provided capital investment costs for measures
required by Articles 11.3(b-l), 11.4 and 11.5. The information provided by another two
Member States varied widely between the RBDs. No information was provided by one
Member State because the information was not available in the required format.
From the information reported, it can be estimated that the total capital investment needed for
Article 11(3)(a) measures from 2016-2021
will be at least € 56000 million and that € 10200
million/year will be needed for operation and maintenance costs. The total capital investment
costs for measures required by Articles 11(3)(b-l),
11(4) and 11(5) will be at least € 59600
million with € 3850 million/year in operation and maintenance costs.
Financing of measures
The planned measures identified will not be implemented unless the financing for these
measures has been agreed. Lack of finance was one of the key barriers to effective
implementation. Generally the Member States are expected to carry the costs of the EU
environmental acquis, although, when eligible, they can call on EU funds for support.
As several Member States have met their basic needs in terms of water services with the help
of EU funds, a significant source of support to Member States for the financing of measures
is still EU funds, similar to the first RBMPs. Two thirds of RBDs reported that they are
expecting a contribution from EU funds to the POMs. For instance, in the 2014-2020 period,
EU cohesion policy invests about 15 billion EUR in the water sector.
An additional source of funding has been the LIFE+, which has been used for many different
types of measures. Under its Environmental subprogramme, the development of RBMPs may
be identified as a target for 'Integrated Projects', which has been done for example in
Germany, Malta, Spain and UK.
Member States were asked to report the sectors for which a clear financial commitment has
been secured for the implementation of the PoMs in each of these sectors. Nearly half of
RBDs reported that financing has been secured for measures in all the relevant sectors, but a
fifth of RBDs (in Belgium, UK, Spain, Italy and Latvia) reported that financing had not been
secured for measures in any sector, whilst a tenth of RBDs reported that funding had been
secured for only one sector, although for a few of these RBDs only that specific sector was
reported as relevant (Figure 6).
Figure 7 below shows the number of RBDs that have secured funding for each sector. Over
half of the RBDs have reported securing financing for measures in the agricultural sector,
and/or from a governmental source (Parliament, Ministry of Finance etc.). At the other end of
203
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
the scale, only a tenth of RBDs report that finance has been secured for measures in the
energy sector for measures in the transport sector.
204
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0206.png
Table 6: Information reported by Member States on the costs of measures in the second cycle Programme of Measures
Articles 11.3(b-
Article11.3(a)
Depreciation
l), 11.4 and 11.5
Level
cost Capital
Article11.3(a)
included
in Capital
information
investment
Annual
costs Article
11.3(a) investment
reported
investment
reported
reported
reported
Member State
Yes
Yes
No
Yes
Some
RBDs, Some
RBDs,
RBD/Region
Some as 0
Some as 0
No
Yes
RBD
Yes
No
No
Yes
Member State
Yes
As 0
No
Yes
RBD
As 0
As 0
No
Yes
Nothing reported for all RBDs
Member State
No
No
No
Yes
Some
RBDs, Some
RBDs,
RBD
Yes
Yes
Some as 0
Some as 0
Some
RBDs,
RBD
Yes
Some as 0
No
Yes
Member State
Yes
Yes
No
Yes
RBD
Yes
No
No
Yes
Member State
Yes
Yes
No
Yes
Member
State/RBD
Yes
Yes
No
Yes
Some
RBDs, Some
RBDs,
Some
RBDs,
Some as 0, Some Some as 0, Some No
or
not Some as 0, Some
RBD
not reported
not reported
reported
not reported
Some
RBDs,
RBD
Some as 0
No
Not reported
Yes
205
Depreciation
Articles 11.3(b- included
in
l), 11.4 and 11.5 Articles 11.3(b-
Annual
costs 1), 11.4 and 11.5
reported
investment
Yes
No
Yes
No
As 0
No
No
No
No
No
No
No
Mem
ber
State
AT
BE
BG
CY
CZ
DE
DK
EE
ES
FI
FR
HR
HU
Yes
Yes
Some
RBDs,
Some as 0
No
Yes
No
No
No
Yes
Yes
Yes
No
Some
RBDs,
Some as 0, Some No
or
not reported
reported
No
Not reported
not
IT
LU
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0207.png
Mem
ber
State
LV
MT
NL
PL
PT
RO
SE
SI
SK
UK
Article11.3(a)
Level
cost Capital
information
investment
reported
reported
RBD
Yes
Member State
Yes
RBD (but all
numbers
No
identical)
Some
RBDs,
RBD
Some as 0
RBD
Yes
RBD (but only 1
Yes
RBD)
Member State
As 0
Member State
Yes
Member State
Yes
RBD
For most RBDs
Articles 11.3(b-
Depreciation
l), 11.4 and 11.5
Article11.3(a)
included
in Capital
Annual
costs Article
11.3(a) investment
reported
investment
reported
Yes
No
Yes
Yes
No
Yes
Depreciation
Articles 11.3(b- included
in
l), 11.4 and 11.5 Articles 11.3(b-
Annual
costs 1), 11.4 and 11.5
reported
investment
Yes
No
Yes
No
No
All RBDs 0
Yes
Yes
No
No
Yes
No
Some
RBDs,
Some as 0
Yes
Yes
Yes
Yes
Yes
Yes
Yes
For most RBDs
Yes
No
No
No
No
No
No
No
Yes
No
Yes
As 0
No
Yes
Yes
No
Yes
Yes
No
Yes
For most RBDs
No
For most RBDs
Source: WISE electronic reports.
206
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0208.png
Figure 6 Number of sectors for which each RBD has secured funding for the
implementation of measures
30
25
Number of RBDs
20
15
10
5
0
0
1
2
3
4
5
6
7
8
9
10
Number of sectors from which funding has been secured
Source: WISE electronic reports.
Figure 7 Number of RBDs for which funding is secured for the implementation of
measures in each specific sector
100
90
80
70
60
50
40
30
20
10
0
Number RBDs
Sector
Source: WISE electronic reports.
207
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0209.png
Co-ordination with MSFD
Article 13(2) of the MSFD
107
requires integration between the POMs adopted under the
MSFD and the POMs adopted under the WFD. As the timescales of the two Directives are
aligned, it is expected that joint consultation on the programmes will be carried out. This
section will discuss whether the preparations of the RBMP and PoM have been co-ordinated
with the implementation of the MSFD, whether the need for additional measures or more
stringent measures beyond those required by the WFD in order to contribute to the
achievement of the relevant MSFD objectives in coastal and marine environments have been
considered in the PoM, and, if so, what parameters those measures should address. This
section will also consider the KTMs that have been reported to be relevant to the purposes of
the MSFD.
Table 7 shows the number and percentage of RBDs who have reported that the preparation of
the RBMPs and PoMs has been co-ordinated with the MSFD and shows, that in the vast
majority of cases this has been carried out. Table 8 shows that only a third of RBDs reported
that the need for additional measures or more stringent measures beyond those required by
the WFD in order to contribute to the achievement of the relevant MSFD objectives in coastal
and marine environments have been considered in the PoM. Figure 8 shows the parameters
for which additional or more stringent measures are needed, and the number of RBDs for
which this applies.
For each measure reported in the inventory of measures, Member States were asked to
indicate if it is relevant to the MSFD. 7 485 basic measures and 5 068 supplementary
measures (a total of
12 553 measures) were reported to be relevant to the MSFD. Figure 9
shows the number of measures by KTM and Figure 10 shows the number of measures
reported by Member State as relevant to the MSFD (note: these are a total of the measures
reported for each RBD; if national measures apply in more than one RBD they will be double
counted).
107
Directive 2008/56/EC of the European Parliament and the Council of 17 June 2008 establishing a framework
for community action in the field of marine environmental policy (MSFD)
https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:32008L0056&from=EN
208
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0210.png
Table 7: RBDs that have co-ordinated the preparations of the RBMP and PoM with the
MSFD
Preparations of RBMP and PoM co-ordinated with Number
MSFD
RBDs
Yes
100
No
17
Landlocked country
21
Source: WISE electronic reports.
Percentage
RBDs
72.5%
12.3%
15.2%
Table 8: RBDs which reported whether the need for additional measures or more stringent
measures beyond those required by the WFD in order to contribute to the achievement of the
relevant MSFD objectives in coastal and marine environments have been considered in the
PoM
Need for additional measures considered
Yes
No
Landlocked country
Source: WISE electronic reports.
Number of RBDs
41
82
18
Percentage of RBDs
29%
58%
13%
Figure 8: The parameters for which additional measures or more stringent measures are
needed beyond those required by the WFD in order to contribute to the achievement of the
relevant MSFD objectives in coastal and marine environments
Parameter for which additional
measure needed
None
Others
Litter
Chemicals
Nutrients
0
5
10
15
20
25
Number of RBDs
Source: WISE electronic reports.
Note: “None” indicates that the need for additional measures was considered but the
conclusion was that no additional measures are needed.
209
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0211.png
Figure 9: Number of basic and supplementary measures reported as relevant to the MSFD by KTM
KTM99
KTM25
KTM24
KTM23
KTM22
KTM21
KTM20
KTM9
KTM8
KTM7
KTM6
KTM5
KTM4
KTM3
KTM2
KTM19
KTM18
KTM17
KTM16
KTM15
KTM14
KTM13
KTM12
KTM11
KTM10
KTM1
KTM
Supplementary
Basic
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
Total number of measures reported relevant to MSFD
Source: WISE electronic reports.
210
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0212.png
Figure 10: Number of MSFD relevant measures reported by Member State
4000
3500
3000
2500
2000
1500
1000
500
0
AT
BG
CZ
DK
ES
FR
HU
LU
MT
PL
RO
SI
UK
Basic
Supplementary
Source: WISE electronic reports.
Co-ordination with the Floods Directive
The integration and high level co-ordination between the WFD and the Floods Directive
108
has
been discussed in Section <> of this document on Governance. Article 9(2) of the Floods
Directive requires that the development of the first FRMPs should be carried out in co-
ordination with the review of the WFD RBMPs. This section investigates whether the
objectives and requirements of the Floods Directive have been considered in the second RBMP
and PoM, whether specific win-win measures in terms of achieving the objectives of the WFD
and Floods Directive, drought management and use of Natural Water Retention Measures
(NWRM) have been included in the PoM and whether the design of new and existing structural
measures, such as flood defences, storage dams and tidal barriers, have been adapted to take
into account WFD environmental objectives.
Table 9 summarises the results of the analysis carried out on these aspects. A minority of RBDs
reported that the objectives and requirements of the Floods Directive had not been considered
in the PoM. The majority of RBDs reported to have included win-win measures in the RBMPs
in terms of achieving the objectives of the WFD and Floods Directive, drought management
and use of Natural Water Retention Measures (NWRM), with only a few RBDs reporting that
they have not included such win-win measures in the PoM. A similarly high proportion of
108
Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment
and management of flood risks
https://eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:32007L0060&from=EN
211
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0213.png
RBDs reported that the design of new and existing structural measures have been adapted to
take account of WFD objectives. A few RBDs reported that structural measures had not been
adapted.
Table 9: Summary of aspects relating to the integration of the PoMs for the WFD with the
requirements of the Floods Directive
Objectives
Requirements
Number
RBDs
Yes
No
123
18
and
FD Win
of
Win
measures
Structural measures adapted
Number
RBDs
124
17
Percentage
RBDs
88%
12%
Considered in PoM
included
Percentage
RBDs
89%
11%
Percentage Number
RBDs
RBDs
87%
13%
125
16
Source: WISE electronic report
Main changes in implementation and compliance since 1
st
cycle
The assessment of the first RBMPs showed that the measures were often not concrete and the
expected achievements not always clear. In general, there was limited understanding that the
PoM are to reflect the result of the analysis of pressures and impacts and the status information
from the monitoring programmes. Often the definition of the measures was too vague and there
was little clarity on the scope of the measure.
Furthermore, the financial commitment, the actors responsible for the implementation, the
planned timetable and the expected effects on the improvement of the status were not described
in the majority of the RBMPs. This lack of detail in the definition of the measures may have led
to insufficient action to tackle the specific problems of the water bodies and hindered the
achievement of the WFD at local level.
It is clear from the assessment of the second RBMPs that most Member States have taken some
steps to improve the link between the status and measures by providing some information on
the gap to good status, and the level of implementation of measures that is required to address
that, for some of the relevant significant pressures. However, only a few Member States could
be considered to have reported this analysis thoroughly and it is clear that a sharing of
information on the methodologies used to carry out this analysis between and within Member
States would assist in improving this aspect of implementation further for the third POMs.
The number of basic measures and supplementary measures reported has increased, although
the number of measures reported by some Member States does appear to be excessive
it is
questionable whether the number of measures reported can be properly implemented. Only
very few Member States have reported that all the basic measures required by Article 11(3) are
212
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
in place. In particular measures for the implementation of the Habitats and Birds Directive, for
controls of artificial recharge or augmentation of groundwater and for the cost recovery of
water services are lacking to a great extent.
The methodologies used by the Member States for the selection and prioritisation of measures
are still not sufficiently transparent. Member States do not appear to be using quantitative cost
effectiveness analysis techniques widely to assist them in the selection of measures.
All Member States have started to implement all or some of the measures planned in the first
POMs, with the main obstacles to progress being a lack of finance, and unexpected planning
delays. It is therefore important for the effective implementation of the second POMs that
financing is in place. Despite this, only 46% of RBDs have reported that funding has been
secured for the implementation of measures in all relevant sectors and 17% of RBDs have
reported that no financing has been secured for the second POMs.
Measures related to other significant pressures
Introduction, key relevant requirements of WFD
Annex II of the WFD requires Member States
to identify “other anthropogenic impacts on the
status of water bodies, and Article 11(3)(i) requires basic measures to be in place “for any other
significant adverse impact on the status of water identified under Article 5 and Annex II”. This
section of the report will provide an overview of the measures included in the second POMs to
address the other anthropogenic pressures identified, specifically:
Introduced species and diseases
Exploitation or removal of animals or plants
Litter or fly tipping
Anthropogenic pressure - Other
Anthropogenic pressure - Unknown
Anthropogenic pressure - Historical pollution
Assessment of implementation and compliance with WFD requirements in 2nd cycle
Figure 8 below shows the number of RBDs where operational measures are reported in place to
address other significant pressures in groundwater and surface water.
213
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1. Measures related to other significant pressures in groundwater
One Member State identified “Introduced species and diseases”, a quarter of the Member States
“Anthropogenic pressure – Other”, a third of the Member States “Anthropogenic Pressure –
Unknown” and a few Member States identified “Anthropogenic pressure
- Historical
pollution” as significant pressures to groundwater.
One Member State reported the
KTM “KTM99
- Other KTM reported under PoM - No KTM
data available” as being in place to address introduced species and diseases. Other KTMs
reported as being in place to address “Anthropogenic pressure – Other” include:
KTM12 - Advisory services for agriculture,
KTM14 - Research, improvement of knowledge base reducing uncertainty,
KTM21 - Measures to prevent or control the input of pollution from urban areas,
transport and built infrastructure,
KTM25 - Measures to counteract acidification.
Other, nationally developed KTMs that are reported to address this pressure include “Measures
to prevent or control the adverse impacts of other human activities”, “Environmental
management of soil extraction sites”, “Other national measures” and “Measures to prevent or
limit groundwater contamination”.
KTMs reported as in place to address “Anthropogenic Pressure – Unknown” in groundwater
include,
KTM13 - Drinking water protection measures (e.g. establishment of safeguard zones,
buffer zones etc) and, unsurprisingly,
KTM14 - Research, improvement of knowledge base reducing uncertainty.
The measures in place to address “Anthropogenic pressure
-
Historical pollution” include:
KTM3 - Reduce pesticides pollution from agriculture,
KTM4 - Remediation of contaminated sites (historical pollution including sediments,
groundwater, soil),
KTM13 - Drinking water protection measures (e.g. establishment of safeguard zones,
buffer zones etc),
KTM14 - Research, improvement of knowledge base reducing uncertainty,
214
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
KTM15 - Measures for the phasing-out of emissions, discharges and losses of Priority
Hazardous Substances or for the reduction of emissions, discharges and losses of
Priority Substances.
No nationally derived measures were reported to control historical pollution.
2. Measures related to other significant pressures in surface waters
About half of the Member States identified
“Introduced species and diseases”
as a significant
pressure in surface waters and all reported KTMs to address it. The KTMs reported to be in
place include:
KTM1 - Construction or upgrades of wastewater treatment plants,
KTM5 - Improving longitudinal continuity (e.g. establishing fish passes, demolishing
old dams),
KTM6 - Improving hydro-morphological conditions of water bodies other than
longitudinal continuity,
KTM14 - Research, improvement of knowledge base reducing uncertainty,
KTM18 - Measures to prevent or control the adverse impacts of invasive alien species
and introduced diseases,
KTM21 - Measures to prevent or control the input of pollution from urban areas,
transport and built infrastructure,
KTM23 - Natural water retention measures and
KTM24 - Adaptation to climate change.
Other nationally derived KTMs include “Lake restoration”, “Active fish stock/ shellfish stock
management” and “Active vegetation management”.
“Exploitation or removal of animals or plants”
was identified by a quarter of the Member
States as a significant pressure to surface waters. Measures in place to address it include:
KTM6 - Improving hydro-morphological conditions of water bodies other than
longitudinal continuity,
KTM14 - Research, improvement of knowledge base reducing uncertainty,
KTM18 - Measures to prevent or control the adverse impacts of invasive alien species
and introduced diseases,
215
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
KTM19 - Measures to prevent or control the adverse impacts of recreation including
angling,
KTM20 - Measures to prevent or control the adverse impacts of fishing and other
exploitation/removal of animal and plants,
KTM24 - Adaptation to climate change.
Other nationally derived KTMs reported include “Measures to prevent or control the adverse
impacts of other human activities” and “Other national measures to preserve and improve the
structure and functions
of aquatic ecosystems”.
“Litter or fly tipping”
was reported as a significant pressure to surface waters by a few
Member States. KTMs reported to address it include:
KTM14 - Research, improvement of knowledge base reducing uncertainty,
KTM19 - Measures to prevent or control the adverse impacts of recreation including
angling,
KTM21 - Measures to prevent or control the input of pollution from urban areas,
transport and built infrastructure
The nationally derived KTMs “Other measures at the source” and “Other management
measures” were reported by one Member State.
About half of the Member States identified
“Anthropogenic pressure – Other”
as a
significant pressure to surface water bodies with operational measures in place to address it,
and provided details of the KTMs. One Member State also identified this as a significant
pressure with operational measures in place, but did not report the KTMs. A wide range of
measures in reported to be place to address this pressure including:
KTM4 - Remediation of contaminated sites (historical pollution including sediments,
groundwater, soil),
KTM6 - Improving hydro-morphological conditions of water bodies other than
longitudinal continuity,
KTM12 - Advisory services for agriculture,
KTM14 - Research, improvement of knowledge base reducing uncertainty,
KTM17 - Measures to reduce sediment from soil erosion and surface run-off,
216
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
KTM18 - Measures to prevent or control the adverse impacts of invasive alien species
and introduced diseases,
KTM19 - Measures to prevent or control the adverse impacts of recreation including
angling,
KTM20 - Measures to prevent or control the adverse impacts of fishing and other
exploitation/removal of animal and plants,
KTM21 - Measures to prevent or control the input of pollution from urban areas,
transport and built infrastructure,
KTM23 - Natural water retention measures,
KTM24 - Adaptation to climate change and
KTM25 - Measures to counteract acidification.
Other nationally derived KTMs include “Measures to prevent or control the
adverse impacts of
other human activities”, “Lake restoration”, “Measures to retain sediment and nutrient before
discharged to surface waters”, “Reduce nutrient pollution from other sources”, “measure in
river water bodies limiting significant pressure on
lake water body” and “Develop evidence
base to support management of marine litter and marine litter strategy”.
More than two-thirds of the Member States reported KTMs to address the significant pressure
“Anthropogenic pressure – unknown”.
One Member State did not report this as a significant
pressure where operational measures are in place, and two Member States reported that
operational measures are in place, but did not report KTMs. The KTMs reported as being in
place to address this pressure include:
KTM6 - Improving hydro-morphological conditions of water bodies other than
longitudinal continuity,
KTM8 - Water efficiency, technical measures for irrigation, industry, energy and
households,
KTM9 - Water pricing policy measures for the implementation of the recovery of cost
of water services from households,
KTM13 - Drinking water protection measures (e.g. establishment of safeguard zones,
buffer zones etc),
KTM14 - Research, improvement of knowledge base reducing uncertainty,
217
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
KTM15 - Measures for the phasing-out of emissions, discharges and losses of Priority
Hazardous Substances or for the reduction of emissions, discharges and losses of
Priority Substances,
KTM18 - Measures to prevent or control the adverse impacts of invasive alien species
and introduced diseases,
KTM19 - Measures to prevent or control the adverse impacts of recreation including
angling,
KTM20 - Measures to prevent or control the adverse impacts of fishing and other
exploitation/removal of animal and plants, and
KTM21 - Measures to prevent or control the input of pollution from urban areas,
transport and built infrastructure.
Other nationally derived KTMs include “Measures to prevent or control the adverse impacts of
other human activities”, “Lake restoration”, “Reduce nutrient pollution from other sources”,
“Characterise and quantify hydrological input of land based contaminants (including litter) to
coastal waters from major sub catchments”, “Investigate the role transboundary contaminants
through hydrographic
pathways and the extent of its contribution to marine contamination”,
“Carry out investigations to gauge potential contribution of contaminants to our coastal waters
by atmospheric deposition”, and “Carry out a survey of all direct discharges to sea
and identify
their source with the objective of setting up a plan to curtail/regulate such discharges”, “Risk
management”, and a “Study on development and application of methodology for assessing the
ecological status in terms of salinity of water bodies
with natural mineral loading”.
More than a third of the Member States identified
“Anthropogenic pressure –
Historical
pollution”
as a significant pressure. All reported that operational measures are in place to
address them and provided details of the KTM. One Member State also reported this as a
significant pressure with operational measures in place, but did not give details of the KTMs.
KTMs reported as in place to address the pressure include:
KTM4 - Remediation of contaminated sites (historical pollution including sediments,
groundwater, soil),
KTM14 - Research, improvement of knowledge base reducing uncertainty and
KTM21 - Measures to prevent or control the input of pollution from urban areas,
transport and built infrastructure.
218
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0220.png
Other nationally derived
KTMs include “No measure in this cycle
- review of less stringent
target in next cycle”, “Reduce nutrient pollution from other sources”, and “Other generic
measures”.
The analysis of the gap to good status and the identification of indicators for the
implementation of measures is also valid for measures related to other significant pressures, as
discussed for the other pressures above.
Figure 8 Number of RBDs with operational KTMs to address other significant pressures
9 - Anthropogenic pressure - Historical
pollution
8 - Anthropogenic pressure - Unknown
Significant Pressure
7 - Anthropogenic pressure - Other
Surface water
Groundwater
5.2 - Exploitation or removal of animals or
plants
5.1 - Introduced species and diseases
0
20
40
60
80
100
5.3 - Litter or fly tipping
Number of RBDs
Source: WISE electronic reports.
Main changes in implementation and compliance since 1st cycle
The approach taken to addressing other pressures was not assessed in the first cycle and
therefore it is not possible to make a direct comparison.
219
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.13.2.
Conclusions
Progress has been made with the implementation of the first POMs, although a lack of finance
is a significant obstacle. 27 RBDs in five Member states (Belgium, UK, Spain, Italy and
Latvia) reported that financing had not been secured for measures in any sector.
Most Member States have made some progress in identifying the gap to good status for each
significant pressure, and the level of implementation of measures required to achieve good
status. Four Member States (Germany, Finland, Malta and UK) provided some information for
a number of significant pressures for some RBDs and few Member States only provided
indicators of the expected gap to good status for significant pressures for 2015 and 2021.
However, more work is needed to refine this for the third POMs.
It is clear that a lack of finance is likely to continue to present an obstacle to the
implementation of the second POMs as 54% of RBDs have yet to secure finance for all relevant
sectors.
Not all Member States have reported other significant pressures. It is not clear whether this is
because they are not relevant or because they have not assessed them.
For those Member States that have identified other pressures, measures are in place to address
them, the gap to good status has generally been identified, and indicators developed to identify
the level of implementation required to achieve good status.
1.13.3.
Recommendations
Member States should ensure that the RBMPs clearly identify the gap to good status for
individual pressures and water bodies, and that Programmes of Measures are designed
and implemented to close that gap.
Clear financial commitments should be ensured for all RBDs and information on the
costs of the measures provided.
KTMs should be reported to address significant Priority Substances, RBSPs and
abstraction pressures, identified as causing failure of objectives.
All KTMs should be operational and measures should cover all the significant pressures
identified as causing failure of objectives.
220
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0222.png
1.14.Measures related to abstractions and water scarcity
1.14.1.
Introduction
More than 7 600 (7%) of Europe’s surface water bodies are affected by significant water
abstraction pressures and 16% of the area of groundwater bodies is affected by over-
abstraction, being 11% of the area in worse than good quantitative status
109
. Since the first
RBMPs were published, there has been little progress in improving status due to reducing
abstraction pressures; although it is noted that total water abstraction decreased by around 7%
between 2002 and 2014
110
. However, it should also be noted that significant abstraction
pressures are not always metered and are often just estimated, e.g. based on surveys or cropping
patterns, which can lead to significant degree of uncertainty.
In the past, water scarcity management in the EU has largely focused on increasing supply by
drilling new wells, constructing dams and reservoirs, applying desalination techniques,
constructing large-scale water-transfer infrastructures, etc.; and there are still RBDs where such
actions remain as a major focus (as for instance Ebro RBD in Spain). However, as Europe
cannot endlessly increase water supply, demand measures should be applied including the use
of economic instruments, water loss controls, water-reuse and recycling, increased efficiency of
domestic, agricultural and industrial water use combined with water savings
111
. Moreover,
land-use or cropping-pattern changes should be applied, as well as the use of natural water
retention measures and water-saving campaigns should be supported by public education
programs. Water savings will bring additional benefits, for example by reducing pollution
discharges, treatment costs and energy consumption.
The WFD provides a comprehensive framework for the protection and management of water.
Sound water management requires joint management of qualitative and quantitative aspects.
Water quantity can have a strong impact on water quality and therefore on the achievement of
GES, e.g. by exercising abstraction pressures. Hence, quantitative requirements are implicit in
the definition of GES and explicitly through the inclusion of flow regime as a supporting
hydro-morphological element.
In particular, good quantitative status is required for groundwater, where a balance between
abstraction and recharge must be ensured. Furthermore, groundwater levels should not be
subject to anthropogenic alterations that might have impacts on surface waters and groundwater
dependent ecosystems.
EEA (2018) European waters
assessment of status and pressures 2018. EEA 2018 State of Water report
https://www.eea.europa.eu/data-and-maps/indicators/use-of-freshwater-resources-2/assessment-2
111
E.g. supported by Art.46 of Regulation (EU) No 1305/2013 of the European Parliament and of the Council of
17 December 2013 on support for rural development by the European Agricultural Fund for Rural
Development (EAFRD) and repealing Council Regulation (EC) No 1698/2005
109
110
221
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0223.png
When developing the WFD RBMPs and associated PoMs, quantitative and qualitative aspects
should be jointly considered to be coherent and to create synergies where possible. Quantitative
issues should, in particular, be taken into account when making operational the objective of
GES and the objective of no further deterioration of current status (Articles 4(1), 4(5), 4(6) and
4(7)). In particular, actions to manage and preserve water quantity (e.g. actions to address water
scarcity) should be considered as measures (basic/supplementary) when developing the RBMP
and associated PoM.
Article 11(3)(e) of the WFD explicitly requires controls over the abstraction of surface water
and groundwater and impoundment of fresh surface waters including a register or registers of
water abstractions and a requirement for prior authorization of abstraction and impoundment.
These permits have to be periodically reviewed and, where necessary, updated. Furthermore,
other basic measures to be considered in addressing water abstractions, are those under Article
11(3)(c) to promote an efficient and sustainable water use and Article 11(3)(f) which refers to
controls, including a requirement for prior authorisation of artificial recharge or augmentation
of groundwater bodies, as well as those on water pricing considered under Article 10.
Supplementary measures (Article 11(4)) can address other related topics, such as water reuse.
Assessment of implementation and compliance with WFD requirements in 2nd cycle
For the majority of Member States, the reported information to WISE concerning abstractions,
water scarcity and related measures is coherent and there are no doubts or unexpected gaps.
However, for some Member States, the information reported was unclear for some RBDs (for
instance in Bulgaria, Czech Republic, Germany or France), where water scarcity/over
abstraction had not been considered as relevant in the reporting, despite the fact that they have
RBDs where more than 10% of surface or groundwater bodies are affected by significant
abstraction pressures.
Water exploitation and trends
Water exploitation and/or trends have only been reported to WISE for some RBDs (e.g. in
Cyprus, Spain, Hungary, Italy, Malta, Portugal, Slovakia, UK). However, the data assessment
by the European Environmental Agency
112
allows showing an overview on water consumption,
as reflected on the following four maps (January, April, July and October) for the latest
available year (2014):
112
http://www.eea.europa.eu/data-and-maps/explore-interactive-maps/water-exploitation-index-for-river-1
222
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0224.png
Figure: Water Exploitation Index + of European RBDs in January, April, July and
October 2014
The maps show the most severe water consumption pressures for spring and summer mainly in
the Western and Eastern Mediterranean.
Main uses for water consumption
In many Member States, the most relevant uses for water consumption have not been reported
to WISE because the pressures from those uses on water quantity have not been considered as
significant (some reported information came from Belgium, Spain, Croatia, Italy, Malta and
UK). However, the most relevant water uses continue stable compared to the first cycle, mainly
for energy production in Northern Europe; and abstractions for agriculture in Southern Europe.
Water quantity pressures have been reported as significant only in 10 Member States
113
and for
most (all except Belgium and Denmark), information is reported on the most relevant uses for
water consumption. It should also be noted that in some Member States, although water
quantity pressures are not reported as significant (and thus no data on water consumption uses
are provided), there are significant water abstraction pressures present in one or more of their
RBDs (e.g. in Bulgaria, Croatia, Czech Republic, Germany, France).
Measures related to abstractions and water scarcity
Controls over the abstraction of surface water and groundwater and impoundment of fresh
surface waters including a register or registers of water abstractions and a requirement for prior
authorization of abstraction and impoundment (under Article 11(3)(e)) are used along all
Member States, with certain differences regarding the existence of a register or of controls for
all abstractions. Most Member States
114
apply exemptions to permitting and/or register for
small abstractions, and though this lowers administrative burden it might be inconsistent, if
groundwater bodies do not achieve good quantitative status due to the accumulation of such
113
114
Belgium, Cyprus, Denmark, Spain, Hungary, Italy, Malta, Portugal, Slovakia, UK
Bulgaria, Czech Republic, Cyprus, Estonia, Spain, Finland, France, Croatia, Hungary, Italy, Malta, the
Netherlands, Portugal, Romania, Sweden, Slovenia, Slovakia, UK
223
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0225.png
minor abstractions. The causal chain for specific water bodies has not been assessed in this
report.
Water permits have to be periodically reviewed and, where necessary, updated. The granted
permits are in place for very different timespans, ranging from short periods up to very long
periods which hardly allow adapting abstraction permits to thresholds required for achieving
the WFD objectives.
Other basic measures to address water abstractions are in place widely across the EU, such as
those under Art.11.3 (c) to promote an efficient and sustainable water use and
less extended
Article 11(3)(f) controls, including a requirement for prior authorisation of artificial recharge or
augmentation of groundwater bodies. Supplementary measures (Article 11(4)), such as e.g.
water reuse, are in place in many RBDs, and in particular in those which suffer from water
scarcity.
The key technical measures most employed by Member States to tackle significant abstraction
pressures are KTM7 - Improvements in flow regime and/or establishment of ecological flows
and KTM8 - Water efficiency, technical measures for irrigation, industry, energy and
households. Some further KTM have also been applied in some cases, including KTM9/10/11 -
Water pricing policy measures for the implementation of the recovery of cost of water services
from households/ industry/ agriculture, KTM12 - Advisory services for agriculture, KTM13 -
Drinking water protection measures (e.g. establishment of safeguard zones, buffer zones etc),
KTM21 - Measures to prevent or control the input of pollution from urban areas, transport and
built infrastructure, for groundwater related pressures, and KTM24 - Adaptation to climate
change.
Main changes in implementation and compliance since 1st cycle
According to the reporting on the second RBMPs, for most Member States no major changes
have occurred regarding measures to address water abstractions and scarcity. However, several
Member States (15 out of 25 assessed Member States
115
) are planning new measures or
significant changes to basic measures related to water abstraction and scarcity (e.g. basic
measures under Article 11(3)(c) and 11(3)(f)).
Some Member States which previously had specific recommendations from the European
Commission to improve measures related to water abstraction and scarcity still present major
gaps on implementation (Spain, Portugal and to lesser extent Sweden) and other still need
progress in those previous recommendations (Italy, Malta, Slovenia).
-
Some Member States have taken measures to improve controls on abstractions, which
can reflect good practice (Cyprus, Hungary, Malta, Portugal, Slovenia, UK).
115
Belgium, Bulgaria, Cyprus, Czech Republic, Estonia, Croatia, Hungary, Italy, Luxembourg, Malta,
Netherlands, Portugal, Romania, Sweden, Slovakia
224
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.14.2.
Conclusions
More than 7 600 (7%) of Europe’s surface water bodies are affected
by significant water
abstraction pressures and 16% of the area of groundwater bodies is affected by over-
abstraction.
Basic and supplementary measures are in place in most of the RBDs concerned with water
scarcity. However, progress in reducing pressures is slow.
More progress is needed especially in those Member States in which small abstractions are
exempted from controls and/or register, but water bodies are suffering from significant water
abstraction pressures and therefore do not achieve good status (e.g. Estonia, Spain, France,
Italy, Malta, Poland, Portugal, UK).
Some Member States still need to make progress in fulfilling previous recommendations to
improve water scarcity management (Spain, Portugal, Italy, Malta, Sweden, Slovenia).
However, relevant action in extending metering, water abstraction controls and review licenses
can be observed in some countries, while water abstraction datasets have improved in others.
1.14.3.
Recommendations
Member States should progress in reducing existing significant water abstraction
pressures, and in truly acting in river basin districts concerned with water scarcity
issues.
Groundwater bodies with over-abstraction problems are often well identified. Thus,
action needs to be focused on implementing the required measures to revert trends and
achieve good quantitative status.
Relevant action is required in extending metering, water abstraction controls and review
of licenses and water abstraction registers. Small abstractions exempted from
control/registers should be reviewed in areas with significant abstraction pressures.
Member States are encouraged to monitor water consumptions/abstractions per sector
and assess trends over the WFD cycles, as quantitative and qualitative aspects should be
jointly considered in the status assessment and establishment of measures.
Recommended and endorsed indicators such as Water Exploitation Index+ should be
further applied in water scarce basins.
225
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0227.png
1.15.Measures related to pollution from agriculture
1.15.1.
Introduction
Key relevant requirements of WFD
As set out in chapter 6.9 above, in accordance with the environmental objectives laid out in
WFD Article 4 and based on a risk assessment and the status assessment supported by the
monitoring programmes, Member States are required to implement necessary measures to
prevent the deterioration of water bodies and to achieve good water status in surface and
groundwater. These measures should be listed in the POMs (WFD Article 11).
The POMs must include basic measures and supplementary measures addressing the identified
pressures. Basic measures relevant for the agricultural sector include those set out in WFD
Article 10 (IPPC Directive,
116
Nitrates Directive
117
) and in Annex VI including the Habitats
Directive
118
and Plant Protection Products Directive
119
. WFD Articles 16 and 17 further affect
the agricultural sector by requiring the establishment of a list of priority substances that pose a
risk to the aquatic environment, including those in relation to fertiliser and pesticide application
in the agricultural sector.
The assessment of the first RBMPs showed that basic measures alone, mostly likely, may not
lead to sufficient improvements in water body status in all cases; supplementary measures
(according to WFD Annex VI, Part B) may be needed to target the significant pressures which
the agricultural sector poses on the water environment and to achieve the objectives set out in
Article 4.
Assessment of implementation and compliance with WFD requirements in 2nd cycle
Main pressures
According to the EEA report “European
waters --
Assessment of status and pressures” (2018),
agriculture is the main driver for failure of good chemical status to EU groundwater, causing
diffuse pollution by nitrates and pesticides. Agricultural production is also a major source of
diffuse pollution into surface water, mostly associated with excessive emissions of nutrients
116
Directive 2008/1/EC of the European Parliament and of the Council of 15 January 2008 concerning integrated
pollution prevention and control
https://eur-lex.europa.eu/legal-content/EN/ALL/?uri=CELEX:32008L0001
117
Council Directive 91/676/EEC of 12 December 1991 concerning the protection of waters against pollution
caused by nitrates from agricultural sources
https://eur-lex.europa.eu/legal-content/en/ALL/?uri=CELEX:31991L0676
118
Council Directive 92/43/EEC of 21 May 1992 on the conservation of natural habitats and of wild fauna and
flora
https://eur-lex.europa.eu/legal-content/FRF/TXT/?uri=celex:31992L0043
119
Regulation (EC) No 1107/2009 of the European Parliament and of the Council of 21 October 2009 concerning
the placing of plant protection products on the market and repealing Council Directives 79/117/EEC and
91/414/EEC
https://eur-lex.europa.eu/legal-content/frn/TXT/?uri=CELEX:32009R1107
226
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0228.png
and chemicals such as pesticides. Water abstraction for agriculture is amongst the main
significant pressures causing failure of good quantitative status of groundwater bodies
120
.
Based on the assessment of the first RBMPs, the Commission recommended to almost all
Member States to assess actions needed to close the gap between the current status and the
achievement of good status in terms of load reductions for nutrients and pesticides. This
recommendation was followed by half of the Member States, which reported their RBMPs, as
shown in table 1 below. The remaining Member States are still lacking a gap assessment and it
remains unclear how the selection and location of measures will contribute to closing the gap.
Those Member States or RBMPs, which have performed a gap assessment, either based
themselves on the loads to be reduced or the areas to be covered by agricultural measures. For
those Member States which carried out gap assessments, nitrogen is addressed in all cases and
phosphorus by two-thirds of them. Pesticides are addressed in the gap assessment by only a few
Member States.
Table 1
Gap assessment in terms of load reductions for nutrients and pesticides
Information on gap assessment in the second RBMPs
A gap assessment for nitrogen was performed including an
evaluation/prediction of how effective the measures are/will be at reducing
the pressures to the level needed for achieving good status.
A gap assessment exists for pesticides, nitrogen and phosphorus. .
A gap assessment for the reduction in the number of applications of
pesticides is only provided for a few RBDs. A gap assessment on the load
of nitrogen/phosphorus to be reduced to achieve objectives was done in all
RBDs.
A gap assessment has been performed for water quantity (abstraction
pressures) and nitrates pollution.
A gap assessment has been performed for diffuse nutrient pollution.
A gap assessment for nitrogen and phosphorus was performed and is
reported.
A gap assessment can only be found for nutrients in a few RBDs
A gap assessment has been performed on the load of nitrogen/phosphorus
to be reduced to achieve objectives for 2015. There is also information on
the area (km2) of agricultural land required to be covered by measures to
tackle nutrient pollution to achieve WFD objectives.
A gap assessment has been performed for diffuse nutrient pollution,
physical alteration of channel/bed/riparian area/shore from agriculture and
dams, barriers and locks serving the purpose of irrigation in all basins.
Member State
Cyprus
Czech
Republic
Germany
Spain
Croatia
Hungary
Italy
Latvia
Netherlands
120
”European
waters -- Assessment of status and pressures 2018
227
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0229.png
Poland
Romania
Sweden
The gap assessment addresses diffuse chemical pollution and nitrates.
A gap assessment for nutrients and pesticides was performed and the areas
that need to be covered by measures are indicated.
A gap assessment was carried out for the load of nitrogen/phosphorus to be
reduced and for reduction in the number of applications of pesticides to
achieve objectives.
Source: Second RBMPs.
Types of measures applied in the second cycle programmes of measures
According to the assessment of the second RBMPs, all programmes of measures contain basic
and supplementary measures. To tackle diffuse pollution, the WFD requires the implementation
of basic measures under Article 11(3)(h) to prevent or control the input of pollutants from
agriculture at source. Such basic measures are reported for all assessed Member States, but not
for all RBDs and not for all diffuse pollutants (sediments, phosphorus, pesticides, nitrates,
microbiological/bacteriological and other pollutants).
Member States are also required to state whether general binding rules are in place for the
control of diffuse pollution from agriculture. Furthermore, Member States are required to report
whether these rules apply across the whole RBD, only in Nitrate Vulnerable Zones (NVZ) or if
there different rules apply for different parts of the RBD, linked to where pressures have been
identified. The figure below gives an overview of the application of binding rules in the RBDs
at EU level. Overall, general binding rules are in place in 140 RBDs. In only three RBDs are
binding rules not applied. In most RBDs (73), the same binding rules apply across the whole
RBD.
Figure 13: Application of general binding rules in RBDs for the control of diffuse pollution
from agriculture
Application of binding rules in RBDs
No general binding rules.
Yes, but rules apply only in Nitrate
Vulnerable Zones.
Yes, but there are differentiated rules for
different parts of the RBDs.
Yes, same rules apply across the whole RBD.
0
10
20
30
40
50
60
70
80
Source: WISE electronic reporting.
228
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0230.png
If general binding rules are applied, Member States are required to provide information on the
particular issues covered (sediments, phosphorus pesticides, organic pollution, nitrates,
microbiological/bacteriological and other pollutants).
Figure 14: Number of RBDs and issues covered in the general binding rules
Number of RBDs and issues covered in the general
binding rules
Sediments
Phosphorus
Pesticides
Organic pollution
Nitrates
Microbiological/bacteriological pollution
Other pollutants
0
20
40
60
80
100
120
140
160
Source: WISE electronic reporting.
According to Figure 2 above, general binding rules for nitrates are applied in all except five
RBDs. General binding rules for all other pollutants are less often applied.
The figures below show the number of Member States which report national basic and
supplementary measures under the main
KTMs related to agriculture.
Figure 15: Number of Member States which report national basic measures under KTM
related to agriculture.
229
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0231.png
Source: WISE electronic reporting.
Figure 4: Number of Member States which report national supplementary measures under
KTM related to agriculture
Source: WISE electronic reporting.
Most Member States have reported national basic measures under KTM2 to reduce nutrient
pollution from agriculture. There are also supplementary measures reported under KTM2 in
almost all Member States with few exceptions. The majority of Member States also have basic
measures reported under KTM3 to reduce pesticides pollution from agriculture, KTM8 on
water efficiency, technical measures, KTM15 to phase-out or reduce emissions of Priority
Substances and KTM13 on drinking water protection measures.
Special attention is given to drinking water protection. Most Member States have defined, or
are in the process of defining, specific zones including specific water protection measures (see
also chapter 15) and apply basic measures under KTM13 (Drinking water protection measures
(e.g. establishment of safeguard zones, buffer zones etc)). In several countries, there are also
supplementary measures reported under KTM13.
While basic measures are mandatory in most cases, the supplementary measures are mostly
applied on a voluntary basis and are linked to the EU Rural Development Programs under the
Common Agricultural Policy (CAP). Payments under Article 38 of the Rural Development
Regulation contribute to the implementation of the Water Framework Directive.
230
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0232.png
Considering the fact that agricultural pressures and in particular nutrients are still amongst the
main reasons for not achieving good status, the high dependency on voluntary action by the
farming sector might not lead to an adequate degree or rate of improvement across all RBDs, if
the uptake by farmers remains low.
The CAP´s mandatory
cross-compliance framework
includes statutory requirements related to
water protection and management arising from the implementation of the Groundwater
Directive and Nitrates Directive, as well as GAEC
121
standards relevant for the protection of
waters. In addition, under the CAP´s Greening, additional rules have been introduced for
protecting water and habitats by establishing ecological focus areas. It is acknowledged that
there is room for improvement in the implementation of this measure.
122
Farmers Consultation
Almost all Member States reported having consulted with farmers or farmers associations when
setting up the programmes of measures.
Financing of measures
More than two-thirds of the Member States reported that the financing of agricultural measures
is secured in all their RBDs and, in a few cases, in most of their RBDs. The EU Rural
Development Program is mentioned as the main source of funding. For those Member States
where financing of measures is not secured, the effectiveness of the POMs with regard to
agriculture might be significantly impacted. Also, the voluntary nature of measures could be a
limiting factor if their uptake by farmers remains low.
The WFD also requires the application of the polluter pays principle under Article 9. This is
only partly implemented in the agricultural sector as most supplementary measures are still
financed by external sources such as the EU Rural Development Programs and national
sources.
Main changes in implementation and compliance since 1st cycle
Due to differences in the reporting of Member States under the first and second RBMPs and
different methods of status assessments of the RBMPs, a detailed comparison between the first
and second cycle is not possible. However, some observations can be made:
121
Good Agricultural and Environmental Conditions
https://ec.europa.eu/agriculture/direct-support/cross-
compliance_en
See also Special report no 21/2017 from the European Court of Auditors:
“Greening: a more complex income
support scheme, not yet environmentally effective”
https://www.eca.europa.eu/en/Pages/DocItem.aspx?did=44179
122
231
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
The main pressures remain diffuse pollution (with excessive emissions of nutrients and
chemicals such as pesticides) and water abstraction in certain areas.
Agriculture remains one of the main drivers for water pollution and over-abstraction.
Some progress has been made in terms of identifying and quantifying the gap between
the current status and good status in terms of load reductions for nutrients and
pesticides.
The types of measures applied by the agricultural sector have not changed. Many of the
supplementary measures found in the second cycle programmes of measures are linked
to the Rural Development Programmes with potential for inadequate progress in
mitigating risk to water due to the voluntary nature of measure implementation, when
there is a low uptake by farmers.
Farmers’ involvement seems to have increased as most Member States report having
consulted with farmers or farmers associations when setting up the programmes of
measures. However, the quality of this engagement remains unclear and ongoing
advisory support for farmers in implementation of measures is absent from most
RBMPs.
1.15.2.
Conclusions
Agriculture continues to be a significant pressure on surface and groundwater in most RBDs in
the EU. Agriculture has been identified as a major source of pollution and over-abstraction and
is partly responsible for habitat degradation. Only about half of the Member States have
performed a gap assessment in terms of load reductions for nutrients and pesticides for their
second RBMPs, following the Commission recommendation from the first cycle. For those
who have not yet carried out such a gap assessment, it remains unclear how the selected
measures will contribute to achieving good status. Member States need to closely monitor
whether the objectives are going to be achieved or not. This includes investigation of the causes
of the possible failure and establishment of necessary additional measures.
Basic measures under Article 11.3 are mandatory in most RBDs. Supplementary measures are
mostly applied on a voluntary basis and linked to the EU Rural Development Programs.
Considering the fact that agricultural pressures, and in particular nutrients, are still a main
reason for not achieving good status, the high dependency on voluntary action by the farming
sector might not lead to an adequate degree or speed of improvement to achieve WFD
objectives within a reasonable timeframe. This is of particular importance when developing the
next phase of the Common Agricultural Policy, which is likely to continue to be a major source
of funding.
232
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.15.3.
Recommendations
In the third RBMPs, Member States should identify appropriate sources of funding,
such as Common Agricultural Policy Strategic Plans, to facilitate implementation of
measures to contribute to achieving the WFD objectives in all RBDs. The effective
involvement of environmental authorities in the designing of CAP Strategic Plans
should support this process.
Member States should ensure that there are explicit links in the RBMPs between the
WFD and other related Directives (e.g. Nitrate Directive, Sustainable Use of Pesticides
Directive etc.), supporting programmes and instruments (e.g. CAP Strategic Plans, LIFE
etc.) and include both nitrogen and phosphorus in the general binding rules.
Member States should state clearly to what extent, in terms of area covered and
pollution risk mitigated, basic measures (minimum requirements to be adhered to) or
supplementary measures (designed to be implemented in addition to basic measures)
will contribute to achieving the WFD objectives in all RBDs.
Member States should ensure a clear strategy is developed that defines the basic
measures that all farmers should adhere to as well as the additional supplementary
measures that may be required. The strategy should be developed in cooperation with
the farming community to ensure technical feasibility and acceptance and an expert and
effective advisory service should be made available to farmers to aid successful
implementation of the measures. The strategy should be reflected in the system of
conditionality, eco-schemes and agri-environment-climate commitments of the CAP
Strategic Plans.
1.16.Measures related to pollution (including nutrients, organic matter and
chemicals) from sectors other than agriculture
1.16.1.
Introduction
In the context of this chapter, pollution is considered in terms of:
(a) general physico-chemical elements and river basin specific pollutants (RBSPs) from
non-agricultural sources causing failure or risk of failure to achieve GES;
(b) priority substances from non-agricultural sources causing failure or risk of failure to
achieve good chemical status of surface waters; and
(c) groundwater pollutants from non-agricultural sources causing failure or risk of failure to
achieve good chemical status of groundwaters.
Chemical pollution from non-agricultural sources, like that from agriculture, poses a threat to
the aquatic environment and to human health via the environment. Effects include acute and
233
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
chronic toxicity in aquatic organisms, accumulation of pollutants in ecosystems, loss of habitats
and biodiversity, and contamination of drinking water supplies and fishery products. As a
matter of priority, causes of pollution have to be identified so that measures to combat it can be
put in place. Pressure and impact assessment for the identification of sources of pollutants has
to be carried out under Article 5 WFD. On the basis of the information collected in accordance
with that Article and Article 8, Member States have to establish an inventory of emissions,
discharges and losses of all priority substances, and the eight so-called
“other pollutants” in the
EQSs Directive, for each RBD or part of a RBD lying within their territory, including their
concentrations in sediment and biota, as appropriate.
Emissions of pollutants should be dealt with at source, in the most economically and
environmentally effective manner.
According to WFD environmental objectives, in making operational the programmes of
measures specified in the RBMPs, the Member States must implement the necessary measures
in accordance with WFD Article 16(1) and (8), with the aim of progressively reducing
pollution from priority substances and ceasing or phasing out emissions, discharges and losses
of priority hazardous substances to the aquatic environment. Specifically in relation to
groundwater, the Member States shall implement the measures necessary to prevent or limit the
input of pollutants into groundwater and to prevent the deterioration of the chemical status of
all bodies of groundwater.
More explanation about the types of measures applied is provided in chapter 6.9.
Chapter 5.2 provides information on the assessment of pressures and impacts on surface and
groundwater bodies as well as on the establishment and use of inventories of discharges,
emissions and losses of chemical substances. Chapter 6.4 provides information on the
monitoring of priority substances discharged to surface waters and on the priority substances
causing failure of good chemical status. Chapter 6.6 provides information on WFD
groundwater chemical monitoring and substances causing failure to achieve good chemical
status for groundwater bodies.
KTMs to tackle pollution from non-agricultural sources
There are two broad categories of measures that could be established for the control and
reduction of pollution from non-agricultural sources:
measures referring to the source of pollution that allow the reduction/phasing-out of
more than one pollutant (e.g. a wastewater treatment process); and
measures relating to the specific substances causing the pollution (e.g. banning or
restricting the use of a substance).
234
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Assessment of implementation and compliance with WFD requirements in the second cycle
All 25 Member States assessed provided information on measures addressing pollution by
nutrients, organic matter and chemicals (priority substances, river basin specific pollutants,
groundwater pollutants and other physico-chemical parameters) arising from sectors and
sources other than agriculture.
Non-agricultural sectors contributing to pollution include urban wastewater, atmospheric
deposition, mining, Industrial Emissions Directive (IED) plants and non-IED plants, historical
pollution, storm overflows, urban run-off, forestry, transport, contaminated or abandoned
industrial sites, discharges not connected to sewerage networks, and waste disposal sites.
Chapter 6.9 provides more information on the main significant pressures likely to give rise to
pollution of surface and groundwater bodies for which KTMs are operational.
The KTMs reported to be pertinent to tackling pollution from non-agricultural sources include:
-
-
-
-
-
KTM1 - Construction or upgrades of wastewater treatment plants,
KTM4 - Remediation of contaminated sites (historical pollution including sediments,
groundwater, soil),
KTM13 - Drinking water protection measures (e.g. establishment of safeguard zones,
buffer zones etc),
KTM14 - Research, improvement of knowledge base reducing uncertainty,
KTM15 - Measures for the phasing-out of emissions, discharges and losses of Priority
Hazardous Substances or for the reduction of emissions, discharges and losses of
Priority Substances,
KTM16 - Upgrades or improvements of industrial wastewater treatment plants
(including farms),
KTM17 - Measures to reduce sediment from soil erosion and surface run-off,
KTM21 - Measures to prevent or control the input of pollution from urban areas,
transport and built infra-structure,
KTM22 - Measures to prevent or control the input of pollution from forestry,
KTM25 - Measures to counteract acidification, and
KTM99 - Other KTM reported under PoM.
-
-
-
-
-
-
The majority of Member States reported several of the KTMs mentioned above as pertinent to
tackling pollution from non-agricultural sources. However, the reporting to WISE was not
always consistent with the reporting in the RBMPs. Furthermore, some KTMs pertinent to non-
agricultural pollution were not always reported under Topic 12 itself, giving the impression that
they were not considered relevant. More details on the number of RBDs which reported each
KTM as operational to address at least one significant pressure as well as on the number of
235
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
measures and the distinction between basic and supplementary measures are provided in
chapter 6.9.
While in the first RBMPs, the availability of measures against chemical pollution of surface
waters by particular substances was generally not reported, in the second RBMPs, several
Member States reported KTM15 and/or other KTMs in relation to specific substances.
Although some Member States indicated that they were looking at measures to combat mercury
pollution, others indicated that it was difficult to see how sufficient measures could be taken
against that pollutant at Member-State level..
Progress towards achieving the objectives between 2015 and 2027 via measures related to
pollution from non-agricultural sources is expected in most of the Member States which
reported information on relevant pressure gap indicators and KTMs.
Basic measures to reduce pollution from non-agricultural sources are being taken in most of the
Member States:
An
authorisation and/or permitting regime to control wastewater point source
discharges
is in place in all Member States for surface and in most Member States for
groundwater, although coastal waters are not covered in at least one instance.
A
register of wastewater discharges
(Basic measures under Article 11(3)g) is
available in all RBDs of most of the Member States for surface and groundwater. In a
few Member States the register of wastewater discharges is available for surface water
only.
There are no
thresholds below which wastewater discharges do not require permits
and are not subject to registration
(WFD Article 11(3)(g)) in more than half of the
Member States. Small discharges are exempted from controls in fewer than half of the
Member States. In a few Member States, small discharges do not require permits but are
registered.
There is
prohibition of all direct discharges
to groundwater in almost half of the
Member States and in some of the RBDs of a few additional Member States. Some
direct discharges to groundwater are authorised in accordance with Article 11(3)(j) in
other Member States, at least in some of their RBDs.
There are
measures
in place
to eliminate / reduce pollution from priority substances
and other substances
in all (reported) RBDs in the majority of the Member States.
Main changes in implementation and compliance since the first cycle
In the first RBMPs, the measures focusing on household-related pollution covered mostly
measures related to the Urban Wastewater Treatment Directive and to WFD Article 11(3)(g),
(h) and (k). The identification of substance-specific measures was generally missing in the first
RBMPs, as substance-specific measures were reported only for a few RBDs, and they were
236
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
generally not linked to failure of chemical or ecological status. Many of the measures
addressing chemical pollution in the Member States were general and it was not always clear
whether the value they provided could be attributed to action taken specifically to meet the
WFD objectives.
In the second RBMPs, substance-specific measures to reduce the emissions of the chemical
substances preventing the achievement of good status have been adopted in most of the
Member States. In a few Member States, the substance-specific measures are clearly reported
in the RBMPs but in many other Member States, the main evidence for substance-specific
measures comes only from the WISE electronic reports, according to which KTMs are in place
in many Member States for at least some of the priority substances and or river basin specific
pollutants causing failure of good status. In these cases, however, the specific measures
proposed in the respective RBMPs are often generic and not substance-specific, thus not
addressing specific priority substances or river basin specific pollutants.
In a few Member States, no substantial improvement in terms of substance-specific measures
was observed in many or all of their RBDs, and the measures to tackle pollution from non-
agricultural sources are still very general and not linked to failure of chemical and ecological
status.
It has to be pointed out that because of the limited level of detail reported in some of the first
RBMPs on this issue, it is challenging to identify all relevant progress made in Member States.
Several Member States are making particular progress on improving urban wastewater
treatment, through the construction or upgrading of treatment plants. However, it is not always
clear whether funding has been secured for planned upgrades.
1.16.2.
Conclusions
Basic measures to reduce pollution from non-agricultural sources such as an authorisation
and/or permitting regime to control wastewater point source discharges, the operation of
registers of wastewater discharges, and the prohibition or limitation of all direct discharges to
groundwater, and/or other measures to eliminate / reduce pollution from priority substances and
other substances are in place in most of the Member States.
The identification of substance-specific measures was a major gap in the first RBMPs, as
substance-specific measures were reported only for a few RBDs, and they were often general
and not linked to failures of chemical and ecological status. This situation has improved in the
second RBMPs, as substance-specific measures to reduce the emissions of the pollutants
preventing the achievement of good status have been adopted in several Member States. There
is however still significant room for improvement as the specific measures proposed in the
RBMPs of many Member States are often generic and not substance-specific, and in a few
237
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Member States the measures are still very general and not linked to failure of chemical and
ecological status.
Progress towards achieving the objectives between 2015 and 2027 via measures related to
pollution from non-agricultural sources is expected in most of the Member States which
reported information on relevant pressure gap indicators and KTMs. Although some Member
States specifically referred to the need to phase out the emissions of priority hazardous
substances, the rationale for identifying measures appeared in most cases to be the need to meet
the EQSs for good status. Therefore measures are likely to be missing where needed in some
RBDs to achieve the phasing out of emissions.
1.16.3.
Recommendations
Member States should ensure that measures (including KTMs) are identified to address
pollution by individual substances (Priority Substances, RBSPs and Groundwater
pollutants) from non-agricultural sources.
Member States should assess the likely effectiveness of measures so that they can
identify and implement appropriate supplementary measures to achieve the objective of
good status as soon as possible.
Member States should ensure the operation of a register of discharges and a suitable
authorisation/permitting regime for all relevant water bodies.
The progress made on implementing improvements to urban waste water treatment,
including sourcing funding and prioritising the most important locations, should be
continued and accelerated where possible.
Member States should ensure that measures aim at phasing out the emissions of Priority
Hazardous Substances, including where the EQSs have not been exceeded.
238
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.17.Measures related to hydro-morphological alterations
1.17.1.
Introduction
The WFD explicitly requires Member States to manage the effects on the ecological status of
water which result from changes to physical characteristics of water bodies. It requires action in
those cases where the hydro-morphological modifications are having an impact on the
ecological status interfering with the ability to achieve the WFD objectives and to avoid
deterioration due to new modifications or new sustainable human development activities.
Measures related to hydro-morphological improvements in the RBMPs are mainly reported as
supplementary measures with the aim of achieving the objectives established pursuant to
Article 4. Also basic measures under article 11(3) can impose controls over activities related to
hydro-morphological modifications. In addition to controls and registers of physical
modifications, certain regulatory actions may be taken to support the improvement of hydro-
morphology, such as reviewing existing permits to incorporate mitigation measures for the
achievement of WFD objectives.
WFD hydro-morphological measures planned to reduce existing hydro-morphological
pressures and improve the ecological status or potential of impacted water bodies should not be
taken in a silo approach but it is beneficial both in terms of the effects to be achieved and
funding opportunities to coordinate the planning of WFD measures with the planning process
for other sectors (e.g. planning for the energy, transport and agricultural sectors).
Assessment of implementation and compliance with WFD requirements in 2nd cycle
Links of measures to significant hydro-morphological pressures
Significant hydro-morphological pressures have been identified in practically all Member
States assessed for this report. No hydro-morphological pressures were identified in a single
case which may be due to the lack of appropriate assessment methods and appropriate
monitoring data to understand the nature of hydrological and morphological modifications.
Hydro-morphological pressures should be clearly related to the main sectors responsible for
causing these pressures on the water environment However, in the second RBMPs of most
Member States, the identified hydro-morphological pressures are not clearly apportioned to
specific sectors, according to the WISE reporting. The significant hydro-morphological
pressures have been clearly linked to sectors only in a fifth of Member States. In a third of
Member States, the sector linked to the significant hydro-morphological pressures of all or the
largest share of affected water bodies is either unknown or reported as “other” (i.e. not linked to
one of the key sectors in the WISE reporting). In almost half the Member States, there is only
partial apportionment of the hydro-morphological pressures to sectors, i.e. for part of the
239
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
pressures or in part of the RBDs, apportionment has been made, while for other pressures or in
other RBDs, the sector is unknown or “other”.
The KTM reported most frequently by Member States as operational to address significant
hydro-morphological pressures in the second RBMPs are:
KTM 5 Improving longitudinal continuity (e.g. establishing fish passes, demolishing
old dams).
KTM 6 Improving hydro-morphological conditions of water bodies other than
longitudinal continuity (e.g. river restoration, improvement of riparian areas, removal of
hard embankments, reconnecting rivers to floodplains, improvement of hydro-
morphological con-dition of transitional and coastal waters, etc).
KTM 7 Improvements in flow regime and/or establishment of ecological flows.
KTM 14 Research, improvement of knowledge base reducing uncertainty
KTM 23 Natural water retention measures, and
KTM 99
Other KTM reported under the POMs
Section 8.9 provides additional information on the number of national measures (basic and
supplementary) mapped against each of these KTM in each Member State.
The majority of Member States have reported operational KTM to address the significant
hydro-morphological pressures in all their RBDs where such pressures are identified. In a few
Member States, no KTM to tackle hydro-morphological pressures were reported in WISE,
although hydro-morphological pressures are identified. It is noted though that in these Member
States, information in the published RBMPs gives evidence that hydro-morphological measures
are planned for the second cycle, despite the gap in the WISE reporting.
In a few Member States, operational KTM for hydro-morphological pressures are reported only
for some but not all of their RBDs. In some Member States, , KTM are addressing only some
but not all of the main hydro-morphological pressures identified. in once example, KTM are
addressing only pressures linked to continuity barriers but not other types of hydro-
morphological pressures. In one of the RBDs in another country, KTM (research activities) are
generally addressing physical alterations.
The main types of specific national measures taken to address hydro-morphological
modifications were checked in 50 representative RBDs across Member States. The hydro-
morphological measures most frequently planned in the second RBMPs are related to
continuity interruption (e.g. fish ladders, removal of structures such as weirs, bypass channels),
sediment/debris management, setting of ecological flows, habitat restoration and specific
restoration of modified bed and bank structures.
240
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0242.png
Figure 1 Main types of specific national measures on hydro-morphology
Source: Published RBMPs of 50 RBDs selected for detailed assessment across the EU. The
RBDs selected were those with the most extensive hydro-morphological pressures in each
Member State.
Indeed, restoring river continuity is in many RBDs one of the priority issues for hydro-
morphological improvements. River continuity is specifically related to the free passage of fish
and is in this respect distinguished into upstream continuity (allowing the fish to migrate
upstream) and downstream continuity (allowing downstream migration). Management
objectives for restoring river continuity are reported to have been set in all RBDs of
approximately half of the Member States, while in another few Member States, such objectives
have been set for some but not all of their RBDs. More than a third of Member States have
reported not to have set any management objectives for river continuity. The objectives set for
river continuity are quantitative (e.g. km of rivers connected, number of obstacles to be made
passable) in all RBDs of almost half of the Member States, while in another quarter of Member
States, the objectives are quantitative only for some of the RBDs. In one Member State,
although continuity objectives are set, they have not been quantified.
Basic measures under WFD article 11.3(i)
Almost all Member States take basic measures to address hydro-morphological pressures
according to WFD article 11.3(i). These measures correspond to authorization/permitting
regimes to control physical modifications, which cover changes to the riparian area. Only one
has such an authorization/permitting regime, which does not cover changes to the riparian area.
241
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
In another Member State, no authorisation/permitting regime for physical modifications has
been reported.
The majority of Member States also has registers of physical modifications in place in all their
RBDs or in a few of their RBDs. In one fifth of Member States, there is no register of physical
modifications in any of the RBDs.
Natural water retention and green infrastructure measures
In the 2015 recommendations of the Commission based on the assessment of progress on the
implementation of the programmes of measures from the first RBMPs, many Member States
were asked to provide evidence that they consider natural water retention and green
infrastructure measures in their second RBMPs.
Win-win measures in terms of achieving the objectives of the WFD and Floods Directive,
drought management and use of Natural Water Retention Measures are reported to be included
in the programmes of measures in the majority of Member States. In one Member State, such
win-win measures are reported for some but not all of its RBDs, while in a few Member States,
such win-win measures have not been included in their programmes of measures.
The specific KTM on natural water retention (KTM23) is reported as operational to address
significant hydro-morphological pressures (e.g. related to flood protection and agriculture) or
abstractions in one third of Member StatesIn one country , KTM23 is applied but only in
relation to diffuse pollution pressures (hydro-morphology or abstractions). In the majority of
Member States though, KTM23-Natural water retention measures is not reported yet as part of
the operational KTM to tackle significant pressures. Examples of measures reported under
KTM23 refer to the restoration of floodplain meadows and floodplain forests but also
reconstruction of drainage systems in agriculture and forestry or removal of weirs in the context
of river restoration.
Measures for ecological flows and their implementation
Having a sufficient ecological flow regime is a prerequisite to reach GES in rivers and it is
crucial to maintain a flow throughout the river continuum. Therefore, establishing ecologically
based flow regimes is an important measure in the RBMPs.
In the second RBMPs, ecological flows have been reported to be derived and implemented for
all relevant water bodies in very few Member States. In the majority of Member States,
ecological flows have been derived and implemented only for some water bodies yet in all or
part of their RBDs. Therefore, in most Member States, the work on defining and implementing
ecological flows is still ongoing in the second cycle.
242
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0244.png
In one fifth of Member States and in some of the RBDs of another fifth, ecological flows have
not been derived yet, but there are plans to do so during the second planning cycle.
As shown in Figure 1, setting of ecological flows is planned as a specific measure in 42% of
the second RBMPs, in the majority of Member States. Explicit references that the
establishment of ecological flows is addressed by specific regulations were found for several
Member States, while in some of these, the relevant requirements are new compared to the
legislation which was valid under the first RBMPs. In other Member States, there are still
ongoing initiatives to set new standards and methodologies for ecological flow definition in
order to achieve WFD objectives.
Table 1
Derivation and implementation of ecological flows in the second RBMPs
Member States
All RBDs:
ES, CY, EE, HU, NL
In some RBDs:
FR (4 RBDs), IT (2 RBDs),
All RBDs:
CZ, AT, DK, RO, SE, SI
In some RBDs:
UK (Scotland, England, Wales,
Northern Ireland), BE (1 RBD), BG (1 RBD), DE (7
RBDs), FI (7 mainland RBDs), FR (10 RBDs), PL
(8 RBDs), PT (9 RBDs)
All RBDs:
CY, HU, NL
Some RBDs:
FR (2 RBDs)
All RBDs:
CZ, ES, AT, EE, RO, SE, SI
Some RBDs:
UK (Scotland, England, Wales), BG (1
RBD), DE (7 RBDs), FR (2 RBDs), IT (2 RBDs),
PL (8 RBDs), PT (8 RBDs)
All RBDs:
DK
Some RBDs:
UK (Northern Ireland), BE (1 RBD),
FI (7 mainland RBDs)
All RBDs:
LV, LU, MT, SK, HR
Some RBDs:
BE (7 RBDs), BG (3 RBDs), IT (5
RBDs), PL (1 RBD), PT (1 RBD)
DE (3 RBDs), FI (1 RBD), IT (1 RBD), PL (1 RBD)
Derivation and implementation of
ecological flows
Ecological flows
in all
water bodies
derived
in some
water
bodies (work is still
ongoing)
Ecological flows
in all
water bodies
implemented
in some
water
bodies (work is still
ongoing)
Ecological flows derived
but not
implemented
but there are plans to do
so in 2
nd
cycle
Ecological flows
not derived
but there
are plans to do so in 2
nd
cycle
Ecological flows
not derived
and no
plans to do so in 2
nd
cycle*
Source: WISE reporting 2016; Note (*): For some of the RBDs, where there is no intention to
derive ecological flows, this is due to the fact that no river water bodies are reported.
Ambition of hydro-morphological measures in closing the gap to good status/potential
In terms of the level of ambition in tackling significant hydro-morphological pressures, the
situation differs between Member States. In some Member States, there will be small to
medium progress in terms of closing the gap for hydro-morphological pressures by 2021, but
the main progress is expected between 2021 and 2027. In other countries, the information
reported in WISE indicates that no or very little progress is expected in closing the gap for
significant hydro-morphological pressures between 2015 and 2021.
243
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Overall, however, from the information reported by the 25 Member States, it is clear that the
implementation of the analysis of the gap to good status and of the level of implementation
expected in the KTMs varies considerably between the Member States (see also section 8.9).
Quite frequently data on the gap to good status are only reported for 2015 and 2021 but not for
2027, or are reported for only part of the pressures or part of the KTM. For some Member
States, no conclusion on the level of ambition in closing the gap for hydro-morphological
pressures can be reached due to the lack of reporting on the relevant indicators.
Main changes in implementation and compliance since 1st cycle
In the first RBMPs, a linkage between water uses, types of hydro-morphological pressures and
specific hydro-morphological measures could be found only in around 40% of the RBMPs
assessed across the EU. Thus, it was not possible to assess in detail whether the hydro-
morphological measures planned covered all the significant hydro-morphological pressures. In
the second RBMPs, information on the links between measures, hydro-morphological pressures
and water uses/sectors has largely improved, partly due to the improved WISE reporting which
requires a linkage between KTM, pressures and specific sectors. Nevertheless, for a large
number of water bodies affected by hydro-morphological pressures, the sector/driver is still
unknown/obsolete.
In addition, through the improved WISE reporting, the gap to be closed for hydro-
morphological pressures is better specified for 2015 and 2021.
Several hydro-morphological measures of the first RBMPs have not been implemented yet
mainly due to lack of financing, planning procedures, public acceptance of measures, legal
issues and issues related to land ownership. In most cases, measures of the first RBMPs which
were incomplete by end 2015 are included in the second RBMPs.
In some Member States, no specific hydro-morphological measures or very limited measures
were reported in the first RBMPs). In these Member States, the reporting of operational KTM
and more detailed measures related to hydro-morphological modifications in the second
RBMPs is considered an improvement compared to the first RBMPs.
1.17.2.
Conclusions
The majority of Member States, with few exceptions, have reported operational KTMs to
address significant hydro-morphological pressures. In some Member States, no specific hydro-
morphological measures or very limited measures were reported in the first RBMPs. Overall,
the reporting of operational KTM and more detailed measures related to hydro-morphological
modifications in the second RBMPs is considered an improvement compared to the first
RBMPs.
244
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
The hydro-morphological measures most frequently planned in the second RBMPs are related
to continuity interruption (e.g. fish ladders, removal of structures such as weirs, bypass
channels), sediment/debris management, setting of ecological flows, habitat restoration and
specific restoration of modified bed and bank structures.
In the second RBMPs, information on the links between measures, hydro-morphological
pressures and water uses/sectors has largely improved, partly due to the improved WISE
reporting which requires a linkage between KTM, pressures and specific sectors. Nevertheless,
for a large number of water bodies affected by hydro-morphological pressures, the sector/driver
was reported as still unknown/obsolete.
In addition, through the improved WISE reporting, the gap to be closed for hydro-
morphological pressures is better specified for 2015 and 2021. In some Member States, there
will be small to medium progress in terms of closing the gap for hydro-morphological pressures
by 2021, but the main progress is expected between 2021 and 2027. In other Member States,
the information reported in WISE indicates that no or very little progress is expected in closing
the gap for significant hydro-morphological pressures between 2015 and 2021. For some
Member States, no conclusion on the level of ambition in closing the gap for hydro-
morphological pressures can be reached due to the lack of reporting on the relevant indicators.
In most Member States, the work on defining and implementing ecological flows is still
ongoing in the second cycle. Ecological flows were reported to have been derived and
implemented for all relevant water bodies only in few Member States. In the majority of
Member States, ecological flows have been derived and implemented only partially.
1.17.3.
Recommendations
Member States should continue the work on restoration of water bodies, and in
particular improve river continuity and restore habitats in many RBDs throughout
Europe. Authorisation and permitting systems to ensure appropriate control of physical
alterations should be applied more widespread in all Member States.
Ecological flows required to achieve GES should be properly derived wherever relevant
based on all relevant biological quality elements, and their implementation for the
timely achievement of GES ensured.
The use of green infrastructure and/or natural water retention measures should be more
widespread to allow for a large range of environmental, social and economic benefits
that these types of interventions have the potential to provide, as compared to grey
infrastructure.
245
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.18.Economic analysis and water pricing policies
1.18.1.
Introduction
At the time of its introduction, the WFD was one of the first framework directives to explicitly
refer to economic analysis and include the use of economic instruments (e.g. environmental
charges and taxes). This is based on the polluter pays principle and on the understanding that
economic instruments can be important tools in managing environmental pressures that affect
Europe’s waters.
The WFD includes three general economic concepts, closely related but not equivalent, each
one imposing specific requirements on water economics in general and water pricing schemes
specifically:
Cost recovery establishes the overall amount that users are charged for water services
(through fees or taxes). The WFD requirements, however, are not limited to the
financial costs for the provision of a water service, but also of the costs of associated
negative environmental impacts (environmental costs) as well as forgone opportunities
of alternative water uses (resource costs).
Incentive pricing deals with the way water users pay for their use and whether the right
price signals are transmitted, i.e. it addresses the question how water is being paid for
and how the water price affects the behaviour of water users.
The polluter pays principle establishes how environmental costs should be covered
among economic agents, i.e. it looks at the adequacy of contributions from the different
agents based on their role in causing these costs.
The principle of cost recovery is referred to in Article 9(1) of the WFD as follows:
“Member States shall take account of the principle of recovery of the costs of water services,
including environmental and resource costs, having regard to the economic analysis conducted
according to Annex III, and in accordance in particular with the polluter pays principle.
Member States shall ensure by 2010
-
that water-pricing policies provide adequate incentives for users to use water resources
efficiently, and thereby contribute to the environmental objectives of this Directive,
-
an adequate contribution of the different water uses disaggregated into at least
industry, households and agriculture, to the recovery of the costs of water services
based on the economic analysis conducted according to Annex III and taking account of
the polluter pays principle.
246
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Member States may in so doing have regard to the social environmental and economic effects
of the recovery as well as the geographic and climatic conditions of the region or regions
affected."
As a basis for this, Article 5 of the WFD requires Member States to undertake an economic
analysis of water uses according to the specifications of Annex III. Annex III of the WFD
requires that the economic analysis of water uses should contain enough information in
sufficient detail (taking account of the costs associated with collection of relevant data) in order
to:
Make the relevant calculations necessary for taking into account the principle of
recovery of the costs of water services under Article 9, taking into account long term
forecasts of supply and demand for water in the RBD and where necessary:
-
-
estimates of the volume, prices and costs associated with water services.
estimates of the relevant investment including forecasts of such investments.
Make judgments about the most cost-effective combination of measures with respect to
water uses to be included in the Programmes of Measures under Article 11 based on
estimates of the potential costs of such measures.
Assessment of implementation and compliance with WFD requirements in the 2nd cycle and
key changes since the 1st cycle
Water services and cost recovery
In about one third of the Member States assessed, only public water supply and waste water
collection/treatment are covered (in the first cycle, a narrow definition was used by more than
half of the Member States). Such a
narrow definition
limits very significantly the potential
impact of Article 9 provisions by reducing the scope of the analysis and cost recovery
calculations to a limited number of water services. Compared to the first cycle however, where
more than half of the Member States used a narrow definition of water services, this is a
significant improvement.
In more than one third of the Member States, a rather
wide definition
of water services is used,
including water use activities that have a significant impact on water bodies such as for
example (inter alia), hydropower generation, navigation and flood protection, or self-
abstraction for irrigation and industrial purposes. In Latvia for example, a broad definition of
water services has been used, and cost recovery rates are presented for all these services.
According to
Article 9.4
of the WFD, Member States can choose not to apply the "cost
recovery principle" for some water services, in cases where this does not compromise the
purposes and the achievement of the objectives of the WFD. While most Member States take
247
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0249.png
waste water and sanitation as the core area for cost recovery, it is counter-intuitive to note that
one fifth of the Member States applied Article 9.4 for precisely this area.
Self-abstraction is the water service for which Art 9.4 has been most often used. Further it is
noted that the application of Article 9.4 varies across Member States, and also across RBDs in
the same Member State. Additionally, in some Member States, the water services for which
Article 9.4 is applied do not correspond with the water services which are reported for Article 9
cost recovery purposes.
Figure 1:
Article 9.4 applied in (all/some/none) RBDs in Member States
Source: WISE reporting 2016.
Calculation of cost recovery rates and the inclusion of environmental and resource costs
The main observation with regards to the calculation of cost recovery rates is that there are
varying methodologies
in place, which can be attributed to the fact that such calculations need
to take into account the local conditions but which makes it difficult to make comparisons
across RBDs or Member States.
Overall there is a consensus in all Member States about the need to cover the
financial costs
of
water services. Considerable work is reported in all Member States regarding the calculation of
financial costs of water services (in all Member States there is some information of financial
cost recovery presented). At the same time, the approaches vary across the Member States and
it is not always clear how exactly financial costs are calculated and if all elements of financial
costs are taken into account in the calculation, for example regarding capital costs (investment
costs, depreciation, cost of capital, replacement costs etc).
248
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0250.png
Regarding the estimation and integration of
environmental and resource costs
it is reported
that environmental and resource costs are calculated for all reported water services in half of
the Member States (in about one third of the Member States environmental and resource costs
are not calculated, and in a few Member States only some water services are). However, this
does not automatically mean that the calculation is transparent.
The significance of these costs is judged very differently among the Member States, from being
highly important to not significant at all. The situation also differs significantly with regard to
their (partial or full) internalization, often even within Member States. As in the first RBMPs,
an often-shared opinion is that the environmental and resource costs are already minimized
through permit systems and internalized through charges and fees. In several Member States, in
cases in which the good environmental status is not reached in a water body due to a specific
water service, the environmental and resource costs of that service are assumed to be as high as
the costs of the measures that would be needed to reach the good status (abatement cost
approach).
Figure 2: Environmental and resource costs calculated in RBDs in all Member States
assessed for all/some/no water services
Source: WISE reporting 2016.
The use of quantification and monetary valuation of ecosystem services is so far not used for
supporting the Article 9 implementation.
249
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Water-pricing policies, adequate incentives and volumetric charges
Water-pricing policies
are unevenly implemented across the EU. Price levels for water
services vary significantly across the assessed Member States, ranging from 0 over very small
amounts to rather high levels.
Incentive pricing
is not referred to in many of the RBMPs. Even when referred to, the
information is mostly too general and does not present the situation in appropriate analytical
detail. In most cases, a global explanation is provided, stating that the regulations and
instruments in place guarantee that incentives are set.
In the first cycle, in many cases there was not sufficient information on whether
water
metering
was in place for different water uses, information that is fundamental when
considering an incentive pricing policy. In the second cycle, the information has improved,
even if water metering is not a requirement in all Member States and for all water uses, since
various exemptions for some activities (mostly agricultural activities) exist.
Across the EU,
volumetric charges
are in place for 58% of all reported water services. For
31% of the reported water services, volumetric charges are partially in place, and only for 11%
of the reported water services, no volumetric charges are in place. The assessment of the
incentive function of volumetric charges is not reported in detail, and only general statements
regarding this issue are given.
Finally, in the first RBMPs, limited efforts were made on documenting the
adequate
contribution
of water uses, and this situation did not change much in the second RBMPs. The
contributions of the water uses to the recovery of the costs are still unclear in many cases, or
very vaguely described. Especially in agriculture, adequate contributions are mostly not defined
(in 58% of all reported water services, there is either no contribution reported at all, or the
situation is unclear). In Hungary and Slovakia however, pricing policies have been modified to
increase cost recovery in agriculture.
Polluter pays principle
The polluter pays principle is mentioned in most second RBMPs only in a general way without
providing details, e.g. regarding which policy instruments or other mechanisms guarantee that
the polluter pays principle is applied and how.
Economic analysis
The economic analysis has been updated in virtually all RBDs assessed (fully in 125 and
partially in 15 RBDs). It has not been updated in only one RBD, and for two RBDs the
situation is not clear.
250
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.18.2.
Conclusions
In spite of the efforts made by several Member States, in part thanks to the ex-ante
conditionality for the 2014-2020 European Structural and Investment Funds, progress on the
implementation of the principle of cost recovery and the use of economic instruments has been
limited, which limits the potential of promoting efficient water management. The RBMPs in
the majority of cases do not report much progress or changes since the first implementation
cycle. Only a number of Member States have changed their previous approaches to water
pricing or their water pricing policies based on the work done to implement Article 9.
Some progress can be noted. A significant amount of Member States have widened the
definition of water services to water use activities that have a significant impact on water
bodies, such as for example hydropower generation, navigation and flood protection, or self-
abstraction for irrigation and industrial purposes. This does not mean however that the
respective cost recovery calculations are fully developed or transparently presented.
On the calculation of financial costs of water services, considerable work is reported by all
Member States (even if not always complete/transparent).
Environmental and resource costs are treated more specifically in the second cycle compared to
the first cycle: there are more efforts evident to calculate these costs and more information is
available on methodologies and approaches, and there is more transparency on whether these
costs have been internalized or not.
In the second cycle the information has improved on whether water metering was in place for
different water uses, even if water metering is not a requirement in all Member States and all
water uses, since various exemptions for some activities (mostly agricultural activities) exist.
The economic analysis has been updated in almost all RBDs.
Nonetheless the implementation of Article 9 remains incomplete, which limits the potential of
promoting efficient water management in the EU. Several key points require further attention.
It is noted that reporting is uneven across Member States and even across RBDs within the
same Member State. In many cases methodologies to calculate costs are insufficiently
documented and essential information is missing. This makes it difficult to efficiently assess
the effectiveness of the use of economic instruments.
Cost recovery is not always applied to all water use activities having a significant impact on
water bodies. The application of Article 9.4 also varies across Member States, and across RBDs
in the same Member State.
The Member States that calculate the environmental and resource costs of water services
generally use a wide range of different methodologies, which can be attributed to the fact that
251
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
such calculations need to take into account the local conditions but makes it difficult to make
comparisons across Member States. However, in many cases these costs are considered as
calculated through their internalization, without a primary effort to actually estimate them.
Hence, significant gaps remain and there is room to improve the transparency on how these
costs have been dealt with. The European Commission could support the development of more
consistent methodologies.
Limited changes in the water pricing policies have taken place in order to implement the
Article 9 provisions. Information on the incentive function of water pricing and the adequate
contribution of water uses is often rather limited and generic.
1.18.3.
Recommendations
Reporting on cost recovery policies should be sufficiently detailed and transparent,
while at the same time focusing only on the information that is relevant to assess the
effectiveness of the use of economic instruments. To the extent possible it should be
done in a way that allows for comparison across RBDs.
Cost recovery should be applied to all water use activities that have a significant impact
on water bodies, including impoundments, abstraction, storage, treatment and
distribution of surface waters, and collection, treatment and discharge of wastewater,
also when they are 'self-services', for instance self-abstraction for agriculture.
Exemptions based on Article 9(4) should be transparently justified.
Sufficient information should be provided about how the financial, environmental and
resource costs have been calculated and how the adequate contribution of the different
users is ensured (disaggregated into at least industry, households and agriculture), i.e.
demonstrating how the polluter pays principle has been taken into account.
Sufficient information should be provided about the water-pricing policies, including
the use of adequate incentives for users to use water efficiently, and documenting
volumes, prices, and costs associated with water services (as required by the Annex III).
In line with the requirements of the Annex III Member States should provide a
transparent overview of estimated investments and investment needs.
252
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
1.19.Protected Areas
1.19.1.
Introduction
According to Article 6 and Annex IV of the WFD, Member States shall ensure the
establishment of a register or registers of all areas lying within each RBD which have been
designated as requiring special protection under specific Community legislation for the
protection of their surface water and groundwater, or for the conservation of habitats and
species directly depending on water, including the protection of Natura 2000 sites and
economically significant aquatic species.
For water bodies which are designated as Protected Areas, the environmental objectives set are
beyond good status, as more stringent objectives may have to be set for those areas in the
relevant Community legislation.
The relevant EU legislation for the protection of water with additional or more stringent
objectives includes the following directives:
Drinking Water Directive (80/778/EEC, as amended by Directive 98/83/EC).
Shellfish Directive (2006/113/EC) (repealed)
Freshwater Fish Directive (2006/44/EC) (repealed).
Bathing Water Directive (2006/7/EC)
Nitrates Directive (91/676/EEC)
Urban Wastewater Treatment Directive (91/271/EEC)
Birds Directive (2009/147/EC)
Habitats Directive (92/43/EEC)
Member States were required to report on monitoring, additional objectives and additional
measures for protected areas under the Habitats/Birds, Shellfish and Drinking Water Directives.
The Freshwater Fish Directive and the Shellfish Directive were repealed on 22 December 2013.
According to the WFD, the level of protection should be maintained through the inclusion of
the designated areas as Protected Areas under WFD, but Member States were not required to
report on additional objectives and measures for freshwater fish protected areas.
Annex VII (7)(1) of the WFD requires that the RBMPs contain a summary of the measures
required for implementing Community legislation for the protection of water. Additional
measures for Protected Areas should be an integral part of the RBMPs in order to ensure that
the requirements of those Protected Areas are included in the overall management of the RBDs
253
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0255.png
and to ensure the coherence of the entire water planning with the objectives already established
by other Community and national legislation.
Article 11(5) of the WFD states that “additional measures as may be necessary in order to
achieve those objectives are established, including, as appropriate, the establishment of stricter
EQSs following the procedures laid down in Annex V.”
Article 4(1)(c) of the WFD states that ‘Member States shall achieve compliance with any
standards and objectives at the latest 15 years after the date of entry into force of this Directive,
unless otherwise specified in the Community legislation under which the individual Protected
Areas have been established’. Therefore, water bodies in the Protected Areas must be of good
status by 2015 at the latest, and earlier if required by another piece of Community legislation. If
a water body is not of good status then it would be expected that an exemption under Article
4(4) of the WFD has been applied.
1.19.2. Assessment of implementation and compliance with WFD requirements in 2nd cycle
Identification of protected areas
All 25 Member States, which have been assessed, have in general reported and identified
protected areas for the relevant Directives (see Table 1).
Table 1 Number of protected areas for each type at Member State level
Protected area type
Urban
Waste
Member
Water
State
Article
7
Treatment
Abstraction
Directive
for drinking
Sensitive
water
Bathing Birds Fish Habitats Nitrates Shellfish Area
Other
AT
201
134
61
97
BE
605
40
220
278
13
1
5
BG
CY
CZ
DE
DK
EE
ES
FI
FR
HR
359
25
374
2971
402
2
8736
2132
25690
250
94
113
160
1641
1038
43
1834
273
3344
917
18
598
110
66
420
198
194
27
44
254
109
706
21
168
116
120
219
37
593
3269
234
328
1023
343
940
626
11
80
18
107
70
134
1
104
181
392
6
6
5827
16
96
12
14
1
761
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0256.png
Protected area type
Urban
Waste
Member
Water
State
Article
7
Treatment
Abstraction
Directive
for drinking
Sensitive
water
Bathing Birds Fish Habitats Nitrates Shellfish Area
Other
HU
IT
LU
LV
MT
NL
PL
PT
RO
SE
SI
SK
UK
1952
13870
6
211
1
25
368
418
2755
1266
1259
202
1623
238
2609
11
54
87
376
126
499
49
439
46
26
616
55
437
15
5
5
61
133
53
136
117
11
40
65
81
7
28
145
7
552
374
1474
30
139
14
128
645
87
270
1058
214
219
1520
211
1
94
17
72
4
32
3
54
1
372
7
12
6
1270
69
251
131
1
39
2
1
2596
100
3
177
133
696
225
448 489
614
Source: WISE reporting 2016.
Note: The values in the table represent unique Protected Areas as determined from the
Protected Area codes entered by each Member State into WISE. A Protected Area that is
associated with more than one water body category is counted only once.
Status assessment
The reporting of the status assessment regarding both surface and groundwater protected areas
and also regarding ecological, quantitative and chemical status is quite comprehensive in the
second RBMPs. The share of water bodies with unknown status is relatively low, with the
exception of chemical status of surface water bodies in protected areas which is unknown for a
share of almost 20% (see Figure 1).
Nearly 70% of the ecological status assessments have been made with high or medium
confidence, meaning that the status assessment should be based on monitoring data. Only for
6% of the water bodies, it is reported that no information is available for a status assessment.
Also in the case of groundwater, nearly 70% of the quantitative status assessments have been
made with high or medium confidence. Only for 8% of the water bodies, it is reported that no
information is available for a status assessment.
255
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0257.png
Figure 1 Status of water bodies within protected areas
Source: WISE reporting 2016
Ecological status/potential
Source: WISE reporting 2016
256
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0258.png
Chemical status - surface water
Chemical status
groundwater
257
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0259.png
Quantitative
groundwater
Additional objectives in protected areas
The establishment of additional objectives for the different types of protected areas is shown on
the EU level in Figure 2.
It is concluded that drinking water areas (under Article 7) are the dominant type of protected
area for which objectives have been set, followed by protected areas related to the Habitats
Directive, Nitrate Sensitive Areas and bathing waters. Objectives related to the repealed
directives (Fish and Shellfish) are very limited and concentrated in a few countries. The
situation is similar for protected areas under the Urban Wastewater Treatment Directive, for
which specific objectives have been set in only few countries.
258
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0260.png
Figure 2: Objective setting in protected areas per category of protected area.
Source: WISE reporting 2016
Table 2 shows whether specific objectives have been set to protect water dependent habitats
and species for protected areas under the Birds and Habitats Directives (amounting to
approximately 16 000 protected areas) in the different Member States. For 44% of the protected
areas under the nature Directives, the additional needs (to reach the more stringent objectives)
are still unknown. Considering also that for 13% of the protected areas for which objectives
have been set, work to determine the needs is ongoing, this indicates that for nearly 60 % of the
protected areas under nature Directives, the needs for improvement are not yet established. The
low reported monitoring activities in relation to protected areas makes this critical, as the data
necessary to determine the needs are not being produced.
Only for 17% of protected areas under the nature Directives, specific water objectives have
been set and the needs for changes should be known. Further information in some of the
relevant RBMPs indicates that a considerable part of this category consists of water bodies,
where the more stringent objectives are already met, meaning that no further effort is needed.
For a number of nature protected areas (26%), the achievement of the WFD good status is
expected to be sufficient also to achieve favourable conservation status under the nature
Directives. Some Member States have reported all their protected areas in this category, and
further clarification may be needed on whether this decision is based on individual assessments
of water bodies.
259
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0261.png
Table 2: Percentage of protected areas under the Birds and Habitats Directives in the RBMPs for which specific objectives have been set or
not set.
Member No specific objectives No specific objectives set - Achievement of Some specific objectives set - Specific objectives set (all
set - Additional needs WFD good status is sufficient to achieve But work still on-going to water dependent habitats
State
are not known
favorable conservation status
determine needs
and species)
Austria
(AT)
Belgium
(BE)
Bulgaria
(BG)
Cyprus
(CY)
0
27
0
0
0
47
26
100
0
0
7
44
0
0
0
19
30
0
0
Czech
100
Republic
(CZ)
German
y (DE)
Denmar
k (DK)
Estonia
(EE)
82
0
87
0
100
13
0
0
0
18
0
0
260
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0262.png
Member No specific objectives No specific objectives set - Achievement of Some specific objectives set - Specific objectives set (all
set - Additional needs WFD good status is sufficient to achieve But work still on-going to water dependent habitats
State
are not known
favorable conservation status
determine needs
and species)
Spain
(ES)
Finland
(FI)
France
(FR)
Croatia
(HR)
Hungary
(HU)
62
0
84
0
6
28
80
12
100
25
13
97
10
20
4
0
16
33
3
0
0
0
0
53
1
0
Italy (IT) 53
Luxemb
ourg
(LU)
Latvia
(LV)
Malta
(MT)
0
0
0
0
10
0
100
90
100
0
0
0
The
0
Netherla
nds (NL)
261
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0263.png
Member No specific objectives No specific objectives set - Achievement of Some specific objectives set - Specific objectives set (all
set - Additional needs WFD good status is sufficient to achieve But work still on-going to water dependent habitats
State
are not known
favorable conservation status
determine needs
and species)
Poland
(PL)
Portugal
(PT)
0
0
0
93
100
0
0
100
26
0
7
0
100
0
0
34
100
0
0
0
0
0
39
Romania 0
(RO)
Sweden
(SE)
Slovenia
(SI)
Slovakia
(SK)
United
Kingdo
m (UK)
EU
0
100
0
1
44
26
13
17
Source: WISE reporting 2016
262
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0264.png
Table 3 shows the percentage of shellfish areas where a standard has been set and those without
any standard. It should be noted that most countries have used the same standards as in the
repealed Directive, and only very few countries have fully or for a considerable percentage of
the protected areas introduced standards different to those in the repealed Directive. Also few
countries have either no standards at all or no standards for a considerable percentage of the
shellfish areas.
Table 3: Percentage of protected shellfish areas where information on standards has been
reported
Member State
Microbiological
Microbiological
No
microbiological
standards have been standards have standards have been
set to protect shellfish been
set
to set to protect shellfish.
and
these
are
identical to those in
the repealed Shellfish
Directive
2006/113/EC.
protect shellfish
and these are
different to those
in the repealed
Shellfish
Directive
2006/113/EC.
-
-
0
-
-
0
100
-
0
-
0
0
-
1
-
-
-
0
-
-
100
-
-
59
0
-
58
-
0
0
-
42
-
-
-
0
Austria (AT)
Belgium (BE)
Bulgaria (BG)
Cyprus (CY)
Czech Rep (CZ)
Germany (DE)
Denmark (DK)
Estonia (EE)
Spain (ES)
Finland (FI)
France (FR)
Croatia (HR)
Hungary (HU)
Italy (IT)
Luxembourg (LU)
Latvia (LV)
Malta (MT)
The Netherlands (NL)
-
-
0
-
-
41
0
-
42
-
100
100
-
57
-
-
-
100
263
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0265.png
Member State
Microbiological
Microbiological
No
microbiological
standards have been standards have standards have been
set to protect shellfish
and
these
are
identical to those in
the repealed Shellfish
Directive
2006/113/EC.
been
set
to set to protect shellfish.
protect shellfish
and these are
different to those
in the repealed
Shellfish
Directive
2006/113/EC.
Poland (PL)
Portugal (PT)
Romania (RO)
Sweden (SE)
Slovenia (SI)
Slovakia (SK)
United
(UK)
EU
-
100
0
100
-
-
59
0
100
0
-
0
22
-
41
0
0
0
-
2
22
Kingdom 98
56
Source: WISE
reporting 2016; Note: “-“ in the table indicates no information available.
Protected area exemptions
In the second RBMPs, exemptions for protected areas have been reported to a very limited
extent, as only 6% of the protected areas have been exempted from the relevant protected area
objectives or standards. More than half of the exemptions for protected areas have been applied
in only few Member States.
Exemptions have not been applied equally for all Directives, ranging from 1-2% of exemptions
applied for Drinking Water protected areas and Nitrate Sensitive Areas up to 15% exemptions
applied for protected areas under the Habitats Directive. The most frequently reported type of
exemptions is time extension under Article 4(4), because of technical feasibility issues,
amounting to nearly 50% of all the exemptions applied.
Monitoring
Reporting of monitoring specifically targeted towards protected areas is very limited
in
certain countries even missing. Especially for groundwater (both for drinking water and
dependent habitats and species), the reported monitoring activities are in general very low or
often missing (see table 4). Figure 2 shows that more than 50% of the protected areas with
264
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0266.png
objectives set are drinking water areas
meaning several thousands of sites, that need to be
monitored. Table 4 shows the monitoring sites especially related to protected drinking water
areas, summing up to approximately 13 000 sites. According to table 4, more than half of the
monitoring sites are reported by one country, while more than one third of countries report no
monitoring sites at all of protected drinking water areas.
The reported information shows a need for specific monitoring of protected drinking water
areas as well as of other types of protected areas. In a number of countries, there seems to be a
contradiction between the confidence of the status assessment (high or medium) and the limited
reported monitoring activity especially related to protected areas. High or medium confidence
on the status assessment requires a data basis established through a monitoring program and
this coherence is not present in the reporting of a number of countries.
Table 4 Number of monitoring sites associated with drinking water protected areas for
groundwater and surface water
Monitoring sites drinking water
Member Groundwater
State
AT
BE
BG
CY
CZ
DE
DK
EE
ES
FI
FR
HR
HU
IT
LU
LV
MT
NL
PL
PT
RO
0
21
375
0
0
374
7084
0
773
346
0
286
0
641
0
0
0
0
0
0
0
Surface water
0
84
327
0
0
79
0
0
977
22
22
0
0
64
0
0
0
0
120
0
197
265
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0267.png
Monitoring sites drinking water
SE
SL
SK
UK
EU
1253
0
60
60
11273
86
0
7
7
1992
Source: WISE reporting 2016.
Measures for protected areas
The main information available from the reporting on measures related to protected areas
concerns safeguard zones. According to Article 11(3)(d) of the WFD, measures are needed to
meet the requirements of Article 7 (Waters used for the abstraction of drinking water),
including measures to safeguard water quality in order to reduce the level of purification
treatment required for the production of drinking water. According to Article 7(3) of the WFD
Member States shall ensure the necessary protection for the bodies of water identified
according to Article 7(1) (drinking water protected areas) with the aim of avoiding
deterioration in their quality in order to reduce the level of purification treatment required in the
production of drinking water. Member States may establish safeguard zones for those bodies of
water.
Table 5 shows whether safeguard zones have been established in the second RBMPs and
whether there is going to be any change as a result of the second cycle. For nearly 80% of the
RBMPs, safeguard zones are established and no changes are foreseen as a result of the second
RBMPs.
266
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0268.png
Table 5: Number of RBMPs where safeguard zones have been established (or not established), indicating also needs to change the regulations.
Member
States
Austria
(AT)
Belgium
(BE)
Bulgaria
(BG)
Cyprus
(CY)
Czech
Rep (CZ)
Germany
(DE)
Denmark
(DK)
Estonia
(EE)
Spain
(ES)
Finland
(FI)
7
1
0
0
17
0
0
0
3
10
4
2
0
0
0
0
0
0
0
0
0
0
0
0
1
1
3
0
0
0
0
0
4
2
0
0
Safeguard zones and no plans to Safeguard zones but there will be No safeguard zones but plans No safeguard zones
change the regulations as a result significant changes to them as a to implement them as a result and no plans
of this RBMP
result of this RBMP
of this RBMP
establish them
3
0
0
0
to
267
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0269.png
Member
States
France
(FR)
Croatia
(HR)
Hungary
(HU)
Italy (IT)
Safeguard zones and no plans to Safeguard zones but there will be No safeguard zones but plans No safeguard zones
change the regulations as a result significant changes to them as a to implement them as a result and no plans to
of this RBMP
result of this RBMP
of this RBMP
establish them
14
0
1
5
0
2
0
1
0
3
0
4
0
0
0
2
0
1
0
0
0
0
0
0
0
0
0
0
Luxembo 1
urg (LU)
Latvia
(LV)
Malta
(MT)
The
Netherla
nds (NL)
Poland
(PL)
Portugal
(PT)
Romania
(RO)
9
9
1
0
1
0
1
0
0
0
0
0
0
0
0
268
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0270.png
Member
States
Sweden
(SE)
Slovenia
(SI)
Slovakia
(SK)
United
Kingdom
(UK)
EU
Safeguard zones and no plans to Safeguard zones but there will be No safeguard zones but plans No safeguard zones
change the regulations as a result significant changes to them as a to implement them as a result and no plans to
of this RBMP
result of this RBMP
of this RBMP
establish them
0
2
1
11
5
0
0
0
0
0
0
2
0
0
0
2
107
22
Source: WISE reporting 2016
5
2
269
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
For the remaining water bodies especially those protected under the Habitat and Birds
Directives, needs are either not known or it is reported that the WFD good status is sufficient to
achieve favourable conservation status. In both cases, measures are not necessary in the second
cycle.
Overall, there is very limited information about measures to be implemented in protected areas,
which is probably also related to the fact, that only a very small number of protected areas have
a specific objective set
and most of them probably already fulfil the objective.
Main changes in implementation and compliance since 1st cycle
Changes with regard to protected areas since the first cycle are generally very limited. There
seems to be a general reduction in the reported monitoring activities specifically targeted
towards protected areas and especially regarding ground water. This is critical as monitoring
data should be the basis for setting objectives, determining needs for improvement (gap
analysis) and for the implementation of measures in the third cycle.
1.19.3.
Conclusions
Very little has changed with regard to protected areas since the first cycle. There seems to be a
large gap between the intensions of the WFD concerning protected areas and the Member
States’ efforts –
and this goes for both drinking water protected areas and for nature protected
areas.
There is a large proportion of the protected areas, where the knowledge about status, pressures
etc. is lacking - and therefore no objectives are set. Specific objectives have only been set for a
limited number of protected areas and for a considerable part of water bodies in this category,
the more stringent objectives are already met, meaning that no further effort is needed.
Furthermore, for a significant part of the water bodies related to protected areas, GES under the
WFD is reported as sufficient also to reach the more stringent objectives according to other
Directives. Therefore, the need for additional measures in protected areas can be described only
for a very small number of water bodies.
Reporting of monitoring specifically targeted towards protected areas is very limited
in
certain countries even missing. Especially regarding groundwater monitoring (both for drinking
water, but also for groundwater dependent habitats and species), the gap between the actual
level of reported monitoring and the needed monitoring is large. In the light of an insufficient
activity in specific monitoring of protected areas, it is difficult to see how knowledge about the
needs in protected areas can change significantly during the second cycle.
1.19.3.
Recommendations
Member States should ensure that the register of Protected Areas required under Art. 6
of the WFD is complete and kept up to date, that additional objectives linked to the
conservation of those Protected Areas are identified where needed, that adequate
monitoring is in place and that all measures necessary to fulfil the specific objectives for
Protected Areas are included in the Programmes of Measures.
270
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0272.png
1.16. Adaptation to climate change and drought
Introduction
Adaptation to climate change
Floods and droughts have already affected large parts of the EU and have an important impact
on socio-economic developments. In the future, climate change will probably increase both the
number and magnitude of these hydrological extremes
123
. The WFD does not explicitly refer to
adaptation to climate change, although Annex II refers to the need to identify ‘significant
pressures’ affecting water bodies. Furthermore, when drafting the CIS guidance document No.
24 River Basin Management in a Changing Climate, Member States agreed that from the
second planning cycle onwards climate-related threats and adaptation planning should be
incorporated in their RBMPs. This is reinforced by the fact that almost all the elements which
are included in the definition of WFD qualitative and quantitative status are sensitive to climate
change and due to the step-by-step cyclical approach are well-suited for adaptation action. The
requirements include:
Assessing direct and indirect (primary and secondary) climate pressures in order to
provide information for the pressures analyses.
Assessing monitoring programmes to ensure early climate impact signal detection.
Close monitoring of climate impacts in reference sites (sites with limited anthropogenic
modification).
Integrating potential additional pressures, impacts and constraints caused by climate
change in the economic analysis of WFD.
Undertaking a ‘climate check’ of the PoMs by applying a transparent and fully
documented methodology.
Outlining of specific adaptation measures with preference of robust no-regret actions is
further recommended.
Assessment of implementation and compliance with WFD requirements in 2nd cycle
Even if the WFD does not explicitly refer to climate change, it is mentioned as being linked to
the Directive in nearly all RBDs in various ways, with few exceptions. Climate change aspects
which are reported to have been considered include the following:
123
Assessing direct and indirect climate pressures
Detecting climate change signals
Monitoring change at reference sites
Setting objectives
EEA (2017): Climate change, impacts and vulnerability in Europe 2016, EEA Report No 1/2017
271
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0273.png
Forecasting the economics of water supply and demand
Checking the effectiveness of measures
Selecting preferably robust adaptation measures
Maximising cross-sectoral benefits and minimising negative effects across sectors
Applying flood risk management
Addressing drought management and water scarcity
The table below shows the number of RBDs for which each of the climate change aspects has
been considered in the second RBMPs.
Figure 1: Number of RBDs for which each of the climate change aspects have been
considered
Source: WISE reporting 2016.
Climate change has been mostly considered in the context of flood risk management (112
RBDs) followed by the assessment of direct and indirect climate pressures (98 RBDs).
The CIS Guidance on climate change has been used by most Member States.
The ‘climate check’ of the PoMs is supposed to carry out a sensitivity analysis of the proposed
measures based on a fully transparent methodology to evaluate long-term effectiveness and
cost-efficiency under changing climatic conditions. The results of the climate check should be
integrated in other RBMP processes. A climate check of PoMs has been carried out in all
RBDs, except for some RBDs in a few Member States
Specific sub-plans addressing the issue of climate change have been reported for a few Member
States.
32% of the Member States (eight out of 25 assessed in this report) in one way or another
adopted specific adaptation measures to climate change under KTM24 in their RBMPs. The
table below gives an overview of those countries which are applying KTM24. Even if the total
272
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0274.png
number of Member States applying adaptation measures has decreased (from 11 in 2009), it
should be noted that due to the mainstreaming efforts of climate change at EU and Member
State level over the last years, several planned measures with a different objective will support
adaptation.
Table 1
Application of KTM24-Adaptation to climate change in the second RBMPs
in the Member States
Member
State
Bulgaria
(BG)
Germany
(DE)
Application of KTM24-Adaptation to climate change
KTM24 is made operational to address significant pressures in 2 of the RBDs
(BG2000 and BG3000) and national measures are mapped against KTM24.
KTM24 is applied to tackle abstractions and hydro-morphological pressures.
DE2000, DE4000, DE5000, DE6000, DE7000 all apply KTM24-adaptation
measures to address significant pressures.
Finland (FI) Specific climate change adaptation measures, KTM24, have not been applied
to tackle pressures in any RBD. However, there are national measures mapped
against KTM24 in one RBD (FIWDA).
France (FR) Specific climate change adaptation measures, KTM24, have been applied in
FRA FRB2, FRD, FRE, FRH FRK, FRL. In all basins there are national
measures mapped against KTM24.
Italy (IT)
KTM24 are made operational to address significant pressures related to
agricultural diffuse pollution in ITA and ITE, as well as abstractions and
hydrological alterations in ITG.
KTM24 is not made operational to address significant pressures in the RBD,
although national measures have been mapped against KTM24.
KTM24 is made operational to address significant pressures in SK4000. Also
national measures are mapped against KTM 24 in SK4000
KTM24 is not made operational to address significant pressures in the RBDs,
although national measures are mapped against KTM 24 in all basins.
Source: WISE reporting 2016.
Main changes in implementation and compliance since 1st cycle
The main change on how climate change is addressed in the plans in comparison to the first
cycle is that the number of basins where climate change has been considered has increased
significantly and only a few Member States/RBDs have not considered climate change yet.
While in the first cycle a climate check of PoMs was carried out in 41% of the RBMPs (46 out
of 112), this is now done in all RBDs except RBDs in six Member States (117 out of 143
RBDs, which corresponds to 82%).
Romania
(RO)
Slovakia
(SK)
Croatia
(HR)
273
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0275.png
Adaptation to Droughts
Drought
124
is a natural phenomenon. It is a temporary, negative and severe deviation along a
significant time period and over a large region from average precipitation values (a rainfall
deficit), which might lead to meteorological, agricultural, hydrological and socioeconomic
drought, depending on its severity and duration.
A specific Communication from the Commission to the European Parliament and the Council
for addressing the challenge of water scarcity and droughts in the EU
125
gave further indication
on the key measures that should be promoted in the RBMPs and other tools in order to reduce
the impacts of these phenomena.
The WFD includes several references to droughts:
It contributes to mitigating the effects of droughts (Article 1.e).
According to Article 4(6), temporary deterioration in the status of bodies of water shall
not be in breach of the requirements of this Directive if this is the result of
circumstances of natural cause or force majeure which are exceptional or could not
reasonably have been foreseen, in particular prolonged droughts.
Supplementary measures (Article 11(4)) can include (ix) demand management
measures, inter alia, promotion of adapted agricultural production such as low water
requiring crops in areas affected by drought.
The RBMPs may be supplemented by the production of more detailed programmes and
management plans for sub-basin, sector, issue, or water type, to deal with particular
aspects of water management, such as when and where needed, a specific drought
management (sub)plan (Article 13(5)).
Within the Common Implementation Strategy of the WFD, a Technical report on Drought
Management Plans
126
was adopted in 2007, and refers to the three key elements for the proper
mitigation of drought impacts:
Indicators and thresholds establishing onset, ending, and severity levels of the
exceptional circumstances (prolonged drought).
Measures to be taken in each drought phase in order to prevent deterioration of water
status and to mitigate negative drought effects.
Based on Schmidt, J.J. Benítez & C. Benítez (2012) Document: Working definitions of Water scarcity and
Drought. Version 4, and taken note by Water Directors (4 June 2012)
125
European Commission (2007) Communication from the Commission to the European Parliament and the
Council - Addressing the challenge of water scarcity and droughts in the EU {SEC(2007) 993} {SEC(2007)
996}/* COM/2007/0414 final */
126
http://ec.europa.eu/environment/water/quantity/pdf/dmp_report.pdf
124
274
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0276.png
Organizational framework to deal with drought and subsequent revision and updating of
the existing drought management plan
Furthermore, the 2009 Guidance document No. 24 (River Basin Management in a Changing
Climate) provides further guidance, such as e.g. its “Principle 11: Drought
management and
water scarcity: Use the WFD as the basic methodological framework to achieve climate change
adaptation in water scarce areas and to reduce the impacts of droughts”. Furthermore, the Water
Blueprint
127
, including the Review of the EU policy on water scarcity and droughts, in 2012
encourages Member States to better integrate drought risk management and climate change
aspects in their future RBMPs and when developing cross sectoral and multi hazard risk
management plans.
1.16.1.1. Assessment of implementation and compliance with WFD requirements in 2nd cycle
Overall, in the second cycle of the WFD implementation, there are 11 Member States where
drought is considered not to be relevant. However, this reflects a geographically quite varied
picture which is not aligned with the drought occurrence as they are identified by the European
Drought Observatory
128
.
For 14 Member States, drought is a relevant issue, even if the relevance covers only the sub-
basin level or one specific RBD.
129
The main strength of these Member States lies in the
adoption of Drought Management Plans, whilst the major weaknesses refer to the lack of such
plans, at least for the RBDs concerned with droughts (see table below).
In total, six Member States have reported Drought Management Plans in the second RBMPs.
Table: Strengths and weaknesses of Member State’s drought management in the second
RBMPs (selection)
Strengths
Weaknesses
Drought
Management
Plans
including key measures are
approved and aligned with RBMP
There is a specific sub-plan to
address water scarcity and
droughts in 2 RBDs
No Drought Management Plans
have been reported for Germany
(Danube RBD).
There is concern about a possible
Drought Management Plans are in broad application of Article 4(6)
place
exemptions due to drought,
following the 2017 draft Drought
Cyprus
Czech Republic
Germany
Spain
127
Communication from the Commission to the European Parliament, the Council, the European Economic and
Social Committee and the Committee of the Regions: A Blueprint to Safeguard Europe's Water Resources
COM/2012/0673
128
http://edo.jrc.ec.europa.eu/edov2/php/index.php?id=1000.
129
For one Member State (Croatia), no information is reported regarding the relevance of droughts.
275
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0277.png
Management Plans, not yet adopted
All Finnish RBDs recognise the
existence of local or sub-basin
drought spells as one of the effects
of climate change. However, none
of the RBDs has developed a
Drought Management Plan.
Droughts are relevant for the
country. No Drought Management
Plan have been reported for France.
There is no clear distinction in the
country between droughts and
water scarcity. No Drought
Management Plan has been
developed in Hungary
No Drought Management Plan has
been reported for one RBD (ITH).
Drought Management Plans have
not been reported
Exemptions have been applied
following Article 4(6) due to
prolonged droughts for all four
RBDs.
Drought Management Plans have
not been reported for Poland
Droughts are relevant for a major
part of Portugal. It is unclear if
proper
drought
management
planning and actions are in place to
justify the Article 4(6) exemptions
which have been applied.
No Drought Management Plans
have been reported for Sweden
Preparation of selection of drought No Drought Management Plan is
indicators (as measure)
established
Changes in recognising drought
risk for several RBDs. Drought
Management Plans are in place for
some RBDs.
Source: WISE reporting 2016 and second RBMPs.
Finland
France
Hungary
Italy
Malta
Drought Management Plan are
developed for some RBDs
The Netherlands
Sub-plans
addressing
water
scarcity and droughts have been
reported for all RBDs in the 2nd
cycle
Poland
Portugal
Measures are included in the
RBMPs
Sweden
Slovenia
United Kingdom
Furthermore, it should be noted that a few Member States have applied Article 4(6) exemptions
due to prolonged droughts in the second cycle. No information has been reported on other
effects of droughts than the applied exemptions.
Main changes in implementation and compliance since 1st cycle
Out of the list of Member States for which drought is considered as a relevant topic, only three
Member States have made progress since the first RBMPs.
276
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
No change or improvement has been identified for seven Member States since the first cycle,
whilst the information reported does not allow drawing conclusions regarding the remaining
Member States due to the few relevant elements reported.
1.16.2.
Conclusions
The assessment of the second RBMPs clearly shows that climate change has been integrated
into water management across Europe. While in the first cycle not all RBDs had considered
climate change, in the second cycle almost all Member States followed the CIS agreement that
from the second planning cycle onwards climate-related threats and adaptation planning should
be incorporated in their RBMPs. Thereby, the CIS Guidance on climate change has been used
by most countries. Climate change is mostly considered in relation to flooding, followed by the
assessment of pressures from climate change. In one third of the Member States, specific
measure to adapt to climate change are applied.
The consideration of drought as a relevant water management feature follows an inconsistent
geographical pattern: in 14 assessed Member States, droughts are considered as relevant
(including at sub-basin level), whilst in another 11 Member States they are not relevant.
The development of Drought Management Plans is the key management measure for mitigating
the impact of droughts but is not yet fully adopted in all drought-facing river basin districts.
The adoption of elements within the RBMPs that address clearly the key elements for drought
mitigation (indicators, measures, organisational set-up) can provide a step-wise approach, but
their implementation has not been assessed in detail for the purpose.
Most Member States have reported that they have used the Common Implementation Guidance
number 24, River Basin Management in a changing climate, have done a climate proofing of
the POMs and have a national Climate Change Strategy or Plan. However, the assessment has
not allowed to determine the effectiveness of the climate proofing methodologies, and in
general green infrastructures and water retention measures are underused.
At least two Member States have applied Article 4(6) exemptions due to prolonged droughts
during the first planning cycle. Drought Management Plans, and their indicators and measures
can provide proper elements for a justification.
At least two Member States have progressed in their drought management since the first
planning cycle by developing drought indicators and extending the number of RBDs with
Drought Management Plans.
1.16.3.
Recommendations
To further improve climate proofing, technical measures and planned infrastructures
should take due account of climate change predictions, especially for the occurrence of
extreme phenomena and changes in river flows.
277
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
A national Strategy for Adaptation to Climate Change should be developed and taken
into account in the design of the PoM in the relevant Member States.
Regarding drought management, Member States are encouraged to develop Drought
Management Plans where appropriate and monitor drought events and their severity
with specific indicators.
When applying exemptions under article 4(6) for prolonged droughts, Member States
should be fully transparent when providing information on the methodologies applied
and all possible measures considered to avoid deterioration.
278
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0280.png
6.
COOPERATION UNDER THE
EU D
IRECTIVE
2000/60/EC
ESTABLISHING A FRAMEWORK FOR THE
C
OMMUNITY ACTION IN THE FIELD OF
130
WATER POLICY
I
NTERNATIONAL
1.17.Introduction
The WFD stipulates that Member States shall ensure that a river basin covering the territory of
more than one Member State is assigned to an iRBD. Appropriate administrative arrangements,
including the identification of the appropriate competent authority for the iRBD shall be
established by the Member States. Member States shall ensure that the environmental
objectives of the Directive are met in iRBDs. To this end, Member States shall coordinate at the
international level on a POMs.
In the case of an iRBD falling entirely within the EU, Member States shall ensure coordination
with the aim of producing a single international river basin management plan (iRBMP),
including involving third countries. If an iRBMP is not produced, Member States shall produce
RBMPs covering at least those parts of the iRBD falling within their territory to achieve the
objectives of the Directive.
International coordination by the EU Member States was assessed for the second river basin
management cycle. The following sections reflect the situation described by the River
Commissions in their iRBMPs, reported by each Member State in 2016 or 2017 and
information on international coordination described in the national RBMPs. The circumstance
in the River Commissions or the situation in the Member States may have further developed
since then. More detailed information on individual international basins can be obtained from
the accompanying document compiling iRBMP assessments.
1.17.1.
International river basin districts and their coordination mechanisms
There are 75 iRBDs and 30 sub-basins in the EU. International coordination mechanisms
(agreements, working groups etc.) under the WFD vary among the different international river
basins districts. Based on their level of cooperation, four main categories were identified. An
overview of different types of international cooperation is given in Table 6.
Table 6
Different types of international coordination in relation to the WFD
Category Formal
international International
iRBMP produced
agreement
coordinating body
1
Yes
Yes
Yes
2
Yes
Yes
No
3
Yes
No
No
4
No
No
No
130
This document reflects the situation as described by the River Commissions in their iRBMPs, or as reported by
each Member State to the European Commission in 2016 or 2017 and with reference to national RBMPs
prepared earlier. The circumstance in the River Commissions or the situation in the Member State may have
further developed since then.
279
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0281.png
EU Member States were requested to report to WISE the iRBD in their territory and the level
of international coordination taking place in these iRBDs. Greece, Ireland and Lithuania were
delayed in the second river basin management cycle and thus did not report to WISE the level
of international coordination in their iRBDs. The categories of these iRBDs were taken from
the assessment of international coordination in the first cycle
131
.
The map below shows the iRBDs and their level of international coordination.
Figure 16
Overview map of iRBDs
131
See: Vogel, B., et al. (2012): Transboundary Cooperation Fact Sheets. Comparative Study of Pressures and
Measures in the Major River Basin Management Plans. available at:
http://ec.europa.eu/environment/archives/water/implrep2007/pdf/Governance-
Transboundary%20Fact%20Sheets.pdf
280
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0282.png
6.1.2. Selection of iRBDs for the assessment
Twenty-one iRBDs were chosen for the assessment (see Table 7). The selection was based on
the following criteria:
All iRBDs with iRBMPs were selected.
In cases where EU Member States/third countries share several iRBDs (e.g. there are 4
iRBDs shared between Portugal and Spain), the most representative basin was
identified, taking into account the overall iRBD catchment area size, the balanced share
of catchment area between the iRBD sharing countries and the level of international
coordination.
iRBDs that hold an insignificant international share (e.g. <1%) were excluded.
International basins shared with Greece (5 iRBDs
132
), Ireland (2 iRBDs
133
) and Lithuania (2
iRBDs
134
) were not assessed due to delays in the adoption of the national level RBMPs and
reporting. As a result, Category 4 basins (see Table 6 for explanation) were not assessed. Table
7 presents the list of basins included in the assessment and the categories of these iRBDs as
reported by the EU Member States.
Table 7
Category
List of selected iRBDs for which an assessment was done
International
River Basin
Danube
EU Member States/Non-EU countries
Austria, Bulgaria, Czech Republic, Germany,
Croatia, Hungary, Italy, Poland, Romania, Slovenia,
Slovakia
Non-EU: Switzerland, Albania, Bosnia and
Herzegovina,
Serbia,
Ukraine,
Moldova,
Montenegro, Macedonia
Austria, Czech Republic, Germany, Poland
Germany, The Netherlands
Belgium, Germany, France, Luxembourg, The
Netherlands
Czech Republic, Germany, Poland
Austria, Belgium, Germany, France, Italy, ,
Luxembourg, The Netherlands
Non-EU: Switzerland, Liechtenstein
Croatia, Slovenia
Non-EU: Albania, Bosnia and Herzegovina,
Montenegro and Serbia
Belgium, France
Category 1
Elbe
Ems
Meuse
Odra
Rhine
Sava
Scheldt
Aoos/Vjosa, Drin, Western Aegean, East Aegean (Maritsa/Evros/Meric) iRBD and Central Macedonia
(Axios/Vardar) iRBDs
133
Neagh Bann and Northwestern
134
Lielupe, Nemunas
132
281
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0283.png
Category
International
River Basin
Teno/Tana
Adige/Etsch
EU Member States/Non-EU countries
Finland
135
Non-EU: Norway, Russia
Italy,
Non-EU: Switzerland
Dniester/Dnistr/Nistru Poland
Non-EU: Moldova, Ukraine
Garonne
Cantabrico France, Spain
-Ebro
Guadiana
Spain, Portugal
Gauja/Koiva
Estonia, Latvia
136
Isonzo/Soca
Italy, Slovenia
Rhone
France, Italy
Non-EU: Switzerland
Torneälven/Tornionjok Sweden, Finland
Non-EU: Norway
Eider
Germany, Denmark
Narva
Estonia, Latvia
137
Non-EU: Russia
Schlei Trave
Germany, Denmark
Vistula
Poland, Slovakia, Lithuania
Non-EU: Ukraine, Belarus
Luleälven, Umeälven, Sweden
Piteälven
Non-EU: Norway
1.18.Overview of International Cooperation
1.18.1.
International coordination mechanisms
The foundation for international cooperation on water management are agreements or
conventions to which EU Member States and third countries are party to. These agreements or
conventions set the objectives, topics for cooperation and coordination mechanisms within the
iRBD. They can be bilateral, i.e. between two countries, or multi-lateral, addressing in a
number of cases cooperation among all the riparian countries.
All Category 1 basins have
agreements or conventions
in place. For about �½ of the Category
1 basin, the agreement or convention is signed by all the iRBD sharing countries. In four
iRBDs
the Danube, the Elbe, the Rhine and the Sava - the international agreements are signed
by those countries whose national territory represents a meaningful share of the basin.
Finland reported to WISE that the Teno, Näätämöjoki and Paatsjoki iRBD is a Category 2 basin. However, in
2016 Finland and Norway produced a Joint Management Report similar to an iRBMP. Therefore, the basin has
been categorized as Category 1.
136
In the case of the Gauja/Koiva, a long-term project with governmental representatives from both countries
facilitated international coordination in the basin and as such the basin has been designated as Category 2
within this assessment.
137
In the Narva iRBD, there does not appear to be a permanent body or long-term project promoting coordination
and hence the basin has been designated as Category 3
135
Category 3
Category 2
282
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0284.png
However, in the Rhine, a Coordinating Committee was established that expands international
coordination to include the iRBD sharing countries not party to the convention. The EU is a
contracting party to these agreements in the Danube and the Rhine.
The Category 2-3 basins included in the assessment have bilateral agreements in place.
Permanent commissions, working groups
or other forms of cooperation bodies can be found
in all Category 1 and 2 basins. They are responsible for the coordinated implementation of the
WFD in the basins. In the two out of the four Category 3 basins, meetings were held to discuss
various aspects of WFD implementation but a permanent body is not in place. All the
permanent commissions of the Category 1 basins allow external observers to participate in
meetings. The observers come from sectors like hydropower, public and private water services,
dredging, navigation, industry, local governmental agencies, other international river
commissions, research, tourism and environmental non-governmental organisations.
For most of the basins assessed, the coordination mechanisms have not changed since the 1
st
river basin management cycle. In most cases the agreements have stayed the same with no new
additions. However, in some cases international coordination has expanded through the
ratification of new agreements and work carried out under cooperation projects:
Two iRBDs developed international RBMPs or joint management documents for the first
time. In the Sava iRBD
138
, which is a sub-basin of the Danube, an international RBMP
was developed for the first time. Following the signing of a new agreement between
Finland and Norway in 2014, the two countries produced a “joint roof report in the form
of a comprehensive “executive summary” of the two national RBMPs”.
In the Rhône International RBD, France and Switzerland negotiated a new agreement for
integrated management and established in 2016 the Franco-Swiss dialogue to discuss,
among others, water management during water scarcity periods, river water levels,
drinking water from surface water and groundwater, inter-basin transfers, floods, etc. In
addition, France and Italy signed a protocol in 2013 for cooperation on the shared Roya
River sub-basin with the goal to develop a transboundary river contract to support
common actions for the attainment of WFD’s objectives.
A new agreement between Sweden and Norway in 2014 now clearly sets out the
coordination of Swedish and Norwegian river basins.
A project in the Gauja/Koiva iRBD
shared between Estonia and Latvia - led to increase
coordination on a number of WFD topics, such as delineation, typology, monitoring,
assessment and classification.
138
The Sava iRBD sharing countries are: Bosnia and Herzegovina, Croatia, Montenegro, Serbia and Slovenia.
283
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
A long-term project in the Dniester iRBD between the Ukraine and Moldova has led to
improved data-sharing and monitoring.
Public consultation
was coordinated by the Category 1 basins. All of the basins published the
iRBMPs online for consultation. In addition, some iRBDs held public events (e.g. the Elbe
Forum and workshops in the Sava) and in the Odra working groups were established to enable
participation. The Category 1 basin iRBMPs mention that further public consultation outreach
was done at the national level.
Basin-wide strategies or plans
have been jointly developed in some iRBDs (mainly Category
1). Joint climate change strategies (see section 6.2.5) were developed in five iRBDs. They
define common principles and provide guidance on selecting adaptation measures. In addition,
a few basins have jointly developed programmes to support fish migration (see section 0).
In the Danube four documents produced by the International Commission for the Protection of
the Danube River (ICPDR), while not legally binding, are intended to serve as a "common
roadmap" guiding national activities and supporting harmonization of actions throughout the
basin. The documents are:
Joint Statement Navigation & Environment;
•Guiding Principles on Sustainable Hydropower Development in the Danube Basin;
•ICPDR Strategy on Adaptation to Climate Change; and
•Ecological prioritisation approach for measures to restore river and habitat continuity.
The Joint Statement on Navigation & Environment was launched in 2007 by the ICPDR in
cooperation with the Danube Commission and the International Sava Commission.
In the Rhine, multiple basin-wide programmes are mentioned, mainly focussing on addressing
hydro-morphological pressures such as the Habitat Connectivity along the Rhine programme,
Salmon 2020 programme, the Lake Constance Lake Trout programme, the Eel Management
Plans, the Master Plan Migratory Fish Rhine and the Rhine 2020 programme.
The Rhine (2009), the Elbe (2014) and the Sava have adopted basin-wide sediment
management plans. In the Rhine and the Elbe, risk areas were classified to enable the
prioritisation of management options. In the Sava, the Protocol on Sediment Management,
defines the framework for developing a basin-wide sediment management plan.
1.18.2. International
assessment
Characterisation of iRBD
The WFD stipulates that for each river basin an analysis should be carried out of the
characteristics of the RBD. This includes identifying the location and boundaries of water
bodies, typologies of water bodies, establishing of type-specific reference conditions and the
identification of pressures and their impacts.
284
coordination
on
characterisation, monitoring and
status
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
All the Category 1 basins coordinated on the development of the
Article 5 assessments,
i.e. the
analysis on the characterisation of the iRBD. A few Category 2 basins reported to WISE that
coordination took place, for example in the Gauja/Koiva, Isonzo/Soca, and
Torneälven/Tornionjok.
Most of the Category 1 basins indicated that some
coordination of the delineation
of
transboundary
surface water bodies
took place. In the Danube, Sava and Rhine iRBDs
(Category 1 basins), common criteria were developed for delineation that focus the iRBMP on
water bodies of basin-wide importance. The countries in the Category 1 basins have used
differing methodologies, which led to different results. For the most part, the results have been
harmonised, which has helped surface water bodies to mostly be delineated similarly. Overall,
the coordination on the delineation of rivers is further along than the delineation of lakes. Most
of the Category 2-3 basins do not provide information on whether there was coordination on
surface water body delineation. In some cases, information was found in the RBMPs that state
coordination took place but the details are limited.
Transboundary
groundwater bodies
were delineated in the Danube, the Rhine, the Sava and
the Isonzo/Soca iRBDs. In the Isonzo/Soca international river basin, a joint approach/method
for a coordinated ground water body delineation (for the transboundary water bodies) has been
developed and applied. The Eastern Alps RBMP, which covers the Italian part of the
Isonzo/Soca, states that coordination initiatives are underway between Italy and Slovenia for
the revision of the delineation of groundwater bodies on the basis of the hydrogeological
structure rather than administrative boundaries, as agreed at the Italian-Slovenian Commission
for Water Management.
The
designation of heavily modified and AWBs
mostly took place at national level and
details on international coordination efforts are limited. In the Danube iRBD, the countries
agreed on a harmonised procedure for the final designation and on specific criteria for a step by
step approach on the Danube main river. The designations for the tributaries are based on
national methods and respective reported information. In the Rhine, the EU Member States
agreed on common steps for HMWB designation, but the iRBMP states that these steps were
implemented differently within the individual sub-catchments of the Rhine. The Scheldt
iRBMP states that each of the parties used different descriptors for the designation of HMWBs
but that the different approaches did not lead to substantial differences in the final assessment.
Coordination on
typology
has taken place in most of the Category 1 basins as part of the
intercalibration exercise, although in some cases despite coordination differences remain. The
typology of the Danube River was developed in a joint activity by the basin sharing countries
already in during the first management cycle. In the Danube, a harmonised typology was used
by all the basin countries. In the Rhine, water bodies of basin-wide importance (i.e. those with
catchments >2,500 km
2
) were classified using a common approach. For each part of the river,
so-called
“Passports” or files were created using common criteria.
285
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Information on the coordination of typology is not available for most of the Category 2-4
basins. In the Gauja/Koiva iRBD (Category 2), Latvia and Estonia participated in typology
coordination within the 2011-2013 transboundary project. An attempt to harmonise national
typologies with regard to cross-border water bodies was made in the frame of the project. In the
iRBDs shared with Sweden, a revision of the typology system has recently been agreed in
Sweden, attempting to further harmonize most of the typology factors and their ranges to those
used in Norway and Finland. This new typology is planned to be applied for the 3rd RBMP.
Information on the coordination of
type-specific reference conditions
is limited in all
international river basins. Most of the basins either did not provide information in their
iRBMPs and RBMPs or specifically mentioned that the establishment of type-specific
reference conditions was undertaken within the individual countries. However, in general it can
be assumed that the intercalibration exercise led to a certain level of coordination. In the
Danube iRBD (Category 1), countries have agreed on general criteria as a common base for the
definition of reference conditions for rivers of basin-wide importance. These have then been
further developed on the national level into type-specific reference conditions. In the
Gauja/Koiva iRBD, the Latvian RBMP mentioned that there are differences in type-specific
reference conditions between the two Member States but that they will be coordinated during
the next planning period.
Joint significant water management issues
were identified by the Category 1 basins. In a few
of the Category 2 basins, for example in Torneälven/Tornionjok, coordination was carried out
on the pressure analysis, which is a first step in identifying joint management issues in the
future.
Monitoring
Surface water bodies
All of the Category 1 basins and 6 of the Category 2-3 basins were assessed regarding the
monitoring of surface water bodies. Not all iRBDs were assessed as an initial screening showed
that international coordination on monitoring was not taking place in all iRBDs.
Joint or coordinated monitoring of surface water bodies is taking place in most Category 1
basins. In the Danube, the Elbe, the Meuse, the Rhine, the Sava and the Scheldt there are joint
or coordinated programmes for ecological and chemical monitoring. In the Category 2-3 basins,
about half of the basins (e.g. Gauja/Koiva, Dniester, Tana/Tena, Vistula) mention that joint
monitoring is being carried out, while the other basins mention that coordination has taken
place although more detailed information on coordination efforts is limited.
In the Danube, a joint survey is carried out every 6 years, which aids in the harmonisation of
monitoring methodologies; filling information gaps in monitoring networks; testing new
methods; or
checking the impact of “new” chemical substances in different matrices. In the
286
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0288.png
Meuse and the Scheldt iRBDs, joint surveys for assessing the status of surface waters are
carried out. Every three years, the commissions of the two iRBDs publish a report with the
most important results of the measured parameters per measuring station or measuring location.
For seven Category 1 iRBDs
139
and the Gauja/Koiva iRBD (Category 2 basin) a more detailed
assessment of the information reported to WISE was possible:
Monitoring of ecological status
In operational monitoring,
quality elements
in rivers are assessed that are most
sensitive to the
prevalent pressures.
Such a quality element can then be used as the least common
denominator for comparable assessments of ecological status, provided that the Intercalibration
has been successful. The information reported to WISE by the EU Member States in each
iRBD were compared
140
to determine whether the quality elements selected were the same.
In all the iRBDs assessed, there is a general agreement between iRBD sharing countries on
sensitive quality elements used to assess nutrients, organic pollution and morphological
pressures. In addition, there was a general agreement on quality elements for hydrological
pressures in the basins except for in the Danube, the Elbe and the Odra. For chemical pollution
and temperature pressures, the iRBD sharing countries used different quality elements to assess
these pressures.
The
river basin specific pollutants
and their EQSs reported by the Member States to WISE
were evaluated. The summary of the evaluation concern two essential aspects:
which and how many substances have been selected for the entire basin or parts of it;
and
whether the EQSs are the same or in one or another way comparable (in the same
range/order of magnitude, for the same matrix).
The analysis showed similar findings in all eight iRBDs assessed. The identification of the
number of river basin specific pollutants varied widely within the iRBDs, with some Member
States identifying a significantly higher number river basin specific pollutants compared to
other iRBD sharing countries. This means that within the same basin Member States are using a
different set of river basin specific pollutants for assessing ecological status. In addition, there
were considerable differences in the number of river basin specific pollutants identified by the
Member States and the number of pollutants for which EQSs had been defined. The lack of
EQSs reduces the usability of the monitoring data for those pollutants in terms of assessing
ecological status. In the basins with three or more iRBD sharing countries, there was not one
139
The Sava and the Tana/Teno could not be assessed as these basins mostly have third countries sharing the
basin and information for these countries was not reported to WISE.
140
The analysis differentiates 4 biological quality elements (or 3 biological quality elements and 2 sub- biological
quality elements), 9 different pressures and 4 different water categories.
287
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
2026318_0289.png
common river basin specific pollutant with an environmental quality standard identified. In
most cases, the river basin specific pollutants with an environmental quality standard were
commonly identified by half the iRBD sharing countries. In the iRBDs shared by only two
Member States, common river basin specific pollutants with an environmental quality standard
were identified. Overall, there was limited agreement for the level of EQSs for river basin
specific pollutants among the iRBD sharing countries. This hinders being able to compare the
results of the status assessment of surface water bodies.
Monitoring of chemical status
Member States are required to report to WISE on the priority substances in their RBDs and to
establish EQSs in line with the EQSs Directive. In operational monitoring, these pollutants
should be monitored once a month for the duration of the river basin management cycle. In
surveillance monitoring, the pollutants must be monitored once a month for one out of the six
years of the management cycle. An important aspect for chemical status assessment, therefore,
is whether the water samples during monitoring have been taken with the frequency outlined in
the WFD. Other frequencies need a justification based on expert judgement or technical
knowledge.
The analysis of the frequency the Member States monitored priority substances showed
variations within the iRBDs. For some Member States within an iRBD, the monitoring
frequency reflected the frequency as outlined by the WFD, but for other Member States within
the same basin the monitoring frequency was less than 12 times/year without providing further
justification. In none of the iRBDs assessed was the monitoring sampling frequency 100% in
line with the frequency suggested by the WFD for all iRBD sharing countries.
Quantitative and chemical monitoring of transboundary groundwater bodies
Transboundary groundwater bodies were delineated in 5 of the iRBDs, namely the Danube, the
Isonzo/Soca, the Rhine, the Sava and the Scheldt. The Danube iRBMP states that monitoring of
the 11 transboundary groundwater bodies of basin-wide importance has been integrated into the
Transnational Monitoring Network of the ICPDR. In the Isonzo/Soca international river basin,
cooperation efforts between Italy and Slovenia to define transboundary groundwater bodies and
to put in place a transboundary monitoring network are underway. The Italian RBMP covering
the Isonzo/Soca reports that the monitoring networks for transboundary groundwater bodies
will be defined in 2016. This work is being carried out under the Italian-Slovenian Commission
for Hydro-economy via Interreg projects supported by the EU (the Italian RBMP refers to the
ASTIS and HYDROKARST projects). According to the background document on groundwater
bodies, a future Sava Commission groundwater body monitoring network is planned and will
be based on the existing national monitoring networks. Maps showing the status of
transboundary groundwater bodies are included in the iRBMPs of the Rhine and Scheldt but
288
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
joint monitoring or the coordination of monitoring of transboundary groundwater bodies is not
described.
Status assessment
Surface water bodies
All of the Category 1 basins and 6 of the Category 2-3 basins were assessed regarding the
monitoring of surface water bodies. Not all iRBDs were assessed as a screening showed that
international coordination on status assessment was limited.
The review of the Category 1 basin iRBMPs shows that most of the iRBDs made efforts to
harmonise the assessment of ecological and chemical status. Despite harmonisation efforts,
differences still remain but the iRBMPs reported that progress is being made. In the Ems iRBD,
to compare the credibility of the results, a three-level confidence level was introduced. In the
assessment, the overwhelming majority of the results were classified in the high confidence
level, since the assessment was reported to be carried out in accordance with the WFD
requirements. Most of the results of the second intercalibration phase were incorporated into
the national evaluation systems. In the Meuse, the iRBMP states that for transboundary water
bodies bi- and trilateral coordination between the Member States took place to ensure
coherence on the status of water bodies. In the Scheldt, the assessment methods are not the
same throughout all iRBD shares. To aid in the harmonisation of monitoring and assessment,
individual
files or “flash cards” have been produced for each transboundary water body, which
according to the iRBMP are used for coordination and alignment of results.
Limited information on harmonisation of status assessment is available in the 6 Category 2-3
basins assessed. The Spanish and French RBMPs of the Garonne/Eastern Cantabrian/Ebro
iRBD mention that international cooperation has taken place with respect to status assessment
but details are not provided.
Groundwater bodies
The Danube and the Scheldt describes in their iRBMPs how the quantitative and chemical
status assessment of groundwater bodies is coordinated. Both iRBMPs highlighted the need for
further cooperation efforts. In the Danube iRBD, the countries used a broad spectrum of
different methodologies for the assessment of the chemical and quantitative status. Despite
there being overall coordination facilitated by the ICPDR Groundwater Task Group, the need
for further harmonisation of the national methodologies is mentioned. In the Scheldt, Member
States have compared their assessments of quantitative status. During the international
coordination within the Scheldt district, information was exchanged on the groundwater
monitoring networks for surveillance monitoring, with a particular focus on the transboundary
aquifers. However, chemical status has not been harmonised, and each Member State/Region
289
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
has defined criteria to assess the status that are causing groundwater bodies to be designated as
at risk.
Defining ecological potential of heavily modified and artificial water bodies
Approaches for the determination of GEP were defined at national level by the individual EU
Member States in all the iRBDs. Some of the Category 1 basins describe harmonisation or
coordination efforts to align national level approaches. According to the Rhine iRBMP, the
differences in the methodologies were intensively discussed within the iRBD and are relevant
with respect to the harmonisation of classification results of transboundary water bodies.
According to the Odra iRBMP, each Member State has its own methodologies for determining
GEP, but the approaches were coordinated through a two-day workshop to minimize
differences. The Meuse iRBMP states that bilateral coordination was undertaken to ensure
coherence.
1.18.3.
International coordination on exemptions and economic analysis
The Category 1 basins were assessed regarding coordination of exemptions on transboundary
surface and ground water bodies and the economic analysis of water services.
Exemptions
The iRBMPs of the Rhine and Scheldt indicated that coordination took place at the
international level. The Scheldt iRBMP states that Member States and Regions used different
methodologies for the application of exemptions but that coordination on transboundary water
bodies took place. Coordination of exemptions for groundwater bodies was not mentioned in
the iRBMPs. In the Rhine iRBD, exemptions were reported to be coordinated for surface water
bodies of basin-wide importance, and the iRBMP outlines the reasons for the application of
exemptions. The other Category 1 basins indicated in their iRBMPs that exemptions were
applied at national level but not that specific coordination took place at the international level.
Economic analysis
Half of the Category 1 basins reported coordinating on the economic analysis. In the other
basins, the analysis was carried out at national level and the information was summarized in the
iRBMP.
In the Danube iRBD, the economic analysis and water pricing policies summarized in the
iRBMP is based on the joint work performed for the 2013 Update of the Danube Basin
Analysis. To facilitate the international coordination, two questionnaires were developed and
sent out in 2013 to collect information on economics from the Danube countries. The collected
information was summarised in form of tables. The overview tables highlight the
commonalities and differences in approaches among the Member States and third countries in
290
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
the Danube. The iRBMP states that cost-effectiveness analysis is currently only addressed at
national level; however, the planning period until 2021 could be used to “pave the way” for a
possible use of cost-effectiveness analysis in the third management cycle.
In the Odra iRBD, the sub-working
Group “Economic Analysis” of the Odra Commission has
the main objective to coordinate the exchange of data and information pertaining to economic
issues within the area of water management. The economic analysis in the Rhine iRBMP
presents a trans-national summary of the economic analysis. The information provided is brief
and summarizes the water uses and the baseline for the Rhine as whole. In the Scheldt iRBD,
the countries applied a joint approach (commonly agreed indicators) regarding the economic
analysis of the drivers (households, industry & agriculture). Water pricing policies were not
coordinated; however, the countries analysed the differences in the approaches.
In the Gauja/Koiva iRBD (Category 2), the 2011-2013 transboundary project had as an
objective to develop a cost-effectiveness assessment methodology. One of the main results of
the project was the coordination of a joint economic analysis approach, which included the
analysis of essential water uses, water services, potential future trends and costs. Work has
been carried out to coordinate methodologies for economic analysis but methodological gaps
still remain.
1.18.4.
International coordination on Programme of Measures
All of the Category 1 basins cooperated on the development of a joint international Programme
of Measures (iPoM). These iPoMs are all based on jointly identified significant water
management issues. Management objectives were developed in each in the basins to address
the significant issues. The iRBMPs present the measures included in the iPoMs, which for the
most part are a summary of measures at national level. About half of the Category 1 basins
mention joint measures being implemented at international level. These joint measures focus
mainly on addressing pollution and overcoming hydro-morphological alterations to surface
water bodies. None of the iPoMs provide detailed information on the measures included in the
programme, such as timing, stakeholders involved, financing, etc., but the iRBMPs refer to the
national plans for further details.
In the Scheldt, while there are no joint measures, files for each transboundary water body were
developed, wherein national measures planned by the different Member States are included.
Through the files, the Member States and Regions can take note of the measures planned by the
other Parties for the transboundary watercourse involved. According to the iRBMP, these files
help to influence other Member States and Regions regarding potential measures, for example,
for new sources of pollutions or resolving existing bottlenecks.
Four of the Category 1 basins mention a prioritisation method for selecting measures to address
the transboundary significant water management issues. In the Elbe, priorities at international
level have been defined for measures, mainly measures to reduce hydro-morphological
291
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
pressures, measures to reduce pollution from agriculture and measures to reduce pollution from
chemical substances and measure related to waste water treatment. In the Ems iRBD, for the
transboundary management issues, such as the improvement of the water structure and
continuity as well as the reduction of nutrient and pollutant inputs, measures were prioritized
for their implementation and agreed in cross-border coordinated processes. In the Odra iRBD, a
Strategy was developed in 2013 that defined significant water management issues, suggested
measures and prioritised action. This information influenced the development of national
PoMs. In the Sava iRBMP, priorities for the effective implementation of national measures on a
basin-wide scale are highlighted and are the basis of further international coordination.
Measures to address water scarcity
Water scarcity and droughts were not identified as an international significant water
management issue in the Category 1 basins. As such, the iPoMs do not define joint measures or
strategies to address this issue. Nonetheless, in about half of the iRBDs measures to address
water scarcity and water abstraction are described. These measures are carried out at the
national level.
Measures to address pollution from agriculture and other sectors
All of the Category 1 basins reported pollution from agriculture and other sectors as a
significant water management issue and measures have been developed. Most of the basins
refer to national level measures to address the issue.
In the Danube, future development scenarios were developed and the estimated effect of
measures on the basin-wide scale were assessed. The iPoM also includes joint measures to
address agriculture pollution. One joint measure mentioned is the elaboration of basin-wide
management strategies with the aim to reduce nutrient loads of surface and coastal waters. A
set of measures related to the concept of best agriculture practice is also suggested to be
adopted in the entire Danube Basin. For pollution from sectors other than agriculture, a number
of joint measures are described in the iRBMP. The ICPDR has been supporting the introduction
of the phosphate-free detergents in the Danube countries which committed themselves at
ministerial level to initiate the introduction of a maximum limit for the phosphate content of the
consumer detergents.
In the Scheldt, the Member States and Regions have a joint approach to address nutrient
pollution. Measures to address the reduction of nitrogen pollution were compiled and
compared, and the Member States and Regions jointly estimated their impact and costs.
To address point source pollution, all the Category 1 basins are implementing similar measures
and strategies. All the basins have internationally coordinated accidental pollution warning and
response systems in place. The focus of the measures in the iPoMs is on constructing or
optimizing municipal sewage treatment plants. The implementation of the Urban Waste Water
Directive is frequently mentioned. In addition, three Category 1 basins include measures to
292
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
address rainwater discharges and two basins include measures to address micro-pollutants.
Based on the decision of the Rhine Ministers in 2007, the ICPR has intensively worked on the
assessment of the relevance of micro-pollutants for the Rhine e.g. due to pharmaceutical
residues and has recommended relevant reduction strategies. In the Meuse, the Netherlands is
committed supporting drinking water companies and water boards to investigate the
elimination of medicines from the water cycle.
Measure to address hydro-morphological alterations
Hydro-morphological alterations, especially interruptions in river continuity, have been
identified as significant water management issues in all of the Category 1 basins. Most of the
basins have identified joint measures, including joint approaches for prioritising actions within
the iRBD. The Meuse, the Scheldt and the Rhine each developed a “Master Plan Migratory
Fish”, a strategy to identify where
measures should be taken in each iRBD to improve the
habitat and migratory corridors of fish species.
In the Danube iRBD, in order to enable a sound estimation of where to target measures most
effectively at the basin-wide scale, an ecological prioritisation of measures to restore river and
habitat continuity in the iRBD has been carried out. The approach provides information on the
estimated effects of national measures in relation to their ecological effectiveness at the basin-
wide scale and serves as a supportive tool in the implementation of measures. In the Odra, the
2013 Strategy to address pressures in the basin details the problem analysis of river continuity
issues within each Member State, focussing on the three main transboundary rivers within the
basin. At the international level, rivers that act as migration corridors are especially prioritized.
The Strategy follows with an analysis of the necessary measures for re-establishing river
continuity through the national programmes within each Member State, followed by a
prioritisation of locations and measures.
Similarly, in the Ems iRBD the Member States agreed to a joint approach in the prioritisation
of measures to address river continuity. Habitat requirements of target species were evaluated
to identify nationally significant migratory routes. In the Sava iRBD, to address morphological
alterations the iRBMP differentiates between water bodies at risk, possibly at risk and not at
risk.
1.18.5.
International coordination on Climate change and droughts
Climate change impacts and the need to adapt to climate change was highlighted in all the
Category 1 iRBMPs. A few of the Category 1 basin have developed basin-wide adaptation
strategies, and some iRBMPs mention taking climate change effects into account in the
selection of measures.
In the Danube, a Climate Change Adaptation Strategy was developed in 2012. The ICPDR’s
Climate Change Adaptation Strategy provides guidance on adaptation measures for the Danube
River Basin and includes information specific for WFD implementation. The Meuse
293
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Commission is currently working on a joint report on water scarcity that will help to develop a
first framework for a future approach to dealing with exceptional low water events in the
Meuse catchment area. The Rhine Commission has developed a Strategy for Adapting to
Climate Change, which was published in 2015. The Adaptation Strategy includes suggestions
for measures to be implemented by the Member States. Within the Scheldt, an initial
exploratory climate memorandum has been developed. According to the iRBMP, the Climate
memorandum discusses use restrictions/limitations on abstraction as an option and points out
that the issue needs to be mapped out further on district level before actions and measures can
be recommended.
According to the Elbe iRBMP, in the future adaptation strategies for climate change will play a
role in the selection of measures and their implementation in the medium and long term. Initial
scientific results on the impacts of climate change in the Elbe iRBD have already been taken
into account in the selection of measures for the present management plan. The Ems iRBMP
states that measures in the iRBD were assessed regarding their sensitivity to climate change
impacts, and measures were prioritised that would have a positive effect on water management
under a wide range of climate change effects. According to the Sava iRBMP, the priority in
dealing with climate change in this cycle of WFD implementation is to propose a set of guiding
principles to assist Sava River Basin managers to establish a strategy for building adaptive
capacity.
Most of the Category 2-3 basins did not mention international coordination in the context of
climate change in their RBMPs. In the Dniester iRBD progress has been made regarding
cooperation on adaptation to climate change between the Ukraine and Moldova. The Strategic
Framework for Adaptation to Climate Change in the Dniester River Basin was published in
2015. It describes the climate change issues facing the river basin, the potential for adaptation
to climate change and defines priorities and measures.
1.19.Recommendations for international cooperation under the WFD
In basins where an iRBMP has not been developed, the national RBMPs should include
a dedicated chapter in their RBMPs describing the international coordination efforts to
increase transparency.
iRBD specific information should be reported to WISE as opposed to reporting for the
whole national RBD.
Institutional arrangements in Category 3 and 4 basins should be further strengthened
through increased active exchange and coordination on all aspects of WFD
implementation.
All iRBDs should strive to improve or to initiate coordination on delineation and
typology of water bodies.
294
kom (2019) 0095 (forslag) - COMMISSION STAFF WORKING DOCUMENT European Overview - River Basin Management Plans Accompanying the document - Implementation of the Water Framework Directive (2000/60/EC) and the Floods Directive (2007/60/EC) Second River Basin Management Plans First Flood Risk Management Plans
Joint or coordination monitoring programme should be enhanced. To ensure that results
of assessing ecological status are comparable, at least one biological quality element
should be common for each pressure.
EQSs should be harmonised for the same pollutants.
WFD consistent monitoring of priority pollutants should be made a priority in all basins
to ensure that chemical status assessment is based on appropriate data.
Status assessment for surface and groundwater bodies should be coordinated.
A joint methodology for setting exemptions on transboundary water bodies should be
developed.
International Programmes of Measures should strive to present more information on
international mechanisms for measures implementation rather than summarizing actions
within Member States. Basin-wide approaches should be emphasized.